CONSTRUCTION OF ANNUNE-ANGUHAR-NAGI ROAD (29.

0 Km) ROAD

BILL NO. 1 GENERAL

ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT


Provide, furnish and maintain
officeaccommondation for the Engineers
representatives as specified in schedule No
1.01 V1 4,000,000.00 PS PS 4,000,000.00
Provide equipment, labour and assistance as
may be required by the Engineers
Representative in accordance with schedule
1.02 No V1 4,000,000.00 PS PS 4,000,000.00
Provide, erect and maintain living
accommodationfor the Engineers
Representative as specified in schedule No
1.03 V1 2,500,000.00 PS PS 2,500,000.00
Provide or erect and maintain living
accommodation for Resident Engineers as
1.04 specified in schedule No.V1 2,500,000.00 PS PS 2,500,000.00
Provide, erect and maintain living
accommodation (A.T.O type) as specified
1.05 in schedule No V1 2,000,000.00 PS PS 2,000,000.00
Provide, erect and maintain living
accommodation (T.A type) as specified in
1.06 schedule No V1 1,000,000.00 PS PS 1,000,000.00
OTHER PROVISIONAL SUM ITEMS

Allow for compensation in accordance with


1.09 clause 92 of the condition of contract. 5,000,000.00 PS PS 5,000,000.00

1.10 Allow for the cost of progress photographs. 300,000.00 PS PS 300,000.00

Allow for cost of stationery and equipment


1.11 required by Engineers representative. 500,000.00 PS PS 500,000.00
Allow for the provision of furniture for the
living accommodation of the Engineers
1.12 Representative. 1,000,000.00 PS PS 1,000,000.00
Allow for the payment of staff wages to
daily rated staff of the Engineers
1.13 Representative 2,000,000.00 PS PS 2,000,000.00
Allow for purchase, maintenance and
running cost of the official vehicles or
motor boats for the Engineers
1.14 Representative as directed. 25,000,000.00 PS PS 25,000,000.00
Allow for services to the Engineers
1.15 Representative. 2,500,000.00 PS PS 2,500,000.00

1.16 Allow for cost design as required 25,000,000.00 PS PS 25,000,000.00


TOTAL CARRIED TO SUMMARY 77,300,000.00
BEME
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (N)
Clear site on either side of centre line of
road up to the limits of construction width
of all bush, shrub, grass and tree, remove
2.01 anthills etc and cart to spoil. M2 522,000.00 85.00 44,370,000.00
Remove topsoil 150mm deep and cart to
2.02 spoil M3 78,300.00 2,100.00 164,430,000.00

Excavate in any materials except rock in


cutting and side drains, haul excavated
materials any distance, deposit, spread in
150mm layers and compact to 100% B.S
compaction as filling for embankments and
2.03 trim slopes to required cross section. M3 26,950.00 2,400.00 64,680,000.00

Excavate unsuitable materials and other


material except rock in cutting and filling
areas and side drains and haul to spoil
2.04 (haulage inclusive). M3 12,360.00 4,500.00 55,620,000.00
Excavate in any materials except rock to
form turnouts, triangular or trapezoidal
drains at toes of embankments, catch water
drains at top of cutting and dispose
2.05 excavated material as directed. M3 7,320.00 2,400.00 17,568,000.00

Excavate from approved borrow pits, haul


excavated material any distance, deposit,
spread in 150mm layer and compact to
100% B.S compaction as filling for
embankment and trim slopes to required
2.06 cross section. M3 228,042.50 3,150.00 718,333,875.00
Provide, place and spread in layers in
crushed rock as replacement of unsuitable
2.07 material. M3 0.00 4,000.00 0.00

Provide and place 200mm thick stone


pitching rip - rap protection set in 1 to 4
2.08 cement mortar as and where directed. M2 2,000.00 3,255.00 6,510,000.00
TOTAL CARRIED TO SUMMARY 1,071,511,875.00
BILL NO. 3 CULVERT AND DRAINS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
Clear site and debris in pipe and box
3.01 culvertsand dispose as directed. M3 200.00 1,500.00 300,000.00
Ditto item 3.01 but at inlet and outlet of
3.02 culverts and river channels. M3 0.00 1,488.00 0.00

Demolish, remove and haul to spoil pipe


culverts and concrete drains including
3.03 concrete surrounds, wing walls, aprons and M 120.50 2,500.00 301,250.00
Demolish, remove and haul to spoil box
3.04 culverts including wing walls aprons and M 12.00 5,000.00 60,000.00

