You are on page 1of 26

EXCAVADORA 411 [PILAS][MAYO 2020]

HOROMETRO
REPORT HRS OPERATIVO
FECHA TURNO OPERADOR INICIAL FINAL TOTAL OBSERVACION DIESEL EXTRA JT (FIRMA) CHEK LIST (LO MALO) O F/S

A 0
1-May
B 0.0
A 0.0 0
2-May
B 0.0
A 0.0 0
3-May
B 0.0 0
A 0.0 0
4-May
B 0.0 0
A 0.0 0
5-May
B 0.0 0
A 0.0 0
6-May
B 0.0 0
A 0.0 0
7-May
B 0.0 0
A 0.0 0
8-May
B 0.0 0
A 0.0 0
9-May
B 0.0 0
A 0.0 0
10-May
B 0.0 0
A 0.0 0
11-May
B 0.0 0
A 0.0 0
12-May
B 0.0 0
A 0.0 0
13-May
B 0.0 0
A 0.0 0
14-May
B 0.0 0
A 0.0 0
15-May
B 0.0 0
A 0.0 0
16-May
B 0.0 0
A 0.0 0
17-May
B 0.0 0
A 0.0 0
18-May
B 0.0
A 0.0 0
19-May
B 0.0 0
A 0.0 0
20-May
B 0.0 0
A 0.0 0
21-May
B 0.0 0
A 0.0 0
22-May
B 0.0 0
A 0.0 0
23-May
B 0.0 0
A 0.0 0
24-May
B 0.0 0
A 0.0 0
25-May
B 0.0 0
A 0.0 0
26-May
B 0.0
A 0.0 0
27-May
B 0.0
A 0.0 0
28-May
B 0.0
A 0.0 0
29-May
B 0.0
A 0.0 0
30-May
B 0.0
A 0.0 0
31-May
B 0.0 0
TOTAL HORAS EXTRA 0
TOTAL HORAS MES 0
TOTAL DIESEL 0.0

HORAS ESTEBAN CHAVEZ 0


HORAS LUIS HIDALGO 0
HORAS RUDY PINTO 0
HORAS DAMIAN CESPEDES 0
TOTAL 0
EXCAVADORA 412 [PATIO ACOPIO][MAYO 2020]
HOROMETRO
HRS
REPOR CHEK LIST (LO OPERATIVO
FECHA TURNO OPERADOR INICIALFINAL TOTAL OBSERVACION DIESELEXTR JT (FIRMA) O F/S
T N° A
MALO)
A JUAN ALFARO 9260 9271 0 APILADO DE RIPIO PILA 8 7495 431 11
1-May
B JUAN ACOSTA 9271 9282 0 APILADO DE RIPIO PILA 8/ DISPERSAR COVER 7496 11
A JUAN ALFARO 9282 9292 0 APILADO DE RIPIO PILA 8 7497 463 10
2-May
B JUAN ACOSTA 9292 9303 0 APILADO DE RIPIO PILA 8 7498 11
A JUAN ALFARO 9303 9314 0 APILADO DE RIPIO PILA 8 7499 469 11
3-May
B JUAN ACOSTA 9314 9325 0 APILADO DE RIPIO PILA 8 7500 11
A JUAN ALFARO 9325 9328 0 CARGUIO DE COVER EN PILA 6 A PILA 8 7101 298 3
4-May
B JUAN ACOSTA 9328 9338 0 APILADO DE RIPIO PILA 8 7102 10
A JUAN ALFARO 9338 9344 0 APILADO DE RIPIO PILA 8 7103 319 6
5-May
B JUAN ACOSTA 9344 9355 0 APILADO DE RIPIO PILA 8 7104 11
A 9355 -9355
6-May
B 0 0
A 0 0
7-May
B 0 0
A 0 0
8-May
B 0 0
A 0 0
9-May
B 0 0
A 0 0
10-May
B 0 0
A 0 0
11-May
B 0 0
A 0 0
12-May
B 0 0
A 0 0
13-May
B 0 0
A 0 0
14-May
B 0 0
A 0 0
15-May
B 0 0
A 0 0
16-May
B 0 0
A 0 0
17-May
B 0 0
A 0 0
18-May
B 0 0
A 0 0
19-May
B 0 0
A 0 0
20-May
B 0 0
A 0 0
21-May
B 0 0
A 0 0
22-May
B 0 0
A 0 0
23-May
B 0 0
A 0 0
24-May
B 0 0
A 0 0
25-May
B 0 0
A 0 0
26-May
B 0 0
A 0 0
27-May
B 0 0
A 0 0
28-May
B 0 0
A 0 0
29-May
B 0 0
A 0 0
30-May
B 0 0
A 0 0
31-May
B 0 0
HORAS EXTRA 95
TOTAL HORAS MES -9355

