LECTURE -02
CHAPTER TWO
CREATING A TASK LIST: GOAL
1
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
In the first cell directly below the Task name column heading,
type Site Work and then press the enter key on your
keyboard.
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
The default start date is the same as the project start date.
2
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
3
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
What if I already have a lot of tasks entered into another application, like
Excel?
From Microsoft Office Project Help:
Click Open.
In the Files of type box, click the file type you want to import data
from.
Click Open.
Follow the instructions in the Import Wizard to import the data you
want into the proper Microsoft Office Project 2003 fields.
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
4
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
5
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
Click Next.
It’ll ask you if you want to create a new map or use an existing
map. Choose New Map, and click Next.
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
It’ll ask you “How do you want to import this file?” The
choices are:
As a new project
Append data to the active project
Merge the data into the active project
6
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
It’ll ask you to select the types of data you want to import. We’re trying
tasks, so choose Tasks. Also, under “Microsoft Office Excel Options,” check
off Import includes headers. And click Next.
7
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
In here, source
sheet name, select
sheet 1
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
Then it’ll map the fields from Excel for you automatically, matching the
header named Name in your Excel file with the field named Name in
Project, which is the Task Name field in the Gantt chart.
8
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING TASK
You can save your new map if you want to. Or, click Finish.
It should import them:
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
9
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
m min minute
h hr hour
d day day
w wk week
mo mon month
10
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
Elapsed duration
If you want to schedule something that happens over nonworking
time. Like “wait for concrete to cure” or “wait for paint to dry.”
No one’s on the clock during it.
The next task after it is dependent upon its completion, though.
Use the abbreviation “ed”, so “2ed” is 2 elapsed days.
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
11
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
By default, in Project:
One minute = 60 seconds
One hour = 60 minutes
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
12
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
On project management:
Coming up with accurate task durations
The overall project duration generally tends to correlate – long projects have
long tasks. Short projects have short tasks.
Consider the level of detail you need and want to track. Too much detail
causes unnecessary work.
Measure down to the level of detail that you need to control the project.
13
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
CHAPTER TWO
CREATING A TASK LIST: ESTIMATING DURATIONS
14
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ENTERING A MILESTONE
Entering a Milestone
Click the name of task 5, Superstructure and insert New Task.
Type Substructure Complete. In the Duration field, type 0d and then
press the Enter key. It adds a milestone to your plan.
Milestone
CHAPTER TWO
CREATING A TASK LIST: ENTERING A MILESTONE
Select the
checkbox
15
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ORGANIZING TASKS INTO PHASES
Substructure, Superstructure
A summary task behaves differently from other tasks.
You can’t edit its duration or start date, or other calculated
values. They’re derived, or “rolled-up” from the subtasks contained
within the summary task.
Top-down and bottom-up planning
CHAPTER TWO
CREATING A TASK LIST: ORGANIZING TASKS INTO PHASES
16
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ORGANIZING TASKS INTO PHASES
CHAPTER TWO
CREATING A TASK LIST: ORGANIZING TASKS INTO PHASES
17
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: ORGANIZING TASKS INTO PHASES
Summary
Task
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
18
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
19
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
Linking Tasks
Finish to start (FS)
Start to Start (SS)
Finish to Finish (FF)
Start to Finish (SF)
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
Highlight two tasks, and then on the Edit menu, click Link Tasks.
20
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
21
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
22
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
CHAPTER TWO
CREATING A TASK LIST: LINKING TASKS
23
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: DOCUMENTING TASKS
Documenting Tasks
Task notes
There’s a Task Notes button on the Standard toolbar:
CHAPTER TWO
CREATING A TASK LIST: CREATING A HYPERLINK
Create a hyperlink
Select a task
On the Insert menu, choose Hyperlink.
You can also click the Insert Hyperlink button, or right-click on a task
and choose Hyperlink.
Text to Display and the Address
24
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: CHECKING THE PLAN’S DURATION
CHAPTER TWO
CREATING A TASK LIST: CHECKING THE PLAN’S DURATION
25
2/23/2015
CHAPTER TWO
CREATING A TASK LIST: CHECKING THE PLAN’S DURATION
CHAPTER TWO
SUMMARY
Key Points
Essential aspects of tasks in a project plan include their duration and order of
occurrence.
Task links, or relationships, cause the start or end of one task to affect the start
or end of another task. A common task relationship is a finish-to-start
relationship in which the completion of one task controls the start of another
task.
In Project, phases of a schedule are represented as summary tasks.
You can document additional details using task notes and create hyperlinks to
the Internet.
The Project Information dialog box (Project menu) is an excellent way to
observe the key values of a project plan, such as its scheduled finish date and
duration.
26
2/23/2015
CHAPTER TWO
IMPORTANT TERMINOLOGY
Tasks: are the most basic building blocks of any project. Tasks
represent the work to be done to accomplish the goals of the
project.
CHAPTER TWO
IMPORTANT TERMINOLOGY
27
2/23/2015
CHAPTER TWO
IMPORTANT TERMINOLOGY
CHAPTER TWO
IMPORTANT TERMINOLOGY
Entry Table: The grid in the left side of the default Gantt
Chart view.
28
2/23/2015
CHAPTER TWO
IMPORTANT TERMINOLOGY
CHAPTER TWO
IMPORTANT TERMINOLOGY
29
2/23/2015
CHAPTER TWO
IMPORTANT TERMINOLOGY
CHAPTER TWO
IMPORTANT TERMINOLOGY
30
2/23/2015
CHAPTER TWO
IMPORTANT TERMINOLOGY
CHAPTER TWO
IMPORTANT TERMINOLOGY
References
Microsoft Project Step by Step 2007
Microsoft Project Help