1 1,900.00 m2 72.00 72 2
2 1,770.00 m2 82.00 82 2
3 1,050.00 m2 55.00 55 2
Hydrant Jumlah
Indoor 6
Hydrant Pillar 2
Out Door 2
Head Pompa :
Jarak terjauh dari pompa 76 meter ( Tekanan Min Splinker )
3 Urinal 120l/mnt 0 - - 0 0
`
4 Pantry 90l/mnt 0 - 1 1 90
5 Janitor 90l/mt 0 - 0 0 0
3 Urinal 120l/mnt 0 - - 0 0
`
4 Pantry 90l/mnt 0 - 1 1 90
5 Janitor 90l/mt 0 - 0 0 0
Total buangan airbekas perhari jika 100 % pemakaian = 5520 liter /menit x24 jam = 2208 liter /hari
2.208 m3 /hari
Total buangan kotor perhari jika 100 % pemakaian = 5280 liter/menit x 24 jam = 2112 liter/hari
2112m3/hari
SPESIFIKASI TEKNIS
PEMBANGUNAN GEDUNG INSPECTION CENTRE RSU WAHIDIN SUDIRO HUSODO
MAKASSAR
Sprinkler VIKING :
Flow Switch Jonshon , honey well . :
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVIN
PEKERJAAN : MEKANIKAL ELEKTRIKAL
KOTA : GORONTALO
TAHUN : 2009
No URAIAN JUMLAH
IV MEKANIKAL ELEKTRIKAL
1 Sistim Instalasi Listrik Rp. 2,275,365,000.00
2 Instalasi HVAC Rp. 565,550,000.00
3 Instalasi Telepon Rp. 97,367,800.00
4 Instalasi Sistim Tata suara Rp. 153,710,250.00
5 Instalasi fire alarm Rp. 121,262,400.00
6 Sistem Instalasi CCTV Rp. 62,739,000.00
7 Sistim Instalasi Air Bersih Rp. 440,896,500.00
8 Sistem Air bekas, Air kotor dan Vent. Rp. 26,980,000.00
9 Sistim Instalasi Hujan Rp. 10,437,500.00
10 Sistim Instalasi Fire Hydrant Rp. 975,858,796.33
11 Sistim Instalasi Petir Rp. 45,755,595.00
Rp. 4,775,922,000.00
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
SUB PEKERJAAN : SISTIM INSTALASI FIRE ALARM
KOTA : GORONTALO
TAHUN : 2009
-
1.2.4 Instalasi Listrik Lantai 3 - Rp. 47,840,000.00
1.2.4.1 Instalasi listrik lengkap conduit, kabel dan accsesories -
1.2.4.1.1 Titik lampu 92.00 Ttk Rp. 220,000.00 Rp. 20,240,000.00
1.2.4.1.2 Installasi Stop kontak 62.00 Ttk Rp. 220,000.00 Rp. 13,640,000.00
1.2.4.1.3 Instalasi stop kontak UPS 38.00 Ttk Rp. 350,000.00 Rp. 13,300,000.00
1.2.4.1.4 Instalasai titik Exhaust Fan 3.00 Ttk Rp. 220,000.00 Rp. 660,000.00
1.5.3.2 Lampu HPIT 400 Watt 8.00 bh Rp. 1,750,000.00 Rp. 14,000,000.00
1.5.3.3 Kabel NYFGby 4x6 mm 150.00 mtr Rp. 70,000.00 Rp. 10,500,000.00
1.5.3.4 Pondasi Tiang 4.00 bh Rp. 650,000.00 Rp. 2,600,000.00
-
2 Instalasi Telepon
2.1 Penyambungan Aliran Ke PT. TELKOM 1.00 ls Rp. 20,000,000.00
2.2 Kabel Telpon roll Rp. -
Rp. 20,000,000.00
3 Instalasi AC
3.1 Kabel NYM 3 x 4 mm roll Rp. -
Rp. -
4 Instalasi Komputer
4.1 Panel distribusi stopn kontak komputer Bh Rp. -
