You are on page 1of 7
ACCEPTANCE TEST CERTIFICATE FOR C & R PANEL ‘CERTIFICATE NO. DPL/20/RAYP/AT-101 | DATE OF ISSUE: 10.09.2020 NAME OF CLIENT: H/S RAYS 'PROSECT: TOMW (Ac) SO_AR PY PLANT POWER INFRA, [IMUTNALFUR SAMARANFUR UP (NDIA, DRAWING NO.: 3443 (Sh.-1 TO 47) DETAIL OF EQUIPMENT: 152KV LINE CONTROL & RELAY PANEL PANEL SERIAL NO. 2020545, 1, MISWAL CHECK: visual Check for overal Finish of Pane, Mimic, Layout of ‘Component, Ferule No, at both end of wires, Rating and Make of Component as per ‘approved drawings / Technical Specifications etc, and Found satistactory. 2, NAME PLATE EIXING & ALIGNMENT: Hiome Plate and their Fixing End alignment check for all component and found satisactory. 3, VERIFICATION OF DIMENSION: Verification of Dimensions and sheet thickness of contrat ‘nd relay panel Checked and found alistactory ac per approved drawing no.3443, 2h-3 to 7, ‘SR. [Description] Granted Value in Observed Sheet thickness In mm NO. mm 1 Front 2.50. 252 2 Sides 12.50 — 281 3. Rear Door | 2.50 252 a. Door Frame | 2.50 251 5 Base/Botton | 2.50 2:80 ‘SR. [Description | Granted Value in| Observed Value in mm NO. ci rs : L HEIGHT 2312 (22104102) | 2312 (2104102) 2 WIDTH, 1000 1001 3 DEPTH ‘300 [300 4. BASE STAND | 102 102 4. VERIFICATION OF BILL OF MATERIAL: Verification of Bill of materal as per approved Craving no.-3483 sh, 8489 checked for their makes and quantity and found saisatory 5. VERIFICATION OF COLOR SHADE & THICKNESS: Verification of color shade of control ‘and relay pane! as per approved drawing and found color shade RAL 7032 Tor outside and White for inside and black for bottom portion and found satisfactory. Thickness of powder {Coating checked and found mare than 80 microns as a guaranteed va we, SR.NO, | Description Paint thickness in Micron 1 Rear sae 90, 90 = 2 Sides ‘90, 90, 80, 90 3.____|Front ‘90, 90, 90" = 4 ‘Average Thickness (Micron) — 6. HIGH VOLTAGE TEST: Checked High Voltage Test at 2.0 KY for 1 minute at all contol ‘wing 7.8’ shorted together and with respect to panel Body earth and found no Flashover. 7. IBLIESL: Checked Insulation Test between all control wiring and ane body with SO0V’ ‘magger and value found satisfactory. “SR.NO._| Description IR Vale in WORM = ra Before HV Test (2KV, 1 Min.) | >100 & ‘After HV Test (2KV, 1Min.) “| >100 8. EARTH CONTINUITY TEST: Checked Continuity test with eespect to al earth wiring by Continuity tester and continuity found satisfactory an same wiring 9. DOOR LOCKING ARRANGEMENT CHECK: Checked door locking and gasket arrangement for control and relay panel and Operation of door locks found satisfactory. 10. SCHEME TEST | Checked Scheme Test and their operation and found ~ OK Checked Power circut and found ~ OK ‘Checked Control Circult and found - OK ‘Checked Metering Circuit by injected secondary Current ané voltage at | {heir terminal and found operotive + Checked Protection Relay Gre by injected secondary current andsecondery PT Voltages and all relay found operative ‘Checked Aux. relays Circuit through given 110V OC supply and found operative, {Checked AC/DC Cireut through inject AC/OC supply at proper termnal and checked all fuse circuit thraugh remove fuses one by one and found OK + Checked Mechanical Operation of Switches and Relays and found satisfactory operation. ‘VENDOR: H/S Danish Pvt hd, | INSPECTED BY: INSPECTED GY: Jaipur NAME: ARVIND KUMAR Me, RAHUL PATEL Mr, ANAND DESHPANDE ‘SR. PROJECT ENGINEER ASSOCIATE MANAGER ELECTRICAL PROJECT CONSTRUCTION & MANAGEMENT Bool | SIGNATURE: SIGNATURE: SIGNATURE: F S80 SRT TET PH IAPR, OIE OTA “Toue assts-sucaon fa 6 98143 5660s ena info@sanish.co.inveb, wwrw.danish.co.in Page: 2 of 2 danish ACCEPTANCE TEST CERTIFICATE FOR C & R PANEL [CERTIFICATE NO.: DPL/20/RAVP/AT-102 NAME OF CLIENT: M/S RAYS POWER INFRA. DRAWING NO.: 3444 (Sh.