HORAS RAMON LARRODO


HORAS ALIRO CONTRERAS
HORAS GERMAN PALLERO
HORAS RODRIGO LEYTON
CAMION TOLVA 4
FACTOR 24 FACTOR

ALMEJA A PILAS RIPIO PILAS


HOR VIAJES
HRS HORA
REPOR AS DE TONEL
FECHA TURNO OPERADOR T N° DIESEL EXTR TON/HR S
ALM ALMEJ ADAS
A RIPIO
EJA A
A FRANKLIN PINTO 7901 215 0 0 5
S 1-May
B 0 0
A FRANKLIN PINTO 7902 200 0 0
D 2-May
B 0 0
A FRANKLIN PINTO 7903 102 0 0 7
L 3-May
B 0 0
A FRANKLIN PINTO 7904 187 0 0
M 4-May
B 0 0
A 0 0
X 5-May
B 0 0
A 0 0
J 6-May
B 0 0
A 0 0
V 7-May
B 0 0
A 0 0
S 8-May
B 0 0
A 0 0
D 9-May
B 0 0
A 0 0
L 10-May
B 0 0
A 0 0
M 11-May
B 0 0
A 0 0
X 12-May
B 0 0
A 0 0
J 13-May
B 0 0
A 0 0
V 14-May
B 0 0
A 0 0
S 15-May
B 0 0
A 0 0
D 16-May
B 0 0
A 0 0
L 17-May
B 0 0
A 0 0
M 18-May
B 0 0
A 0 0
X 19-May
B 0 0
A 0 0
J 20-May
J 20-May
B 0 0
A 0 0
V 21-May
B 0 0
A 0 0
S 22-May
B 0 0
A 0 0
D 23-May
B 0 0
A 0 0
L 24-May
B 0 0
A 0 0
M 25-May
B 0 0
A 0 0
X 26-May
B 0 0
A 0 0
J 27-May
B 0 0
A 0 0
V 28-May
B 0 0
A 0 0
S 29-May
B 0 0
A 0 0
30-May
B 0 0
A 0 0
31-May
B 0 0
0 0 0 0 12

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
ION TOLVA 401 MAYO 2020]
38 FACTOR 38 FACTOR 38 1
RIPIO PILAS COBER PILAS RAJO NORTE
HORA VIAJE
VIAJE HOR
TONELAD TON/H S S TONELAD TON/H VIAJES TON./ HRS
S AS AS AS TON. HR. EFECTIV
R COBE COBE R RN
RIPIO RN
R R
15 570 114 2 8 304 152 0 0 7
0 0 0 0 0 0 0
0 0 0 0 9 4 152 16.889 9
0 0 0 0 0 0 0
25 950 135.714 2 8 304 152 0 0 9
0 0 0 0 0 0 0
0 0 0 0 8 4 152 19 8
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0.0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0.0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0.0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0.0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0.0 0
0 0 0 0 0 0.0 0
0 0 0 0 0 0.0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
40 1520 4 16 608 8 35.889 33

0 0

0 0
HRS
RESERV HRS TOTAL
STAND
A
TALLE
HRS
OBSERVACION
BY R

1 1 9 DE PILA 24 A PILA 8/RIPIO DE PILA 6 A PILA 8/ COVER DE PILA 24 A LA 8


RIPIO
0
1 10 RN
0
1 10 RIPIO DE PILA 23 A PILA 8/ COVER DE PILA 23 A PILA 8
0
1 1 10 RN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
CHEK LIST (LO MALO)