Rp. -
Rp. 14,300,000.00
6 Instalasi sound system
6.1 Power Amp. 360 watt 1.00 unit Rp. 11,000,000.00
6.2 Mixer Pre amp/360 Watt 1.00 unit Rp. 9,000,000.00
6.3 Monitor Panel 1.00 unit Rp. 4,000,000.00
6.4 Kabel NYMHY 2 x 1,5mm 1.00 Roll Rp. 4,000,000.00
Rp. 28,000,000.00
7 Instalasi Kebakaran
7.1 Header diameter 6" ( P = 1,5 m ) Rp. -
7.2 Safety valve diameter 4" Rp. -
7.3 Alarm valve dia. 4" + bell Rp. -
7.4 Gate valve dia. 4" Rp. -
7.5 Check valve dia. 4" Rp. -
bpk gto EE ME (LISTRIK) Hal. 10
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : SISTIM INSTALASI LISTRIK
KOTA : GORONTALO
TAHUN : 2009
Rp. -
B. LANTAI DASAR
1 Installasi Listrik Lantai 1
2.1 Panel Lantai Dasar 1.00 Unit Rp. 3,300,000.00
2.2 Instalasi listrik lengkap conduit, kabel dan accsesories
2.2.1 Titik lampu 165.00 Ttk Rp. 20,625,000.00
2.2.2 Installasi Stop kontak 16.00 Ttk Rp. 2,000,000.00
Rp. 25,925,000.00
5 Installasi AC
5.1 Panel Distribusi AC 1.00 Ttk Rp. 2,000,000.00
5.2 Installasi AC 19.00 Ttk Rp. 2,850,000.00
Rp. 4,850,000.00
6 Installasi Komputer
6.1 Panel Komputer LT. 1 1.00 Bh Rp. 1,375,000.00
6.2 Stop Kontak Komputer 10.00 Bh Rp. 435,000.00
Rp. 1,810,000.00
7 Instalasi Air bersih
7.1 Pipa PVC Dia. 1/2 " 80.00 m' Rp. 1,800,000.00
7.2 Pipa PVC Dia. 3/4 " 30.00 m' Rp. 450,000.00
7.3 Pipa PVC Dia. 1 1/4" 20.00 m' Rp. 230,000.00
7.4 Pipa PVC Dia. 2" 30.00 m' Rp. 345,000.00
7.4 Acsesories 1.00 Ls Rp. 2,500,000.00
Rp. 5,325,000.00
Rp. 24,291,500.00
9 Instalasi Air hujan
9.1 Pipa PVC dia. 4" 250.00 m' Rp. 12,500,000.00
Rp. 12,500,000.00
10 Instalasi Sound system 43.00 ttk Rp. 5,805,000.00
Rp. 5,805,000.00
5 Installasi AC
5.1 Panel Pembagi LT. 2 1.00 Ttk Rp. 2,000,000.00
5.2 Installasi AC 18.00 Ttk Rp. 2,700,000.00
Rp. 4,700,000.00
6 Installasi Komputer
6.1 Panel Komputer LT. 1 1.00 Bh Rp. 1,375,000.00
6.2 Stop Kontak Komputer 10.00 Bh Rp. 435,000.00
Rp. 1,810,000.00
7 Instalasi Air bersih
7.1 Pipa PVC Dia. 1.5 " 50.00 m' Rp. 1,125,000.00
7.2 Pipa PVC Dia. 3/4 " 60.00 m' Rp. 900,000.00
7.3 Pipa pvc Dia. 1/2 " 100.00 m' Rp. 1,150,000.00
7.4 Acsesories 1.00 Ls Rp. 2,500,000.00
Rp. 5,675,000.00
8 Instalasi Air Kotor
8.1 Pipa PVC Dia. 1" 20.00 m' Rp. 500,000.00
8.2 Pipa PVC Dia. 1 1/2" 4.00 m' Rp. 100,000.00
8.3 Pipa PVC Dia. 2" 233.00 m' Rp. 5,825,000.00
8.4 Pipa PVC Dia 3" 190.00 m' Rp. 9,500,000.00
8.5 Pipa PVC Dia 4" 36.00 m' Rp. 2,700,000.00
8.6 Acsesories
8.5.1 Knee dia. 1 1/4" 46.00 bh Rp. 161,000.00
