ENGINEERING ORDER ER=t~

Priority: MANDATORY
Compiled: 09/082004 -

!TITLE:

GAA\
.FAA\
I
= Installation of EGPWS - Wiring and testing
DGAC\ - AQ 1JAR OPS 1.665 1
RLffiOTHER. .
Mods Committee approval NO
N/A

1
This Engineering Order has been raised to ea~ry wiring alterations, install parts
/ - and perform the testing (as per the Omnibus EP - 7/53-1776/x) of a Semi -
Integrated Enhaneed Ground Proximity (EGPWS~ ~ystem.
'/
2. Effec t··t·
IVI y .
.,;::'.:-.- r
,_ 2'_ .~~;, V • .
GROUP 1 Aircraft.- G-BYZJ (PQ291), G-OBMP .C~pt92)
,GROUP 2 Aircraft.- G-ECAS (PQ971), G-OJn.rtKPQ975), G-ODSK (PQ996}
' GROUP 3 Aircraft.- G-BVKA (PT181), G-BVKCtPT182), ), G-BVKD (PT186),-
GROUP 3 Aircraft - G-BVZE (PT187) G-BVZG (PT701), G-BVZH (PT702), G-BVZI (PT703)
GROUP 4 Aircraft.- G-BVKB (PT188) -
3. Planning Notes: ~" .~
~-- -
This Engineering Ordef requires the following aetions:
'ESMP Critica!' to be annotated on Job Cards
Aircraft to be Jacked
High Povver \Idle Engine Ground Run
Notice to Crew to be inserted in Technical Log
Flight test
Fleet Offiee \bmi Regional to be informed on aeeomplishment Yes
• >,r
Planning to atlaeh copies of the following Boeing doeuments a) SB 737-34 1776 (22
pages), b) IN 737-34-1776 IN 01 (1 page), e) ECS Serviee Bulletin No. ECS-202562
(9 pages)
EO B737/34-0597 (Symbol Generator software upgrade) is to be earried out prior to
or in eonjunction with this Engineering Order.
4. Accomplishment:
31 st Deeember 2004

5. Manpower:
3 men 300 hours.

6. Controlling Documentation:
Boeing Serviee Bulletin 737-34-1776 rey O.
Omnibus EO B737/34-0596/-
~ -6Sh midland~.

ENGINEERING ORDER mi
Priority: MANDATORY
Compiled: 09/082004

~TITLE: I nstallation of EGPWS - Wiring and testing

7. Drawings:
Boeing 880A0021 }
Boeing 829P0062} For revision number refer SB 737-34-1776
Boeing 829P0063} for specifie ale groups.
Boeing 829P0064 }
Modifieation Test Proeedure doeument. number 7373449011 rey B (16 pages).

8. Special Tooling:
NIL

9. Appendices:
Appendix A: Material Requirement Form (1 page).
Appendix B: Removed at this revision
Appendix C Removed at this revision

10. Issue History:


INITIAL
Issue 1 Raised to amend typing errors, add sign off boxes to stage sheets, add
group numbers to the Aireraft effeetivity and add to Planning Notes.
Issue 2 To a) Amend the material formo b) Add Drwg Boeing 829P0064 rey M to
the list of Drawings. e) Add the latest Test Proeedure Doe no. 7373449011
rey B to the list of Drawings. d) Amend the number of Worksheets to 16.
d) Amend stage sheets to betler refleet bmi baby aireraft.
Issue 3 a) Add AED DOI SINo 133 plus SIN 134 if found to be applicable on this

J
I
aireraft stage sheets, b) Amend Drawing Referenees. e) Add and amend
affeded doeuments d) Amend Weight & Balance information. e) Amend
Planning Notes and Appendiees
11. Worksheets:
Sheets 1 to 16
12. Affected Documentation:
Maintenanee Doeumentation Affeeted AMM/IPC/WDM
Publieation Amendments requested YES/oo
Maintenanee Schedule ~NO

Airframe Modifieation book NeB Mandatory Seetion


Airframe \ Engine Log book YES/oo

Flight Manual YES/NO


Operations Manual YES/NO
M.E.L. ~NO

Other (specify) YES/oo Eleetrieal Load Analysis refer

I Omnibus EO 737-34-1776/-
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004

~TITLE: Installation of EGPWS - Wiring and testing

13. Weight & Balance:

I 14.
Refer Omnibus Engineering Order 8737/34-1776/-

Hazardous Materials:
PLEASE NOTE: ALL ITEMS FALLlNG UNDER THE CATEGORY OF 'HAZARDOUS' MUST BE SHIPPED/HANDLED
IAW THE CURRENT lATA REGULATIONS COVERED IN THE 'DANGEROUS GOODS REGULATIONS' BOOK
NIL

,"'-'
\
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004

ITITLE: Installation of EGPWS - Wiring and testing


AMENDMENT REQUEST
Aircraft \Unit Type 8737300/500
ATA Chapter & Section 34 42 -
Aireraft Registration This list reflects the Amendment effectivity only and NOT the modification status of the listed aircraft

G-BVKA (PT181), G-BVKB (PT188), G-BVKC (PT182), G-BVKD (PT186), G-BVZE (PT187),
G-BVZG (PT701), G-BVZH (PT702), G-BVZI (PT703), G-OBMP (PQ292) G-BYZJ (PQ291),
G-ECAS (PQ971), G-OJTW (PQ975), G-ODSK (PQ996)
. . Mldland Publicatlon Supplement Blnders Affected
r \I Bntlsh I Please mark relevant boxes
\

IPC YES EQUIP LlST YES


MM YES
WDM YES OTHER (Specify)

Reason for the Amendment:


Following installation of the Enhanced Ground Proximity (EGPWS) system there are
numerous wiring changes plus replacement of equipment and a new testing procedure.

