Professional Documents
Culture Documents
Schedule and Cost
Schedule and Cost
No Keterangan Kerjaan 7 8 9 10 11 12 13 14 15 16 17 18
I Punch 150 T
1 Machining and fabrication
2 Site reassembly
3 Punch setting and commissioning
II Tapping Machine I
1 Assembly
2 Setting
3 Test
IV Punch 100 T
1 Assembly
2 Setting
3 Test
V Training
19 20 21 22 23 24 25 26 27 28 29 30 31 Estimasi Cost
IDR 18,000,000.00
IDR 27,500,000.00
IDR 105,000,000.00
IDR 18,000,000.00
IDR 18,000,000.00
IDR 18,000,000.00