खान मंालय
अिधसूचना

नई दली, 17 अ
ैल, 2015

सा.
सा.का.
का.िन.
िन. 304( क ीय सरकार, खान और खिनज (िवकास और िविनयमन) अिधिनयम,
304(अ).— 1957 (1957 का

67) क धारा 13 ारा


दत शितय का
योग करते ए िन!निलिखत बनाती है, अथा#त:—

1. संि त नाम और ारं भ :

1.1 इन िनयम का संि'(त नाम “खान (खिनज अंतव#,तु का सा.य) िनयम, 2015” है ।

1.2 ये राजप0 म अपने


काशन क तारीख को
वृत हगे ।

2. लागू होना : ये िनयम िन!निलिखत को छोडकर सभी खिनज पर लागू हगे :

(i) पे8ोिलयम और
ाकृ ितक गैस;

(ii) कोयला, िल:नाइट और भूगत# रेत भरण;

(iii) खान और खिनज (िवकास और िविनयमन) अिधिनयम, 1957 (1957 का 67) क


थम अनुसच
ू ी के भाग
‘ख’ म सूचीब? खिनज; और

(iv) गौण खिनज

1759 GI/2015 (1)


2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

3. परभाषाएं और िनवचन :

इन िनयम म जब तक संदभ# म अ@यथा अपेि'त न ह, -


(क) “अिधिनयम” से खान और खिनज (िवकास और िविनयमन) अिधिनयम, 1957 (1957 का 67) अिभ
ेत
है;

(ख) “संयु त अनुि तसे अिधिनयम क धारा 10ख क उप-धारा


” (2) या धारा 11 क उप-धारा (3) के

अधीन जारी पूवB'ण अनुCि(त-सह-खनन पDा अिभ


ेत है;
(ग) “ अनुप से
येक मामले के िलए अपेि'त पEरि,थित के िनकटतम Fप अिभ
ेत है
” ;

(घ) “खिनज अंतवतु का सा!य से यथाि,थ


” ित िनयम 4, िनयम 5 अथवा िनयम 7 के उपिनयम (2) म
यथािविनGदHट खिनज उपि,थित के सा.य क पुिHट अिभ
ेत है;
(ड़) “ख िनज# का $ेस हो(ड मू(य
से भारतीय खान Iयूर ारा कसी िनधा#Eरत 'े0 और िनधा#Eरत समय के

िलए कसी खिनज क सJजीकरणीयता और/अथवा िवपणनता के आधार पर समय-समय पर िनधा#Eरत


सीमाएं; िजससे कम म खनन से
ा(त पदाथ# को अपिशHट मानकर छोड़ा जा सकता है अिभ
ेत है ।

(च) ‘अनुसूची’ से इन िनयम के उपाब? संल:न अनुसूची अिभ


ेत है ।
(छ) इन िनयम म
युत शIद आवी'ण सवB'ण (जी4), आरं िभक गवेषण (जी3), साधारण गवेषण (जी2),
िव,तृत गवेषण (जी1), आवी'ण खिनज संसाधन (334), अनुमािनत खिनज संसाधन (333), उपदLशत
खिनज संसाधन (332), पEरमािपत खिनज संसाधन (331), संभािवत खिनज भंडार (121 और 122),

सबूत खिनज भंडार (111), Mयवहाय#ता खिनज संसाधन (211), Mयवहाय#तापूव# खिनज संसाधन (221

और 222), उपांतEरत कारक, भूवैCािनक अNययन (एफ-3), Mयवहाय#तापूव# अNययन (एफ 2), Mयवहाय#ता

अNययन (एफ 1), तािवक Fप से आLथक (ई3), संभाMय Fप से आLथक (ई2) और आLथक (ई1) के अथ#
इन िनयम क अनुसूची के भाग-1 म यथा पEरभािषत अनुसार हगे;
(ज) इन िनयम म
युत सभी शIद और अिभMयितय जो पEरभािषत नहP कए गए हQ, का वहP अथ# होगा
जो अिधिनयम अथवा उसके अंतग#त बनाए गए िनयम म यथा िनधा#Eरत कया गया है ।
4. अिधिनयम क, धारा क क, उपधारा
10 (2) के खंड (ख) के उप-
उप-खंड (i) के अधीन खिनज िव/मानता का अवधारण
करना :