8.5.2 Knee dia. 2" 4.00 bh Rp. 20,000.00
8.5.3 Knee dia. 3" 51.00 bh Rp. 382,500.00
8.5.4 Knee dia.4" 10.00 bh Rp. 125,000.00
8.5.5 Tee dia. 3 x 2" 12.00 bh Rp. 240,000.00
8.5.6 Tee dia. 4 x 2" 4.00 bh Rp. 100,000.00
8.5.7 Tee dia.4 x 3" 4.00 bh Rp. 120,000.00
8.5.8 TY 90 dia. 4" 2.00 bh Rp. 70,000.00
8.5.9 TY dia. 4" x 2" 20.00 bh Rp. 600,000.00
8.5.10 TY dia. 2" 15.00 bh Rp. 225,000.00
8.5.11 TY 45 dia. 4" 2.00 bh Rp. 70,000.00
8.5.12 V. sock 2 x 1 1/4" 2.00 bh Rp. 40,000.00
8.5.13 sock dia. 3" 14.00 bh Rp. 210,000.00
bpk gto EE ME (LISTRIK) Hal. 12
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : SISTIM INSTALASI LISTRIK
KOTA : GORONTALO
TAHUN : 2009
11 Pemadam kebakaran
11.1 Hydrant box (indoor) panjang slang 30m' 4.00 bh Rp. 12,200,000.00
11.2 BSP diameter 3" 100.00 m' Rp. 17,500,000.00
11.3 BSP 2 1/2" 100.00 m' Rp. 11,000,000.00
11.4 Gate Valve dia. 2 1/2" 3.00 bh Rp. 3,375,000.00
11.5 ABC Dry chemical powder kap. 2 x 3 kg 3.00 bh Rp. 6,750,000.00
11.6 Fitting dan alat bantu 1.00 ls Rp. 2,200,000.00
Rp. 53,025,000.00
4 Installasi AC
4.1 Panel Pembagi LT. 3 1.00 Ttk Rp. 2,000,000.00
4.2 Installasi AC 4.00 Ttk Rp. 600,000.00
Rp. 2,600,000.00
5 Instalasi Air bersih
5.1 Pipa PVC Dia. 1.5 " 50.00 m' Rp. 1,125,000.00
5.2 Pipa PVC Dia. 3/4 " 60.00 m' Rp. 900,000.00
5.3 Pipa pvc Dia. 1/2 " 40.00 m' Rp. 460,000.00
5.4 Acsesories 1.00 Ls Rp. 2,500,000.00
Rp. 4,985,000.00
8 Instalasi Air Kotor
8.1 Pipa PVC Dia. 1" 17.00 m' Rp. 425,000.00
8.2 Pipa PVC Dia. 1 1/2" 6.00 m' Rp. 150,000.00
8.3 Pipa PVC Dia 2" 260.00 m' Rp. 13,000,000.00
8.4 Pipa PVC Dia 3" 100.00 m' Rp. 7,500,000.00
8.5 Acsesories
8.5.1 Knee 90 dia. 1" 26.00 bh Rp. 156,000,000.00
8.5.2 Knee 90 dia. 1 1/2" 6.00 bh Rp. 36,000,000.00
8.5.3 Knee 90 dia. 2" 52.00 bh Rp. 312,000,000.00
8.5.4 Knee 90 dia. 3" 28.00 bh Rp. 168,000,000.00
8.5.5 TY 90 dia. 2" 25.00 bh Rp. 150,000,000.00
8.5.6 TY 90 dia. 2 x 1 1/2" 1.00 bh Rp. 6,000,000.00
8.5.7 TY 90 dia. 3 x 2" 18.00 bh Rp. 108,000,000.00
8.5.8 TY 90 dia. 3" 4.00 bh Rp. 24,000,000.00
8.5.9 Tee dia. 3 x 2" 6.00 bh Rp. 36,000,000.00
8.5.10 Tee dia. 3" 3.00 bh Rp. 18,000,000.00
8.5.11 Tee dia. 1 1/2" 1.00 bh Rp. 6,000,000.00
8.5.12 V. sock dia. 2 x 1" 14.00 bh Rp. 84,000,000.00
8.5.13 V. sock dia. 3 x 2" 6.00 bh Rp. 36,000,000.00
8.5.14 sock drat dalam dia. 2" 33.00 bh Rp. 198,000,000.00
8.6 Material bantu 1.00 lot Rp. 6,000,000.00
Rp. 1,365,075,000.00
Rp. #REF!