Delails of Amendment:
PLEASE ENSURE THAT YOU GIVE A COMPLETE AND ACCURATE DESCRIPTION OF YOUR AMENDMENT REQUEST. PLEASE
REMEMBER TO INCLUDE ANY ADDITIONAL INFORMATION ANDtOR ILLUSTRATIONS YOU WISH TO INCORPORATE WITHIN
YOUR AMENDMENT REQUEST.
1) ADD to the AMM
a) Test Proeedure Doeument number 7373449011.
Add drawing alterations to EFIS control panels.
2) ADD to the ¡PC
a) EFIS Control Panel modo drwg. no. 823A00113 sheet 2 frames 1 to 3
b) E & E Bay (E2 Eleetronies Shelf) EGPWS and relay installation drwg. no. 8924A0001 sheet 1
frames 1 to 2.
e) EGPWS Computer part number 965-0976-060-216-216 Vendor ref V9789

3) Add to the Equip List


Removed GPWS Computer part number 965-0648-xxx Vendor ref V97896
Installed EGPWS Computer part number 965-0976-060-216-216 Vendor ref V97896

Requested by: Print Name: IF. Johnson Date: 109/08/04


This section for use by the Technical Publications Officer Only
r---------------------------------------~
Amendment Reference Numbers :

Date Accomplished: I ARL Recorded: Ves / No*

Signature: Print Name:


ENGINEERINGORDER
Priority: MANDATORY
ate Compiled: 09/082004

¡TITLE: Installation of EGPWS - Wiring and testing

11 Maintenance Schedule Amendment Request!


Requested By Date

Details of Requested Amendment

NOT REQUIRED
..'

r .- ..

Reason for Requested Amendment

Signature: Date:
Reliability / Schedules Engineers Comments

Signature: Date:
r , Materials Controller Comments

Signature: Date:
Quality Assurance Managers Approval

Signature: Date:
ENGINEERING ORDER
Priority: MANDATORY
ate Compiled : 09/082004

Installation of EGPWS - Wiring and testing


I COMPILED BY: F. JOHNSON I A/C: 0=0051<.
WORK REQUIREMENT I MECH INSP
CAUTION: TAKE ALL NECESSARY PRECAUTIONS TO MINIMISE THE RISK OF INJURY TO
PERSONNEL OR DAMAGE TO EQUIPMENT.
NOTE: DURING EMBODIMENT OF THIS MODIFICATION WEIGH ALL COMPONENTS PERMANENTLY
INSTALLED OR REMOVED AND ENTER WE IGHT AND POSITION ON THE WEIGHT AND BALANCE
FORM: BME/PC/3016 PER BRITISH MIDLAND COMPANY GTI5-07.
NOTÉ: EVALUATE THE NEED FOR ANY ADDITIONAL DUPLlCATE INSPECTIONS OF VITAL POINTS
IAW GTI5-03.
1 Remove electrical power from the Aeroplane. ~
r Refer AMM 24-22-00 ~
1~--4-=-~----~~~~~--~~--~~----~---------r--------~1
2 Gain access to the Electronic bay and remove the
electronic equipment from the E1-1, E1-2, E2-2 , E2-3, E2-4
and E3-4 Electronic shelves labe! items and store in the
Avionic Workshop for refitment.

Note: Use additional worksheets to control the removal


/refitment and testing of all items disturbed during the
completion of this Engineering Order.
3 Remove the E1 ;.1, E1-2, and E2-2, E2-3, E2-4 and E3-4
Electronic Shelves to the Avionic Workshop for modification
as detailed in later stagesSíL 11'~ :2.. C'N ~.{ tLl 9 {;7
4 Any other Electronic equipment or shelves removed to gain
access are to be labelled and retained in the Avionic
Workshop for refitment at a later stage.
Note Use additional worksheets to control the
r, Removal / refitment of all ·items removed.
I~--~===-------------------------------------+-------~I
5 NOTE

BMI aircraft do not utilise extension brackets for


the shelf disconnects. Spare cut outs may be
used and a list of connectors to cut outs and their reverent
positions is to be given to Technical Services
and passed to Boeing and AEO

Note. Refer_AEO 001 SIN 133

6 WIRING AL TERATIONS WIRE KIT 829P0064


PROGRAME PIN OPTION

G_OJTW~~~~-~-~~o~ ~ ..
G-BYZJ, G-OBMP, G-ECAS , ~.
PROGRAMME PIN OPTION 737-300 . ~ (,(-l_ui"
Carry out wiring alterations to the EGPWS as detailed in
Boeing drawing 829P0064 sheet 4 101 .8 at latest revision.
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004

