Professional Documents
Culture Documents
Report
of the
Advisory
Committee
August 2002
Advisory Committee
Imagine the possibilities. . .
In September 2001, Maryland Department of Transportation Secretary John D. Porcari appointed 23 a system of fast, convenient and
elected, civic, business, transit and community leaders from throughout the Baltimore region to reliable rail lines running throughout
serve on The Baltimore Region Rail System Plan Advisory Committee. He asked them to recommend the region, connecting all of life's
a Regional Rail System long-term plan and to identify priority projects to begin the Plan's implemen- important activities.
tation. This report summarizes the Advisory Committee's work. Imagine being able to go just about everywhere you
really need to go…on the train. 21 colleges, 18 hospitals,
Co-Chairs 16 museums, 13 malls, 8 theatres, 8 parks, 2 stadiums,
and one fabulous Inner Harbor. You name it, you can
get there. Fast. Just imagine the possibilities of Red,
Mr. John A. Agro, Jr. Ms. Anne S. Perkins Green, Blue, Yellow, Purple, and Orange – six lines, 109
Senior Vice President Former Member
miles, 122 stations. One great transit system.
We can get there. Together.
EarthTech, Inc. Maryland House of Delegates
Building a system of rail lines for the Baltimore region
will be a challenge; no doubt about it. But look at
Members Atlanta, Boston, and just down the parkway in
Washington, D.C. They did it. So can we.
Mr. Mark Behm The Honorable Mr. Joseph H. Necker, Jr., P.E.
Vice President for Finance & Dean L. Johnson Vice President and Director of It won't happen overnight. But we start with a plan.
Administration Mayor* Engineering Bold and visionary… but doable. Piece by piece over
University of Maryland City of Annapolis HRD/The Rouse Company
Baltimore County the next forty years, we will build and fine tune our sys-
tem, expanding from the center. We'll work together to
Mr. Roy Kienitz The Honorable James Ports create a system that is fast and reliable.
Mr. Bruce Campbell
Secretary Republican Whip
Senior Vice President Maryland Department of Planning Maryland House of Delegates
Nottingham Properties This is an enormous challenge, but an even bigger
opportunity. It's a chance to change the way that we get
Mr. Joseph Kocy Dr. Earl Richardson around, the way that we shape our communities, the
Ms. Barbara T. Cutko President
Director way that we relate to one another and connect. New rail
Vice Chairwoman Harford County Department of Morgan State University
Transit Riders League of Planning & Zoning lines will bring new jobs, new opportunities, and a new
Metropolitan Baltimore
Mr. Christopher Ryer
The system is all about giving way to connect regionally. Our region has the beginnings
The Honorable Executive Director * you a choice in how to get to of a first class rail system.
Ms. Carol Filipczak With this plan, we can do
Howard County Public
James E. Malone, Jr. Washington Village-Pigtown work, to school, and to play.
Transportation Board Vice Chairman Neighborhood Planning Council even more!
No more sitting in long lines of traffic on I-95. You're
Baltimore County Delegation
Maryland House of Delegates Ms. Marjorie Slater-Kaplan going 50 miles per hour while everyone else fumes in
Mr. Alfred Foxx the back-up. No more endless circles around crowded
Director President
The Honorable Nathaniel League of Women Voters mall parking lots. No more paying $15 a day to park at
Baltimore City
Office of Transportation McFadden of Baltimore County the Inner Harbor. You can get there and back for $3. If
Budget & Taxation Committee you think traffic is bad on the Beltway now, just imagine
Maryland State Senate
Mr. Donald C. Fry Mr. C. William Struever what it will look like in a few years!
Executive Vice President CEO
Reverend Douglas Miles
Greater Baltimore Committee
Struever Bros. Eccles & Rouse We have the foundation of a rail system in place.