-1 TO 50) ie DETAIL OF EQUI PANEL SERIAL NO. 2020346, DATE OF TSSUE: 10.09.2020 ;PRODECT: 7OMW (AC) SOLAR PV PLANT HHUTMALPUR SAHARANPUR UP (INDIA) ‘000000367, BT. 14.04.2020, (ENT:_139KV TRANSFORMER CONTROL 8 RELAY PANEL — 1, MASUAL CHECK: Visual Check for overall Finish of Panel, Mimic, Layout of, Component, Ferrule No. at both end of wires, Rating and Nake of Component as per approved drawings / Technical Speciications etc. and Found satisfactory, 2. MAME PLATE EDUNG & ALIGNMENT: Name Plate and thelr Fixing and alignment check for ‘all component ana found satistactory. 3. VERIFICATION OF DIMENSION: Verification of Dimensions and sheet thickness of control ‘and relay panel Checked and found satisfactory as per approved drawng no.3444, sh-3 to 7 ‘Description | Granted value in| Goservea Sheet thiexness in mim Front 2.50 ca 2:50 252 2:50 2:52 2.50 51 2:50 51 Description [Granted Value in] Observed Value in mm HEIGHT 2312 (22102102) | 2312 (2210102) wioTs 1000. [ooo DEPTH 00 ‘300 BASE STAND | 102 102 4, VERIFICATION OF BILL OF MATERIAL: Verification of Bill of mater al as per approved ‘rawing no. 3444 sh, 8 8.9 checked for their makes and quantity and found satisfactory. : Verification of color shade of contol ‘and relay panel 8s per approved drawing and found color shade RAL 7032 for outside and White for inside and black for bottom portion and found satisfactory. Thickness of powder coating checked and found more than 80 microns as a guaranteed vakie. ‘SR.NO, | Description Paint thickness in Wieron 1 Rear “[100, 90, B Sides 30, 100, 6, 50 3 jt 90, 90, 90 = [4 Taverage Thickness (wieron) — [92 ws Page: 1 of 2 ©. HIGH VOLTAGE TEST: Checked High Voltage Test at 2.0 KV for 1 minute at all contrat waiting T.8.'s shorted together and with respect to panel body earth and found no Flashover. 7. IBLIEST: Checked insulation Test between all control wiring and rane! body with S00v| ‘magger and value found satisfactory SRNO._ | Description TR Value in M Of 1. Before HV Test (2KV, 1 Min.) | >100, 4 2 ‘After HV Test (2KV, 1Min.) “| >100 —— 8. EARTH CONTINUITY TEST: Checked Continuity test with respect to all earth wiring by Continuly tester and continuity found satisfactory on same wiring 9. DOOR LOCKING ARRANGEMENT CHECK: Checked door locking and gasket arrangement for control and relay panel and Operation of door locks found satisfactory. 10. SCHEME TEST. ‘Checked Scheme Test and their operation and found ~ OK CChecked Powter crcut and found - OK {Checked Contra Circuit and found ~ OK checked Metering Circuit by injected secondary Current and voltage at ther terminal and found operative, + Checked Protection Relay ercut by injected seconary current andsecondary PT Voltages and all relay found operative + Checked Aux. relays Circuit through given 110V OC supply and found operative, Checked AC/OC Circuit through inject AC/OC supply at proper termnal and ‘checked all use circuit through remove fuses one by one and found -OK + Checked Mechanical Operation of Switches and Relays and found satisfactory operation. ‘TERGOR: RUE Dah Pa PECTED SPEED Secraca faosce conemction sod sions sicnarine FB Sapir TLR FA, IAPR, TORE OTR oie aet4ssuosson race at-t4t 64801 ena info@sanish.co,inweo; wwrw.danish.co.in Page: 2 0f 2 Aanish ACCEPTANCE TEST CERTIFICATE FOR C & R PANEL [CERTIFICATE NO. DPL/2O/RAYPIA NAME OF CLIENT: M/S RAYS POWER INFRA, 103 DATE OF ISSUE! 10.09.2020 >RODECT: 7OHW (AC) SOLAR PY PLANT HHUTHALPUR SAHARANPUR UP (INDIA), 5000000367, OT 14.08.2020, DRAWING NO.: 3444 (Sh.