Priority: MANDATORY
Compiled: 09/082004 -
!TITLE:
GAA\
.FAA\
I
= Installation of EGPWS - Wiring and testing
DGAC\ - AQ 1JAR OPS 1.665 1
RLffiOTHER. .
Mods Committee approval NO
N/A
1
This Engineering Order has been raised to ea~ry wiring alterations, install parts
/ - and perform the testing (as per the Omnibus EP - 7/53-1776/x) of a Semi -
Integrated Enhaneed Ground Proximity (EGPWS~ ~ystem.
'/
2. Effec t··t·
IVI y .
.,;::'.:-.- r
,_ 2'_ .~~;, V • .
GROUP 1 Aircraft.- G-BYZJ (PQ291), G-OBMP .C~pt92)
,GROUP 2 Aircraft.- G-ECAS (PQ971), G-OJn.rtKPQ975), G-ODSK (PQ996}
' GROUP 3 Aircraft.- G-BVKA (PT181), G-BVKCtPT182), ), G-BVKD (PT186),-
GROUP 3 Aircraft - G-BVZE (PT187) G-BVZG (PT701), G-BVZH (PT702), G-BVZI (PT703)
GROUP 4 Aircraft.- G-BVKB (PT188) -
3. Planning Notes: ~" .~
~-- -
This Engineering Ordef requires the following aetions:
'ESMP Critica!' to be annotated on Job Cards
Aircraft to be Jacked
High Povver \Idle Engine Ground Run
Notice to Crew to be inserted in Technical Log
Flight test
Fleet Offiee \bmi Regional to be informed on aeeomplishment Yes
• >,r
Planning to atlaeh copies of the following Boeing doeuments a) SB 737-34 1776 (22
pages), b) IN 737-34-1776 IN 01 (1 page), e) ECS Serviee Bulletin No. ECS-202562
(9 pages)
EO B737/34-0597 (Symbol Generator software upgrade) is to be earried out prior to
or in eonjunction with this Engineering Order.
4. Accomplishment:
31 st Deeember 2004
5. Manpower:
3 men 300 hours.
6. Controlling Documentation:
Boeing Serviee Bulletin 737-34-1776 rey O.
Omnibus EO B737/34-0596/-
~ -6Sh midland~.
ENGINEERING ORDER mi
Priority: MANDATORY
Compiled: 09/082004
7. Drawings:
Boeing 880A0021 }
Boeing 829P0062} For revision number refer SB 737-34-1776
Boeing 829P0063} for specifie ale groups.
Boeing 829P0064 }
Modifieation Test Proeedure doeument. number 7373449011 rey B (16 pages).
8. Special Tooling:
NIL
9. Appendices:
Appendix A: Material Requirement Form (1 page).
Appendix B: Removed at this revision
Appendix C Removed at this revision
J
I
aireraft stage sheets, b) Amend Drawing Referenees. e) Add and amend
affeded doeuments d) Amend Weight & Balance information. e) Amend
Planning Notes and Appendiees
11. Worksheets:
Sheets 1 to 16
12. Affected Documentation:
Maintenanee Doeumentation Affeeted AMM/IPC/WDM
Publieation Amendments requested YES/oo
Maintenanee Schedule ~NO
I Omnibus EO 737-34-1776/-
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004
I 14.