VER DE PILA 24 A LA 8

CAMION PRESENTA PROBLEMA EN CRUCETA, QUEDA FUERA DE SERVICIO


CAMION TOLVA 402 (71) MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33
ALMEJA A PILAS RIPIO PILAS COBER PILAS
HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS HRS
REPOR AS DE TONEL TONELAD TON/H S S TONELAD TON/H RESERV
FECHA TURNO OPERADOR DIESEL EXTR TON/HR S S EFECT STAND TALL TOTAL HRS OBSERVACION CHEK LIST (LO MALO)
T N° ALM ALMEJ ADAS AS R COBE COBE AS R IV BY
A
ER
A RIPIO RIPIO
EJA A R R
A IVAN CODOCEO 7751 101 0 0 3 10 330 110 6 18 594 99 9 1 10 COVER DE PILA 24 A PILA 8/ COVER DE PILA 23 A PILA 8/ RIPIO DE PILA 6 A PILA 8
S 1-May
B 0 0 0 0 0 0 0 0
A IVAN CODOCEO 7752 71 0 0 10 21 693 69.3 0 0 10 10 RIPIO DE PILA 24 A PILA 8/ TIEMPOS DE ESPERA DE 1 HORA ENTRA CARGA Y DESCARGA
D 2-May
B 0 0 0 0 0 0 0 0
A IVAN CODOCEO 7754 95 1 6 144 144 5 18 594 118.8 0 0 6 1 3 10 RIPIO DE PILA 23 A PILA 8/ CONO A PILA 16 CAMION SUFRE DESPERFECTO EN DIFERENCIAL, QUEDA FS
L 3-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
M 4-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
X 5-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0.0 0 0
S 8-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0.0 0 0
L 10-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
X 12-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
M 18-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
X 19-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
J 20-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
S 29-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0
1 6 144 2.322581 18 49 1617 6 18 594 2 3 30

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 403 (77) MAYO2020]
FACTOR 24 FACTOR 33 FACTOR 30 FACTOR 30

ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE


HORA VIAJES HORA
HRS HORA HRS TOT
REPO S DE TONEL VIAJES TONELAD TON/H S VIAJES TONELAD TON/H HORA VIAJES TON./H HRS HRS
RESER
FECHA TURNO OPERADOR RT N° DIESEL EXTR TON/HR S TON. EFEC STAND TALL AL OBSERVACION CHEK LIST (LO MALO)
ALME ALMEJ ADAS RIPIO AS R COBE COBER AS R S RN RN R. TIV BY
VA
ER HRS
A RIPIO
JA A R
A ROBERTO ARAYA 8130 139 0 0 5 15 495 99 4 9 270 67.5 0 0 9 1 10 RIPIO DE PILA 24 A PILA 8/ COVER DE PILA 23 A PILA 8
S 1-May
B JONATHAN BELT 8131 0 0 7 18 594 84.8571 0 0 0 0 7 3 10 RIPIO DE PILA 24 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
A ROBERTO ARAYA 8132 125 0 0 10 24 792 79.2 0 0 0 0 10 10 RIPIO DE PILA 24 A PILA 8
D 2-May
B JONATHAN BELT 8133 0 0 9 24 792 88 0 0 0 0 9 1 10
RIPIO DE PILA 24 A PILA 8/ RIPIO DE PILA 23 A PILA 8 / STANDBY POR REPARACION DE ACCESOS
A ROBERTO ARAYA 8135 150 0 0 8 25 825 103.125 1 4 120 120 0 0 9 1 10 RIPIO DE PILA 23 A PILA 8
L 3-May
B JONATHAN BELT 8137 0 0 9 23 759 84.3333 0 0 0 0 9 1 10 PILA 23 A PILA 8/ RIPIO DE PILA 6 A PILA 8 / STANDBY POR REPARACION DE ACCESOS
RIPIO DE
A ROBERTO ARAYA 8138 120 8 22 528 66 1 3 99 99 0 0 0 0 9 9 ALMEJA A PILA 16/ RIPIO DE PILA 23 A PILA 8
M 4-May
B JONATHAN BELT 8139 0 0 9 24 792 88 0 0 0 0 9 9 RIPIO PILA 23 A PILA 8
A ROBERTO ARAYA 8140 100 8 28 672 84 1 4 132 132 0 0 0 0 9 1 10 ALMEJA A PILA 16/ RIPIO DE PILA 23 A PILA 8
X 5-May
B JONATHAN BELT 8141 0 0 9 28 924 102.667 0 0 0 0 9 1 10 RIPIO DE PILA 23 A PILA 8
A 0 0 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 8-May
B 0 0 0 0 0 0.0 0 0 0 0
A 0 0.0 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0.0 0 0 0 0
L 10-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 12-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 18-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 19-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 20-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 29-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0 0 0
16 50 1200 2.4 68 188 6204 5 13 390 0 0 0 9 0 98

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 405 MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33 FACTOR 32

ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE


HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS TOT
REPOR AS DE TONEL TONELAD TON/H S S TONELAD TON/H HORA VIAJE TON./H RESERV HRS
FECHA TURNOOPERADOR T N° DIESEL EXTR TON/HR S S TON. EFECTI STAND TALLE AL OBSERVACION CHEK LIST (LO MALO)
ALM ALMEJ ADAS AS R COBE COBE AS R S RN S RN R.
V BY
A R HRS
A RIPIO RIPIO
EJA A R R
A ESTEBAN ROJO 7612 140 0 0 3 11 363 121 2 4 132 66 2 1 32 16 7 2 1 10 RN/ COVER DE PILA 24 A PILA 8/ RIPIO DE PILA 6 A PILA 8 CAMBIO DE NEUMATICO
S 1-May
B MIGUEL ROJAS 7613 0 0 7 19 627 89.5714 0 0 0 0 7 3 10 DE PILA 24 APILA 8/ STANDBY POR REPARACION DE ACCESOS
RIPIO
A ESTEBAN ROJO 7614 160 0 0 5 12 396 79.2 0 0 4 2 64 16 9 1 RN /10
RIPIO DE PILA 24 APILA 8/ STANDBY POR REPARACION DE ACCESOS
D 2-May
B MIGUEL ROJAS 7615 191 0 0 0 0 0 0 9 5 160 17.7778 9 1 10 RN
A ESTEBAN ROJO 7616 147 0 0 0 0 0 0 6 3 96 16 6 4 10 CAMBIO DE NEUMATICO EN RN P10
L 3-May
B MIGUEL ROJAS 7617 0 0 8 23 759 94.875 0 0 0 0 8 2 RIPIO DE PILA 10
24 APILA 8/ RIPIO DE PILA 6 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
A ESTEBAN ROJO 7619 101 6 22 528 88 3 3 99 33 0 0 0 0 9 1 10
ALMEJA A PILA 16/ ALMEJA A PILA 15/ RIPIO DE PILA 23 A PILA 8
M 4-May
B MIGUEL ROJAS 7620 0 0 9 24 792 88 0 0 0 0 9 1 10 RIPIO DE PILA 23 A PILA 8
A ESTEBAN ROJO 7621 100 1 6 144 144 7 20 660 94.2857 0 0 0 0 8 2 10 RIPIO DE PILA 23 A PILA 8/ ALMEJA A PILA 16
X 5-May
B MIGUEL ROJAS 7622 0 0 9 30 990 110 0 0 0 0 9 1 10 RIPIO DE PILA 23 A PILA 8
A 0 0 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 8-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 10-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 12-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
M 18-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0.0 0 0 0 0.0 0 0
X 19-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
J 20-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 29-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0 0 0
7 28 672 3.741935 51 142 4686 2 4 132 21 11 352 14 5 100

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 408 MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33 FACTOR 32
ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE
HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS HRS TOT
REPOR AS DE TONEL TONELAD TON/H S S TONELAD TON/H HORA VIAJE TON./H RESERV TALLE
FECHA TURNO OPERADOR T N° DIESEL EXTR TON/HR S S TON. EFECTI STAND AL OBSERVACION CHEK LIST (LO MALO)
ALM ALMEJ ADAS AS R COBE COBE AS R S RN S RN R.
V BY
A R HRS
A RIPIO RIPIO
EJA A R R
A GERMAN PALLER 8498 150 0 0 3 5 165 55 0.5 2 66 132 0 0 3.5 5.5DE PILA 23 A PILA 8/ RIPIO DE
RIPIO 9 PILA 24 A PILA 8/ SE REEMPLAZA PARA COLACION AJUAN ALFARO, SE OPERA CARGADOR DE MTV 15:30 A 19:30
S 1-May
B FELIPE ARAYA 8499 0 0 7 19 627 89.5714 0 0 0 0 7 3 10 RIPIO DE PILA 24 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
A GERMAN PALLER 8500 102 0 0 9 18 594 66 0 0 0 0 9 1 10 23 A PILA 8/ RIPIO DE PILA 24 A PILA 8/ SE REEMPLAZA PARA COLACION AJUAN ALFARO
RIPIO DE PILA
D 2-May
B FELIPE ARAYA 7701 0 0 9 23 759 84.3333 0 0 0 0 9 1 10 PILA 24 A PILA 8/ RIPIO DE PILA 23 A LA 8 / STANDBY POR REPARACION DE ACCESOS
RIPIO DE
A GERMAN PALLER 7702 140 0 0 9 18 594 66 1 3 99 99 0 0 10 1023 A PILA 8/ COVER DE PILA 23 A PILA 8 / SE REEMPLAZA PARA COLACION AJUAN ALFARO
RIPIO DE PILA
L 3-May
B FELIPE ARAYA 7703 0 0 10 24 792 79.2 0 0 0 0 10 10 RIPIO DE PILA 23 A PILA 8/ RIPIO DE PILA 6 A PILA 8
A GERMAN PALLER 7704 100 3 7 168 56 1 3 99 99 2 9 297 148.5 0 0 6 6 APILA15/ ALLMEJA A PILA 16/ COVER DE PILA 6 A PILA / RIPIO DE PILA 23 A PILA 8
ALMEJA
M 4-May
B FELIPE ARAYA 7705 0 0 9 23 759 84.3333 0 0 0 0 9 9 RIPIO DE PILA 23 A PILA 8
A GERMAN PALLER 7706 100 8 37 888 111 2 5 165 82.5 0 0 0 0 10 10 ALMEJA A PILA 16/ RIPIO DE PILA 23 A PILA 8
X 5-May
B FELIPE ARAYA 7707 0 0 9 30 990 110 0 0 0 0 9 9 RIPIO DE PILA 23 A PILA 8
A 0 0 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 8-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 10-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 12-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0.0 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
M 18-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0.0 0 0 0 0.0 0 0
X 19-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
J 20-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0 0 0
A
S 29-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0 0 0
11 44 1056 2.737705 68 168 5544 3.5 14 462 0 0 0 10.5 0 93

