Professional Documents
Culture Documents
Installation Guideline
1. MATERIAL
1.1 Introduction P. 7
1.2 Alloy and quality P. 8
1.3 Ecological relevance P. 8
1.4 Electromagnetic radiation P. 9
1.5 Identification P. 10
1.6 Material properties P. 11
1.7 Surfaces P. 12
1.7.1 RHEINZINK-bright rolled P. 12
1.7.2 RHEINZINK-“preweatheredpro blue-grey“/
“preweatheredpro graphite grey“ P. 13
1.8 Response to external influences P. 15
1.8.1 Installation under other metals P. 15
1.8.2 Installation under other building materials P. 15
1.8.3 Installation with other materials, including mortar P. 15
1.8.4 Influence of oil heating systems P. 15
2. PROCESSING
2.1 Storage and transportation P. 16
2.2 Processing P. 17
2.2.1 Marking P. 17
2.2.2 Jointing techniques P. 18
2.2.2.1 Soft soldering P. 18
2.2.2.2 Seaming Techniques P. 18
2.2.2.3 Lapped joints P. 18
2.2.3 Forming (folding) P. 18
2.2.4 Adhesive fastening P. 19
2.3 Material temperature P. 20
2.4 Thermal expansion P. 20
2.5 Fastening P. 25
STANDING SEAM TECHNOLOGY, DESIGN AND APPLICATION
8. Standards/guidelines P. 97
9. Contacts P. 101
8|9
MATERIAL 1.
0,70 RHEINZINK
1.4
RHEINZINK
RHEINZINK
10|11
MATERIAL 1.
1.20 8.64 5.79 5.18 4.32 3.46 2.88 2.42 2.16 1.73
1.00 7.20 4.82 4.32 3.60 2.88 2.40 2.02 1.80 1.44
0.80 5.76 3.86 3.46 2.88 2.30 1.92 1.61 1.44 1.15
0.70 5.04 3.38 3.02 2.52 2.02 1.68 1.41 1.26 1.01
Table 1: Table of weights for standard nominal size and metal thickness in kg/m
12|13
MATERIAL 1.
Waviness
Coils
The appearance of slight undula-
tions is characteristic of thin sheet
metal and is not treated in any way.
These waves (oil canning) are the
result of natural internal stresses
within the material, after undergo-
ing coiling and de-coiling proce-
dures in the plant as well as corre- Fig. 2: RHEINZINK-bright rolled sur-
sponding forming processes (pro- face, VITRA Administrative Building in
filing, etc.) during fabrication and CH-Birsfelden
installation.
When light is reflected on the Sheets
bright-rolled surface, its changing Optimum surface evenness is
appearance is much more notice- achieved by using sheets, which
able. As the patination process con- RHEINZINK produces and supplies
tinues, this perception decreases. If in lengths of up to 6 m. Wave di-
aesthetics are important, for e.g. mensions are subjected to strict con-
for façades and roofs, ”preweath- trols and may not exceed the value
ered pro blue-grey” or ”preweath- defined according to DIN EN 988,
ered pro graphite-grey” is recom- which is 2 mm per m. RHEINZINK-
mended. standards stipulate a max. of one
wave, 1 mm high, per m of panel
length.
14|15
MATERIAL 1.
1.8 R
esponse to external tend to corrode metal if they are
influences in contact with moisture.
■■ A suitable underlay should be
1.8.1 I nstallation under other installed between RHEINZINK-
metals sections and these building ma-
Absolutely safe: terials.
■■ Aluminium, bright rolled ■■ Installation sequence:
or coated Clean these materials prior to
■■ Lead RHEINZINK-installation (use
■■ Stainless steel temporary protective sheeting
■■ Galvanized steel (rust streak- wherever possible).
ing is possible if the cut edges ■■ De-icing salt, combined with
are unprotected) moisture, will corrode metal
Questionable:
■■ Copper 1.8.4 I nfluence of oil heating
systems
1.8.2 I nstallation under other Due to the contents and additives
building materials contained in heating oil, discolour-
Questionable: ation of RHEINZINK-surfaces can
■■ unprotected, bituminous water- occur where oil heating is used.
proof sheeting for roofs without This happens to all roofing mate-
granular coating (oxide acid rial; it is a visual impairment and
corrosion) does not affect durability.
■■ PVC-roofing sealants
(hydrochloric acid emissions) Note:
The owner must be made aware of
1.8.3 Installation with other this phenomenon. Discolouration
building materials, includ- does not occur when gas heating
ing mortar systems are used.
