Describe the significant aspects of the OMNI AUTO LIMITED
organization’s legal structure: ie:
Same company name for all sites,
joint ventures, HQ, etc.?
Submitted by authorized Abhishek Rajan / MR Date: 21/12/2017
representative: Name / Title
1) Please select the desired Certification Structure you are interested in:
Single Manufacturing Site (a single address where value-added manufacturing occurs). Skip tables A and B below.
Single Manufacturing Site with Extended Sites (a single manufacturing site expanded into one or more additional manufacturing sites with
different addresses - please read and complete Table B below (skip table A) to determine eligibility.
Corporate Scheme (Multiple manufacturing sites are audited collectively with common support functions (please complete table A only).
c) The balance of activities which could be centrally managed include, planning, policy making, contract review, supplier control, training evaluation, QMS
documentation, management review, corrective action evaluation, design, quality planning, and improvement activities.
a) Single Site: Date of Last Audit 26.05.2017 Last Day of Previous Initial Audit or Recertification Audit
c) Has your quality management system been in place at this site for at least 12 months? No Yes
(If no, DNV GL can only issue a Letter of Conformance after this audit.)
3) Have you Previously Been Certified by Another Certification Body to TS16949 or IATF16949? No Yes – if yes, please provide the following
information along with this completed RFQ-CP:
Name of previous certification body: Enter name here or attach certificate
Last 3 years of audit reports from the previous certification body
Evidence that all nonconformities issued by the previous certification body are closed
Status of current certificate: Issued Suspended Cancelled Withdrawn
4) Please indicate your preference for Periodic Audit cycle: 6 month 9 month 12 month
1) If English is the language of the audit, but 10% of shop floor personnel do not speak English, please include the language needed. If they speak Spanish but also speak English as a
second language, then do not include them here.
2) If Korean is the language of the audit, but 20% of shop floor personnel do not speak Korean, please include this. If they speak another language as their main language, but speak
Korean as a second language, then this does not have to be recorded here.
6) Has DNV GL previously provided you with any Registration-related Management Systems Consulting (this includes on-site Training)?
No Yes If yes, please describe:
If you have no automotive customers currently, do you have a request for quote from an automotive customer? No Yes
List Automotive Customers: Timken /Schaeffler
10) Do you want an ISO 9001 certificate in addition to the IATF 16949 certificate? No Yes If so, Accreditation:
Design responsibility for non-automotive products: Organization Customer
Please provide your desired ISO 9001 certification scope statement
MANUFACTURE OF FORGED, MACHINED AND HEAT TREATED RINGS
Sites and RSL’s to the Main MFG Site.Transit Time (Hours) from Extended MFG
Location/ Address Mfg Site RSL Contract Review ,Quality system 150 48 Hrs TS16949 NA 132051-2013-AQ-
B 7,8,9 Phase VII, Adityapur Industrial management,Engineering, Laboratory, Policy IND-IATF 0231513
Extended Mfg Site 14.09.2018
Area, Jamshedpur making, Purchasing, Strategic Planning, Training
Gated Condition
Location/ Address Mfg Site RSL
Extended Mfg Site
Gated Condition
Location/ Address Mfg Site RSL
Extended Mfg Site
Gated Condition
Location/ Address Mfg Site RSL
Extended Mfg Site
Gated Condition
Single Manufacturing Site with Extended Sites (a single manufacturing site expanded into one or more additional manufacturing sites with different
addresses (please read and complete Table A below to determine eligibility).
Corporate Scheme (Multiple manufacturing sites are audited collectively with common support functions (please complete Table B).
Note: Documentation submitted by the client demonstrating that the certification structure requirements meet IATF Rules requirements must be
maintained with the RFQ. (ie: Quality Manual, Process Maps, products manufactured, etc.)
Periodic Audit Days From Worksheet: (Minimum X.X TOTAL Onsite Audit Man Days Required) Approval Date:
(should not be filled out if Letter of Conformance Audit)
Single Site /Proposed Commencement Date of Certification:NC’s must be closed within 90 days and before
expiration of the current Certificate. (Audit must be completed on or before date to meet Audit Cycle
Requirements.)
NACE codes:
NOTE: Assure no assigned auditor has performed a pre-assessment or other audit of the assigned site within the last 3
years.
Additional Houston Office Review Notes:
TRANSFER AUDITS ONLY - GCU USA to verify transfer eligibility via the IATF dB