(1) जहां यथाि,थत कसी आवी'ण परिमट अथवा पूवB'ण अनुCि(त के धारक ारा पूवB'ण अनुCि(त अथवा खनन पDा
,वीकृित संबंधी आवेदन 12 जनवरी, 2015 से पूव#
,तुत नहP कया गया हो, तो ऐसे परिमट अथवा
अनुCि(त धारक ारा अिधिनयम क धारा 10क क उप-धारा (2) के खंड (ख) के उप-खंड (i) के अंतग#त खिनज
िवRमानता का िनधा#रण कया गया समझा जाएगा, यद धारक के पास –
(क) पूव 1 ण अनुि त दान करने के मामले म3
(i) बाद म गवेषण के यो:य जोन ('े0) का पता लगाने के िलए आवी'ण सवB'ण (जी4) कया है;
और

(II) अनुसूची के IV भाग के अनुFप एक भूवैCािनक अNययन Eरपोट# तैयार कया है और यह

भूवैCािनक अNययन Eरपोट# राJय सरकार को


,तुत क गई है;
(ख) खनन प4ा दान करने के मामले म3 :

(I) संसूिचत खिनज संसाधन (332) का Tया@वयन के िलए 'े0 म कम से कम साधारण गवेषण

(जी2 ,तर) कया है; और


¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 3

(II) संभािवत खिनज भंडार (121 और 122) का पता लगाने के िलए अनुसूची के भाग-Vके पुिHट म
कम से कम एक पूव-# Mयवहाय#ता अNययन (एफ-2) तैयार कया ताक खनन पDे के आरंभ क
तारीख से पांच वषU क अविध के िलए खनन
चालन क योजना बनाई जा सके और यह ये
EरपोटV राJय सरकार को
,तुत क गई है ।
(2) जब यथाि,थित कसी आवी'ण परिमट अथवा पूवB'ण अनुCि(त के धारक ारा पूवB'ण अनुCि(त अथवा खनन पDा
,वीकृित संबंधी आवेदन 12 जनवरी, 2015 से पूव#
स्तुत कया गया हो, तो ऐसे परिमट अथवा अनुCि(त धारक
ारा अिधिनयम क धारा 10क क उप-धारा (2) के खंड (ख) के उप-खंड (i) के अधीन खिनज िवRमानता का
िनधा#रण कया गया माना जाएगा, यद धारक के पास -
(क) पूव 1 ण अनुि त दान करने के मामले म3
(i) खिनज संर'ण और िवकास िनयम, 1988 के अधीन पूवB'ण क ,कम के अनुसार पूव'
B ण

चालन Tया@वत कए गए; तथा
(II) पूवB'ण क ऐसी ,कम के अनुFप और खान मं0ालय ारा तारीख 24 जून, 2009 और 30
अतूबर, 2014 को जारी खिनज Eरयायत
,ताव क
सं,करण के िलए माग#दश#क िस?ांत म
अिधकिथत शतU को पूरा करके आवी'ण
चालन पूरा करने के बाद Eरपोट# राJय सरकार को

,तुत क ।
(ख) खनन प4ा दान करने के मामले म3
(I) खिनज संर'ण और िवकास िनयम, 1988 के अधीन पूवB'ण क ,कम के अनुसार पूव'
B ण

चालन कया; तथा
(II) पूवB'ण क ऐसी ,कम के अनुFप और खान मं0ालय ारा तारीख 24 जून, 2009 और 30
अतूबर, 2014 को जारी खिनज Eरयायत
,ताव क
सं,करण के िलए माग# दश#क िस?ांत म
अिधकिथत शतU को पूरा करके आवी'ण
चालन पूरा करने के बाद Eरपोट# राJय सरकार को

