2 Civil Rehabilitation
Drawing for Primary
Clarifier Phase I (D003) C-1624-
01-CI- DWG-1001-18
Rehabilitation Drawing for Primary Clarifier Phase I R4
All line sizes and MOC of equipment’s shall be updated as per comments given on
BEP-rev-0.
CH2m 2nd Comments: Noted
Decommission and demolish the existing flocculator arrangement. Provide external
flocculator as per comments given on BEP- rev-0.
Provide levels after approval of hydraulic flow diagram. CH2m 2nd Comments:
Provide as per comments in revision 2
CH2m 3rd Comments: Noted
CH2M 6th Comment (18 Nov): Ch2M 5th comment was missing in Contractor reply.
Please do not delete the comments. As per 15 Nov meeting at Taloja MIDC office,
contractor to provide walkway for primary clarifier phase-I as per NIT.
NA Closed
Ok Revised Closed
Ok Revised Closed
Ok Revised Closed
Ok Revised Closed
Ok Revised Closed
Confirmed Closed
Ok Confirmed Closed
KDC-AQUA Reply on 3rd comment:
Please note that, we have submitted existing drawing of primary clarifier
for reference. Proposed civil explains the possible modification in
existing structure.
Extension of top of wall for PU wheel shall be provided up to Closed
400 mm. 1200 mm walking platform around the tank is not possible for
construction since the tank is existing.
KDC-AQUA reply to 3rd comment:
1. Please note that this is existing structure of more than 20 years old.
extension of platform on current structure is not feasible.
KDC-AQUA reply to 4th comment:
Kindly note that provision of 1200mm walkway is not possible for this
existing structure. This has been discussed and cleared during MIDC
meeting
For access to tank, we are providing RCC stair with standing platform. Closed
For access Operator need to wait till mechanism reaches to standing
platform. then he has to climb the scraper mechanism platform.
Since existing wall thickness is 250 mm only, to rotate the mechanism
with PU wheel, we are increasing the wall thickness at top on both side
by 75 mm. (total width of wall at top is 400 mm) This is marked in the
drawing already.
2. Reference Drawings are already marked in the drawing.