You are on page 1of 1

E D C B A E D C B A

3.70 4.00 2.00 3.70 4.00 2.00

1.20 2.20 1.50 1.20 1.20 2.20 1.50 1.20


ROOF LINE ROOF LINE

1.20

1.20
a b
4 4

ROOF LINE

ROOF LINE
LPP- 3 b

3.00

3.00

3.00

3.00
a

LPP- 2
b S
3 3
S2W

1.50

1.50
a LPP LPP
LPP- 1
2' b a 2' LPP-5

4.50

4.50

4.50

4.50
SM
a

3.00

3.00
a b a

1.20

1.20
a SM

9.00

9.00
2 2

a b a b
ROOF LINE

ROOF LINE
SM
4.50

4.50

4.50

4.50
a b a b
LPP-4
SM SM SM
S2W
1 1
1.20

1.20

1.20

1.20
a b a

ROOF LINE ROOF LINE

2.20 1.50 4.00 2.00 1.20 2.20 1.50 4.00 2.00 1.20

9.70 9.70

12.10 12.10

1 LIGHTING LAYOUT 2 POWER LAYOUT


E-1 SCALE 1:100 M E-1 SCALE 1:100 M

2-10MM 6MM LIGHTING AND POWER


ENTRANCE CAP PANELBOARD (LPP)
CONDUCTORS IN 50MM DIA. RSC.

LEGEND & SYMBOLS : LOAD SCHEDULE


(220 V) LIGHTING AND POWER PANEL "LPP"

CRT OTHER VA PER AMP LOAD SIZE OF BRKS SIZE OF HOMERUN


CEILING LIGHT WATT-HOUR
NO. LOAD DESCRIPTION LTS C.O. LOADS CIRCUIT PER CIRCUIT
4 WATTS FOR PERIMETER CEILING F P T WIRE CONDUIT METER 1 20A 20A 2
18 WATTS FOR INSIDE CEILING
1 18W LED LAMP 9 162.0 2.00 50 2 20 2-3.5MM M
DUPLEX CONVIENCE OUTLET 220V 3 20A 20A 4
2 18W LED LAMP 8 144.0 2.00 50 2 20 2-3.5MM
SM DUPLEX CONVIENCE OUTLET 220V 5 20A 6
3 4W LED LAMP 7 28.0 2.00 50 2 20 2-3.5MM
FOR SEWING MACHINE
4 DUPLEX CONVENIENCE OUTLET 6 720.0 3.27 50 2 20 2-3.5MM 7 8
LPP LIGHTING AND POWER PANEL BOARD
5 SEWING MACHINE 6 450.0 2.04 50 2 20 2-3.5MM

6 SPARE 1 3,000.0 13.64 50 2


S SWITCH GROUNDING WIRE CONNECTED
7 SPARE 1 1,500.0 6.82 50 2 TO G. I. WATER PIPE

8 SPARE 1 1,500.0 6.82 50 2

TOTAL LOAD IN THE BUILDING 39.51 AMPERES


3 SINGLE LINE
D. F. (DEMAND FACTOR) = 80% USE : 50AF 2P 40AT 220V
I (TOTAL) = (37.51 X 0.8) + (8 X.25) = 33.61 AMPERES CB (CIRCUIT BREAKER) E-3 DIAGRAM

OWNER PROJECT TITLE/LOCATION SHEET CONTENTS DRWN. CHKD. RECOMMENDING APRROVAL APPROVED SHEET NO.

AS SHOWN IRMA R. RODIS


ENGR. RAMIL B. BARCELONA PROFESSIONAL AGRICULTURAL ENGINEER
PRC: 3859
REMEDIOS V. ABGONA, PhD KENNEDY T. COSTALES E-1
CHKD.
PTR: N/A CHIEF, FIBER UTILIZATION AND TECHNOLOGY DIVISION EXECUTIVE DIRECTOR
3/F DA-PCAF BLDG., DEPARTMENT OF AGRICULTURE 1 1
ELLIPTICAL ROAD, DILIMAN, QUEZON CITY BRGY. MALABOR, TIBIAO, ANTIQUE ENGR. EMMA Z. BALABIS
TIN: N/A
DATE: 05/28/2018

You might also like