You are on page 1of 9

Replies to comments on Civil Rehabilitation Drawing for Primary Clarifier Phase I R4

Item Doc.Page/Clause Referencew


No No.

2 Civil Rehabilitation
Drawing for Primary
Clarifier Phase I (D003) C-1624-
01-CI- DWG-1001-18
Rehabilitation Drawing for Primary Clarifier Phase I R4

Consultant (CH2M) Comments

Contractor to ensure GA are revised as per BEP


comments.
CH2m 2nd Comments: Noted
Contractor to note this GA is not in line with BEP discussion hence complete
mechanical Details have not been reviewed.
CH2m 2nd Comments: NA

All line sizes and MOC of equipment’s shall be updated as per comments given on
BEP-rev-0.
CH2m 2nd Comments: Noted
Decommission and demolish the existing flocculator arrangement. Provide external
flocculator as per comments given on BEP- rev-0.

Please specify section marking in plan. CH2m 2nd Comments: Noted

Flash mixer shall be revised as per comments given on BE Prev- 0.


CH2m 2nd Comments: Noted
Provide and represent scum removal mechanism.
CH2m 2nd Comments: Noted
Provide details of adjustable weirs as per NIT.
CH2m 2nd Comments: Noted
Provide 1.2 m width of walkway as per NIT.
CH2m 2nd Comments: Not seen in sectional view.
CH2M 4th Comment: Refer below for similar comments

Provide MOC of scraper mechanism as SS316 as per NIT.


CH2m 2nd Comments: Noted

Dimensions of existing structures are as per actual dimensions measured by


contractor. Please Confirm
CH2m 2nd Comments: Noted

Provide levels after approval of hydraulic flow diagram. CH2m 2nd Comments:
Provide as per comments in revision 2
CH2m 3rd Comments: Noted

The structure is currently operational. Any modification or changes after detailed


assessment shall be incorporated.
Afterwards the drawing will be reviews and approved. CH2m 3rd Comments:
Contractor to update on changes
or modification required for satisfactory operation of unit
CH2M 4th Comment: Noted
CH2m 3rd Comments:
1200 mm walkway with hand rail around the tank is required. Reference drawing
not marked
CH2M 4th Comment
1200 mm walkway with hand rail around the tank is required to remove algae and
other debris from weir, launder and surface of clarifier. This is done twice a week.
The arrangement suggested by Contractor is not workable.
Contractor is required to rehabilitate and upgrade the existing structure
(rehabilitate existing primary treatment but in very bad conservation situation Refer
Clause 2.3.1 of Volume 2 Technical Specification) Design Life of
rehabilitated/upgraded structure should confirm to as specified in Clause 1.1.4 of
Volume 2 Technical Specification

CH2M 5th Comment (12 Nov):


Not providing so is deviation to tender requirement. The wait will be very long
(approx. 2.5 hrs) from O & M point of view and emergency if any. The speed of
rotating bridge is 0.039 RPM as per mechanical GA-C- 1624-01- ME- DWG-1001-05.
During MIDC meeting it was discussed to provide multiple platforms for
maintenance of Primary clarifier.
CH2M Comment (09.01.20): As per below points the comment is closed.

CH2M 6th Comment (18 Nov): Ch2M 5th comment was missing in Contractor reply.
Please do not delete the comments. As per 15 Nov meeting at Taloja MIDC office,
contractor to provide walkway for primary clarifier phase-I as per NIT.

CH2M 6th Comment (18 Nov):


The surface loading rate of proposed deign is more than
35 m3/m2/d (As given in NIT) which is not acceptable. Also, check the weir loading
rate.
Contractor to go with already approved drawing in R2. Comments on RCC drawings
submitted on 19th Nov follows.
CH2M Comment (09.01.20): As per below points the comment is closed.

CH2M 6th Comment (20 Nov);


The current SOR is 35.4 m3/m2/d which is more than NIT, but as the structure is
existing this is acceptable. As per NIT Walkway width shall be of 1200 mm, although
due to construction and space constraint the proposed walkway of 1000 mm is
accepted.
Please check velocity in sludge pipe as it very low. (~0.05m/s).
Ensure safe maintenance of central clarifier motor. CH2M Comment (09.01.20):
Noted
CH2M 7th Comment (4 Dec);
The comment that was deleted in replies.
Ensure safe maintenance of central clarifier motor. Contractor to ensure to do
changes if any due to change in RCC drawings.
CH2M Comment (09.01.20): Noted

CH2M Comment (09.01.20): There is a mismatch between Civil GA and RCC


drawings. The sludge collection sump shall be updated.
Please update the civil and mechanical GA.
Consultant (CH2M)
Contractor Reply Descision
(Open/Closed)
Ok Revised Closed

NA Closed

Ok Revised Closed

Ok Revised Closed

Ok Revised Closed

Ok Revised Closed

Ok Revised Closed

Already provided notch for adjusting weir Closed

Already provided Open


Reply to 4th Comment: Please refer reply below

Already provided Closed

Confirmed Closed

Revised HFD submitted Revised as per HFD Closed

Ok Confirmed Closed
KDC-AQUA Reply on 3rd comment:
Please note that, we have submitted existing drawing of primary clarifier
for reference. Proposed civil explains the possible modification in
existing structure.
Extension of top of wall for PU wheel shall be provided up to Closed
400 mm. 1200 mm walking platform around the tank is not possible for
construction since the tank is existing.
KDC-AQUA reply to 3rd comment:
1. Please note that this is existing structure of more than 20 years old.
extension of platform on current structure is not feasible.
KDC-AQUA reply to 4th comment:
Kindly note that provision of 1200mm walkway is not possible for this
existing structure. This has been discussed and cleared during MIDC
meeting

For access to tank, we are providing RCC stair with standing platform. Closed
For access Operator need to wait till mechanism reaches to standing
platform. then he has to climb the scraper mechanism platform.
Since existing wall thickness is 250 mm only, to rotate the mechanism
with PU wheel, we are increasing the wall thickness at top on both side
by 75 mm. (total width of wall at top is 400 mm) This is marked in the
drawing already.
2. Reference Drawings are already marked in the drawing.

There is no change in Drawing, we submitted last revision


KDC-AQUA reply to comment: Please Note that Civil Rehabilitation
Drawing for Primary Clarifier Phase I (D003) has been Revised as per
MIDC Engineer & Structural Consultant comments .

Reply to 6th Comment: Open


Platform provided as per MIDC meeting.

Reply to 6th Comment: There is no change in the earlier design we Closed


submitted. SLR remains same as mentioned in the PDC document. All
process parameters remains as per PDC document approved.

Reply to 6th Comment: Closed


Since, tank is old, sludge pipe below cannot be replaceable. Outside,
pump suction maintain the velocity for sludge flow.
We ensure the safe maintenance of central clarifier
Ok, noted. Closed

Ok drawing is done as per RCC drawing Open

Replies to comment: Already submitted the revised Civil GA on dated