MATERIAL/PRODUCT APPROVAL
EZ03-CW05-
SUBMITTAL OF ROOF FRAMES STEEL For
MEME-CIV- 1 14/01/2019
STRUCTURES (ETIHAD STEEL FACTORY Approval
MAS-230011
- MANUFACTURER, AALCO -SUPPLIER)
MESSAGE
The attached documents have completed the "TD Submittal Review - (3 Reviewers)" workflow with the following results :
https://mea.aconex.com/Logon 1/2
1/31/2019 Aconex
Review
Doc No Step Participant Comments
Outcome
EZ03- 1. Provide list of steel sections proposed for the fabrication/production. 2. Provide
B-
CW05- equivalency details for the codes and standards specified in QCS and
Co- Proceed
MEME- corresponding codes and standard with which material complies. Galvanization of
Reviewer M Kumar - Revise
CIV- the materials not in accordance with the standards specified in the part-2, section-
1 &
MAS- 16, QCS 2014 3. All materials delivered to site shall come with manufacturer's
Resubmit
230011 certificates along with test results.
B-
Co- Proceed
The contractor is informed that the proposed sections shall be based on detailed
Reviewer S Pulukul - Revise
design and approved shop drawings prior to fabrication/construction work.
2 &
Resubmit
B-
Subject to sampling testing and submission of the tests results demonstrating
Co- Proceed
compliance with QCS 2014 Section 16 Part 2,4,5 and 7 requirements. 2.To attach
Reviewer B Savant - Revise
readable MME conformity and Industrial legal certificates. 3. Compliance statement
3 &
to align with the QCS 2014 Section 16 Part 4,5 and 7 as well.
Resubmit
B-
SRE Proceed
K
Final - Revise
Anderson
Review &
Resubmit