You are on page 1of 16

IN PARTIAL FULFILLMENT OF

CE519/D (4978)FOUNDATION ENGINEERING


PLATE NO : ONE (1)
PROJECT TITLE : PROPOSED 6 STOREY RESIDENTIAL COMMERCIAL BUILDING
SUBJECT : GEOTECHNICAL ENGINEERING II

SUBMITTED BY : OBEJERO, NICO GILLO


LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
TUMBOKON, NICOLLE MOSQUEDA

SUBMITTED TO : ENGR. ABO YASSER L. MANALINDO RCE, RMP

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: CODE NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LOCATION:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FRONT PAGE
ENGR. LLANES, AHNEEN
CHECKED BY: CE
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO 519 D
TRACED BY:
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
THIS
SITE

AD
RO
AD
ED
PI
R
PE
UP

VICINITY MAP

PERSPECTIVE
m PARKING AREA
16
12
m

SITE DEVELOPMENT PLAN

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
PERSPECTIVE
SITE DEVELOPMENT PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
VICINITY MAP ENGR. ABO YASSER MANALINDO
TRACED BY:
01
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
A B H I A B H I
6.00 m C D E F G 6.00 m 6.00 m C D E F G 6.00 m

6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m
1.20 m

1.20 m
3.00 m

3.00 m
3.00 m

3.00 m
3.00 m

3.00 m
3.00 m 3.00 m

3.00 m 3.00 m 3.00 m


3.00 m

FRONT ELEVATION REAR ELEVATION

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FRONT ELEVATION
REAR ELEVATION
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
02
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
2 2
1 3 4 5 6 7 8 9 10 11 11 10 9 8 7 6 5 4 3 1
3.00 m 3.00 m

1.20 m
1.20 m

3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m
3.00 m

3.00 m
3.00 m

3.00 m
3.00 m

3.00 m
3.00 m 3.00 m

3.00 m 3.00 m
3.00 m

3.00 m
LEFT ELEVATION RIGHT ELEVATION

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
LEFT ELEVATION
RIGHT ELEVATION
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
02
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
A B C D E F G H I
6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m

1 2 3 4 5 6 7 8 9 10 11 w
3
w
3

FIRE
w
1
w
1

FIRE
EXIT EXIT
FEMALE MALE MALE FEMALE

3.0 m
TOILET TOILET TOILET TOILET

D D

HALLWAY

HALLWAY
D D 1 1 D D
2 2 2 2

3.0 m
commercial commercial w
space 2 space 2 1
D D
3 3

3.0 m
D D

HALLWAY
D D

HALLWAY
commercial commercial commercial commercial w

HALLWAY

HALLWAY
space 1 1 space 1 1 1 space 1 1 space 1 1

3.0 m
commercial D commercial D D commercial D commercial w
space 1 1 space 1 1 1 space 1 1 space 1 1

HALLWAY
HALLWAY
HALLWAY

HALLWAY

3.0 m
commercial D D commercial w
space 1 1 1 space 1 1

3.0 m
commercial D commercial D D commercial D commercial w
space 1 1 space 1 1 1 space 1 1 space 1 1

HALLWAY
HALLWAY
HALLWAY

HALLWAY

3.0 m
commercial D commercial D D commercial D commercial w
space 1 1 space 1 1 1 space 1 1 space 1 1

3.0 m
commercial D D commercial w
space 1 1 1 space 1 1
HALLWAY

HALLWAY

3.0 m
commercial D D commercial w
space 1 1 1 space 1 1

3.0 m
STAIRS STAIRS
D D
1 1

w w w w
1 1 1 1

GROUND FLOOR
ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:
PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
03
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
A B C D E F G H I
6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m

1 2 3 4 5 6 7 8 9 10 11 FIRE
w
1
w
1
w
1
w
1
w
1
w
1
FIRE
EXIT EXIT
FEMALE MALE MALE FEMALE

3.0 m
TOILET TOILET TOILET TOILET

HALLWAY

HALLWAY
D D
D D 4 4 D D
2 2 2 2

3.0 m
w w w w
1 1 1 1
D D D D
4 4 4 4

3.0 m
w w w w

HALLWAY

HALLWAY
HALLWAY

HALLWAY
1 1 1 1
D D D D
4 4 4 4

3.0 m
w w w w
1 1 1 1
D D D D
4 4 4 4

HALLWAY

HALLWAY
HALLWAY

HALLWAY

3.0 m
w w w w
1 1 1 1
D D D D
4 4 4 4

3.0 m
w w w w
1 1 1 1
D D D D
4 4 4 4

HALLWAY

HALLWAY
HALLWAY

HALLWAY

3.0 m
w w w w
1 1 1 1
D D D D
4 4 4 4

3.0 m
w w
1 1
D D
4 4
HALLWAY

HALLWAY

3.0 m
w w
1 1
D D
4 4

3.0 m
STAIRS STAIRS

w w
1 1

2ND - 6TH FLOOR


ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:
PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
03
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
A B C D E F G H I
6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m 6.00 m