¡TITLE: Installation of EGPWS - Wiring and testing


~_~ ~:...e::r.~

7 G-BVKA/KB/KC/KDIZE/ZG/ZH/ZI only. ,/ ' BMEL _,


'\, PP::t7
~~~ ( ~')[Y;I(
PROGRAMME PIN OPTION 737-500. ',,~ -~=~:J
~a J, ,.,... -: '-J
Á"

. \b-I "' ~
Carry out wiring alterations to the EGPWS as detailed in
I Boeing drawing 829P0064 sheet 4 101 .7 latest revision. Q~o B
f(l..oo rbA~~' -b-/.t:.
8 Carry out continuity tests of wiring alterations carried out at
stage 5 or stage 6 as applicable. g >'j¡'~
i

9 WIRE KIT INSTL. DRWG. No. 827 AOO20


r FLlGHT DECK and GPS ANTENNA Pages 7-11

Wire Bundle W 0001 from cabin to electronics bayo


~.
~~~v
\
~)
Fit and secure cable 100m wire bundle W0001 from P1 -3
panel to E2-3 shelf iaw Drwg number 827 A0020 Sheets 1
pages 7-11 ./
10 Carry out continuity tests of new wiring fitted at stage 8.
e;J
.l"'I1'
a
936 ..
IJ-'
~1
11 ·Pages 7-11
Wire Bundle W 0003 from cabin (P3 panel)
to electronics bay (E2-4 shelf). ~,\\\""

~
/JO' 'í'"

Fit cable 100m wire bundle W0003 from P3-3 & P3-7 to E2- 28
4 shelf iaw Drwg no's 827A0020 Sheet 1 pages 7 to 11

OJ
/.
¡l
12 Carry out continuity tests of new wiring fitted at stage 10.
936 ~~ ~\
13 Page 12
Wire Bundle W0029 - P18 Power panel to AP 1801B.
\~~.
~
.;;

Fit and secure new cable 100m wire bundle W0029 from . j
C 1519 of P 18-1 Power panel to AP 1801 B panel iaw Drwg ~
no's 827 A0020 Sheet 1 page 12 . . ,-

(!~
14 Carry out continuity tests of new wiring fitted at stage 12.

\,"'1
15 Pages 13-16
Wire Bundle W 0109 - AP 1800A panel to E2 rack.
~~\¡' ~.-\
, Q::
Fit and secure new cable 100m w ire bundie W01 09 from
\¿,~
panel AP1800A to E2 ráck iaw Drwg no's 827A0020 Sheet -
1 pages 13 to 16.
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004

!TITLE: Installation of EGPWS - Wiring and testing

.~
16 Carry out continuity tests of new wiring fitted at stage 14.
':ti ,
\ 28
17 Pages 17-19
Wire Bundle W 0189 - E2 rack to E3 rack.

Fit and secure new cable 100m wire bundle W0189 from E2
rack to E3 rack iaw Drwg no's 827A0020 Sheet 1 pages 17
,!
; - \" Ú
-
/
~ ~©
I -1,
-:Y'~'
O:J

to 19.

~
I ! t:Q' , (' ~
18 Carry out continuity tests of new wiring fitted at, stage 16 , \1 r
l( U \ 93
i ~ ' 'J., d~
i""
19 Pages 20-22
Wire Bundle W 0461 & W0463 - E2 rack to E1 rack.

Fit and secure cable 100m wire bundles W0461 and W0463 ~
,
0r-QJ
'

from E2 rack to E1 rack iaw Drwg no's 827A0020 Sheet 1 ~aJ


pages 20 to 22.

20 Carry out continuity tests of new wiring fitted at stage 18. ~


t:Q "

'-~~/'
21 Pages 23-27 (excluding 25. 1)

~
Wire Bundle W 0491 - E2 Electronics rack to P8-52 panel.

Fit and secure cable 100m wire bundle W0491 ,from E2 rack ~ IlK-'
to P8-52 panel iaw Drwg number 827A0020 Sheet 1 pages
23 to 27.

22 Carry out continuity tests of new wiring fitted at stage 20.


fI¡PC- ~
llJ' 'f"

\..'~~:
~'- J ,c

23 ' Pages 23-24and 25.1

Wire Bundle W 0491 - E2 Electronics rack to P9-1/P9-2


panel.
~
Fit and secure cable 100m wire bundle W0491 from E2 rack ,3V
to P9-1 or P9-2 panel iaw Drwg number 827A0020 Sheet 1
pages 23, 24 and 25.1.

Carry out continuity tests of new wiring fitted at stage 22.

~
24

t:Q~36~~ 'b4
ENGINEERING ORDE,R
Priority: MANDATORY
ate Compiled : 09/082004

ITLE: Installation of EGPWS - Wiring and testing

25 Pages 28-33

Wire Bundle W1611 - E2 Electronics rack to GPS antenna.