bpk gto EE ME (LISTRIK) Hal. 14
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : SISTIM INSTALASI LISTRIK
KOTA : GORONTALO
TAHUN : 2009
2 Equipment
2.1 Genset 250 KVA 1.00 Unit Rp. 362,000,000.00
2.1.1 Pek. Sistem pertanahan genset 1.00 ls Rp. 1,100,000.00
2.1.2 Tangki bahan bakar harian 1.00 set Rp. 4,125,000.00
2.1.3 Tangki bahan bakar mingguan 1.00 set Rp. 22,000,000.00
2.1.4 Pompa bahan bakar elektric 1.00 unit Rp. 4,750,000.00
2.1.5 Sistem pemipaan bahan bakar lengkap 1.00 unit Rp. 5,750,000.00
2.1.6 testing comisioning 1.00 ls Rp. 6,250,000.00
Rp. 405,975,000.00
2.6.2 Kjokey hydrant pump. Kap. 500GPM 1.00 Unit Rp. 21,500,000.00
Kapasitas 25 GPM
head : 80m'
Type multi stage in line
Power 30 KW/380V/50Hz/3phase
RPM 2900
Rp. 756,850,000.00
B LANTAI 2
1 FIXTURE
1.1 Listrik
1.1.1 Lampu TL 2 x 40 watt setara philip 24.00 bh Rp. 2,868,000.00
1.1.2 Lampu Pijar PL 10 watt setara philip 11.00 bh Rp. 753,500.00
1.1.3 Down light 25 watt setara philip 54.00 bh Rp. 5,940,000.00
1.1.4 Lampu RM 3 x 20watt 80.00 bh Rp. 23,000,000.00
1.1.5 Lampu UFO 9.00 bh Rp. 315,000.00
1.1.6 Lampu Chandelier 1.00 bh Rp. 2,005,000.00
1.1.7 Out put AC 8.00 bh Rp. 1,360,000.00
1.1.8 Out Put TV bh Rp. -
1.1.9 Saklar Tunggal 24.00 bh Rp. 1,020,000.00
1.1.10 Saklar Seri 47.00 bh Rp. 1,997,500.00
1.1.11 Stop kontak 11.00 bh Rp. 478,500.00
1.1.12 KKB bh Rp. -
Rp. 39,737,500.00
1.2 Sanitary
1.2.1 Closet duduk setara American standard Type Granada 300 7.00 bh Rp. 11,375,000.00
1.2.2 Wastafel Ex Toto Standard ( lengkap ) 6.00 bh Rp. 3,450,000.00
1.2.3 Urinoir setara American standard Type washbrook bh Rp. -
1.2.4 Kran Air San Ei 7.00 bh Rp. 1,312,500.00
1.2.5 Kran air setara San Ei type A 10 JRN 7.00 bh Rp. 612,500.00
1.2.7 Floor Drain Dia 3" setara San Ei type H508 7.00 bh Rp. 1,400,000.00
1.2.8 Kitcen zink setara Arisston type LVE 1003 -1 single 1.00 bh Rp. 625,000.00
bpk gto EE ME (LISTRIK) Hal. 15
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : SISTIM INSTALASI LISTRIK
KOTA : GORONTALO
TAHUN : 2009
Rp. #REF!