Refer Omnibus Engineering Order 8737/34-1776/-
Hazardous Materials:
PLEASE NOTE: ALL ITEMS FALLlNG UNDER THE CATEGORY OF 'HAZARDOUS' MUST BE SHIPPED/HANDLED
IAW THE CURRENT lATA REGULATIONS COVERED IN THE 'DANGEROUS GOODS REGULATIONS' BOOK
NIL
,"'-'
\
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004
G-BVKA (PT181), G-BVKB (PT188), G-BVKC (PT182), G-BVKD (PT186), G-BVZE (PT187),
G-BVZG (PT701), G-BVZH (PT702), G-BVZI (PT703), G-OBMP (PQ292) G-BYZJ (PQ291),
G-ECAS (PQ971), G-OJTW (PQ975), G-ODSK (PQ996)
. . Mldland Publicatlon Supplement Blnders Affected
r \I Bntlsh I Please mark relevant boxes
\
Delails of Amendment:
PLEASE ENSURE THAT YOU GIVE A COMPLETE AND ACCURATE DESCRIPTION OF YOUR AMENDMENT REQUEST. PLEASE
REMEMBER TO INCLUDE ANY ADDITIONAL INFORMATION ANDtOR ILLUSTRATIONS YOU WISH TO INCORPORATE WITHIN
YOUR AMENDMENT REQUEST.
1) ADD to the AMM
a) Test Proeedure Doeument number 7373449011.
Add drawing alterations to EFIS control panels.
2) ADD to the ¡PC
a) EFIS Control Panel modo drwg. no. 823A00113 sheet 2 frames 1 to 3
b) E & E Bay (E2 Eleetronies Shelf) EGPWS and relay installation drwg. no. 8924A0001 sheet 1
frames 1 to 2.
e) EGPWS Computer part number 965-0976-060-216-216 Vendor ref V9789
NOT REQUIRED
..'
r .- ..
Signature: Date:
Reliability / Schedules Engineers Comments
Signature: Date:
r , Materials Controller Comments
Signature: Date:
Quality Assurance Managers Approval
Signature: Date:
ENGINEERING ORDER
Priority: MANDATORY
ate Compiled : 09/082004
G_OJTW~~~~-~-~~o~ ~ ..
G-BYZJ, G-OBMP, G-ECAS , ~.
PROGRAMME PIN OPTION 737-300 . ~ (,(-l_ui"
Carry out wiring alterations to the EGPWS as detailed in
Boeing drawing 829P0064 sheet 4 101 .8 at latest revision.
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004
. \b-I "' ~
Carry out wiring alterations to the EGPWS as detailed in
I Boeing drawing 829P0064 sheet 4 101 .7 latest revision. Q~o B
f(l..oo rbA~~' -b-/.t:.
8 Carry out continuity tests of wiring alterations carried out at
stage 5 or stage 6 as applicable. g >'j¡'~
i
~
/JO' 'í'"
Fit cable 100m wire bundle W0003 from P3-3 & P3-7 to E2- 28
4 shelf iaw Drwg no's 827A0020 Sheet 1 pages 7 to 11
OJ
/.
¡l
12 Carry out continuity tests of new wiring fitted at stage 10.
936 ~~ ~\
13 Page 12
Wire Bundle W0029 - P18 Power panel to AP 1801B.
\~~.
~
.;;
Fit and secure new cable 100m wire bundle W0029 from . j
C 1519 of P 18-1 Power panel to AP 1801 B panel iaw Drwg ~
no's 827 A0020 Sheet 1 page 12 . . ,-
(!~
14 Carry out continuity tests of new wiring fitted at stage 12.
\,"'1
15 Pages 13-16
Wire Bundle W 0109 - AP 1800A panel to E2 rack.
~~\¡' ~.-\
, Q::
Fit and secure new cable 100m w ire bundie W01 09 from
\¿,~
panel AP1800A to E2 ráck iaw Drwg no's 827A0020 Sheet -
1 pages 13 to 16.
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004
.~
16 Carry out continuity tests of new wiring fitted at stage 14.
':ti ,
\ 28
17 Pages 17-19
Wire Bundle W 0189 - E2 rack to E3 rack.
Fit and secure new cable 100m wire bundle W0189 from E2
rack to E3 rack iaw Drwg no's 827A0020 Sheet 1 pages 17
,!
; - \" Ú
-
/
~ ~©
I -1,
-:Y'~'
O:J
to 19.
~
I ! t:Q' , (' ~
18 Carry out continuity tests of new wiring fitted at, stage 16 , \1 r
l( U \ 93
i ~ ' 'J., d~
i""
19 Pages 20-22
Wire Bundle W 0461 & W0463 - E2 rack to E1 rack.