-1 TO 50) DETAIL OF EQUIPMENT: 132KV TRANSFORMER CONTROL & RELAY PANEL PANEL SERIAL NO.! 2020347 41, MESUAL CHECK: Visual Check for overall Finish of Panel, Mimic, Layout of Component, Ferule No. at both end of wires, Rating and Make of Component as per approved drawings / Technical Specfications etc. and Found satisfactory 2, NAME PLATE EIXING & ALIGNMENT: lame Plate and thelr Fixing and alignment check for ‘ilcomponent an found satisfactory 3, VERIFICATION OF DIMENSION: Verification of Dimensions and sheet thickness of control | and relay panel Checked and found satisfactory as per approved drawing no.3444, sh-3 to 7. SR. [Bescon | Granted Value i] Observed Sheet thickness i rie No. ° mm 1, [Front 250 251 2 [siaes 2:50 251 3._[Rear Door [2:50 252 4 4. | Boor Frame | 2:50 251 5. Base/Bottom [2:50 pi = SR. [Description] Granted Value in | Observed Value in mm NO. mm 1 HEIGHT 2312 (2210F103) | 9512 (22107102) 2 [wots {1000 1001 3. [DEPTH ‘800 —{s00 = 4. [BASE STAND_[ 102 102 4. VERIFICATION OF BILL OF MATERIAL: Verification of Bill of materal as per approved raving no.-3464 sh. 8&9 checked for their makes and quantity and found satisfactory, 5. VERIFICATION OF COLOR SHADE & THICKNESS: Vercation of color shade of contro! ‘and relay pane! as per approved drawing and found color shade RAL 7032 for outside and white for inside and black for bottom portion and found satisfactory. Thickness of powder Coating checked and found more than 80 microns as 8 quarantesd value. 'SR.NO._| Description aint thickness in Nicron L Rear {30,80 2 ‘Sides ‘90, 80, 90, 80 3 Front 90, 90, 80 4 ‘Average Thickness (Micron) | 86 = = Page: 1 of 2 — ‘HIGH VOLTAGE TEST: wiring T-B’ shorted together and with respect Co panel body earth and feuné no Flashover 7. IRLIESL: Checked insulation Test between all control wiring end ponel body with S00V| ‘megger and value found satisfactory. ‘SR.NO. | Description: 1. Before HY Test (2KV, 1 Min 2. ‘After HV Test (2KV, 1Min.) 8. RARTH CONTINUITY TEST: Checked Continuity test with respect toll earth wiring by |” continuity tester and continuity found satisfactory on samewiing, 9. DOOR LOCKING ARRANGEMENT CHECK: Checked door locking anc gasket arrangement for control and relay panel and Operation of door locks found satisfactory. 10. SCHEME TEST ‘Checked Scheme Test and their peration and found - OK Checked Power cuit and found" OK ‘Checked Control Circuit and found - OK Checked Matering Crcut by injected secondary Current and voltage at their terminel and found operative. + Checked Protection Relay ercult by injected secondary current andsecondary Dr'valtages and ail relay found operative + Checked Aux, relays Circuit through given 110V OC supply and found operative. ‘Checked AC/DC Circult through inject AC/DC supply at proper termnaland checked al fuse circuit through remove fuses ane By one and found “OX + Checked Mechanical Operation of Switches and Relays and found satisfactory operation VENDOR: M/S Danish PvE TRG. INSPECTED BY: INSPECTED BY! daipur NAME: ARVIND KUMAR, Mr, RAHUL PATEL Hc, ANAYD DESHPANDE ‘SR, PROJECT ENGINEER ASSOCIATE MANAGER ELECTRICAL PROJECT CONSTRUCTION & NN MANAGEMENT SIGNATURE! SIGNATURE: SIGHATIRE: Tele 9-141s169500 foe # 9-141-169801 ema iMfo@danish.co.in web: www.danish.co.in Page: 2 of 2 danish Private Limited DETAILS OF INSTRUMENTS USED DURING ACCEPTANCEIROUTINE TEST OF CONTROL & RELAY PANELS. ‘Se Particulars of Make Sr-No.of Name of Date of No. Equipment used (Manufacturer Equipment Calibation Calibration During testing Name) Agerey 1. Power System Simulator OMICRON KoasT cal 17.10.2018 Tester 2. HN. Breakdown (Flash) AGRONIC eFE-02 csi 16.03.2020 Tester 3. Insulation Tester Meco 2025 cal 12.08.2020 4. Outside Micro Meter mrTuTovo, 37089861 c&l_—=—(20.09.2010 5. Digat clamp meter KUSAMMECO Teazas = GB zuuM.ZuTY 6 Digital Coating Thickness Microprocessor N734057 CBI 27.12.2019 Meter 7. Measuring Tape siroco DPuMTot — c8i_——20009.2019 TESTED BY Sok NEDA fcaen thence nase oa

You might also like