\>f\ . ~
Q)'
'r-
Fit and secure cable 100m wire bundle W1611 from E2 23

~.....
Electronics rack to GPS antenna iaw Drwg number
827 A0020 Sheet 1 pages 28 to 33.
"")

,~
Q)' ,
26 Carry out continuity tests of new wiring fitted at stage 24.
r :
f2 B

27 Ensure all ground connections are secured at the locations


specified iaw Drwg number 827A0020 Sheet 1 pages
6 (P1/P3 Panel), 34 (P1 Panel), 35 (P3 Panel), page 36 6;,.\--;:
.r:.
(E2-3 rack) and page 37 (E2-4 rack). ;OJ
~54
Note Refer al so AED 001 SIN 134 if applicable. Technical . ~

>
Services to be informed of this requirement. lJ\~ ()

28 G-ECAS (PQ971) G-OJTW (PQ975) & G-ODSK (PQ996) ONLY


~,~
On EGPWS 2 switch Annunciator Assembly p/n 200- Q)'
!
90023-103 shorten the 'stand offs' iaw ECS Service 2lB
Bulletin No. ECS-202562 (Appendix C of this EO). -
This is to be carried out prior to fitting at F/O's P3 panel

29 INFORMATION ONLy

The following wiring tasks are a combination of Generic


and SUPPLEMENT Modification Drawings numbered
829P0062 (Generic) and 829P0063 (SUPPLEMENT) and
the materiallists (subkits) are attached to the relevant
sheets. rY-
Q)' '

28
Refer Top Kit Drawing number 880A0021 for the latest
revision of these drawings.

Note 1 BMI aircraft are all groul2 A effective. N9~


ENGINEERING ORDER
MANDATORY
09/082004

¡TITLE: Installation of EGPWS - Wiring and testing

30 Drawings 829P0062 (Generic)and


829P0063 (Supplemental)

E2-2 SHELF (GROUP A EFFECTIVITY ONLy - i.e. ALL

~
BMI A/C)

~
Generic DnNg.no.829P0062 ~' "

Subkit 104 W0017

Carry out wiring alterations iaw OnNg. no. 829P0062


~~ "\'7
~(o ¡r~~
I "l..- l C)

Sheet 4.104.2.
31

32
Carry out continuity tests of wiring alterations carried out at
stage 29.

P1-3 CAPT's EGPWS REMOTE PANEL


® 65

Generic DnNg.no.829P0062
Subkit 101 WOO017 ,(~~\
Fit new cable assy. iaw OnNg. no. 829P0062
Sheet 4.101.3
Note: See subkit -115 (W0461) tor D4412J part numbers
~
~
~ 2 0;

33 Carry out continuity tests of neW wiring fitted at stage 31 , ' 'í'"" 'f .

~
I
. {
,
;

oS
34 P3-3 F/O EGPWS REMOTE PANEL TO E2-3 ANO E2-4
SHELF'S

Generic OnNg.no.829P0062
Subkit 102 WOO03
~ "'o
. Q;¡ '

Fit new cable assy. iaw DnNg. no. 829P0062


Sheet 4.102.3 \0. ' ,
\~\o ')
Note: a) See subkit -115 (W0461) ter 04412J & D4420J p/n's.
b) See also step 22.
1,0

~
35 Carry out contiñuity tests of new wiring fitted at stage 33
/
/ Q)'936'f"'?

<"-
ENGINEERING ORDER
Priority: MANDATORY
Compiled: 09/082004

IITITLE: Installation of EGPWS - Wiring and testing

36 E3-4 SHELF

vl~
Generic DnNg.no.829P0062
Subkit 107 W0025
QJ"

Fit new cable assy. iaw Drwg. no. 829P0062


Sheet 4.107.2 ~
v
, '1

37 Carry out continuity tests of new wiring fitted at stage 35.


QJ"

.....
38 E1-2

Generic DnNg. no. 829P0062


Subkit 103 WOO09 ~QJ"

\0V
Fit new cable assy. iaw Drwg. no. 829POO62
Sheet 4.103.3
39 Carry out continuity tests of new wiring fitted at stage 37. ~

40 E2-2 SHELF
'r! ¿'

Supplemental Drwg. no. 829P0063


Subkit 103 WOO17

Carry out wiring alterations iaw Drwg. no. 829P0063


As per the relevant sheet fram sheets 4.103.2/3/4 or 5
J¿ -.
QJ'k.
~

41 Carry out continuity tests of new wiring fitted at stage 39.


QJ
~
\
6
41 E2-4 SHELF

GEmeric Drwg. no. 829P0062


Subkit 106 W0021

~
Fit new cable assy iaw Drwg. no. 829P0062
I! M"E.L.
348
<~
As per sheets 4.106.4,5,6 and 7.
Note 1 Refer to the notes on the individual sheets. IR'"--2-0'
Note 2 Refer also AEO 001 SIN 134 iffound applicable.
Technical $ervices to be informed of this
requirement.
ENGINEERINGORDER
Priority: MANDATORY
Compiled : 09/082004

ITITLE: Installation of EGPWS - Wiring and testing

42 Carry out continuity tests of new wiring fitted at stage 41. ~ ~


Cij

'l ' ~
43 E2-4 SHELF

SUlmlemental DnNg. no. 829P0063 S.M.E.L.