Fit and secure cable 100m wire bundles W0461 and W0463 ~
,
0r-QJ
'
'-~~/'
21 Pages 23-27 (excluding 25. 1)
~
Wire Bundle W 0491 - E2 Electronics rack to P8-52 panel.
Fit and secure cable 100m wire bundle W0491 ,from E2 rack ~ IlK-'
to P8-52 panel iaw Drwg number 827A0020 Sheet 1 pages
23 to 27.
\..'~~:
~'- J ,c
~
24
t:Q~36~~ 'b4
ENGINEERING ORDE,R
Priority: MANDATORY
ate Compiled : 09/082004
25 Pages 28-33
~.....
Electronics rack to GPS antenna iaw Drwg number
827 A0020 Sheet 1 pages 28 to 33.
"")
,~
Q)' ,
26 Carry out continuity tests of new wiring fitted at stage 24.
r :
f2 B
>
Services to be informed of this requirement. lJ\~ ()
29 INFORMATION ONLy
28
Refer Top Kit Drawing number 880A0021 for the latest
revision of these drawings.
~
BMI A/C)
~
Generic DnNg.no.829P0062 ~' "
Sheet 4.104.2.
31
32
Carry out continuity tests of wiring alterations carried out at
stage 29.
Generic DnNg.no.829P0062
Subkit 101 WOO017 ,(~~\
Fit new cable assy. iaw OnNg. no. 829P0062
Sheet 4.101.3
Note: See subkit -115 (W0461) tor D4412J part numbers
~
~
~ 2 0;
33 Carry out continuity tests of neW wiring fitted at stage 31 , ' 'í'"" 'f .
~
I
. {
,
;
oS
34 P3-3 F/O EGPWS REMOTE PANEL TO E2-3 ANO E2-4
SHELF'S
Generic OnNg.no.829P0062
Subkit 102 WOO03
~ "'o
. Q;¡ '
~
35 Carry out contiñuity tests of new wiring fitted at stage 33
/
/ Q)'936'f"'?
<"-
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004
36 E3-4 SHELF
vl~
Generic DnNg.no.829P0062
Subkit 107 W0025
QJ"
.....
38 E1-2
\0V
Fit new cable assy. iaw Drwg. no. 829POO62
Sheet 4.103.3
39 Carry out continuity tests of new wiring fitted at stage 37. ~
40 E2-2 SHELF
'r! ¿'
~
Fit new cable assy iaw Drwg. no. 829P0062
I! M"E.L.
348
<~
As per sheets 4.106.4,5,6 and 7.
Note 1 Refer to the notes on the individual sheets. IR'"--2-0'
Note 2 Refer also AEO 001 SIN 134 iffound applicable.
Technical $ervices to be informed of this
requirement.
ENGINEERINGORDER
Priority: MANDATORY
Compiled : 09/082004
'l ' ~
43 E2-4 SHELF
45
Carry out continuity tests of new wiring fitted at stage 43.
\......,28
-. /
/ .
,,,, 1,\ 1.
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 109 wk
as per the relevant sheets 4.109.2 and 4.109.3 and 4.109.4 ~,~
46 Carry out continuity tests of wiring alterations carried out at ,, Q)
stage 45. ¡J LIY 28
))~
47 E2-4 Rack Disconnect to E2-3 Rack Disconnect
28
'¡-'
~
Supplemental DnNg.no.829P0063 r
Subkit 110 W0189 ,t 938 '
Fit new cable assy. iaw DnNg. no. 829P0063 1'1/ l (/i
Sheet 4.110.2
50 Carry out continuity tests of new wiring fitted at stage 49. Q)'
* '¿:-'¡-,
936
ENGINEERING ORDER
Priority: MANDATORY
ate Compiled: 09/082004
E:J
Generic DnNg. no. 829P0062
Subkit 115 W0461
Fit new cable assy iaw DnNg. no. 829P0062
Sheet 4.115.3 ~r
NOTE. Refer AEO 001 S/N 133
~
52 Carry out continuity tests of new wiring fitted at stage 51. f2:¡0 0f'
~o~
( ' . 53 E2-3 SHELF SHELF DISCONNECT TO E2-2 SHELF SHELF
I DISCONNECT
Generic
Supplemental DnNg.no.829P0063
.,"") I
the use of sheets 4.106.2 for this a/c.