2 Equipment
2.4 AC
2.4.1 AC Split 1 PK
2.4.1.1 AC Split 1 PK 8.00 Unit Rp. 38,000,000.00
2.4.1.2 AC Split 1.5 PK 2.00 Unit Rp. 10,500,000.00
2.4.1.3 AC Split 2 PK 1.00 Unit Rp. 6,250,000.00
Rp. 54,750,000.00
C LANTAI 3
1 FIXTURE
1.1 Armature
1.1.1 Lampu TL 2 x 40 watt ( philip) 7.00 bh Rp. 836,500.00
1.1.2 Lampu Pijar PL 25 watt (philip) 6.00 bh Rp. 411,000.00
1.1.3 Down light 25 watt ( philip) 41.00 bh Rp. 4,510,000.00
1.1.4 Lampu Down Light mercury 169 watt 2.00 bh Rp. 575,000.00
1.1.4 Lampu RM 3 x 20watt 47.00 bh Rp. 13,512,500.00
1.1.5 Lampu sorot 500 watt 2.00 bh Rp. 2,070,000.00
1.1.6 Out put AC 6.00 bh Rp. 1,200,000.00
1.1.7 Out Put TV bh Rp. -
1.1.8 Saklar Tunggal 15.00 bh Rp. 1,050,000.00
1.1.9 Saklar Seri 18.00 bh Rp. 765,000.00
1.1.10 Stop kontak 4.00 bh Rp. 170,000.00
Rp. 25,100,000.00
1.2 Sanitary
1.2.1 Closet duduk setara American standard Type Granada 300 4.00 bh Rp. 6,500,000.00
1.2.2 Wastafel setara American standard Type Aqualyn 2.00 bh Rp. 1,150,000.00
1.2.3 Kran air setara San Ei type A 10 JRN 4.00 bh Rp. 750,000.00
1.2.3 Jet Washer setara San Ei type S 75 C 4.00 bh Rp. 630,000.00
1.2.4 Floor Drain Dia 3" setara San Ei type H508 4.00 bh Rp. 800,000.00
Rp. 9,830,000.00
1.3 Handle kunci
1.3.1 Handle + kunci Pintu P5 4.00 bh Rp. 5,140,000.00
bpk gto EE ME (LISTRIK) Hal. 16
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : SISTIM INSTALASI LISTRIK
KOTA : GORONTALO
TAHUN : 2009
Rp. 95,380,000.00
2 Equipment
2.4 AC
2.4.1 AC Split 1 PK 4.00 Unit Rp. 19,000,000.00
Rp. 19,000,000.00
2.1 Exhausfan
Pekerjaan Sound system
5.1. TB.SS 3 0.00 unit Rp. -
5.2. Ceiling Speaker 18.00 bh Rp. 10,800,000.00
5.3. Volume control 1.00 ls Rp. 1,525,000.00
5.4. Testing Comisioning 1.00 ls Rp. 5,500,000.00
Tangki Air 3.00 Unit Rp. 13,500,000.00
Rp. 31,325,000.00
3.2.1 Instalasi lengkap kabel UGC 100'x0,6mm, 50.00 m' Rp. 285,000.00 Rp.
lengkap conduit dan accsesories -
3.2.2 Instalasi lengkap kabel ITC 30'x0,6mm, 60.00 m' Rp. 17,500.00 Rp.
lengkap conduit dan accsesories
Jumlah Harga
97,367,800.00
39,967,800.00
29,467,800.00
6,000,000.00
4,500,000.00
14,250,000.00
14,250,000.00
-
1,050,000.00
41,150,000.00
10,100,000.00
2,100,000.00
8,000,000.00
2,100,000.00
30,000,000.00
30,000,000.00
2,000,000.00
1.4.8 Equipment
1.4.8.1 Electric hydrant pump, Cap : 250 gpm, H : 90 m Unit Rp. -
1.4.8.2 Jockey pump, Cap : 30 lpm, H 90 m. Unit Rp. -
1.4.8.3 Diesel pump Capasitas 250 Gpm , H : 90 m Unit Rp. -
1.4.8.4 Pressure tank cap 1000 ltr, Pressure 10 Bar Unit Rp. -
1.4.9 ASSESORIES RUANG POMPA
1.4.9.1 Pipa Header SCH 40 dia. 200 mm m' Rp. -
1.4.9.2 Foot valve dia. 50 mm bh Rp. -
1.4.9.3 Foot valve dia. 100 mm bh Rp. -
1.4.9.4 Pipa isap SCH 40 dia. 50 mm m' Rp. -
1.4.9.5 Pipa isap SCH 40 dia. 100 mm m' Rp. -
1.4.9.6 Strainer dia. 50 mm (screw) bh Rp. -
1.4.9.7 Strainer dia. 125 mm bh Rp. -
1.4.9.8 Flexible con. Isap dia. 50 mm bh Rp. -
1.4.9.9 Flexible con. Isap dia. 100 mm bh Rp. -
1.4.9.10 Flexible con. Tekan dia. 32 mm bh Rp. -
1.4.9.11 Flexible con. Tekan dia. 100 mm bh Rp. -
1.4.9.12 Check valve dia. 100 mm bh Rp. -
1.4.9.13 Check valve dia. 32 mm bh Rp. -
1.4.9.14 Gate valve dia. 100 mm bh Rp. -
1.4.9.15 Gate valve dia. 50 mm bh Rp. -
