You are on page 1of 1

Land 384,400.

00
reclaimation 83,630.00
permit con' 28,000.00
sewage.road 25,000.00
elrectric 5,500.00
expense 41,576.49
road work 65,000.00
ex. Design 35,250.00
re-bar 30,012.75
gravel 6,244.00
sand 6,325.00
brick 6,200.00
car con'c
cement 9,936.00
con'c pipe
con'c pile
excavator 2,262.80 85.20
door
tile
sanitary m
marble
mansory
misc 653.83 1,688.74
elrectric
water s 330.00
rooftile
paint
wooden F
funiture

You might also like