SECTION NR 3

PROVISIONAL SUMS AND DAYWORKS


Dover Castle Catering Project Page 3/1
Section Nr 3 Provisional Sums and Dayworks

A54 PROVISIONAL SUMS


£ p
110 RELOCATING SMOKE DETECTOR
Include the Provisional Sum of £1,000 1,000.00
The work is defined as follows:
Relocating smoke detector contained within demolished
false ceiling to new location to be agreed

120 FIRE EXTINGUISHERS


Include the Provisional Sum of £500.00 500.00
The work is defined as follows:

Place order to supply additional imported topsoil if the


existing excavated fill material is found to be insufficient

130 ADDITIONAL SAMPLES


Include the Provisional Sum of £500.00 500.00
The work is undefined

140 ADDITIONAL BUILDERS WORK IN CONNECTION


WITH SERVICES
Include the Provisional Sum of £2,000 2,000.00
The work is undefined
TO COLLECTION £ 4,000.00
Dover Castle Catering Project Page 3/2
Section Nr 3 Provisional Sums and Dayworks

A55 DAYWORKS
£ p
GENERAL BUILDING AND SPECIALIST TRADES:

Provide below all inclusive hourly labour rates extended


to provisional sums for each of the following trades for
such work as may be executed by Daywork. These
provisional sums will be omitted in part or in whole if not
required.
*
Building labour (Skilled) 15 hours per hour 0.00

Building labour (Unskilled) 15 hours per hour 0.00

Plumbing labour (Skilled – all grades) 15 hours per hour 0.00

Electrical labour (all grades) 15 hours per hour 0.00

* To be inserted by Tenderer

The tenderer is to insert below any other all inclusive


hourly rates for other trades/grades they may require but
these are not to be extended to provisional sums

Trade/Grade Rate
per hour 0.00

per hour 0.00

per hour 0.00

MATERIALS:
Prime cost of Materials and Goods: Include the
provisional sum of £1,500.00 1,500.00
Add for percentage to cover incidental costs, overheads
and profit 0.00%

PLANT:
Prime cost of Plant: Include the provisional sum of
£750.00 750.00
Add for percentage to cover incidental costs, overheads
and profit 0.00%

(Rates for plant costs will be as set out in the Schedule


of Basic Plant Charges published by the RICS current at
the Date of Tender)
TO COLLECTION £

Dover Castle Catering Project Page 3/3


Section Nr 3 Provisional Sums and Dayworks

£ p
COLLECTION

Page 3/1

Page 3/2
TO SUMMARY £