348
Subkit 105 W0021

Carry out wiring alterations iaw DnNg. no. 829P0063


Ir-.:z_
As per the relevant sheet from sheets 4.1 05;ií4/9/1 O¿y( and %
r j 44

45
Carry out continuity tests of new wiring fitted at stage 43.

E2-4 SHELF TO RAD. AL T.


D ~
'l '~
.~

Supplemental DnNg. no. 829P0063 ¡N/A- .~ ~


Subkit 109 W0087 --rt{ l.)
': )J ,

\......,28
-. /
/ .
,,,, 1,\ 1.
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 109 wk
as per the relevant sheets 4.109.2 and 4.109.3 and 4.109.4 ~,~
46 Carry out continuity tests of wiring alterations carried out at ,, Q)
stage 45. ¡J LIY 28

))~
47 E2-4 Rack Disconnect to E2-3 Rack Disconnect

Supplemental DnNg. no. 829P0063 '


Subkit 114 W0721
. rt
\>~ \~\o) "-
~$

28
'¡-'

Fit new cable assy. iaw DnNg. no. 829P0063 ,Li:.~


¡;l 'v\
Sheet 4.114.2 17;
48 Carry out continuity tests of new wiring fitted at stage 47.

49 E2-4 Rack Disconnect to E3-4 Rack Disconnect


Pi

~
Supplemental DnNg.no.829P0063 r
Subkit 110 W0189 ,t 938 '

Fit new cable assy. iaw DnNg. no. 829P0063 1'1/ l (/i
Sheet 4.110.2
50 Carry out continuity tests of new wiring fitted at stage 49. Q)'
* '¿:-'¡-,

936
ENGINEERING ORDER
Priority: MANDATORY
ate Compiled: 09/082004

~TITLE: Installation of EGPWS - Wiring and testing

51 E2-4 SHELF DISCONNECT TO E1-2 SHELF DISCONNECT

E:J
Generic DnNg. no. 829P0062
Subkit 115 W0461
Fit new cable assy iaw DnNg. no. 829P0062
Sheet 4.115.3 ~r
NOTE. Refer AEO 001 S/N 133

~
52 Carry out continuity tests of new wiring fitted at stage 51. f2:¡0 0f'
~o~
( ' . 53 E2-3 SHELF SHELF DISCONNECT TO E2-2 SHELF SHELF
I DISCONNECT

Generic

Fit new cable assy iaw OnNg. no. 829P0062


DnNg. no. 829P0062
Subkit 115 W0461 ~~
¿óhldl
Sheet 40115.4
Carry out continuity tests of new wiring fitted at stage 53. ~.~
54 Q:¡' O
í"
( 936
55 E3-4 SHELF

Supplemental DnNg.no.829P0063

as per the relevant sheets 4.106.2 or 4.106.3


Note:
Subkit 106 W0025
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 106

G-BVKA/KC - Boeing Message BMA-EMA-L00009H consents to


vi¿ <'
~ »~I'rJ
65 .

.,"") I
the use of sheets 4.106.2 for this a/c.
56 Carry out continuity tests of wiring alterations carried out at
stage 55 ~ \ / _f'

57 E1-1 SHELF DISCONNECT TO E2-4 SHELF DISCONNECT


W.o~
Generic OnNg. no. 829P0062
G~b
Q:¡ 0 °

!
Subkit 116 W0463 938
Fit new cable assy iaw DnNg. no. 829P0062 \ "'\
"1 IN"' ., l l\
Sheet 4.116.1 ,'J.
Note - See Subkit - 115 (W0461) for D4420J part number
ENGINEERING ORDER
nty: MANDATORY
Compiled: 09/082004