Koinonia Baptist Church
Already, you can get from Owings Mills to downtown
Mr. Michael Iati Ms. Michelle Whelley Baltimore in just 26 minutes. From BWI Airport to
Mr. Robert Moore
Director of Architecture and President downtown in just 27 minutes. Just imagine when our
President Downtown Partnership of Baltimore
Planning Service Employees International
rail system goes to even more places, even faster…to
The Johns Hopkins Hospital Union, Local 1199E-DC Fells Point, Towson, Columbia, Mt. Vernon, and Arundel
Mills. And with better connections…at Penn Station
and Camden Station, in East and West Baltimore, and at
* Affiliation at time of appointment BWI Airport.
5. The rail system must support existing land use and COST
major targeted growth areas. Approximately $12 billion. More precise costs
will be developed as specific projects are planned
6. The rail system must meet the needs of the transit- and engineered.
dependent population.
10. The rail system must attract new riders to transit Robert Moore, President
and contribute to Maryland's goal of doubling Service Employees International Union,
transit ridership. Local 1199E-DC
10 REPORT OF THE ADVISORY COMMITTEE © 1999 BALTIMORE REGION RAIL SYSTEM PLAN 11
Green Line Yellow Line
The Green Line builds upon the existing Metro Subway between Owings Mills and Johns Hopkins In its entirety, the Yellow Line will run 42 miles from Hunt Valley to Columbia through downtown
Medical Campus. The new portion of the Green Line extends to White Marsh, and then via two separate Baltimore and BWI Airport, with up to 46 stations. Two major segments of the Yellow Line already
branches to I-95 and Martin State Airport. The I-95 branch will include a commuter park-and-ride lot exist as part of the Central Light Rail Line, 6 miles from Hunt Valley to Lutherville, and 8 miles from
with direct access to I-95 north of the Beltway. The second branch will extend from White Marsh Camden Yards to BWI Airport. New construction will be needed between Lutherville and Camden
along the MD 43 corridor to Martin State Airport. An additional 17 miles and 14 new stations are Yards in the York Road/Charles Street Corridor, and
needed to complete the Green Line. This line sup- from BWI Airport to Columbia via Arundel Mills
ports Smart Growth by serving established city and Connecting It All Together and the US 1 and MD 175 Corridors. Connecting It All Together
county neighborhoods like Northwood and Overlea, from Madison Square at BWI Airport
and growing communities like White Marsh. It also The northern section of the
Expansion plans at the BWI Airport call for a multi-
connects Baltimore County's two major growth
The initiative to build a biotechnology research Yellow Line will… modal transportation center to be built, connecting
and industrial park in East Baltimore is a major
areas – White Marsh and Owings Mills. ● Create a new 10-mile "Collegetown Corridor" from various points in the airport vicinity with a people-
opportunity for transit-oriented development. The Towson to downtown Baltimore with stops at or mover system. Until such time as the transportation
project could bring as many as 8,000 new jobs to near Goucher College, Towson University, Loyola
The new section of the Green Line will… center and people mover are built, there must
communities near the Madison Square Station. College, College of Notre Dame, Johns Hopkins always remain a direct connection of the rail system
● Serve Morgan State University, a growing presence Serving them all will be the Green Line, with a fast University, Maryland Institute College of Art, to the airport. When the center opens, the Yellow
in Baltimore, rich with cultural heritage and a built- connection to Johns Hopkins Medical Campus, University of Baltimore, and the University of
and Purple Lines, bus service, Maglev, and other
in ridership base of 7,000 students, faculty, and downtown Baltimore and beyond. A quick connection Maryland Baltimore.
forms of ground transportation will all come
staff. The new Murphy Fine Arts Center and to Penn Station along the Purple Line will provide
● Serve diverse neighborhoods like Waverly, together for quick and convenient access to points
Morgan's planned redevelopment of the easy access to BWI Airport, Washington, DC, and
Charles Village, Mt. Vernon, Govans, Rodgers Forge, within BWI Airport and throughout the Baltimore-
Northwood Shopping Plaza as a hospitality and other major cities in the northeast corridor. Stoneleigh, Towson, Lutherville and Timonium. Washington Corridor.
tourism training center will generate additional
walk-up ridership. ● Provide a direct connection between Penn Station
and Charles Center, greatly enhancing access to
● Provide access to thousands of jobs in White
downtown Baltimore for Amtrak and MARC riders.
