You are on page 1of 1

Voltage

BBU
PROJECT ASSET CUST
SPECIAL
REQUIREMENTS
COLOR
RACK CONF
(wxh)
PBU range
MBU
Voltage
range
BBU ACTION
*PBES service back for rack inst. 11.09.17. commissioning 18.09.17

Text
Standard
ESS1078a Anda Lote Siemens 2R 20W*5H 4 32 770 - 1000 320 *21.08.17 PBU sent to Tersan
RAL7032
770 - 1000 320 *Brian to communicate protection from LCDs is not removed too early. Is this protection enough?
*15.08.17 Melanie: 15 BBU SOMs need reprogramming might be able to get them next week. will check if we can get some plumbing hoses.
*Melanie: Analytic will send 15 complete SD cards. ETA? GD Will send all 29.08.17
*Internal Plumbing Hoses: we need at least enough for 9 BBUs. Melanie to send update on delivery 29.08.17
*Contactors: 20 were ordered (CANADA) on the way.

*15.08.17 Sharon/Melanie: Identify long lead time PBU components from Joe's BOM. When can we get all parts for assembly (@Vancouver).
22.08.17 Longest leadtime 5-6 weeks PO3418 not placed yet. Sharon will look for another supplier.
29.08.17 Ongoing Sharon to follow up on same PO

*PBES TRD to ship 2MBUs ASAP. PO3430 prioritized. Ship to PBES Vancouver. Melanie ask Joe if these need to be tested before.

*INST BOM: PN1178-01 plumbing coupling(Might get some from Aurora?), BBU duct gasket (22) , braided hoses (30), Duct Tape.
ESS1180 RTG Crane CCCCSH CCCC PBES color 1R 4W*5H Custom 2 540-700 14
29.08.17 *Melanie check status of duct gasket and braided hoses delivery

* Missing 2 power cables 0512→1172 and 2 COM cables 0920. (Melanie to check if Eng has any cables we could send, Ta ana to check on test area Trondheim)

*Geoff: We have to pay Tromek plumbing. Welding is not finished. NOK 15388,- + VAT.

*29.08.17 Sharon to doublecheck that these batteries can be shipped by air.

NOTES :
*the integration module box can be imported separately if HS code defined as 85372090 and the invoice attached is lower than 700 USD (5000 RMB)
*We can use Siemens color for delivery
Mr. Gao is expecting to install these once these are received in August as planned.
* Tatiana: Ask for installation dates for racking
*Tim to follow up with Joakim on feet for plumbing (specs)
Different PBU
ESS1064 Damen – SeaXplorer SX62 SIEMENS RAL7032 1R 6Wx4H 1 2 770 - 1000 20 *Tom to add feet to installation BOM
colorRAL9010
*Tatiana: Follow up on question on heat loss to air

* Sharon asked SJET PO 2weeks leadtime (Ducting parts) needs payment.


1/2 BBU *We have enough racking parts to be painted (Elpro). PFO to Elpro for remaining 16 parts. Tatiana send list to Brian.
Special rack* * Unapproved BOM issued by Dimo. Chao to issue official BOM when she is back
70=
Weight Control
2R* 4Wx5H 6 (1/2) +
ESS1072 FEADSHIP DE VRIES Name BBU as port 1,2,3, RAL9003 racks 2 10 500-650 Tatiana to send Sharon qty on ducting parts that haven't been ordered.OK 3481
2R* 6Wx5H 4(1/2)+60
Stbd1,2,3 *Tatiana: send one rack piece to Elpro for painting approval. Sent
Include in subject line Chao: Update BOM and include missing components. OK
“NB700 ESS1072 " Sent customer updated hole pattern drawing and asked for phone meeting (pre-installation meeting) 2017.06.14
Racking installation date agreed: July 31st

*17.08.17 Notified on late plumbing delivery. Shipping documents sent to ABB.


*PO for 9 MBUs issued PO3499
* Ashleigh has updated installation BOM.
RAL9010 Glossy
*Juha to confirm Chris design is approved.
ESS1085 Nobiskrug 790 ABB Smaller (old design) PBU RAL9010 3R* 13Wx3H 1 9 690-900 81
enclosure
Tapio said that dates are not confirmed with shipyard
*Chris has sent Juha proposed schematic. He said that it can fit in the smaller old box
Rittal has confirmed we can order a custom colored PBU enclosure through our local distributor – Gloss range from 70-89

*Rack and Duct qty doesn't match the latest BOM.


→Piece sent to Elpro. Coarse texture. Ask Elpro for fine grain paint lead- me.
→I beams were listed in the BOM. H beams were ordered & painted. Chao to confirm these can be used.
*Tatiana to check if these would be welded or bolted?
→ Plumbing is ordered after new BOM, need to review orders for other parts (couplings, braided hoses, end caps)
ESS1132a&b Woolwich NES RAL 5012 RAL 5012 2R 8Wx5H 2 8 540-700 56
* Installation BOM reviewed Ashleigh
* Tatiana: Confirm we have enough parts from SJET to complete missing racking parts. Confirmed we have enough.

* Lloyds to arrange only one FAT covering the whole scope, that means only after all production and IAT are completed. FAT from October should be
canceled. will notify customer when Lloyds sends other answers.
* Customer OK with :Modbus
* Tatiana: Contacted cust. Informed about missing components to finish BBUs. Cust confirmed plumbing changes. No installation date
planned as cooling system is delayed.
*Torstein to update PO3329
ESS1248 IFE Lab IFE Siemens color 1R 2Wx4H 0 1 308-400 4

*Tatiana: Contacted Chris for design document


Chris confirmed we can use old cells
*15.08.17 Andrew Eydt: To provide Chao with room and system information required for design.
*Tatiana: Check on racking availavility (Waiting on BOM from Chao)
ESS1293 Marine Energy storage MJR Controls Siemens color 0 1 616 - 800 8 * Torstein to order plumbing from Tromek

*Chris confirmed we can use old cells

* 24.08.17 Endre on site to install braided hoses. Kalle said that 57 have not been sent. waiting for money for new order'.

*15.08.17 9pcs outlet pipes missing, 11 pcs inlet pipes left over. Did we order replacements? PO3151 was invoiced. Will look for delivery
note. (Sept 15 these must be delivered by)

* Brian: Make BOM for service spares

Packaging for BBUs has 4 weeks leadtime. Needs to be prepaid.


ESS 1003 Aurora ABB Silver 8R 20Wx5H 4 80 620-800 650

*GD & Tim will plan on next BOM delivery

MBU shipped to yard 20+16+10+4 (4 need parts)+9


Elpro to build 17 (waiting on parts, Torstein plaacing an order for 200 contactors, DNA sending 80 cables)
PBES 4 (Need one bracket sitting at Aurora)

4 needing parts: 3 breaker motors (order placed at Elpro)

Last updated 2017-08-28