1.4.9.16 Gate valve dia. 32 mm bh Rp. -
1.4.9.17 Gate valve dia. 15 mm bh Rp. -
1.4.9.18 Pipa tekan SCH 40 GIP dia. 100 mm ke header & keluar m' Rp. -
1.4.9.19 Pipa Alarm Gong ls Rp. -
1.4.9.20 Pressure gauge bh Rp. -
1.4.9.21 Pressure switch bh Rp. -
1.4.9.22 Safety Relief valve dia. 100 mm bh Rp. -
1.4.9.23 Air Vent dia. 25 mm bh Rp. -
1.4.9.24 Alarm Gong bh Rp. -
7.1.1 Pembuatan sumur dalam ( Depp Well ) 200.00 m' Rp. 1,250,000.00 Rp. 250,000,000.00
- Casing Pipa GIP dia. 3" - -
- Pemipaan dalam pipa GIP Dia. 50mm - -
- -
7.1.2 Gate Valve dia. 50mm 3.00 bh Rp. 525,000.00 Rp. 1,575,000.00
7.1.3 Pipa PN10 dia. 2,5" dari depp well ke R. Pompa 30.00 meter Rp. 80,000.00 Rp. 2,400,000.00
7.1.4 Fitting dan acesories 1.00 ls Rp. 7,000,000.00 Rp. 7,000,000.00
7.1.5 Valve - -
7.1.5.1 Stop kran KITZ dia. 2,5" 5.00 bh Rp. 420,000.00 Rp. 2,100,000.00
7.1.6 Material bantu 1.00 lot Rp. 10,000,000.00 Rp. 10,000,000.00
-
7.2 Instalasi Pompa dan R. Pompa - Rp. 107,250,000.00
-
7.2.1 Pipa Header Dia. 4" BSCH 40 6.00 m' Rp. 525,000.00 Rp. 3,150,000.00
7.2.2 Fitting - -
7.2.2.1 Ball Valve Dia. 2,5" 2.00 bh Rp. - Rp. -
7.2.2.2 Check Valve Dia. 2,5" 4.00 bh Rp. 1,800,000.00 Rp. 7,200,000.00
7.2.2.3 Flexible joint Dia. 2,5" 4.00 bh Rp. 850,000.00 Rp. 3,400,000.00
7.2.2.4 Butterfly Valve Dia. 2,5" 2.00 bh Rp. 650,000.00 Rp. 1,300,000.00
7.2.2.5 Check Valve Dia. 3" 2.00 bh Rp. 2,050,000.00 Rp. 4,100,000.00
7.2.2.6 Flexible joint Dia. 3" 4.00 bh Rp. 925,000.00 Rp. 3,700,000.00
7.2.2.7 Strainer Dia. 3" 2.00 bh Rp. 2,050,000.00 Rp. 4,100,000.00
7.2.2.8 Foot Valve Dia. 3" 3.00 bh Rp. 1,800,000.00 Rp. 5,400,000.00
7.2.2.9 Accsesories 1.00 lot Rp. 10,000,000.00 Rp. 10,000,000.00
7.2.3 Priming Tank Kap. 100lt 1.00 bh Rp. 10,500,000.00 Rp. 10,500,000.00
7.2.4 Sand Filter Kap. 120ltr/menit 1.00 bh Rp. 22,000,000.00 Rp. 22,000,000.00
7.2.5 Multimedia Filter Kap. 250 ltr/det 1.00 bh Rp. 22,000,000.00 Rp. 22,000,000.00
7.2.6 Pipa Transfer PN 10 Dia. 2,5" 40.00 m' Rp. 260,000.00 Rp. 10,400,000.00
-
7.3 Instalasi Suply Air bersih - Rp. 15,045,000.00
7.3.1 Pipa Tegak PN 10 Riser Lt. 1 - Lt.2 -
7.3.1.1 Dia. 2" 6.00 m' Rp. 235,000.00 Rp. 1,410,000.00
7.3.2 Reducer Tee dos 2,5 x 1,5" 1.00 bh Rp. 325,000.00 Rp. 325,000.00
7.3.3 Gate Valve -
7.3.3.1 Dia. 1" 1.00 bh Rp. 550,000.00 Rp. 550,000.00
7.3.4 Fitting dan acesories 1.00 lot Rp. 250,000.00 Rp. 250,000.00
-
7.3.5 Pipa Tegak PN 10 Riser Lt. 2 - Lt.3 -
7.3.5.1 Dia. 2" 6.00 m' Rp. 235,000.00 Rp. 1,410,000.00
7.3.6 Reducer Tee dos 2,5 x 1,5" 2.00 bh Rp. 325,000.00 Rp. 650,000.00
7.3.7 Gate Valve -
7.3.7.1 Dia. 1" 2.00 bh Rp. 550,000.00 Rp. 1,100,000.00
7.3.8 Fitting dan acesories 1.00 lot Rp. 250,000.00 Rp. 250,000.00
-
7.3.9 Pipa Tegak PN 10 Riser Lt. 3 -Atap -
7.3.9.1 Dia. 2" 30.00 m' Rp. 235,000.00 Rp. 7,050,000.00
7.3.10 Reducer Tee dos 2,5 x 1,5" 2.00 bh Rp. 350,000.00 Rp. 700,000.00
7.3.11 Gate Valve -
7.3.11.1 Dia. 1" 2.00 bh Rp. 550,000.00 Rp. 1,100,000.00
7.3.12 Fitting dan acesories 1.00 lot Rp. 250,000.00 Rp. 250,000.00
-
EE ME ( PLUMBING ) Hal - 26
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
SUB PEKERJAAN : SISTIM INSTALASI PLUMBING
KOTA : GORONTALO
TAHUN : 2009
EE ME ( PLUMBING ) Hal - 27
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
