Check List for Mainteance Fire Fighting BG/QA/CL-307/13


System Rev :00

Project:
Date
Status
S.no Inspection required Intial Remarks
Inspected Not inspected
B FIRE FIGHTING

1 Pipe Material & Sizes

2 Fire Sprinklers

3 Pressure test of Main Line Loop

4 Riser Support

5 Fire Hose Reel / Landing Valves

6 Fire Hose Cabinet Connections

7 Inspection Test Connection

8 Zone Control Valve assembly

Interface of Fire Pumps, Control


9 Valves, Flow Switches & Tamper
Sitches with FACP

10 Pressure Testing

11 Flushing connection

12 Red oxide Painting

Inspected by: Name Signature Date