Professional Documents
Culture Documents
Interaction between the Short term Planning tools Overall workflow using the MS Planning tools
and MSPD
MineSight ® Schedule Optimizer (MSSO)
• Misma fase
Dependencias • Diferentes fases
Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.
Preparacion de Datos
Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.
Preparacion de Datos
Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.
Preparacion de Datos
MATERIAL MAPPING
Open pit/
Multiple Multiple
UG/
Mines Processes
GSM
Features – Objetivo (3/10)
Stripping Contenido
Valor Neto
Ratio Metalico
Features – Cantidad (4/10)
Vertical
Shovel Truck
Advance
Hours Hours
Rate
Features – Precedencias
(8/10)
Entre
Entre Bancos Mismo Banco
Fases
Features – Reportes (10/10)