SUB PEKERJAAN : SISTIM INSTALASI PLUMBING
KOTA : GORONTALO
TAHUN : 2009
EE ME ( PLUMBING ) Hal - 28
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
SUB PEKERJAAN : SISTIM INSTALASI PLUMBING
KOTA : GORONTALO
TAHUN : 2009
EE ME ( PLUMBING ) Hal - 29
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
BAGIAN : PETIR
KOTA : GORONTALO
TAHUN : 2009
HARGA Jumlah Harga
No. Uraian Pekerjaan Volume
SATUAN
8.1.1 Antena UHF " IKUSI" SG - 2169/14 set Rp. 1,640,000.00 Rp. Rp. - Rp. - Rp. -
8.1.2 Antena VHF "IKUSI" INT - 070 set Rp. 1,250,000.00 Rp. Rp. - Rp. - Rp. -
8.1.3 ( Parabola 80cm ) set Rp. 2,800,000.00 Rp. Rp. - Rp. - Rp. -
8.1.4 Decoder Receiver INDOVISION/TELKOMVISION unit Rp. 2,600,000.00 Rp. Rp. - Rp. - Rp. -
8.1.5 DVD Player unit Rp. 1,800,000.00 Rp. Rp. - Rp. - Rp. -
8.1.6 DSB AGILE Modulator unit Rp. 4,600,000.00 Rp. Rp. - Rp. - Rp. -
8.1.7 Single Chanel Amplifier unit Rp. 3,528,000.00 Rp. Rp. - Rp. - Rp. -
8.1.8 Power Supply unit Rp. 4,200,000.00 Rp. Rp. - Rp. - Rp. -
8.1.9 Basc plate 9 modules unit Rp. 1,800,000.00 Rp. Rp. - Rp. - Rp. -
8.1.10 Housing 18 modules unit Rp. 3,950,000.00 Rp. Rp. - Rp. - Rp. -
8.1.11 Coaxial bridge bh Rp. 105,000.00 Rp. Rp. - Rp. - Rp. -
8.1.12 Tap - off 4 way 30 dB bh Rp. 1,250,000.00 Rp. Rp. - Rp. - Rp. -
8.2.1 TAP - OFF / SPLITTER 4 way bh Rp. 381,000.00 Rp. Rp. - Rp. - Rp. -
8.2.2 TAP - OFF / SPLITTER 2 way bh Rp. 180,000.00 Rp. Rp. - Rp. - Rp. -
8.2.3 Booster unit Rp. 4,750,000.00 Rp. Rp. - Rp. - Rp. -
8.2.4 Antena TV wall outlett bh Rp. 120,000.00 Rp. Rp. - Rp. - Rp. -
8.2.5 Coaxial Cable RG - 11 m' Rp. 21,500.00 Rp. Rp. - Rp. - Rp. -
8.2.6 Coaxial Cable RG - 6 m' Rp. 11,500.00 Rp. Rp. - Rp. - Rp. -
8.2.7 Conector RG 11 bh Rp. 15,000.00 Rp. Rp. - Rp. - Rp. -
8.2.8 Conector RG 6 bh Rp. 8,000.00 Rp. Rp. - Rp. - Rp. -
8.2.9 Conduit PVC Hight Impact btg Rp. 10,500.00 Rp. Rp. - Rp. - Rp. -
8.2.10 Fitting dan accsesories ls Rp. 900,000.00 Rp. Rp. - Rp. - Rp. -
8.3.1 Setting Adjustment "Head End " Equip Paket 1 paket Rp. 3,500,000.00 Rp. Rp. - Rp. - Rp. -
8.3.2 Instalasi penyambungan ttk Rp. 100,000.00 Rp. Rp. - Rp. - Rp. -
### 8.4 Testing & Commissioning 1.00 LS Rp. 3,000,000.00 Rp. Rp. 3,000,000.00 Rp. - Rp. 3,000,000.00
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
PROYEK : PEMBANGUNAN GEDUNG KANTOR BPK-RI PERWAKILAN PROVINSI GORONTALO
PEKERJAAN : MEKANIKAL ELEKTRIKAL
SUB PEKERJAAN : AC
KOTA : GORONTALO
TAHUN : 2009
HARGA Jumlah Harga
No. Uraian Pekerjaan Volume SATUAN Bahan + Upah
2.1.1 Instalasi AC 1 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 3.00 Unit Rp. 1,550,000.0 Rp.
dan accsesories. -
-
2.1.2 Instalasi AC 1,5 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 6.00 Unit Rp. 2,300,000.0 Rp.
dan accsesories. -
-
2.1.3 Instalasi AC 2 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 14.00 Unit Rp. 2,300,000.0 Rp.
dan accsesories. -
-
2.1.4 AC SPLIT WALL 1 PK lengkap pemipaan &refrigerant 3.00 Unit Rp. 5,400,000.0 Rp.
dan dudukan AC -
-
2.1.5 AC SPLIT WALL 1,5 PK lengkap pemipaan &refrigerant 6.00 Unit Rp. 6,900,000.0 Rp.
dan dudukan AC -
-
2.1.6 AC SPLIT WALL 2 PK lengkap pemipaan &refrigerant 14.00 Unit Rp. 7,900,000.0 Rp.
dan dudukan AC
Rp.