56 Carry out continuity tests of wiring alterations carried out at
stage 55 ~ \ / _f'
!
Subkit 116 W0463 938
Fit new cable assy iaw DnNg. no. 829P0062 \ "'\
"1 IN"' ., l l\
Sheet 4.116.1 ,'J.
Note - See Subkit - 115 (W0461) for D4420J part number
ENGINEERING ORDER
nty: MANDATORY
Compiled: 09/082004
59 E1 .. 1 SHELF
W
\ QJ '
\..2B
·!:
.¡--
63 E2-3 SHELF
Supplemental Drwg.no.829P0063
Subkit 107 W0081
Carry out wiring alterations iaw Drwg. no. 829P0063 subkit 107
as per the relevant items from sheets 4.107.3 and 4.107.5
66 Carry out continuity tests of wiring alterations carried out at
stage 65.
", :::;,1. :
ENGI NEE-RI NGORDER
Priority: MANDATORY
ate Compiled: 09/082004
~
Supplemental DnNg . no. 829P0063
Subkit 115 W1195
936 ~,_
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 115
as per the relevant items from sheet 4,115.2 r
¡
68 Carry out continuity tests of wiring alterations carried out at
stage 67.
(j'
-
Q
69 E2-3 SHELF
Supplemental DnNg. no. 829P0063 Cl:) ' 'í' ,
r Subkit 116 W1197 } 36 , /
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 116
as per the relevant items fram sheet 4.116.2
lo/~·~ o
I
70 Carry out continuity tests of wiring alterations carried out at
stage 69.
(,
.~~
, S3a
A
'- - -
I~
71 E2-3 SHELF
•
Supplemental DnNg. no. 829P0063
Subkit 108 W0083 ~~'1- ~
t:J:J' \ .'í'
1):. , :
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 108 ~.- 54
1 8" '::~CJ'J ,
72
as per sheet 4.108.2
Carry out continuity tests of wiring alterations carried out at
, ----
' ;-~"'\
,
i ,\,\l.r.
stage 71. { (;~"\J'"": -,c '
-. )
.-;)
E2-4 TO E3-4 SHELF ,::~ , ;: . :.;.'~.
73
~ -
74 C,arry out continuity tests of new wiring fitted at stage 73.
w.'f1t9J
Cl:) '#/JÓ
936 V
75 E2-3 TO E2-4 SHELF - -
Generic DnNg. no. 829P0062 ~j1, ~
Cl:) 'í'
/~
, a) See subkit -115(W0461) for D4420J part number.-115
76 Carry out continuity tests of new wiring fitted at stage 75.
~~, !
31
,-E NGINEERING ORDER
Priority: ANDATORY
Compiled: 09/082004
~»
~
Generic DnNg. no. 829P0062 QJ ' '¡-
Subkit 119 W0723
Fit new cable assy iaw DnNg. no. 829P0062 bf\-k():)r . 28
Sheet 4.119.1 I} \\ 'v\o~
Notes:
a) See subkit - 115(W0461) for D4420J part number.
h1 See subkit - 115(W0461) for D4412J part number. VZJ~
~
78 Carry out continuity tests of new wiring fitted at stage 77.
r 37
~
Generic DnNg. no. 829P0062
Subkit 120 W1611
Fit new antenna cable assy wire bundle W1611 iaw DnNg. No.