Marsh and along the MD 43/Middle River
Employment Corridor in Baltimore County.
● Provide a new Inner Harbor Station, immediately
Improved accessibility to these jobs will sustain
adjacent to many Inner Harbor attractions.
development in this corridor and enhance the
region's economic base.
● Provide a fast and convenient transportation The new southern section of the
choice for commuters currently using Interstate 95 Yellow Line will…
from northeastern Baltimore County and Harford
County. A station with direct access to Interstate 95 ● Serve Arundel Mills Mall and other planned
will help ease congestion on this crowded roadway. office and residential development in the MD 100
Corridor in Anne Arundel County. © 1999
● Provide convenient service to existing neighbor-
hoods along Loch Raven Boulevard, Perring ● Support revitalization in Howard County's US 1
Parkway, Harford Road, and Bel Air Road, where a Corridor between Elkridge and Savage, and
high level of transit ridership and potential new improve access to thousands of industrial and Estimated Travel Times (minutes) to
ridership exists. warehousing jobs in the area. Charles Center from:
● Provide a direct connection between Columbia Downtown Towson ...........................................................18
Estimated Travel Times (minutes) to Town Center, the dense mixed-use hub of Howard Belvedere Square .............................................................12
Charles Center from: County, and BWI Airport, with stops in several Penn Station ..........................................................................4
Columbia villages, at Merriweather Post Pavilion
I-95 Commuter Station....................................................29 and in Columbia Gateway. Commuters will be
White Marsh........................................................................26 Estimated Travel Times (minutes) to
able to transfer to the MARC Penn or Camden Lines
Morgan State University ................................................11 at the BWI or Dorsey MARC stations, respectively.
BWI Airport from:
Owings Mills........................................................................25 Columbia Town Center ..................................................42
Arundel Mills ......................................................................12
Downtown Baltimore ......................................................27
The Blue Line largely exists today as the Central Light Rail Line from Hunt Valley through the west side The Purple Line represents an opportunity to use the existing Amtrak Northeast Corridor in the
of downtown Baltimore to Cromwell Station in Glen Burnie. Under the recommended system Plan, Baltimore region for local rail transit service. MARC Penn Line train service using the Amtrak Corridor
Blue Line trains will continue to operate along 26 miles of track, stopping at 31 stations. A significant already provides an excellent transportation option between Baltimore and Washington for the long-
new feature of the Blue Line will be the connection from the north, directly into Penn Station. This distance commuter. This service will continue. The proposed Purple Line would capture a different
new connection will allow for Blue Line trains to transit market – local travel within the Baltimore
either continue to downtown on the existing region – and provide for up to five new stations.
Howard Street alignment, or connect to downtown Connecting It All Together Connecting It All Together
on shared tracks with the Yellow Line between Through and Around The 38-mile Purple Line will… with Our Existing Resources
Penn Station and Camden Yards. Downtown Baltimore ● Implement a new urban-style rail service in the The Purple Line will increase transit ridership
Completion of the Blue Line, with a full connection Amtrak Corridor currently used by the MARC Penn by maximizing the use of existing infrastructure
at Penn Station and access to the Charles and St. Line. Service would operate between Edgewood in investments and transportation assets. The
The Blue Line will… Harford County to Penn Station and on to BWI proposed Purple Line would utilize the existing
Paul Street Corridor, together with the Yellow Line,
● Continue to serve the many neighborhoods and will give maximum flexibility to service in and Airport and Odenton in Anne Arundel County. Amtrak Rail Corridor for local service.