,तुत क ।
5. अिधिनयम क, धारा ख क, उप
10 -धारा (3) और धारा 11 क, उप -धारा (2) के अधीन खनन प4े क, नीलामी के

िलए खिनज अंतवतु िव/मानता


अिधिनयम क धारा 10ख क उप-धारा (3) और धारा 11 क उप-धारा (2) के अधीन कसी 'े0 म खिनज
िवRमानता मानी जाएगी, यद ऐसे 'े0 के िलए :
(क) कम से कम संसूिचत खिनज संसाधन (332) का पता लगाने के िलए साधारण गवेषण (जी2) पूरा कर िलया

गया है; तथा

(ख) अनुसूची के भाग-IV के अनुFप एक भूवैCािनक अNययन Eरपोट# तैयार क गई है ।


6. खनन प4ा अविध क, समाि
समाि त के बाद खनन प4# के िलए और छोड़े गए,
गए, अ6य7थत
य7थत अथवा 9यपगत
यपगत प4# के िलए
नीलामी के ज़रए खनन प4ा दान करना
नीलामी के माNयम खनन पDा
दान करने के िलए कसी 'े0 को अिधसूिचत करने से पूव# िन!निलिखत संबंध म -
(क) पDा अविध क समाि(त के बाद खनन पDे; और

(ख) छोडे गए समा(त कए गए अथवा Mयपगत खनन पDे,


िनयम 5 के अनुसार नीलामी के िलए
,तािवत 'े0 म संसाधन का िव,तृत पुनमू# यांकन कया जाएगा ।
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

7. संयु त अनुि त दान करने के िलए खिनज िव/मानता


(1) अिधिनयम क धारा 10ख क उप-धारा (2) अथवा धारा 11 क उप-धारा (3) के अधीन संयुत अनुCि(त
दान
करने के िलए कसी 'े0 को नीलामी हेतु अिधसूिचत कया जाए, यद ऐसे 'े0 के िलए :
(क)
दत खिनज संसाधन (333) का पता लगाने के िलए आरं िभक गवेषण (जी3) पूरा कया गया है;
तथा

(ख) अनुसूची के भाग-IVक और भाग-IVख के अनुFप एक भूवैCािनक अNययन Eरपोट# तैयार क गई है ।


(2) कसी 'े0 को अिधिनयम क धारा 11 क उप-धारा (10) के अधीन खिनज िवRमानता वाला माना जाएगा, यद
ऐसे 'े0 म :
(क) कम से कम संसूिचत खिनज संसाधन (332) का पता लगाने के िलए साधारण गवेषण (जी2) पूरा

कया गया हो; तथा


(ख) खनन पDे के आरं भ होने क तारीख से पांच वषU क अविध के िलए खनन
चालन क योजना
बनाने के िलए अनुसूची के भाग-V के अनुFप संभािवत खिनज भंडार (121 और 122) का पता लगाने के

िलए कम से कम एक Mयवहाय#ता-पूव# अNययन (एफ2) Eरपोट# तैयार कया गया है और यह Eरपोट# राJय
सरकार को
,तुत क गई है ।
8. िशिथलता

,थानीय भूवैCािनक संरचना, खिनजन क िवRमानता के ,वFप और


कृ ित के आधार पर राJय सरकार, क ीय
सरकार के पूव# अनुमोदन से अनुसूची के भाग-3 म यथािनGदHट गवेषण मानदंड को कसी खिनज अथवा कसी 'े0 के िलए
पूण#त: अथवा अंशत: िशिथल कर सकती है ।
अनुसच
ू ी

[िनयम 2(iii)
iii), 3(च), 3(छ), 4(1)(क
)(क)(ii
)(ii)
ii), 4(1)(ख
)(ख)(ii
)(ii)
ii), 5(ख), 7(1)(ख
)(ख), 7(2)(ख
)(ख)]