■■ Mineral-containing materials
such as lime, cement and plaster
2 . PROCESSING
2. Processing
Dia. 1.1: Storage and transportation Dia. 1.2: Storage and transportation of
of coils, (diagram) profiles, panels, (diagram)
Note:
A dry ventilated area is required
for proper storage at the construc-
tion site. This must be arranged
with the construction supervisor.
16|17
PROCESSING 2 .
Fig. 3: Tensile seam test in the RHEIN- Fig. 4: Metallographic cross section
ZINK-Quality Control Dept. of a flexural test piece after a 180°
fold, without an intermediate layer,
parallel to rolling direction
2.2 Processing
2.2.1 Marking
■■ Use soft pens; do not use
sharp, pointed objects (mark-
ing tools, pocket knives).
2 . PROCESSING
18|19
PROCESSING 2 .
20|21
PROCESSING 2 .
Calculation formula:
I = l0 · ·
Formula symbols:
0m 5.30 m
nel leng
th 16.0 1/3 = ~
Total pa .80 m
rea 3
= ~ 10.7
0m fi xe d clip a
2/3 3.0 0 m
9.20 m
9°
Dia. 2.1: Example, pent roof, roof pitch 9°, panel length 16 m
Example B: Contraction:
Thermal expansion (field-related Eave
values) 2.2 mm
9.2 m · · 35 K = 7.1 mm
■■ Installation temperature 10 m · 10 K
RHEINZINK 15 °C
■■ Panel length 16.0 m Ridge
■■ Roof pitch 9° 2.2 mm
3.8 m · · 35 K = 2.9 mm
■■ Fixed clip area 3.0 m 10 m · 10 K
Expansion: Note:
Eave Through heat irradiation, material
2.2 mm temperature can deviate signifi-
9.2 m · · 65 K = 13.2 mm
10 m · 10 K cantly from the ambient tempera-
ture. Depending on roof pitch, time
Ridge of day, season and orientation of
2.2 mm the surface to the sun, temperature
3.8 m · · 65 K = 5.4 mm
10 m · 10 K differences of up to 100 K are pos-
sible (-20 °C to 80 °C).
22|23
PROCESSING 2 .
24|25
PROCESSING 2 .
3. R
HEINZINK-Roofing Systems ■■ Vapour barrier, airtight con-
– Seamed Roof Coverings nection, Sd-value, depending
on length/pitch of roof
3.1 Roof designs ■■ thermal insulation (DIN 4108)
Ventilated and non-ventilated roofs ■■ breather membrane (optional)
must be planned and designed ac- also functions as an erection
cording to DIN 4108-3. cover (Dia. 3.1)
■■ Height of ventilated space
3.1.1 V entilated designs – ■■ Supporting structure: wooden
component layers sheathing
■■ Inner cladding/installation level ■■ Function level (Dia. 3.2)
■■ RHEINZINK-Roofing
26|27
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
1 Dia. 3.1:
2
3
Ventilated roof structure with
4 non-ventilated supporting
5 structure and fully insulated
6 rafters
7
8
9
10
≤ 0.1 m ≥ 0.1 m
9 Installation level
10 Inner cladding
1
d-Value of breather membrane should be smaller than the Sd-Value of the air-
S
tight layer.
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
1 Dia. 3.2:
2 Ventilated roof structure with
3 structured underlay
4
5
6
7
8
9
10
≤ 0.1 m ≥ 0.1 m
28|29
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
30|31
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
RHEINZINK-Click Roll ≥ 3° 1 2 / 4
Cap System > 15° 1 2 4 /
Table 3: Sub-roofs, underlays and sealant tapes for ventilated design in relation
to the climate at the building site.
32|33
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
RHEINZINK-Click Roll ≥ 3° 2 2 4
Cap System > 15° 2 2 4
Table 4: Design of underlays and sealant tapes for non-ventilated structures in re-
lation to the climate at the building site
For roof pitches of ≥ 3° - ≤ 7° and in the event of ice dams, a sealant tape
should be installed into the seam in the eaves.
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
34|35
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
36|37
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
38|39
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
3.2.3 D
esign of standing seam
systems, terminology/
dimensions
~13
3-5
Dia. 4.1: Double standing seam, bay Dia. 4.2: Profile dimensions – Dou-
width/panel width ble Standing Seam, manufactured by
machine
OC
UC UC
OC OC
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
40|41
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Table 7: Min. number of RHEINZINK clips (per m²); maximum space between
clips (mm) in relation to wind loads.