2.2 LANTAI 02 Rp.
2.2.1 Instalasi AC 1 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 4.00 Unit Rp. 1,550,000.0 Rp.
dan accsesories. -
-
2.2.2 Instalasi AC 1,5 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 1.00 Unit Rp. 2,300,000.0 Rp.
dan accsesories. -
-
2.2.3 Instalasi AC 2 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 13.00 Unit Rp. 2,300,000.0 Rp.
dan accsesories. -
-
2.2.4 AC SPLIT WALL 1 PK lengkap pemipaan &refrigerant 4.00 Unit Rp. 5,400,000.0 Rp.
dan dudukan AC -
-
2.2.5 AC SPLIT WALL 1,5 PK lengkap pemipaan &refrigerant 1.00 Unit Rp. 6,900,000.0 Rp.
dan dudukan AC -
-
2.2.6 AC SPLIT WALL 2 PK lengkap pemipaan &refrigerant 13.00 Unit Rp. 7,900,000.0 Rp.
dan dudukan AC
2.3.1 Instalasi AC 1 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 2.00 Unit Rp. 1,550,000.0 Rp.
dan accsesories. -
-
2.3.2 Instalasi AC 2 Pk lengkap dengan conduit, kabel NYY 3x2,5mm 16.00 Unit Rp. 2,300,000.0 Rp.
dan accsesories. -
-
2.3.3 AC SPLIT WALL 1 PK lengkap pemipaan &refrigerant 2.00 Unit Rp. 5,400,000.0 Rp.
dan dudukan AC -
-
2.3.4 AC SPLIT WALL 2 PK lengkap pemipaan &refrigerant 16.00 Unit Rp. 7,900,000.0 Rp.
dan dudukan AC
Jumlah Harga
Bahan + Upah
565,550,000.00
218,850,000.00
4,650,000.00
-
-
13,800,000.00
-
-
32,200,000.00
-
-
16,200,000.00
-
-
41,400,000.00
-
-
110,600,000.00
-
169,600,000.00
6,200,000.00
-
-
2,300,000.00
-
-
29,900,000.00
-
-
21,600,000.00
-
-
6,900,000.00
-
-
102,700,000.00
Jumlah Harga
Bahan + Upah
177,100,000.00
3,100,000.00
-
-
36,800,000.00
-
-
10,800,000.00
-
-
126,400,000.00
6.1.1 Antena UHF " IKUSI" SG - 2169/14 1.00 set Rp. 1,640,000.00 Rp. 1,640,000.00
6.1.2 Antena VHF "IKUSI" INT - 070 1.00 set Rp. 1,250,000.00 Rp. 1,250,000.00
6.1.3 ( Parabola 80cm ) 1.00 set Rp. 2,800,000.00 Rp. 2,800,000.00
6.1.4 Decoder Receiver INDOVISION/TELKOMVISION 1.00 unit Rp. 2,600,000.00 Rp. 2,600,000.00
6.1.5 DVD Player 1.00 unit Rp. 1,800,000.00 Rp. 1,800,000.00
6.1.6 DSB AGILE Modulator 1.00 unit Rp. 4,600,000.00 Rp. 4,600,000.00
6.1.7 Single Chanel Amplifier 1.00 unit Rp. 3,528,000.00 Rp. 3,528,000.00
6.1.8 Power Supply 1.00 unit Rp. 4,200,000.00 Rp. 4,200,000.00
6.1.9 Basc plate 9 modules 1.00 unit Rp. 1,800,000.00 Rp. 1,800,000.00
6.1.10 Housing 18 modules 1.00 unit Rp. 3,950,000.00 Rp. 3,950,000.00
6.1.11 Coaxial bridge 1.00 bh Rp. 105,000.00 Rp. 105,000.00
6.1.12 Tap - off 4 way 30 dB 1.00 bh Rp. 1,250,000.00 Rp. 1,250,000.00
6.2.1 TAP - OFF / SPLITTER 4 way 1.00 bh Rp. 381,000.00 Rp. 381,000.00
6.2.2 TAP - OFF / SPLITTER 2 way 1.00 bh Rp. 180,000.00 Rp. 180,000.00
6.2.3 Booster 4.00 unit Rp. 4,750,000.00 Rp. 19,000,000.00
6.2.4 Antena TV wall outlett 10.00 bh Rp. 120,000.00 Rp. 1,200,000.00
6.2.5 Coaxial Cable RG - 11 100.00 m' Rp. 21,500.00 Rp. 2,150,000.00
6.2.6 Coaxial Cable RG - 6 100.00 m' Rp. 11,500.00 Rp. 1,150,000.00
6.2.7 Conector RG 11 10.00 bh Rp. 15,000.00 Rp. 150,000.00
6.2.8 Conector RG 6 10.00 bh Rp. 8,000.00 Rp. 80,000.00
6.2.9 Conduit PVC Hight Impact 50.00 btg Rp. 10,500.00 Rp. 525,000.00
6.2.10 Fitting dan accsesories 1.00 ls Rp. 900,000.00 Rp. 900,000.00
6.3.1 Setting Adjustment "Head End " Equip Paket 1 1.00 paket Rp. 3,500,000.00 Rp. 3,500,000.00
6.3.2 Instalasi penyambungan 10.00 ttk Rp. 100,000.00 Rp. 1,000,000.00