गवेषण ,तर से संबंिधत


योग कए गए शIद और गवेषण के िविभ@न ,तर के ज़Eरए
ा(त संसाधन और भंडार क Zेणी
अनुसूची के भाग-I म पEरभािषत हQ । मा0ा और [ेड के संदभ# म 'े0 म खिनज मा0ा क िवRमानता क पुिHट के िलए

मानदंड अनुसूची के भाग-2, भाग-3, भाग-IVक, भाग-IVख और भाग-V म दए गए हQ ।

भाग-
भाग-I

परभाषाएं
1. अनुसूची के भाग-I म
युत पEरभाषाएं और कोड मु\यत: संयुत राH8 िव@यास वग]करण (यूएनएफसी) वज#न-
1997 और खिनज भंडारण अ@तरराH8ीय सूचना मानक (सीआरआईआरएससीओ) टेम(लेट सिमित से िलए गए है । आव^यक

होने पर उसम िव,तार करने के िलए यहां दी गई पEरभाषा_ को यूएनएफसी या सीआरआईआरएससीओ के संदभ# के ारा
अनुपूरक बनाया जाए ।

2. कसी खिनज िन'ेप के िलए गवेषण के चार चरण यथा टोही सवB'ण (जी4),
ारं िभक गवेषण (जी3), सामा@य
गवेषण (जी2) और िव,तृत गवेषण (जी1) होते हQ । गवेषण के ये चरण भूवैCािनक आ^वासन के ,तर को
दLशत करते ए

Tमश: चार संसाधन Zेिणय यथा पूवB'ण खिनज संसाधन, अनुमािनत खिनज संसाधन, इं िगत खिनज संसाधन और मािपत
खिनज संसाधन को दृिHटगत करते है ।
3. टोही सव1 ण (जी4
जी4)-
ादेिशक भूवैCािनक अNययन, 'े0ीय भूवैCािनक मानिच0ण, हवाई तथा परो' िविधयां,

ारं िभक 'े0 िनरी'ण व भूवC ै ािनक हलचल और बिहवBशन के पEरणाम पर


ारं िभक Fप से आधाEरत संबंिधत खिनज
मा0ा वाले 'े0 क संपुिHट करता है । इसका उbे^य िन'ेप क संपुिHट के िलए आगामी अ@वेषण के यो:य खिनजीकृ त 'े0
को पहचानना है । मा0ा_ का
ाकलन के वल तभी कया जाना चािहए यद पया#(त डाटा उपलIध हो और जब वैसे ही
भूवैCािनक ल'ण के Cात िन'ेप का समय अनुमान संभव हो और तब के वल िव,तार क ि,थित के अंदर हो ।
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 5

4. ारंिभक गवेषण संवLधत खिनज मा0ा को


ोसािहत करने वाले संकण# छोटे िनचले 'े0 म खिनज िन'ेप
(जी3
जी3)

के िलए खोज करने क सुMयवि,थत


Tया है ।
युत प?ितयां दृ^यांश पहचान, भूवैCािनक मानिच0ण और परो' िवधाए
जैसे भूभौितकय और भूरासायिनक अNययन है । िन'ेप को पहचानने के िलए नमूना लेने हेतु सीिमत चौड़ाई वाले ,थान पर
िपeटग/8ेfचग /िgfलग काय# कया गया जो आगामी गवेषण के िलए ल.य होगा । मा0ा_ का
ाकलन भूवैCािनक,
भूभौितक, भूरासायिनक और तकनीक अ@वेषण पEरणाम के िनव#चन के आधार पर अनुमािनत कया गया है ।
5. साधारण गवेषण (जी2
जी2) म एक अिभCात िन'ेप का शुFआती सीमांकन शािमल है ।
युत िवधा_ म खिनज क
मा0ा और उसक गुणवता के मूयांकन (
योगशाला ,तर पर खिनज िवCान संबंधी परी'ण सिहत, यद आव^यक हो) के
िलए नमूना लेने के िलए धरातलीय मानिच0, िपeटग/8ेfचग/िgfलग और अ@वेषण क परो' िविधय पर आधाEरत सीिमत
अंतवBशन सि!मिलत है। इसका उbे^य िन'ेप मु\य भूवैCािनक संरचना_ क खोज करना, देश को सही दशा
दान करना
और आकार, बनावट, संरचना तथा [ेड का शुFआती
ाकलन उपलIध कराना है ।