Comments: Wind load tables in Chapter II. 3.1.1. The table can be used for all
fasteners, provided an extraction value of 300 N per clip is guaranteed (see
Chap. II. 3.4.1). Calculating the clips and spaces is based on panel lengths of
ca. 3 m on average.
* panel width when produced manually / ** produced by machine
42|43
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
~11 ~40
~30
14 ~27
23~27
~85
50 ~30
44|45
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Dia. 7:
3.2.6.1 Application
6 Fixed clip area for hipped
roof with expansion strips
7
■■ Roof pitch 9°
■■ Panel length 16 m
3
■■ staggered position with
4 5
roof penetrations (see
examples of calcula-
tions Chap. 2.4)
≥ 60 mm
≥ 80 mm Expansion
area ≥10 mm
*
Expansion area
≥10 mm *
Dia. 8.1.1: Stepped falls connected Dia. 8.1.2: Stepped falls connected
via ”pinched seam”; Roof structure via ”turned down” seam; structured
according to Dia. 3.1 underlay (example), roof structure
according to Dia. 3.2
46|47
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
48|49
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Fig. 13: Proper installation allows for Fig. 14: Incorrect installation of light-
thermal expansion of panel ning rod terminal to panel
50|51
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Fig. 15: Pent roof ridge Fig. 16: Ridge as eave termination
1
2
3 4
3
11
6
2 7
4 1 10
5
12
Dia. 11: Standard eave detail for RHEINZINK-Standing Seam covers, bracket-
mounted gutter with snap-lock bracket according to DIN EN 1462
52|53
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
8 13
Dia. 11a: Design variation: Eave ter- Dia. 11c: Design variation: standing
mination standing round diagonal
machine pre-fabrication possible pre-fabrication by machine not
use distance template possible
use distance template
* RHEINZINK – Applications in Architecture Chap. III. 1.3, III. 2.3, III. 3.3
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
3.4.2 Verge
4b
3
Overlap/drip edge
Height of fascia
54|55
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
≥ 40 mm
≥ 40 mm
height
Seam
12a 12b 12c
height
Seam
12d1 12d2
<8 ≥ 50 ≥ 20 40 - 60*
8 to 20 ≥ 80 ≥ 20 40 - 60*
Note:
See Table 2, P. 26 and instructions
for isolated cases.
Depending on the detail design (fas-
cia height/building height), special
structures may be required apart
from continuous cleats made of gal-
vanized steel.
In the case of pent roof ridges, the
height of the fascia is adjusted to the
verge overlap and is thus higher and
wider than described in Table 9.
56|57
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Note:
100 % protection from drifting snow
is only possible by using sub-roofs.
RHEINZINK-design recommen-
dations available upon request or
contact our application engineer-
Fig. 17: Flush ridge termination on
ing consultants.
verge, high design
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
58|59
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
Note:
The valley pitch is generally small-
er than the roof pitch. If the valley
runs in a 45° angle (top view) to-
ward the eave, the conversion fac-
tor is 1.414.
Given the above-mentioned condi-
Dia. 14.4: Valley design with single
tions, a 10° roof pitch corresponds
seam
to a valley pitch of ca. 7°.
Design of valley joints:
■■ ≤ 10° soft soldering
■■ > 10° see Table 10.
60|61
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
3.4.5 O
ther connection heights/ 3.4.6 D
etails for bituminous roof
measures edge sealing
Lateral connection heights:
< 5° = 150 mm 3.4.6.1 R oof edge terminations
< 22° = 100 mm with RHEINZINK-Flat
≥ 22° = 80 mm Roof Edge Expansion
(in the case of tiles, Element (wall, connec-
from top edge of cover tion, verge, etc.)
material 65 mm) Note:
■■ Width of adhesive flange on
Other connection heights for seamed flashing: ≥ 120 mm
roofing: ■■ Protective coating of flashing
■■ Pent roof ridge ≥ 60 mm required up to 2 cm above the
■■ Pent roof ridge on rising wall top edge of roof covering
etc. (see Chapter on Ridge for ■■ Slip flashing
Vented Gable Roof) ■■ Never direct the torch flame
directly onto the expansion el-
Note: ement or the soldered joint of
The standard design for a connec- the RHEINZINK-flashing with-
tion profile on a rising wall calls out taking precautions.
for a water check; if wall material
such as slate, etc. is used, no water
check is required.
