SUPPLEMENTARY FAX

APPLICATION FOR CONNECTION Oatley 95855816


To be lodged with the Application for Connection. Refer to Document ES1 - Part A. Hornsby 94778366
Erina 43258507
This form is required for: Wallsend 49510828
l New electrical work over 20kW; Muswellbrook 65429037
l Multiple living unit developments (more than 6 units);
l For services greater than 100 Amps;
l CT metered installations;
l Rural or outlying areas;
l HV installations requiring more than 100kW or additional load;
l Work where the proposed equipment may cause excessive fluctuation of voltage (eg. welders, x-ray
machines)
Please complete this form in BLOCK LETTERS

Installation Address
Property Name

Floor Unit Street RMB / Lot

Street Suburb

Cross Street Existing Meter ID Pole Pillar ID

Installation Details Plan


Residential Portion Please show: Connection of Links, North Point, Main Switchboard, P of A,
Pole/Pillar, Property Boundary and Lot/House No. For motors show service
No living units:
and consumer mains length & size when motors connected.
No of bedrooms per unit:
Gas hot water (yes/no):
Lift(s) and start current:
Carpark ventilation current rating:
Air conditioning (yes/no):
Air conditioning rating:

Commercial Portion
Total floor area with air/con: m2
Total office floor area without air/con: m2
Carpark floor area: m2
Warehouse floor area: m2
Commercial areas for food handling (yes/no):

Industrial Portion
Number of factory units:
Total floor area of all factory units: m2

MOTORS – Is there any significant motor load? A.277


(ie. exceed limits set out in NSW Service & Installation Rules)
Issue
Details: d 11th
Feb
2005
Input current:
Input power:
Start current:
Number of starts per hour / day:

Additional Comments