You are on page 1of 4

S.

no Discration Nos Length With Depath Qty


1 Excation 8 4.50 4.50 4.50 729.00
2 PCC 8 4.00 4.00 0.75 96.00
3 Rcc raft 8 4.00 4.00 1.25 160.00
4 Raft Slop 8 2.38 2.75 1.00 52.25
5 Neck column 8 1.50 0.75 2.50 22.50
6 Plinth beam 2 25.00 0.75 1.00 37.50
7 Plinth beam short 5 16.00 0.75 1.00 60.00
9 Column 8 1.50 1.00 8.75 105.00
10 Slab 1 25.00 16.00 0.42 166.40
11 Beam long 3 25.00 0.75 0.75 42.19
12 beam short 5 16.00 0.75 1.25 75.00
13 Stair case 2 8.00 1.50 0.42 9.98
14 stair steps 18 0.50 1.50 13.50
840.32
S.no Discration Nos Length With Depath Qty
1 Rcc raft 16 4.00 4.00 1.25 320.00
2 Raft Slop 16 2.38 2.75 1.00 104.50
3 Neck column 16 1.50 0.75 2.50 45.00

4 Plinth beam 4 32.50 0.75 1.00 97.50


5 Plinth beam short 5 36.25 0.75 1.00 135.94
6 Column 16 1.50 1.00 8.75 210.00
7 Slab 1 47.00 42.00 0.42 821.18
8 Beam long 4 47.00 0.75 0.75 105.75
9 beam short 5 42.00 0.75 1.25 196.88
dection slabfor stair -1 7.00 9.50 0.42 -27.93

10 Stair case 2 7.00 1.50 0.42 8.74


11 stair steps 18 0.30 1.50 8.20
2025.75

1 PCC 16 4.00 4.00 0.75 192.00


2 Plinth beam pcc 4 32.50 1.25 0.75 121.88
3 Plinth beam short PC 5 36.25 1.25 0.75 169.92

1 Excation 16 4.50 4.50 4.50 1458.00


Excation for wall 2 48.00 2.00 2.50 480.00
2 39.00 2.00 2.50 390.00
870.00
Excation for wall 2 48.00 2.00 0.25 48.00
RR masonary 2 39.00 2.00 0.25 39.00
87.00
Excation for wall 2 48.00 1.25 2.25 270.00
RR masonary 2 40.50 1.25 2.25 227.81
497.81
Brick work 2 48.00 0.75 1.50 108.00
2 41.50 1.25 1.50 155.63
263.63
Brick work 2 46.50 0.375 4.00 139.50 6
2 40.75 0.38 4.00 122.25

6 0.75 0.75 4.00 13.50 4.2


3 0.75 0.75 4.00 6.75 20.25
dedtion for gate
-2 15.00 0.375 4.00 -45.00
237.00 216.75

Plastring 4 48.00 0.375 4.00 768.00


4 39.00 0.38 4.00 624.00

6 1.50 0.75 4.00 36.00


3 1.50 0.75 4.00 18.00
1446.00

Brick work 9" thick 2 34.00 0.75 2.10 142.80


2 29.50 0.75 2.10 123.90
deduction
Brick work 4.5" thick 2 34.00 0.75 8.50 578.00
2 29.50 0.75 8.50 501.50