You are on page 1of 2

8/31/2020 Rubble chute - Designing Buildings Wiki

Last edited 11 May 2018

Rubble chute

A rubble chute is used to enable the safe and efficient transfer of debris/materials from
a structure’s scaffold to a skip at street level. The simple concept is that several cylindrical
dustbin-like sections are linked together using chains and hung from the side of
a building or scaffold. The reinforced rubber cylinders, together with steel inner lining, are
tapered and fit together, at effective lengths of 1-metre.

https://www.designingbuildings.co.uk/wiki/Rubble_chute 1/2
8/31/2020 Rubble chute - Designing Buildings Wiki

The usual dimensions of the sections are 510 mm diameter that tapers to 380 mm. There must
be metal ring reinforcement every 6 section units. Overall length should not exceed
40 sectionsand should be tied back to the scaffold every 6m.

A steel top hipper is required to provide an improved aperture at the point where debris is
being placed into the chute to prevent unnecessary spillage. Y-sections can be used to allow
debris to be placed into the chute at intermediate positions along its length. The chute is not
designed to cope with large, long or heavy items such as structural beams, timbers, poles, etc.
Neither should hazardous, corrosive or liquid materials be disposed of down the chute.

The chute is assembled horizontally at ground level before being lifted into position by
a scaffold hoist, with additional sections being added to the bottom in order to achieve the
required length.

Rubble chutes should be hosed down regularly so as to avoid unnecessary damage or


obstruction.

Local authorities may need to give permission or special licences for rubble chutes to be
erected on, across or adjacent to a public highway, and may require safety barriers, cones,
warning lights, tape, signs and so on. Skips may need to be covered to prevent
the spread of dust and other debris.

Find out more

https://www.designingbuildings.co.uk/wiki/Rubble_chute 2/2

You might also like