829P0062 Sheet 4.120.1 ~ _'rrl
"2. 1/ 2.-10 '5-
Note: Refer also drwg no. 827 A0020 sht '1 pages 28 to 33.
28
'
81 GPS ANTENNA
EID
"
Ilrr
SUPPLEMENT DnNg. no. 829P0063
Subkit 112 W0523
Carry out wiring alterations iaw DnNg. no. 829P0063
Sheet 4.112.1
).L " l'<tl:.
©
¡QJ "
¡ih l--
8
'¡-
ENGINEE-RINGORDER
Priority: MANDATORY
Compiled : 09/082004
88
Q... ~
Q~ , .
a)Carry out alterations to number 2 EFIS control panel iaw 8230013
sheet 2 rey A.
\2.:_/'
ÑI.~
b) Fit decal part number 73734-0596 stating 'POST EO 8737-34-0596.6 ,~ . .,
MODIFIED FOR EGPWS OPERATION'. 31
89 Carry out continuity tests of wiring alterations carried out at Q) ' ,
stages 87 and 88 / 31 .
Sheet 4.117.2
91 Carry out continuity tests of wiring alterations carried out at 'v.."" .
Q)'a. ) '.
stages 90. 938
I~
QJ' .(
SUPPLEMENT DnNg. no. 829P0063
936
Subkit 118 W0109
~
Carry out wiring alterations iaw DnNg. no. 829POO63
Sheet 4.118.2
Ji A) . 6.
93 Carry out continuity tests of wiring alterations fitted at stage
92.
v~
938
Q)
'"\
~ "
.
- ENGINEERING ORDER
rity: MANDATORY
Compiled : 09/082004
~
95 Carry out continuity tests of new wiring fitted at stage 94. Q)~ S '.
938
~ ~
Refer also drwg no. 827 A0020 sht 1 page 12. <.:::~"
I ~¡¡e
97 Fit marker p/n BAC27DCC3374 immediately below the 'Terrain
Display' circuit breaker. ~f
936-
~dY
stage 100 r
/ "'936
103 P8 PANEL
1'~8
'í
2
Note 1 Refer Orwg number 823A0013 sheet 2 rey A and
827A0020 sht 1 page 7.
Note 2 Refer Orwg number 827A0020 sheet 1 page 6 for
location of cable grounds.
105 P3-3 PANEL
28
Note 1 Refer Drwg number 823A0013 sheet 2 rey A and
827A0020 sht 1 page 7.
Note 2 Refer Drwg number 827A0020 sheet 1 page 6 for
location of cable grounds.
106 P3-7 PANEL ( Cl>-l~
Remove existing GPWS light plate/test module and install \'11 .
EGPWS System test module assy. p/n 120-87077-"101 at ' ~ '-
P3-7 panel. :2~1Y1.,,~ -+ 9~~ 37
Fit connector D12051W0003 .~~
111
Ensure all items previously disturbed during the completion
of this modification are secure
~
document number 7373449011 Rev B and record the aJ;
obtained results. A-'ml--r,-~ 10
\ '
28
Supplya copy of the test results to Technical Services v~ ~bM:;S.
I TS File Ref.: I
ENGINEERING ANO TECHNICAL SERVICES GROUP
Use this form to tellus what you think of the quality of this Engineering Order. We will use the data that you
give us to improve the quality of our Engineering Orders. Please include data about these or other items.
r.
•
•
•
Did this Engineering Order meet your estimate of quality ?
Was this Engineering Order easy to understand ?
Will you carry out this Engineering Order to its full requirements ?
~~
YES
Is the Planning Information, Materiallnfo and Accomplishment Instruction satisfactory? YES / .
YES /
/1
• Is the manpower estimate to your satisfaction ? YES /
If you answered NO to any of the aboye questions please explain in the section below in more detail as to
why this Engineering Order was not to your satisfaction.
COMMENTS:
¡¡ /
~
' ! ./,
; y'
Signature: I Print Name:
-7~-/-
. ---
Date: ~~h Station/Base:
REMARKS: