Per quarter 200Units / month on basis of LT 2(a)

per quarter Rate per


sanction KW KW
Fixed charges 3 60 180
Total 180

Running charges First 30 3.75 112.5


Second 70 5.2 364
Third 100 6.75 675

Total 1151.5

Total Quarters Fixed charges 180 331 ₹ 59,580.00


Running charges 1151.5 331 ₹ 381,146.50
Total ₹ 440,726.50

Power
sanction 425 130 55250
HT 4 331 1.5 : 500
85% Santion load
Number of units 49650 6.7 332655

Total on HT4 ₹ 387,905.00


Savings per month ₹ 52,821.50
Savings per year ₹ 633,858.00
Proposed HT distribution at CRPF , Yelahanka

BESCOM Incoming

BESCOM Outgoing
5 way RMU

Commercial HT2b Commercial ,


-1 ,Existing HT2b-2, Existing Spare
Meterng cubicle Meterng cubicle,
Right side campus Left side campus

HT : 4
(Residential)

5 way VCB VCB panel

old 245 Proposed, 480nos


New 331 quarters quarters Spare
Quarters
( Spare)