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 409 MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33 FACTOR 32

ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE


HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS HRS TOT RIPIO A
REPOR AS DE TONEL TONELAD TON/H S S TONELAD TON/H HORA VIAJE TON./H RESERV
FECHA TURNO OPERADOR T N° DIESEL EXTR TON/HR S S TON. EFECT STAND TALLE AL OBSERVACION CAMINO CHEK LIST (LO MALO)
ALM ALMEJ ADAS AS R COBE COBE AS R S RN S RN R.
IV BY
A
R HRS S
A RIPIO RIPIO
EJA A R R
A JOSUE LOPEZ 7541 430 0 0 0 0 0 0 10 5 160 16 10 10 RN
S 1-May
B YERCO GONZALE 7542 233 0 0 0 0 0 0 9 5 160 17.7778 9 1 10 RN
A JOSUE LOPEZ 7543 116 0 0 2 7 231 115.5 0 0 6 3 96 16 8 1 1 10 RN/ RIPIO DE PILA 24 A PILA 8 CORTE DE ABRAXDERA DE ESTANQUE HIDRAULICO DE TOLVA.
D 2-May
B YERCO GONZALE 7544 0 0 10 23 759 75.9 0 0 0 0 10 10 RIPIO DE PILA 23 A PILA 8
A JOSUE LOPEZ 7545 230 0 0 3 5 165 55 0 0 6 3 96 16 9 1 10 RIPIO DE PILA 24 A PILA 8/ RN
L 3-May
B YERCO GONZALE 7546 137 0 0 1 4 132 132 0 0 6 3 96 16 7 7 RIPIO DE PILA 23 A PILA 8/ RN
A JOSUE LOPEZ 7547 157 0 0 0 0 0 0 8 4 128 16 8 8 RN SE INTALA ABRAZADERA DE ESTANQUE REPARADA
M 4-May
B YERCO GONZALE 7548 205 0 0 0 0 0 0 9 5 160 17.7778 9 9 RN
A JOSUE LOPEZ 7549 156 0 0 0 0 0 0 9 4 128 14.2222 9 1 10 RN
X 5-May
B YERCO GONZALE 7550 200 0 0 0 0 0 0 9 5 160 17.7778 9 1 10 RN
A 0 0 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
S 8-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 10-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0 10.5 10.5
A 0 0 0 0 0 0 0 0 0 0 1
X 12-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
M 18-May
B 0 0 0 0.0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0.0 0 0
X 19-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
J 20-May
B 0 0 0 0.0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0.0 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 29-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0 0 0 RIPIO DE PILA 24 A PILA 8
A 0 0 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0 0 0
0 0 0 0 16 39 1287 0 0 0 72 37 1184 5 1 104.5 1

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor también


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 410 MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33 FACTOR 32

ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE


HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS TOT
REPOR AS DE TONEL TONELAD S S TONELAD HORA VIAJE TON./H RESERV HRS
FECHATURNO OPERADOR T N° DIESEL EXTR TON/HR S S TON/HR TON/HR TON. EFECTI STAND TALLE AL OBSERVACION CHEK LIST (LO MALO)
ALM ALMEJ ADAS AS COBE COBE AS S RN S RN R.
V BY
A R HRS
A RIPIO RIPIO
EJA A R R
A JUAN CELIS 8082 144 0 0 5 15 495 99 4 9 297 74.25 0 0 9 1 RIPIO DE PILA 24 A10
PILA 8/ COVER DE PILA 23 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
S 1-Apr
B MAURICIO NUÑE 8083 0 0 8 18 594 74.25 2 4 132 66 0 0 10 10 RIPIO DE PILA 24 A PILA 8/ COVER DE PILA 8 A PILA 8
A JUAN CELIS 8084 144 0 0 9 22 726 80.6666666667 1 4 132 132 0 0 10 10 RIPIO DE PILA 24 A PILA 8/ COVER DE PILA 24 A PILA 8
D 2-Apr
B MAURICIO NUÑE 8085 0 0 10 25 825 82.5 0 0 0 0 10 10 RIPIO DE PILA 24 A PILA 8/ RIPIO DE PILA 23 A PILA 8
A JUAN CELIS 8086 150 0 0 8 21 693 86.625 1 4 132 132 0 0 9 1 10 RIPIO DE PILA 23 A PILA 8/ COVER DE PILA 23 A PILA 8
L 3-Apr
B MAURICIO NUÑE 8087 0 0 10 22 726 72.6 0 0 0 0 10 10 RIPIO DE PILA 23 A PILA 8/ RIPIO DE PILA 6 A PILA 8
A JUAN CELIS 8088 110 9 23 552 61.33333 1 2 66 66 0 0 0 0 10 10
ALMEJA APILA 16/ ALMEJA A PILA 15/ RIPIO DE PILA 23 A PILA 8
M 4-Apr
B MAURICIO NUÑE 8089 0 0 9 24 792 88 0 0 0 0 9 9 RIPIO DE PILA 23 A PILA 8
A 0 0 0 0 0 0 0 0 0 0
X 5-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 6-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 8-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 9-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 10-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 12-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 13-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-Apr
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
D 16-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-Apr
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
M 18-Apr
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0.0 0 0 0 0.0 0 0
X 19-Apr
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
J 20-Apr
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 22-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 29-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-Apr
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
B 0 0 0 0 0 0 0 0 0 0
9 23 552 0.989247 60 149 4917 8 21 693 0 0 0 2 0 79

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
CAMION TOLVA 413 MAYO 2020]
FACTOR 24 FACTOR 33 FACTOR 33 FACTOR 32 1
ALMEJA A PILAS RIPIO PILAS COBER PILAS RAJO NORTE
HOR VIAJES HORA VIAJE
HRS HORA VIAJE HRS HRS TOT
REPOR AS DE TONEL TONELAD S S TONELAD TON/H HORA VIAJE TON./H RESERV HRS
FECHA TURNO OPERADOR T N° DIESEL EXTR TON/HR S S TON/HR TON. EFECTI STAND TALLE AL OBSERVACION CHEK LIST (LO MALO)
ALM ALMEJ ADAS AS COBE COBE AS R S RN S RN R.
V BY
A R HRS
A RIPIO RIPIO
EJA A R R
A LUIS GUERRA 7659 0 0 0 0 0 0 8 4 128 16 8 1 1 10 RN CAMBIO DE NUEMATICO
S 1-May
B CRISTOPHER VIL 7660 0 0 9 19 627 69.6666667 0 0 0 0 9 1 10RIPIO DE PILA 24 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
A LUIS GUERRA 7661 150 0 0 9 21 693 77 0 0 0 0 9 1 10RIPIO DE PILA 24 A PILA 8/ STANDBY POR REPARACION DE ACCESOS
D 2-May
B CRISTOPHER VIL 7662 0 0 10 23 759 75.9 0 0 0 0 10 10 RIPIO DE PILA 23 A PILA 8
A LUIS GUERRA 7663 130 0 0 0 0 0 0 7 4 128 18.2857 7 3 10 DE NEUMATICO, ENGRASE, REGULACION DE FRENOS, SOPLADO DE FILTROS
CAMBIO
L 3-May
B CRISTOPHER VIL 7664 0 0 0 0 0 0 2 1 32 16 2 8 10
PROBELAM EN VALVULA NEUMATICO P11 QUEDA FUERA DE SERVICIO
A LUIS GUERRA 7665 90 0 0 1 3 99 99 4 10 330 82.5 0 0 5 5 10 DE PILA 6 A PILA 8/CAMION STANBY POR NO HABER CARGUIO DE RIPIO
COVER
M 4-May
B CRISTOPHER VIL 7666 0 0 10 24 792 79.2 0 0 0 0 10 10 RIPIO DE PILA 23 A PILA 8
A FRANKLIN PINTO 7667 238 0 0 0 0 0 0 8 4 128 16 8 8 RN
X 5-May
B CRISTOPHER VIL 7608 165 0 0 0 0 0 0 9 4 128 14.2222 9 1 10 RN (SE ACABA MINERAL EN ULTIMA VUELTA)
A 0 0 0 0 0 0 0 0 0 0
J 6-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 7-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 8-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 9-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 10-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 11-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 12-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 13-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 14-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 15-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
D 16-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 17-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0.0 0 0 0 0 0 0
M 18-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0.0 0 0 0 0.0 0 0
X 19-May
B 0 0 0 0 0 0 0 0.0 0 0
A 0 0 0 0 0 0 0 0.0 0 0
J 20-May
B 0 0 0 0.0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 21-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 22-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
D 23-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
L 24-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
M 25-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
X 26-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
J 27-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
V 28-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
S 29-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
30-May
B 0 0 0 0 0 0 0 0 0 0
A 0 0 0 0 0 0 0 0 0 0
31-May
B 0 0 0 0 0 0 0 0 0 0
0 0 0 0 39 90 2970 4 10 330 34 17 544 2 9 98