~TITLE: Installation of EGPWS - Wiring and testing

58 Carry out continuity tests of new wiring fitted at stage 57.


(

59 E1 .. 1 SHELF
W
\ QJ '

\..2B
·!:
.¡--

Generic Drwg. no. 829P0062


,.(AJ~
~~~
l:.¡--
\~ .
Subkit 109 W0075
Fit new cable assy iaw Drwg. no. 829P0062 \' )-t;> '.. . . <;
.:):)wll '/!.'~
Sheet 4.109.2
\ '1,'" ... )
60 Carry out continuity tests of new wiring fitted at stage 59. -.~
r
1~6=1~~E~2~-3~S~H~EL~F~--------------------------------;-------~~I

Generic Drwg. no. 829P0062


Subkit 110 W0081
Carry out wiring alterations iaw Drwg. no. 829P0062
As per sheets 4.110.3 and 4.110.4
62 Carry out continuity tests of wiring alterations carried out at /~.~\ .J2.~:\
. ,~.... \
stage 61. 1','-./ •

63 E2-3 SHELF

Generic Drwg. no. 829P0062


Subkit 111 W0083
Carry out wiring alterations iaw Drwg. no. 829P0062
As per sheets 4.111 .3 and 4.111.4 and 4.111.5
Notes:
a) See subkit -110 (W0081) for D4412P part number.
b) See subkit -110 (W0081) for SP2913 part number. 113 í-~7305
c) See subkit -110 (W0081) for SP20,SP21 ,SP22 and
SM45 part numbers.
64 Carry out continuity tests of wiring alterations carried out at
stage 63.
.......-
65 E2-3 SHELF

Supplemental Drwg.no.829P0063
Subkit 107 W0081
Carry out wiring alterations iaw Drwg. no. 829P0063 subkit 107
as per the relevant items from sheets 4.107.3 and 4.107.5
66 Carry out continuity tests of wiring alterations carried out at
stage 65.
", :::;,1. :
ENGI NEE-RI NGORDER
Priority: MANDATORY
ate Compiled: 09/082004

¡TITLE: Installation of EGPWS - Wiring and testing


67 E2-3 SHELF

~
Supplemental DnNg . no. 829P0063
Subkit 115 W1195
936 ~,_
Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 115
as per the relevant items from sheet 4,115.2 r

¡
68 Carry out continuity tests of wiring alterations carried out at
stage 67.
(j'
-

Q
69 E2-3 SHELF
Supplemental DnNg. no. 829P0063 Cl:) ' 'í' ,
r Subkit 116 W1197 } 36 , /

Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 116
as per the relevant items fram sheet 4.116.2
lo/~·~ o
I
70 Carry out continuity tests of wiring alterations carried out at
stage 69.
(,
.~~
, S3a
A
'- - -
I~
71 E2-3 SHELF

Supplemental DnNg. no. 829P0063
Subkit 108 W0083 ~~'1- ~
t:J:J' \ .'í'
1):. , :

Carry out wiring alterations iaw DnNg. no. 829P0063 subkit 108 ~.- 54
1 8" '::~CJ'J ,
72
as per sheet 4.108.2
Carry out continuity tests of wiring alterations carried out at
, ----
' ;-~"'\
,
i ,\,\l.r.
stage 71. { (;~"\J'"": -,c '
-. )
.-;)
E2-4 TO E3-4 SHELF ,::~ , ;: . :.;.'~.
73

Generic DnNg. no. 829P0062

Fit new cable assy iaw DnNg. no. 829P0062


Sheet 4.114.2 '-
Subkit 114 W0189

Note 1: See subkit - 115(W0461) for D4420J part number.


Note 2 Refer also AED 001 SINo 133. Pos. 1/
é;t Cl:)
938
I
l"t t..l~'1>
-, (' !';'
"

~ -
74 C,arry out continuity tests of new wiring fitted at stage 73.
w.'f1t9J
Cl:) '#/JÓ
936 V
75 E2-3 TO E2-4 SHELF - -
Generic DnNg. no. 829P0062 ~j1, ~
Cl:) 'í'

Fit new cable assyiaw DnNg. no. 829P0062


Subkit 118 W0721
~)I.,,fv~ r , W
Sheet 4.118.2 \ (o ')
IJ.--i 'Y
Notes:

/~
, a) See subkit -115(W0461) for D4420J part number.-115
76 Carry out continuity tests of new wiring fitted at stage 75.
~~, !
31
,-E NGINEERING ORDER
Priority: ANDATORY
Compiled: 09/082004

~TITLE: Installation of EGPWS - Wiring and testing


77 E2-3 TO E2-4 SHELF


~
Generic DnNg. no. 829P0062 QJ ' '¡-
Subkit 119 W0723
Fit new cable assy iaw DnNg. no. 829P0062 bf\-k():)r . 28
Sheet 4.119.1 I} \\ 'v\o~
Notes:
a) See subkit - 115(W0461) for D4420J part number.
h1 See subkit - 115(W0461) for D4412J part number. VZJ~

~
78 Carry out continuity tests of new wiring fitted at stage 77.
r 37

I 79 E2-4 SHELF DISCONNECT TO GPS ANTENNA

~
Generic DnNg. no. 829P0062
Subkit 120 W1611
Fit new antenna cable assy wire bundle W1611 iaw DnNg. No.
829P0062 Sheet 4.120.1 ~ _'rrl
"2. 1/ 2.-10 '5-
Note: Refer also drwg no. 827 A0020 sht '1 pages 28 to 33.

80 Carry out insulation and continuity tests of new antenna


cable fitted at stage 79.
eJ
I

28
'

81 GPS ANTENNA

EID
"

Connect GPS Antenna Sensor Systems part number-876-151S=- 65 /


;I~ 5' b7_,S'75~ -
, 1'1
82 Ensure GPS antenna base is sealed iaw Boeing Standard ~ w. .~
practices. 2~· Z -"> QJ' .ga:f"
841
83 EFIS #1 CONTROL PANEL WIRING

Ilrr
SUPPLEMENT DnNg. no. 829P0063
Subkit 112 W0523
Carry out wiring alterations iaw DnNg. no. 829P0063
Sheet 4.112.1
).L " l'<tl:.
©
¡QJ "

¡ih l--
8
'¡-
ENGINEE-RINGORDER
Priority: MANDATORY
Compiled : 09/082004

TITLE: Installation of EGPWS - Wiring and testing

