1. INTRODUCTION 
This report covers the calculation for rectification of the bracket due to the floor finish is lower than 
the height of the bolt head. For the rest of the verification do check AJB‐ZEB‐FAC‐CL‐00021 
Structural Calculation for UCW Supports from 8th To 13th Floor at Connecting Bridge Area. 
 

 
 
   

 
 

2. ORIGINAL FORCES FROM THE CALCULATION 

 
 

3. HOOK CHECK 