1 2 3 4 5 6 7 8 9 10 11

3.0 m
TANK TANK

3.0 m
3.0 m
3.0 m
3.0 m
3.0 m
3.0 m
3.0 m
3.0 m
3.0 m
STAIRS STAIRS

ROOF DECK
ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:
PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
A
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
03
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

STAIRS S-1 S-1 S-1 S-1 S-1 S-1 STAIRS

FLOOR FRAMING PLAN (SLAB)

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR FRAMING PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
01
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1
2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

STAIRS STAIRS

2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1 2B - 1

FLOOR FRAMING PLAN (2ND - 3RD FLOOR BEAM)

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR FRAMING PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
01
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 1 2B - 2 2B - 2 2B - 2 2B - 2
2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

STAIRS STAIRS
2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2 2B - 2

FLOOR FRAMING PLAN (4TH - RD FLOOR BEAM)

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FLOOR FRAMING PLAN
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
01
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB-1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1
FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

STAIRS STAIRS

FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1 FTB - 1

TYPICAL FOOTING TIE BEAM

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FOOTING TIE BEAM
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
03
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
FOUNDATION PLAN (INITIAL)

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FOUNDATION PLAN
(INITIAL)
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
ENGR. ABO YASSER MANALINDO
TRACED BY:
04
NIKKA DIANNE NICOLE ENGR. MARIMON, JEZZALENE
SLAB SCHEDULE

SLAB DETAILING

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
SLAB DETAILING
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
NIKKA DIANNE NICOLE
ENGR. ABO YASSER MANALINDO
TRACED BY: 05
ENGR. MARIMON, JEZZALENE
SCHEDULE OF BEAMS
BEAM BEAM STIRRUPS
AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT
DESIGNATION SIZE DIAM.ø SPACING (mm)

SECOND FLOOR - THIRD FLOOR


300 300 300

4 - 16 MMø 2 - 16 MMø 4 - 16 MMø


200MM 1 @ 50MM, 6 @ 100MM,
2B - 1 X 400MM 10MMø
4 @ 150MM, REST @ 200MM O.C.
400

400

400
2 - 16 MMø 2 - 16 MMø 2 - 16 MMø

SCHEDULE OF BEAMS
BEAM BEAM STIRRUPS
AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT
DESIGNATION SIZE DIAM.ø SPACING (mm)

FOURTH FLOOR - ROOF DECK


200 200 200

4 - 16 MMø 2 - 16 MMø 4 - 16 MMø


200MM 1 @ 50MM, 6 @ 100MM,
2B - 2 X 300MM 10MMø
300

300

300
4 @ 150MM, REST @ 200MM O.C.
2 - 16 MMø 2 - 16 MMø 2 - 16 MMø

BEAM AND COLUMN DETAILING

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
BEAM & COLUMN
DETAILING
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
NIKKA DIANNE NICOLE
ENGR. ABO YASSER MANALINDO
TRACED BY: 05
ENGR. MARIMON, JEZZALENE
SCHEDULE OF TIE BEAM
BEAM BEAM STIRRUPS
AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT
DESIGNATION SIZE DIAM.ø SPACING (mm)
200 200 200

2 - 16MMø 2 - 16MMø 2 - 16MMø


200MM 1 @ 50MM, 6 @ 100MM,
FTB - 1 10MMø

300

300

300
X 300MM 4 @ 150MM, REST @ 200MM O.C.
2 - 16MMø 2 - 16MMø 2 - 16MMø

SECTION

SEE COLUMN DETAILS SEE COLUMN DETAILS

PLAN
NAT. GROUND LINE
1000

100mm THK. GRAVEL BASE


100

GRAVEL BASE GRAVEL BASE

TYPICAL FOOTING TIE BEAM DETAILING

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FOOTING TIE BEAM
DETAILING
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
NIKKA DIANNE NICOLE
ENGR. ABO YASSER MANALINDO
TRACED BY: 07
ENGR. MARIMON, JEZZALENE
SECTION PLAN
SEE COLUMN DETAILS

NAT. GROUND LINE

0.30

100mm THK. GRAVEL BASE


8 - 16mmØ BOTH WAYS

FOOTING DETAILING (INITIAL)

ENGINEER: PROJECT: SHEET TITLE DESIGNED BY: SHEET NO:


PROPOSE 6 STOREY RESIDENTIAL / ENGR. OBEJERO, NICO
COMMERCIAL BUILING
OBEJERO, NICO GILLO AUTOCAD BY:
LLANES, AHNEEN OLIVER
MARIMON, JEZZALENE TONGCO
LOCATION:
UPPER PIEDAD ROAD
AGDAO, DAVAO CITY, PHILIPPINES
FOOTING TIE BEAM
DETAILING
ENGR. LLANES, AHNEEN
CHECKED BY:
S
TUMBOKON, NICOLLE MOSQUEDA
OWNER:
NIKKA DIANNE NICOLE
ENGR. ABO YASSER MANALINDO
TRACED BY: 07
ENGR. MARIMON, JEZZALENE

You might also like