destinations which Light Rail serves today, including Trains would operate throughout the day, and
around downtown Baltimore. Any number of
both Baltimore City and County residential more frequently than current MARC service. The effort and investment necessary in the Purple
communities such as Timonium, Lutherville, Mt. operating methods could be arranged under this
scenario, such as : Line Corridor will require significant coordination
Washington, Woodberry, Westport, Cherry Hill, ● Improve access to downtown Baltimore, Penn between MTA and Amtrak to ensure a proper
Linthicum, and Ferndale. Station, and the Johns Hopkins Medical Campus for
● Creation of a continuous downtown loop balance between long distance commuter,
residents of Baltimore City, Baltimore and Harford
● Improve speed and reliability of the Light Rail, connecting the various parts of downtown. Counties and provide an excellent reverse-commute Northeast Corridor passenger, local transit and
particularly in the Howard Street Corridor. The opportunity to jobs along the Route 40 Corridor in freight needs. As planning is performed for the
double-tracking project currently underway will ● Express, skip-stop, or limited service trains Edgewood and Aberdeen. Purple Line, consistency with Amtrak and freight
assist in meeting this goal. between Hunt Valley/Timonium and Penn master plans must be accomplished.
Station/downtown Baltimore.
● Improve access to the Westside revitalization area Estimated Travel Times (minutes) to
and provide excellent service to the Hippodrome ● Service from the north or south that alternates Charles Center from:
Theatre, Lexington Market, Oriole Park and Ravens between the Howard Street Corridor and the Edgewood ..........................................................39 minutes
Stadium. Access to Federal Hill and South Charles/St. Paul Street Corridor, eliminating
Baltimore will be improved when the Hamburg Rossville..............................................................23 minutes
the need for passengers to transfer from one Odenton ..............................................................32 minutes
Street Station is opened on a year-round basis. line to another.
© 1999 © 1999
● Though use of the rail lines will not eliminate Road segments highlighted are those
Business/Industrial Parks
No Population
highway congestion, it can reduce the need to Retirement Communities
which experienced high levels of 1 – 5 Person/Acre
build more roads. Building this system will help Tourism
to improve air quality and the health of the congestion for at least one hour per 5 – 25 Population and activities overlap to show prime areas
day in 2001. Transportation Hub that will greatly benefit from rail transit service.
Chesapeake Bay. 25 and up
Source: Baltimore Metropolitan Council/
Baltimore Regional Transportation Board
"No single transportation strategy will solve our region's
"The fundamental purpose of Baltimore's rail system must be to
traffic congestion problems. We must have a balanced
serve a variety of activities in the daily lives of the region's citizens."
transportation system, including this extensive rail network,
that gives people choices in how to get around the Baltimore region." James Harkins, Harford County Executive Dr. Earl Richardson
President, Morgan State University
18 REPORT OF THE ADVISORY COMMITTEE SERVING OUR REGION WELL 19
5. The rail system must support existing 9. The rail system must provide a trip The Economic Benefits of the
land use and major targeted growth which is as competitive as possible Baltimore Region Rail System
areas. with the automobile, with respect
● All of the rail system lines are located within to speed and reliability. Significant economic growth for the
Baltimore area can be expected as the
designated Priority Funding Areas or "Smart ● Rail lines will be separated from street traffic
Growth" areas where public infrastructure Baltimore Region Rail System is built.
wherever possible, meaning that trains will not Improved accessibility to jobs throughout
exists or is planned. have to stop for traffic lights or street crossings.
the region, reduced business costs from
● Concentrating mixed-use development around ● As traffic congestion gets worse, the rail system people and goods waiting in traffic conges-
stations will create lively commercial and will provide a fast, convenient, reliable, and tion, and increased employment will all
residential centers that generate transit ridership cheaper alternative to driving. result from a sustained public investment in
throughout the day. Major opportunities for new rail lines. Based on the recommended
new transit-oriented development (TOD) are
10. The rail system must attract new system plan, Transportation Economics &
likely to occur at Arundel Mills, White Marsh,
and Westview. Significant TOD also occurs riders to transit and contribute Management Systems, Inc. of Frederick,
within Baltimore City – both downtown and Maryland projects that over the next twenty
to Maryland's goal of doubling years:
among the neighborhoods.
transit ridership.