TOTAL HORAS
HORAS SEMANA 8 AL 13 ABRIL 0 0 0 0
VIAJES 8 AL 13 ABRIL
TONELADAS 8 AL 13 ABRIL 0 0 0 0

estar revisando aceite motor tambien


revisar y estar echando agua (se calienta
no usar marchas impares (se sospecha puede ser sincronizadores malos)
RESUMEN PRODUCCION SEMANA DEL 29 DE ABRIL AL 4 DE MAYO 2020
HRS TOTAL SEM 144
HORAS XTRA FACTOR 24 DIESEL 532 FACTOR 33 38 FACTOR 33 38
BUZON, VIAJES HORAS HORAS HORAS
HORAS HRS VIAJES VIAJES
EQUIPO STAND BY SAL, ALMEJ TON EFECTIV TON/HR DIESEL TON EFECTIV TON/HR DIESEL TON EFECTIV TON/HR DIESEL
TALLER RESERVA RIPIO COBER
LIMPIEZA A AS AS AS
C401 2 6 4 0 0 0 #DIV/0! 0.0 40 1520 12 126.7 156 16 608 4 152.0 52.0
C402 3 6 10 6 144 1.5 96 9.6 71 2343 28 83.7 178.4 20 660 7 94.3 44.6
C403 0 12 10 72 1728 21 82.3 133.8 206 6798 77 88.3 490.6 18 594 7 84.9 44.6
C408 0 12 8 7 168 2 84.0 11.7 133 4389 56 78.4 328.7742 14 462 4 115.5 23.5
C410 0 12 7 87 2088 23 90.8 141.7 192 6336 78 81.2 480.5357 28 924 11 84 67.8
C409 Apoyo 1 12 5 0 0 0 #DIV/0! 0.0 58 1914 24 79.8 328.4051 0 #DIV/0! 0.0
C405 Apoyo 5 12 11 34 816 9 90.7 127.1 112 3696 44 84.0 621.5 4 132 2 66 28.3
C413 Apoyo 9 12 12 35 840 10 84.0 141.3 115 3795 48 79.1 678 17 561 6 93.5 84.8
TOTALES 5 48 67 172 4128 47.5 88.0 296.8 700 21386 275 91.6 1634 117 3248 41 106.1 232.5
24000
RESUMEN TOTAL TRABAJO EN PLANTA (PILAS)
TOTAL
TOTAL
EQUIPO VIAJES TON DIESEL DIESEL/HR TON/HRS
HORAS
MOVIDO
C401 56 2128 208 13.0 16 133
C402 97 3147 324 8.9 36.5 86.2192
C403 296 9120 669 6.4 105 86.8571
C408 154 5019 364 5.9 62 80.9516
C410 307 9348 690 6.2 112 83.4643
C405 Apoyo 58 1914 1081 13.7 79 24.2278
C409 Apoyo 150 4644 1090 19.8 55 84.4364
C413 Apoyo 167 5196 904 14.1 64 81.1875
TOTALES 910 28,762 5330 11.0 331.5 86.763

RAJO NORTE FACTOR 33 38


VIAJES
HORAS HRS TOTAL
EQUIPO
TALLER RESERVA
STAND BY RAJO TON HORAS TON/HR
HORAS
DIESEL DIESEL/HR
NORTE
401 2 6 4 8 304 17 17.9 17 1970 115.9
405 5 12 11 24 792 45 17.6 45 1970 43.8
409 1 12 5 28 924 54 17.1 54 1970 36.5
413 9 12 12 16 528 30 17.6 30 1980 66.0