6. िवतृ त गवेषण (जी1म नमूने लेने के माNयम से जैसे दृ^यांश, गडढ़ो, खाई, वेधन िछ, शाhट और सुरंग आद से
जी1)

ा(त Cात िन'ेप के िव,तृत तीन िवमीय सीमांकन शािमल है । नमूना लेने वाले ि[ड ,थल जैसे आकार, बनावट, संरचना,
[ेड और िन'ेप के अ@य संबंिधत ल'ण के बत ही करीब है िजनसे उनक शु?ता क सही जानकारी Cात ई है ।
अिधकािधक नमूने लेने के साथ-साथ
Tम जांच करने क भी आव^यकता हो सकती है ।

7. खिनज संसाधन ऐसे Fप, [ेड या गुण व मा0ा म भूपप#टी पर या म आLथक महव क ठोस साम[ी का सांण अथवा
उपि,थित है जो असमात आLथक िनHकष# के िलए उिचत संभावनाएं है। नमूने सिहत िविशHट भूवैCािनक
माण और
जानकारी से खिनज संसाधन क अवि,थित, मा0ा, [ेड या गुण, िनरं तर उपि,थित और अ@य भूवैCािनक ल'ण को Cात
कया गया है, उनका
ाकलन अथवा िनव#चन कया गया है । खिनज संसाधन को बढ़ते भूवैCािनक िव^वास के Tम म
पूवB'ण, अनुमािनत, इं िगत और मािपत संसाधन Zेिणय म उपिवभािजत कया गया है ।
8. पूव 1 ण खिनज संसाधन परो'
माण पर
ारं िभक Fप से आधाEरत
ाकलन है और टोही सवB'ण के ारा
(334)
334)

सृिजत डाटा और सूचना सं[ह है । उपलIध आकड़ क मा0ा खिनज संसाधन के कसी उिचत
ाकलन करने के िलए
सामा@यत: पया#(त नहP है ।
9. 333) खिनज संसाधन का वह भाग है िजसके िलए सीिमत भूवैCािनक
माण और
अनुमािनत खिनज संसाधन (333)

ारं िभक गवेषण के चरण के माNयम से


ा(त नमून के आधार पर मा0ा और [ेड अथवा गुण का
ाकलन कया जाता है ।
इं िगत खिनज संसाधन के
योग क तुलना म अनुमािनत संसाधन का िव^वास ,तर कम है और इसे खिनज भंडारण के िलए
पEरवLतत नहP कया जाएगा । अनुमािनत खिनज संसाधन के बमत को गवेषण जारी रखकर इं िगत खिनज संसाधन से
बढ़ाया जा सकेगा ।

10.
10. इं िगत खिनज संसाधन (332)
332)खिनज संसाधन का वह भाग है िजसके िलए मा0ा, [ेड या गुण, घनव, आकार और
भौितक ल'ण को िन'ेप के आLथक महव के मूयांकन और खान योजना क मदद के िलए पया#(त िववरण म संशोिधत
घटक के अनु
योग के िलए काफ िव^वास के साथ
ाकलन कया जाता है । भूवैCािनक
माण समुिचत िववरण और
िव^वसनीय गवेषण, नमून और परी'ण से
ा(त आ है और यह अवलोकन के िब@दु_ के मNय भूवैCािनक और [ेड या गुण
क िनर@तरता को जानने के िलए पया#(त है । मािपत खिनज संसाधन के
योग क तुलना म इं िगत खिनज संसाधन का
िव^वास ,तर कम है और इसे संभािवत खिनज भंडारण के िलए पEरवLतत कया जा सकता है ।
11.
11. मािपत खिनज संसाधन (331)
331) खिनज संसाधन का वह भाग है िजसके िलए मा0ा, [ेड या गुण, घनव, आकार और
भौितक ल'ण को िन'ेप के आLथक महव के अंितम मूयांकन और िव,तृत खान योजना क मदद के िलए संशोिधत घटक
के अनु
योग के िलए काफ िव^वास के साथ
ाकलन कया जाता है । भूवैCािनक
माण िव,तृत िववरण और िव^वसनीय
गवेषण, नमून और परी'ण से
ा(त आ है यह अवलोकन के िब@दु_ के मध्य भूवैCािनक और [ेड या गुण क िनरं तरता