● Property values will increase near new transit ● Between 6,900 and 12,800 new jobs
● The creation of a comprehensive rail system will be created by the economic
stations, making older neighborhoods an
will improve access for 440,000 jobs in the ripple effect of construction activity,
attractive investment for potential residents
region not currently served by rail transit. improved access and mobility
and business owners. Building this rail
system could aid revitalization in areas such ● Current Metro and Light Rail lines will be extended, ● The current rail systems – Metro Subway, Light throughout the region, and an
as Edmondson Village, Dundalk, Middle River, thereby reducing the need to acquire additional Rail, and MARC Trains – already serve more than enhanced business climate.
and Waverly. rail vehicles. Some new lines may be built in 96,000 people per day in the Baltimore region. ● Personal income in the region will
existing railroad right-of-way. New rail services to additional places in the increase by $113 to $209 million as a
6. The rail system must meet the region can be expected to have similar success. result of new employment and the
needs of the transit-dependent 8. The rail system must be seamless increased profitability of businesses.
population. for the transit rider. This figure reflects the aggregate
increase of all persons in the region.
● Basic mobility will be provided for the region's ● Easy connections among the rail lines will be
citizens in greatest need – the elderly, people made at well-designed transfer stations. An ● Property values will increase by $641
with health problems and disabilities, low-income extensive bus network will provide access to million to $1.2 billion as commercial
residents, and people without an automobile. locations just beyond the reach of the rail and residential development take
All rail vehicles will easily accommodate disabled system, and provide an easy way to get to hold near new and existing rail stations.
individuals. and from stations.
● Jobs and services previously inaccessible by ● Maryland SmartTrip, a new "Smart Card" fare
transit – or a long bus ride away – will now be collection system, will allow riders to transfer
served by fast and reliable rail service. quickly from one rail line or transit system to
another throughout the Maryland and the
7. The rail system must optimize the Washington region.
use of the existing system.
● Improvements to existing rail service are already
underway, including the double-tracking of Light
Rail and the overhaul of Metro Subway cars.
Additional enhancements are recommended "We must aggressively and smartly turn this plan
by the Advisory Committee to improve speed, into a reality if we are to realize neighborhood and
convenience, and reliability of existing services.
business growth in Baltimore."
C . William Struever, CEO
Struever Bros. Eccles & Rouse
Adopted March 2002 Existing Station "If we are to complete this regional rail system in the future, we must start taking the
Proposed Station Location necessary actions that will enable us to accomplish our goal…studies should be done
This version of the rail system plan Transfer Station
to establish the exact path of the rail lines and locations of future stations…[this] will
represents how the Advisory
Committee sees new rail lines being give governments the ability to preserve the rights-of-way needed for the project.
built relative to major roadways and The alignment could be included as part of a jurisdiction's master plan."
geographic features. The Committee
Janet Owens
recognizes that
Anne Arundel County Executive
detailed planning,
environmental analysis,
and engineering must Plans are not self-fulfilling. Converting the concepts and the recommendations of the
be performed before Baltimore Region Rail System Plan into operating rail lines will require consistent and
final alignments are dedicated involvement of many public and private sector leaders and ongoing public
determined. Every effort advocacy. For these reasons, the Committee recommends the following actions be
should be made to use this taken to keep implementation of the rail system plan "on track":
map as the baseline for
implementation efforts. Begin Immediately to Plan, Design, and Construct
Priority Projects
MTA should begin environmental analysis, planning, and design studies
resulting in the construction of the following Phase I priority projects:
● Red Line from Social Security Complex to Fells Point
● Green Line from Johns Hopkins Medical Campus to Morgan State University
● Purple Line from the proposed Madison Square Station to Martin State Airport
MTA should initiate efforts necessary to enhance existing rail services. The cooperationof local
governments and railroad owners will be key to improved service on Light Rail and MARC
Trains, respectively. Coordinated improvements with Baltimore City and private developers
will enhance the connectivity of Light Rail and Metro Subway at Lexington Market.
Once project planning studies are underway for the priority projects, MTA should
work with local governments to perform feasibility studies for new sections of rail
lines not included in the priority project recommendations. These studies will identify
likely rights-of-way and station locations for inclusion in local comprehensive plans.
John D. Porcari
Secretary, Department of
Transportation
Beverley K. Swaim-Staley
Deputy Secretary, Department of
Transportation
Robert L. Smith
Administrator, Maryland Transit
Administration