Tangerang, 7 Oktober 2020

No Keterangan Kerjaan 7 8 9 10 11 12 13 14 15 16 17 18

I Punch 150 T
1 Machining and fabrication
2 Site reassembly
3 Punch setting and commissioning

II Tapping Machine I
1 Assembly
2 Setting
3 Test

III Tapping Machine II


1 Assembly
2 Setting
3 Test

IV Punch 100 T
1 Assembly
2 Setting
3 Test

V Training
19 20 21 22 23 24 25 26 27 28 29 30 31 Estimasi Cost

IDR 18,000,000.00
IDR 27,500,000.00
IDR 105,000,000.00

IDR 18,000,000.00

IDR 18,000,000.00

IDR 18,000,000.00

Total cost IDR 204,500,000.00