को जानने के िलए पया#(त है । इं िगत खिनज संसाधन या अनुमािनत खिनज संसाधन कसी एक के
योग क तुलना म मािपत
खिनज संसाधन का िव^वास ,तर अिधक है । इसे िस? खिनज/भंडारण या संभािवत खिनज भंडारण के िलए पEरवLतत कया
जा सकता है ।

12.
12. खिनज भंडारण आLथक Fप से एक मािपत और/या इं िगत खिनज संसाधन का खननयुत भाग है । इसम 'ित के
िलए डाइयूeटग मैEटEरयल और एलाउं सेस शािमल हQ जो साम[ी को खिनत या/िनकालते समय घEटत हो सकती है और
6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

Mयवहाय#तापूव# या Mयवहाय#ता के ,तर पर यथा उिचत अNययन ारा पEरभािषत कया गया है िजसम संशोिधत घटक का
अनु
योग सि!मिलत है ।
संभा9य खिनज भंडारण (121 व 122)
122) आLथक दृिHट से इं िगत, और कु छ पEरि,थितय म मािपत खिनज संसाधन
का खननयुत भाग है ।
संभािवत खिनज भंडारण के
योग म संशोिधत घटक म िव^वास ,तर िस? खिनज भंडारण के
योग क तुलना म
कम है ।

िस> खिनज भंडारण (111)


111)आLथक Fप से मािपत खिनज संसाधन का खननयुत भाग है । िस? खिनज भंडारण
संशोिधत घटक म िव^वास के उlच ,तर को दशा#ता है।
9यवहाय
यवहायता खिनज संसाधन (211)
211) एक “ Mयवहाय#ता खिनज संसाधन” मािपत खिनज संसाधन का वह भाग है जो
आLथक दृिHट से Mयवहाय#ता ,तर पर अNययन ारा यथा पEरभािषत खननयुत नहP है। यह साम[ी
ौRोिगकय,
आLथक और पया#वरणीय और/या अ@य संबंिधत ि,थितय म पEरवत#न क शत# सिहत संभवत: आLथक दृिHट से
महवपूण# होने के Fप म पहचानी गयी है ।
9यवहाय
यवहायतापूव खिनज संसाधन (221 व 222)
222) एक “ Mयवहाय#तापूव# खिनज संसाधन” एक इं िगत और कुछ
पEरि,थितय म मािपत खिनज संसाधन का वह भाग है जो Mयवहाय#ता पूव# ,तर पर अNययन से आLथक Fप से
महवपूण# नहP पाया गया है । यह साम[ी
ौRोिगकय, आLथक, और पया#वरणीय और/या अ@य संबंिधत ि,थितय
म पEरवत#न क शत# सिहत संभवत: आLथक दृिHट से महवपूण# होने के Fप म पहचानी गई है ।
13.
13. भूवै ािनक
ािनक अ@य आLथक महव का एक आरं िभक मूयांकन है । यह [ेड, मोटाई, गहराई ओर तुलनामक
यन (एफ3
एफ3)

