P{rt -A 2 Marks
1 .Whrt is Vacuum concrcte?$ovlftg 2?14
Only about half of the water Bddcd in concrete go€s iDto chemical combination
and the remaining water is us€d to makc concrete workable. After laying concretc,
water which was making concreting workable is extracted by a special method
known as "vacuunr rnethod",
W z'ttz -
5 whrt arc thcst{ges in dry mlx procels in shotcrete? + \n zay)
i In this Proccss. lhc cotrcrctc is ltixed with water ss for ordirary conirete before
conveying througl] rhe delivery pipeline to the nozzle, at which point it is jettcdby
conrpressed air, onto thc rvork in thc same way as that if mix process,
ii 'lhc rver process has b0en generally desircd in favour.of the dry mix process,
owing to lhe groalrr succcss ofthe lattcr,
Buildings where chemicals have been stored or where asbeslos, lead pdint, dust or
fumes may be present will require specialized protective clothing, :
t
1
I
12. Write short notes on demolitio[ by hand.
Den)olilion of buildings o. by hand-held lools such as electric or
"t*"rur"
pneumatic breakers, sometimes as a preliminary to using
other methods, should be
carried out, where practicable, in the rcve$e order to the original
constluctioD sequence.
Lifting appliqnces may be necessary to hold larger structural members iuring cuning
and
tbr lowering levered slructrtral mcmbers and other debris ,
15. How are explosives used for demolition of a structure? $or loc:.,r,tJ
Ifexplosives are to be used for demolition, the planning and execution, include pre-
rveakening, shoutd be under lhe control of a person competent in these techniques.
For
large demolition. the competent person is likely to be an experienced explosive engineer;
for smaller work. a shot-lirer nray be sufficient.
I
stmctural elements and remove thosF new redundant. This preweakening is essentially a
planned exercise and must be
ireceded by an analysis of its possible effects on the
structure until it collapses, to ensure that the structuml integrity of the building
i
is not
jeopardized accidentally. Insufficient infrirmation and plaming
rclating to lhe structure
may result in dangerous and unsafe work.
The strategy *ill need to lake into account the method ofconstruction used for the
original building and its proximity to other buildings. suuctures and the general public.
These factors, togeth;r with localion, the cost and availabiliry oftipping
and disposal and
the desirability and eionomr'cs ofreuse, musr be taken into account
in rhe developmenl of
arl appropriate strategy for the demolition ofa structure.