QUOTATION
Quotation to arranging power supply by providing and 63 KVA Distribution transformer and associated
equipment / materials in the favour of Thirumenahalli , Bangalore.
Payment terms:
1 Advance for Materials Dumping 50%
2 For Work Commencing 30%
3 For Work Compleation 20%
Note: The above quotation included only supply and erection of materials and BESCOM liaison charges for
1 BESCOM approvals, Estimation, Power Sanction, Work order approval, Material Inspection approval, Joint
The aboveApproval,
Inventory quotationMTincluded Electrical Inspectorate
Commissioning, liaison Submission
Completion Report charges towards submission of Drawings
and Commissioning only. and
2
commission approvals to the above line materials only.
The above quotation not included BESCOM Security Deposits and 10% supervision Charges on the estimated
3
cost againstquotation
The above power sanction to be communicated
not included by BESCOM.
purchase of meters against power sanction to be communicated by
4
BESCOM.
The above quotation not included LT level works like LT Panel Board with Busbar, DG Changeover Provisions
5
and Meters.quotation not included Civil work like Foundation to Transformer, Flatform and Fencing work is
The above
6
under Client Scope.
7 BBMP,
Which isGAIL, and Traffic etc.
not mentioned local
in the authorities’
above quotationpermissions
means notnot included
covered in the
in the above
scope quotation.
of work. Hence, any
8 additional requirement of the client can be discussed and to be get separate quote against requirement of
9 client.
The above quotation not including local / Gov. TAX's (GST) amount. GST EXTRA
For M/s. SAS Electricals
Bengaluru
4664
424
592
236
708
2696.28
508
338
635
100
10901.28
1934.98