Tx-1690 - Ethiopia

KALPATARU POWER TRANSMISSION LIMITED


Tender Opening Result - KPTL/BD-TD-T5
KPTL INTL Divn Tx: 1690
Mumbai, India Date: 10.05.2017
EEP, Ethiopia
Lot 2: Construction 230 kV and 132 kV transmission lines for Awash Weldiya Railway power supply project, ICB No: EEP/PMO/ICB/02/2017
Tender opening results for tender opened on 10.05.2017
Sr. No Party Quoted Price Discount Discounted Price % Position
Eqv USD Eqv USD Per Km
USD 33,074,816 USD - USD 33,074,816
1 Powerchina, China USD 39,024,626 USD 129,650 100.00% L-1
ETB 189,650,187 ETB 53,102,052 ETB 136,548,135

JV of Xian Electric Engg. Co. Ltd. and USD 35,030,812 USD - USD 35,030,812
2 USD 41,351,967 USD 137,382 105.96% L-2
Sichuan Electric Power, China ETB 145,070,494 ETB - ETB 145,070,494

USD 38,223,547 USD - USD 38,223,547


3 Consortium of ETERN – CCCE – HEI, China USD 45,007,490 USD 149,527 115.33% L-3
ETB 155,691,487 ETB - ETB 155,691,487

USD 29,882,990 USD - USD 29,882,990


4 Tata Projects Ltd, India USD 45,611,287 USD 151,533 116.88% L-4
ETB 360,964,426 ETB - ETB 360,964,426

USD 41,626,495 USD - USD 41,626,495


5 KPTL, India USD 49,074,581 USD 163,038 125.75% L-5
ETB 170,933,570 ETB - ETB 170,933,570

USD 44,330,323 USD - USD 44,330,323


6 China Electric Power, China USD 55,184,536 USD 183,337 141.41% L-6
ETB 249,104,177 ETB - ETB 249,104,177

USD 48,499,600 USD - USD 48,499,600


7 China CAMC Engg Co. Ltd, China USD 56,995,413 USD 189,354 146.05% L-7
ETB 194,978,912 ETB - ETB 194,978,912

Exchange Rate (As per Final Tender's P&P)


1 USD = 22.95 ETB
Project Details:
1 Scope Lot 2: Contract AWRPSP-2 for Financing, Design, Supply, Installation and commissioning of 3 Nos. 132 kV S/C TLs (155 Km), 3 Nos. 132
kV D/C TLs (41 KM) and 4 Nos. 230 kV S/C TLs (105 KM). Total: 301 KM

Page 1 of 2
Tx-1690 - Ethiopia

2 Consultant -
3 Funding Bidder need to arrange financing for this project. We have proposed Buyer's credit under NEIA from EXIM Bank.
4 Price Variation No PV. Firm Price contract
5 Tender Validity 180 Days after bid submission date
6 Project Completion 18 months from the Effective date.
7 Taxes & Duties Customs / Import duties excluded on foreign supplies. VAT applicable on Erection and Local Supplies
8 Tower Design New Tower Design
9 Tower Tonnage 8419 MT
10 LME Aluminum considered USD 1922 / MT
11 Aluminum Tonnage 753 MT
12 Total Line Length 301 KM