3. ROOFING SYSTEMS – SEAMED ROOF COVERINGS
62|63
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
~ 60 3.6 R
HEINZINK-Click Roll Cap
System
64|65
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
66|67
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
th
ng
le m
r d .0
da p 3
an a
St oll c m
R m
60
~
p
r la
ve
O
Fig. 21: Roll cap fastening to pre- Dia. 15.5: RHEINZINK-Roll Cap,
vent slipping profile joint with plug-in
68|69
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
70|71
ROOFING SYSTEMS – SEAMED ROOF COVERINGS 3.
430 515
394 394
Module data Cell type Triple junction solar cells made of thin-film silicon
for Standing PV-Module 394 mm x 2848 mm
Seam and Nominal output 68 Wp ± 10 %
Click Roll Cap Operating voltage VMPP 16.5 V
Nominal current IMPP 4.13 A
No-load voltage VOC 23.1 V
Short circuit current ISC 5.1 A
Certificate IEC 61646 (CEC 701) Safety Class 2 (TÜV Rheinland)
Connection MC-box incl. 600 mm cable
Tab. 12: Module data and dimensions for roof cladding using RHEINZINK-
”Solar PV Standing Seam” and ”Solar PV Click Roll Cap”
4 . SEAMED WALL CLADDING
Note: 4.1
Wherever possible, avoid using
double standing seams for façade
cladding, as tools and machines
1.1
may cause a disproportionate
amount of stress-related deforma- 2
tions and mechanical damage. If
this technique is used, please ad- 3
dress your concerns in writing to
4.1
the client.
5.1
Other design variations:
■■ combination of standing seam/ 6
RHEINZINK-“Click Roll Cap
System”
■■ “Click Roll Cap System” Dia. 17.1: Angled standing seam
■■ Flat-lock tiles/small tiles cladding on a wooden substructure
(hook-in seam technique)
72|73
SEAMED WALL CLADDING 4 .
Wall structure
1 Supporting structure as per
4.2 fire regulations:
1.1 made of wood (battens)
1.2 made of metal with Thermo-
1.2 stop (bracket system)
2 Thermal insulation (as per
2 DIN 4108)
3
3 Height of ventilation area
≥ 40 mm (standard is 20 mm),
4.2 and width of ventilation open-
ings ≥ net 20 mm must be co-
5.2 ordinated in the design
Please see Table 2, P. 26 and
6
notes regarding isolated cases.
7 4 Supporting structure:
4.1 made of wood (battens)
Dia. 17.2: Angled standing seam 4.2 made of metal
cladding on a metal substructure (bracket system)
5 Sheathing:
5.1 made of wooden sheathing
(nominal thickness is 24 mm/
width ≤ 100 mm) or BFU/
OSB-plywood sheets
5.2 made of metal (trapezoidal
profiles, galvanized steel or
coated steel)
6 RHEINZINK-Angled Stand-
ing Seam System
7 Underlay (acoustic insulation)
4 . SEAMED WALL CLADDING
74|75
SEAMED WALL CLADDING 4 .
Dia. 19.1: Jamb with window con- Fig. 26: Jamb on lateral connection
nection using a receiver strip windowsill coping
76|77
SEAMED WALL CLADDING 4 .
4.2.2 B
ase detail of façade clad-
ding flush or not flush
Notes pertaining to Dia. 20.1:
see Dia. and description 19.2
78|79
SEAMED WALL CLADDING 4 .
Note:
Dia. 21.1: Design with seam cap Pay attention to the dimensions for
(corner profile), design and aesthetics panel production. In order to avoid
created through symmetry of flashing. excess bulging of the panels, the
width must be made to precise
dimensions, without any plus tol-
erances. This applies primarily to
Dia. 21.2:
Dia. 21.2/21.3.
Diagonal seam
80|81
ROOF DRAINAGE SYSTEM 5.
82|83
ROOF DRAINAGE SYSTEM 5.
5.2.1 D
ata/dimensions of sus-
DIN EN
Excessive rise of water check
612
pended eaves gutters,
min.
mm
6
6
6
6
6
6
halfround or box-type,
outside of buildings ac-
to bead
box-
type
mm
10
10
10
20
cording to DIN EN 612
RHEINZINK
—
8
round
half-
mm
10
11
11
11
21
8
DIN EN
612
min.
mm
40
50
55
55
65
75
Height of front side
Min dim.
box-
110
type
mm
42
55
75
90
RHEINZINK
—
round
107
136
half-
mm
48
61
72
86
Table 13: Nominal sizes, material
thickness, bead diameter, see DIN
RHEIN- DIN EN
612
Bead diameter
mm
14
14
14
14
18
20
EN 612/production data RHEIN-
ZINK GmbH & Co. KG, minimum
requirements
ZINK
mm
16
18
18
20
22
22
0,65
0,65
0,70
0,70
0,80
0,80
mm
200
250
333
500
size
Standards).