Excavate for culvert, and side drains in any


material except rock and to any depth
including back - filling to 100% B.S
3.05 compaction and dispose of surplus material M3 5,847.80 2,400.00 14,034,720.00

3.06 Extra over item 3.05 for excavation in rock. M3 0.00 7,500.00 0.00

Provide and lay new concrete pipe culverts


as shown on the drawings including
3.07 blinding shuttering and concrete surrounds.
3.071 600mm single access pipe culverts. M 200.00 70,000.00 14,000,000.00
3.072 900mm single pipe culverts. M 345.00 110,000.00 37,950,000.00
3.073 900mm double pipe culverts. M 195.00 180,000.00 35,100,000.00
3.074 1200mm single pipe culverts. M 0.00 200,000.00 0.00
3.075 1200mm double pipe culverts. M 0.00 265,000.00 0.00
3.076 1200mm triple pipe culverts. M 0.00 0.00 0.00
Provide, mix and place concrete grade 25 in
head walls wing walls toes and aprons
inclusive of blinding formwork and
reinforcement, in various sizes of pipe
3.08 culverts M3 200.00 150,000.00 30,000,000.00
BOX CULVERT
Provide, mix and place concrete grade 25 in
box culverts inclusive of blinding formwork
3.09 and reinforcement M3 887.50 150,000.00 133,125,000.00
Provide, mix and place concrete grade 25 in
head walls wing walls toes and aprons of
box inclusive of blinding formwork and
3.10 reinforcement. M3 355.00 150,000.00 53,250,000.00
DRAINS
Provide and install grade 25 uncovered
reinforced concrete drains in townships as
3.11 specified and directed size 0.6 x 0.80 M 0.00 50,000.00 0.00
Provide and lay 225mm concrete filled
sandcrete block uncovered drains in
townships as specified and directed size
3.12 0.80 M 2,000.00 25,000.00 50,000,000.00
Provide concrete chutes on high
3.13 embankments as directed. M 500.00 2,325.00 1,162,500.00
TOTAL CARRIED TO SUMMARY 369,283,470.00
4.00 PAVEMENT AND SURFACING BEME
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (N)

Scarify, shape and compact formation level


4.01 as specified to 100% B.S compaction. M2 350,900.00 30.20 10,597,180.00

provide, spread, shape and compact to


100% West African Standard compaction
approved naturally occurring laterite
material as sub base in a layer of 150mm
compacted thickness to carriage - way and
4.02 shoulders (haulage inclusive) M3 70,180.00 3,450.00 242,121,000.00

provide, spread, shape and compact to


100% West African Standard compaction
approved naturally occurring laterite
material as base in a layer of 150mm
compacted thickness to carriage - way and
4.05 shoulders (haulage inclusive) M3 70,180.00 3,450.00 242,121,000.00

Provide and lay prime coat using MCO or


MC1 cut back bitumen at 1.0 liters/m2
4.06 including blinding with sand or quarry fine. M2 298,700.00 700.00 209,090,000.00
Provide and lay first coat bituminous
surface dressing on the carriage - way using
cut back bitumen 100/150 seconds STV at
40oc at 1.3 liters/m2 with 20mm single size
4.07 crushed stone chipping. M2 298,700.00 1,250.00 373,375,000.00

Provide and apply bituminous tack coat at


4.08 an application rate of 0.3 litres/m2 M2 0.00 0.00 0.00

Provide and lay second coat bituminous


surface dressing on the carriage - way using
cut back bitumen 100/150 seconds STV at
40oc at 1.3 liters/m2 with 20mm with
4.09 12mm single crushed stone chipping. M2 211,700.00 1,100.00 232,870,000.00

TOTAL CARRIED TO GENERAL SUMMARY 1,310,174,180.00


MINISTRY OF WORKS AND TRANSPORT,

CONSTRUCTION OF ANNUNE - ANGUHAR - NAGI ROAD (29.0 Km) ROAD

ITEM DESCRIPTION AMOUNT (N)

Bill No1 GENERAL 77,300,000.00

Bill No 2 SITE CLEARANCE &EARTHWORKS 1,071,511,875.00

Bill No 3 CULVERT AND DRAINS 369,283,470.00

Bill No 4 PAVEMENT AND SURFACING 1,310,174,180.00

SUB TOTAL 2,828,269,525.00

Add 5% Contigencies/VOP 141,413,476.25

SUB - TOTAL 2,969,683,001.25

Add 7.5% VAT 222,726,225.09

GRAND TOTAL 3,192,409,226.34