Professional Documents
Culture Documents
facebook.com/360OnlineTutorial
L/B
h/B
0.1 0.5 0.65 1 2 Greater than or equal 3.00
Less than or equal 0.50 1.4 1.45 1.55 1.4 1.15 1.1
Wind
10 1.55 1.85 2 1.7 1.3 1.15
Greater than or equal 40.00 1.95 2.5 2.8 2.2 1.6 1.25
Elevation
Height h = 96 ft
Length L = 338 ft
Breadth B = 78 ft
h/B = 1.23
L/B = 3.00
Cp = 1.104
L
h B
Plan
WIND LOAD ANALYSIS
Short direction:
Pz = Cc x Ci x Cz x Cg x Cp x (Vb)2
Velocity of wind, Vb 195 km/hour
Cc = 4.72E-05
Ci = 1
Cp = 1.273
Cg (For Exposure A) = 1.3850 Table 6.2.11 BNBC
Cg (For Exposure B) = 1.1780 Table 6.2.11 BNBC
Pz = Cc x Ci x Cz x Cg x Cp x (Vb)2
Velocity of wind, Vb 195 km/hour
Cc = 4.7E-05
Ci = 1
Cp = 1.55
Cg (For Exposure A) = 1.3850
Cg (For Exposure B) = 1.1780
Pz (lb/ft²)
0.00
54.82
59.27
66.53
72.21
77.00
81.11
84.73
72.29
74.76
77.07
80.55
83.64
86.51
89.15
93.93
98.15
101.97
105.45
108.71
111.69
114.50
117.15
119.68
122.04
124.34
126.48
128.56
130.58
132.49
136.15
139.57
142.83
145.87
148.79