TOTALES 17 42 32 76 2548 146 17.5 146 7890 18.3


ESTADO DE PAGO N°7 MARZO 2020]
HORA CAMION 28000 Valor Diesel (c/ I.esp) 532 3 USD RAJO PLANTA
HORA EXCAVADORA 45000 Valor Diesel (S/ I.esp) 438 2095 OP3 PLANTA
VALOR TON 730
HORAS EXTRA
EQUIPO VIAJES PILAS HORAS PILAS HORAS RIPIO(OTROS) VALOR TOTAL $ 180 POR TONELADA DE LA EXCAVADORA
401 (78) 0 0 0 $0
402 (71) Err:509 Err:509 Err:509 Err:509
403 (77) #REF! #REF! #REF! #REF!
405 (48) #REF! #REF! #REF! #REF! 89874.99 FEBRERO
407 (57) 0 0 0 $0 80806 MARZO 89871 TON febrero
408 (37) #REF! #REF! #REF! #REF! 80842 marzo
409 (42) #REF! #REF! #REF! #REF!
410 (90) #REF! #REF! #REF! #REF!
413 #REF! #REF! #REF! #REF!
TOTAL CAMIONES #REF! Err:509 #REF! Err:509
411 (pilas) 0 0 $0 4800 5.368827246798
412 (patio) -9355 95 $4,275,000
HORAS EXTRA CAMIONES #REF! #REF!
HORAS EXTRA EXC 95 $4,275,000
TONELADAS MENSUAL 80,842 $59,014,660 80842 TON
DESCUENTO ALIMENTACION $3,530,750
DESCUENTO DIESEL CAMIONES $23,533,813 44236.49 LTS 44236.49 CAMIONES
DESCUENTO DIESEL EXCAVADORA $7,982,252 18224.32 LTS 894.05 FURGON
DESCUENTO DIESEL CAMIONETAS $878,348 1651.03 LTS 1651.03 CAMIONETAS
DESCUENTO DIESEL FURGON $475,635 894.05 LTS 10457.59 EXC 411
7766.73 EXC 412

TOTAL #REF!
RETENCION 5% #REF!

TOTAL NETO A FACTURAR #REF!


IVA #REF! 316531
TOTAL FACTURA #REF!

TOTAL (forma correcta) #REF!


RETENCION 5% #REF!

TOTAL NETO A FACTURAR #REF!


IVA #REF!
TOTAL FACTURA #REF!
PROMEDIO VIAJES DIARIO RAJO NORTE A LA FECHA

CONSUMO COMBUSTIBLE PILAS


CONSUMO COMBUSTIBLE CUMBRES

TRABAJO EN PILAS
TONELAD GASTO VIAJES
LITROS/
EQUIPO AS APROX HORAS PETROL CUMBRE
HORA
PILAS EO S
1 402 Err:509 Err:509 Err:509 Err:509 Err:509
2 403 #REF! #REF! #REF! #REF! #REF!
3 405 #REF! #REF! #REF! #REF! #REF!
4 408 #REF! #REF! #REF! #REF! #REF!
5 409 #REF! #REF! #REF! #REF! #REF!
6 410 #REF! #REF! #REF! #REF! #REF!
7 413 #REF! #REF! #REF! #REF! #REF!
Err:509 Err:509 Err:509 Err:509

TRABAJO EN CUMBRES
TONELAD GASTO VIAJES
LITROS/
EQUIPO AS APROX HORAS PETROL CUMBRE
HORA
PILAS EO S
402 0 0 Err:509 Err:509 Err:509
403 #REF! #REF! #REF! #REF! #REF!
405 #REF! #REF! #REF! #REF! #REF!
408 #REF! #REF! 5578 #REF! #REF!
409 #REF! #REF! #REF! #REF! #REF!
410 #REF! #REF! #REF! #REF! #REF!
413 #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! Err:509
178500

PILAS
HORAS DISPON
HORAS
STAND IBILIDA
F/S
BY D

LLEGA FAENA LUNES 9 MARZO


0 0

UMBRES
HORAS DISPON
HORAS
STAND IBILIDA
F/S
BY D
0 0
FECHA : LUNES 30 DE MARZO DE 2020
Nº EQUIPO DISPONIBILIDAD
0 CAMION 400 STAND BY
1 CAMION 402 OPERATIVO
2 CAMION 403 OPERATIVO
3 CAMION 405 OPERATIVO
4 CAMION 408 OPERATIVO
5 CAMION 409 OPERATIVO
6 CAMION 410 OPERATIVO
7 CAMION 413 OPERATIVO
1 EXCAV. 411 OPERATIVA
2 EXCAV. 412 OPERATIVA
DETALLES
CAMION DISPONIBLE PARA CARGIO SOLO EN PLATAFORMA

EN REPARACION PAQ. RESORTE

DE VUELTA DIA MIERCOLES 18 MARZO turno b

CAMBIAR CALZAS