5. ROOF DRAINAGE SYSTEM
5.2.2 D
ata/dim. gutter brackets for eaves made of RHEINZINK
according to DIN EN 1462
84|85
ROOF DRAINAGE SYSTEM 5.
5.2.3 E
xpansion elements for
bracket-mounted eaves
gutters
86|87
ROOF DRAINAGE SYSTEM 5.
24
6 12 6
3
15
3
36
24
15
15
6
6 6
12
5. ROOF DRAINAGE SYSTEM
88|89
ROOF DRAINAGE SYSTEM 5.
Table 18: Material thickness depends on the diameter or square edge length of
rainwater downpipe. Excerpt from DIN EN 612.
90|91
RHEINZINK FOR COPINGS 6.
Fig. 24.1: RHEINZINK-detail cop- Fig. 24.2: Joint detail for cornice
ings for roof edge coping with flashing strip and UDS-
connector
6. RHEINZINK FOR COPINGS
roof coverings/
wall claddings
92|93
RHEINZINK FOR COPINGS 6.
94|95
RHEINZINK FOR COPINGS 6.
Note: 6.3 D
esign of flashing joints to
Where there is no incline, the pools accommodate expansion
of water on the surface will result The installation of expansion ele-
in zinc hydroxide (this does not af- ments is necessary for soft-soldered
fect service life or durability, only connections.
aesthetics).
Types of design:
RHEINZINK-recommendation: ■■ commercially manufactured
due to various watertight jointing expansion elements
techniques, a minimum pitch of 3° ■■ flat expansion joints
in a cross-wise direction (wherev- ■■ single seam with/without addi-
er possible, to the roof), is recom- tional continuous soldered cleat
mended. ■■ joint connections using RHEIN-
ZINK-UDS-connectors
Avoid using standing seams as pro-
file joints, or restrict panel length to
1.0 m.
RHEINZINK-UDS-connectors can
be installed for all flashings.
6. RHEINZINK FOR COPINGS
3 6 3
1
4 8 8
8 8
4
3
8 8
3
8 8
6
8 8
24.1
8 8
3 1
2
3,5 8 3,5 24.2 24.3
96|97
SPACING OF EXPANSION ELEMENTS 7.
Note:
Half the distance should always be maintained for fixed points (corners, con-
nections, etc.). The prescribed guidelines can be exceeded slightly.
8. STANDARDS/GUIDELINES
8.0 Standards/guidelines
Excerpt from important standards and guidelines, which are also applica-
ble to Germany: National Building Codes; Trade Code for Metal Roofers
(ZVSHK, ZVDH);
DIN 1055 Action on structures
DIN 1986 Drainage systems in private ground;
DIN 4102 Fire behaviour of building materials and components;
DIN 4108 Thermal Insulation in buildings; En EV
DIN 4109 Sound insulation in buildings;
DIN 4426 Safety requirements for workplaces and accesses
DIN 18195 Water-proofing of buildings
DIN 18299 General technical contractual conditions
DIN 18334 Carpentry and timber construction works;
DIN 18338 Roofing and roof sealing;
DIN 18339 Sheet metal works;
DIN 68800 Protection of timber in buildings;
DIN EN 13859 Flexible sheets for waterproofing – Definitions and
characteristics of underlays – Underlays for discontinu-
ous roofing
DIN EN 62305 Protection against lightning – Part 3: Physical damage
to structures and life hazard (IEC 62305-3 Supple-
mentary sheet 4)
98|99
STANDARDS/GUIDELINES 8.
100|101
CONTACTS 9.
RHEINZINK international:
America Norway
Asia Poland
Australia/New Zealand Romania
Austria Russia
Baltic States Sweden/Finland
Belgium/Luxembourg Switzerland
Bosnia-Herzegovina Serbia
Czech Republic Slovakia
Denmark Slovenia
France South Africa
Great Britain Spain/Portugal
Hungary Turkey
Italy United Arab Emirates
Netherlands
www.rheinzink.com
Germany
info@rheinzink.com
www.rheinzink.com