84 Carry out continu ity tests of wiring alterations carried out at


stage 83.
¡j' B'
85 EFIS #2 CONTROL PANEL WIRING

SUPPLEMENT DnNg. no. 829P0063


. Subkit 113 W0525
Carry out wiring alterations iaw DnNg. no. 829POO63
fr~
V "'-'11.¿:
e};]
Sheet4.113.1 '.
86 Carry out continuity tests of wiring alterations carried out at -' t ::C\
/,.,-.,"
' ¡--\
....... ,,",.

stage 85. \'>, J.~. &/f


~~ --,
87 P8 ELECT PANEL

EFIS #1 CONTROL PANEL

a)Carry out alterations to number 1 EFIS control panel iaw drawing


CL
~.
number 82300 13 sheet 2 rey A.

b)Fit decal part number 73734-0596 stating 'POST EO 8737-34-


0596 MODIFIED FOR EGPWS OPERATION
EFIS #2 CONTROL PANEL
b
~
1 ~ .r-
31

88
Q... ~
Q~ , .
a)Carry out alterations to number 2 EFIS control panel iaw 8230013
sheet 2 rey A.
\2.:_/'
ÑI.~
b) Fit decal part number 73734-0596 stating 'POST EO 8737-34-0596.6 ,~ . .,
MODIFIED FOR EGPWS OPERATION'. 31
89 Carry out continuity tests of wiring alterations carried out at Q) ' ,
stages 87 and 88 / 31 .

90 P18 LOAD CONTROL CENTRE -LEFT (CCT BRKR)

SUPPLEMENT DnNg. no. 829P0063


Subkit 117 WOO29
Carry out wiring alterations iaw DnNg. no. 829POO63
~I
I(f"-z ..... r

Sheet 4.117.2
91 Carry out continuity tests of wiring alterations carried out at 'v.."" .
Q)'a. ) '.
stages 90. 938

92 P18 LOAD CONTROL CENTRE -LEFT

I~
QJ' .(
SUPPLEMENT DnNg. no. 829P0063
936
Subkit 118 W0109
~
Carry out wiring alterations iaw DnNg. no. 829POO63
Sheet 4.118.2
Ji A) . 6.
93 Carry out continuity tests of wiring alterations fitted at stage
92.
v~
938
Q)
'"\
~ "
.
- ENGINEERING ORDER
rity: MANDATORY
Compiled : 09/082004

¡TITLE: Installation of EGPWS - Wiring and testing


94 P18 LOAD CONTROL CENTRE -LEFT (CCT BRKR)

Generic DnNg. no. 829P0062 /~-:2":Qf


BK:
Subkit 112
W~89 'nrf9
Fit new cable assy iaw DnNg. no. 829P0062
~-S
Sheet 4.112.1

~
95 Carry out continuity tests of new wiring fitted at stage 94. Q)~ S '.
938

96 P18-1 C/B PANEL

Fit and connect circuit breaker (C 1519) p/n BACC18Z2R as


shown on Drwg number 823A0013 sheet 2 rey A. 348
-
rI B.M.E.l. 1
; (j .?-<.: ~'-

~ ~

Refer also drwg no. 827 A0020 sht 1 page 12. <.:::~"

I ~¡¡e
97 Fit marker p/n BAC27DCC3374 immediately below the 'Terrain
Display' circuit breaker. ~f
936-

98 CAPTs INSTRUMENT PANEL

SUPPLEMENT DnNg.no. 829P0063


Subkit 101 WOO02
Carry out wiring alterations iaw DnNg. no. 829P0063 ~
Q) .
Sheet 4.101.1 \¿V
-1 NOTE Refer AED 001 S/No133 .
-- IL'#
~
99 Carry out continuity tests of wiring alterations carried out at
stage 98 Q)·936·r-.: ~
100 P8/P9 PILOTS CONTROL STAND
WXR CONTROL PANEL
"l\ -s'.-
SUPPLEMENT DnNg. no.829P0063
Subkit 111 W0491
,
¡Q) -
54
\

Carry out wiring alterations iaw DnNg. no. 829P0063


as per sheet 4.111.2 or 3 19/~lo~
101 Carry out continuity tests of wiring alterations carried out at

~dY
stage 100 r
/ "'936

102 E2-3 SHELF


.¡:-~~
Install EGPWS relay p/n BACCR13CE2 iaw drwg number ca' r- .1

824A0001 sht 1 rey C. 54


ENGIN-EE-RING Q-RDE-R
Priority: MANDATORY
ate Compiled: 09/082004

¡TITLE : Installation of EGPWS - Wiring and testing

103 P8 PANEL

lnstall numbers 1 and 2 EFIS Control Panels marked 'POST EO


8737-34-0596 MODIFIED FOR EGPWS OPERATION' ,
h~
\Ü<11té
kJ
::)'

1'~8

104 P1-3 PANEL

Install EGPWS switch panel p/n 200-90023-103,


Fit connector 0831 P/wOO01 \'SI-
¡ Q)

2
Note 1 Refer Orwg number 823A0013 sheet 2 rey A and
827A0020 sht 1 page 7.
Note 2 Refer Orwg number 827A0020 sheet 1 page 6 for
location of cable grounds.
105 P3-3 PANEL

Install EGPWS switch panel p/n 200-90023-103.


Fit connector D833PIW0003 \'SI -
Q)'

28
Note 1 Refer Drwg number 823A0013 sheet 2 rey A and
827A0020 sht 1 page 7.
Note 2 Refer Drwg number 827A0020 sheet 1 page 6 for
location of cable grounds.
106 P3-7 PANEL ( Cl>-l~
Remove existing GPWS light plate/test module and install \'11 .
EGPWS System test module assy. p/n 120-87077-"101 at ' ~ '-
P3-7 panel. :2~1Y1.,,~ -+ 9~~ 37
Fit connector D12051W0003 .~~

Note 1 Refer Drwg number 823A0013 sheet 2 rey A and


\'SI,
827 A0020 sht 1 page 7. Q) -

Note 2 Refer Drwg number 827A0020 sheet 1 page 6 for 2


location of cable grounds.

107 ELECTRONICS BAY

Refit and reconnect all Electronic Shelves removed for


,;\', -
completion of this modification. \Q)'
5
Note Refer additional worksheets for this task
-ENGINEERING -ORDER
Priority:MANDATORY
Compiled: 09/082004

ITITLE: Installation of EGPWS - Wiring and testing


108 Refit al! Electronic units and components removed for
completion ofthis modification. f
~~~
0:;" 'r-
Note Refer additional worksheets for this task. ~

109 EGPWS Computer

Fit EGPWS ,Computer_part number 965-0976-060-216-216 in


Iieu of the original GPWS computer. ~ 93
-- ~v

r 110 COMPLETION ANO TEST

111
Ensure all items previously disturbed during the completion
of this modification are secure

If safe to do so apply ground power iaw AMM Q4)


\~~ '
,
1P )
112 Carry out a function test of the EGPWS iaw Boeing
1371 44 c)o ((

~
document number 7373449011 Rev B and record the aJ;
obtained results. A-'ml--r,-~ 10
\ '

28
Supplya copy of the test results to Technical Services v~ ~bM:;S.

. x-eU- ~ f6bb~ ~4-


113 Return the aircraft to the desired operational or ",, !I
maintenance configuration
' c()'
'r-
,
~
q .ICertifies that the work specified except as otherwise specified was carried out in arordanC~ )Ni -l:
JAR-145 and in that respect the aircraftlaircraft components is considered ready f1 ~~b c() ' -r-
service. G.OrA Approval No: CAA 007?!'> I r~1 <: 28 ./
IApproval NumberUK 14),W/¿'J J
I
ENGINEERING--ORD-ER
Priority: MANDATORY
ate Compiled: 09/082004

IITITLE: Installation ·of EGPWS - Wiring and testing

I TS File Ref.: I
ENGINEERING ANO TECHNICAL SERVICES GROUP

ENGINEERING ORDER FEEDBACK RESPONSE SHEET

Use this form to tellus what you think of the quality of this Engineering Order. We will use the data that you
give us to improve the quality of our Engineering Orders. Please include data about these or other items.

r.



Did this Engineering Order meet your estimate of quality ?
Was this Engineering Order easy to understand ?

Will you carry out this Engineering Order to its full requirements ?
~~
YES
Is the Planning Information, Materiallnfo and Accomplishment Instruction satisfactory? YES / .
YES /
/1
• Is the manpower estimate to your satisfaction ? YES /

If you answered NO to any of the aboye questions please explain in the section below in more detail as to
why this Engineering Order was not to your satisfaction.

COMMENTS:

¡¡ /
~
' ! ./,
; y'
Signature: I Print Name:
-7~-/-
. ---
Date: ~~h Station/Base:

RETURN THE COMPLETED SHEET TO THE TECHNICAL SERVICES DEPT, BM


ENGINEERING, HANGAR 29, EMA AIRPORT OR FAX TO 01332 852585

TECHNICAL SERVICES RESPONSE:


ENGINEERING ORDER
Priority: MANDATORY
Compiled : 02/01/2004

I I T I T L E : ' lilstallation of EGPWS - Wiring and testing

Appendix A MATERIAL INFORMATION W.O.N: 034410


n
T/S ENGINEER JE~UITURE AUTHORISATION ~
JI
RECEIVED BY MAINTENANCE PLANNING 11 SIGN: lI6ATE:
NCTOBE KA KB KC KD ZE ZG ZH ZI MP ZJ AS TW SK
MODIFIED
PLANNED '
INPUT DATE
NCTOBE
MODIFIED
PLANNED
INPUT DATE

ICONFIRM INSTRUCTIONS TO ORDER WARRANTY CLAIM YES/NO


I
IMATERIALS PLANNING I SIGN: SUE LEE 11 DATE: 23/07/04

REMARKS:

a) Item 1 manufactured in-house.

[ITEM QTY PART NO. DESCRIPTION Effectivity PRICE


1 2 73734-0596 Decal AH 10.00
2 4 1720-440-SS-0 Stand-offs AS,TW & SK only

* QUANTITIES ARE PER AIRCRAFT SHIPSET UNLESS OTHERWISE STATED