खनन कायU से
ाकिलत लागत के िलए महवपूण# कट आफ मूय ारा
ा(त होता है । भूवैCािनक अNययन का
योजन
खिनजीकरण को पहचानना, खिनज िन'ेप क िनरं तर उपि,थित, मा0ा और गुण को Cात करना तथा इसम िनवेश के अवसर

को पEरभािषत करना है ।
तथािप, आLथक महव क Zेिणय को एक आLथक महव के मूयांकन के िलए आव^यक िववरण के अभाव के कारण
भूवैCािनक अNययन से सामा@यतया पEरभािषत नहP कया जा सकता है ।
ाकिलत संसाधन मा0ा_ से यह Cात हो सकता
है क िन'ेप मूलभूत आLथक महव अथा#त आLथक से संभािवत Fप से आLथक महव का है।
14.
14. उपांतरत कारक घटक वे घटक हQ जो खिनज संसाधन से खिनज भंडारण म पEरवLतत करने के िलए
Mयवहाय#तापूव# या Mयवहाय#ता अNययन करते समय िवचार िवमश# म
युत कए जाते है इनम खनन
Tया, अंितम उपयोग,
कट आफ [ेड, mेश होड मूय, धािवक, अवसंरचना, आLथक, िवपणन, िविधक, पया#वरणीय, सामािजक और शासकय
घटक शािमल है जो
ितबि@धत नहP है ।
15.
15. 9यवहाय
यवहायतापूव अ@ययन (एफ2
एफ2) खिनज पEरयोजना के आLथक महव के िलए िवकप क Zृंखला का एक अNययन है

जो एक ऐसे चरण तक िवकिसत हो गया है जहां भूिमगत खनन या गडढा संरचना क ि,थित म , खुले गडढ क ि,थित म
अिधमा@य खनन िविध Cात क गई हQ और खिनज
Tया क एक
भावी िविध िनधा#Eरत क गई है । इसम पEरवध#न घटक
क उिचत अवधारणा_ पर आधाEरत िवतीय िव^लेषण तथा कसी अ@य संबंिधत घटक का मूयांकन शािमल है जो
िनधा#Eरत करने के िलए पया#(त है यद खिनज संसाधन के सभी या भाग को सूचना के समय खिनज भंडारण के िलए
पEरवLतत कया जाए । एक Mयवहाय#तापूव# अNययन का िव^वास ,तर Mयवहाय#ता अNययन क तुलना म कम है ।
16.
16. 9यवहाय
यवहायता अ@ययन (एफ1एफ1) एक खिनज पEरयोजना के िलए चयिनत िवकास िवकप का एक िव,तृत आLथक

अNययन है िजसम कसी अन्य संबंिधत


चालनीय कारक सिहत लागू पEरवध#न कारक का उिचत िव,तृत आंकलन और
िव,तृत िवतीय िव^लेषण शािमल है जो सूचना के समय यह
दLशत करना अिनवाय# है क िनHकषण# उिचत Fप से
@यायोिचत (आLथक Fप से खनन यो:य) है। अNययन का िव^वास ,तर Mयवहाय#तापूव# अNययन के िव^वास ,तर क तुलना म
अिधक होगा ।

17.
17. मूलभूत प से आ7थक भूवैCािनक अNययन के साधन ारा आकिलत और Zेणी/गुण सिहत टन/वोयूम म
(ई3)

सूिचत मा0ा मूलभूत Fप से आLथक महव क है । चूंक भूवैCािनक अNययन म के वल आLथक महव का आरं िभक मूयांकन
शािमल है इसिलए आLथक और संभािवत Fप से आLथक के मNय कोई अंतर भेद नहP कया जा सकता है । अत: इन संसाधन
को आLथक से संभािवत Fप से आLथक क Zेणी म ि,थत होना बताया गया है ।
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 7

18.
18. संभािवत प से आ7थक बढ़ती पEरशु?ता के Tम म Mयवहाय#तापूव# अNययन/Mयवहाय#ता अNययन के साधन
(ई2)

ारा
दLशत [ेड/गुण सिहत टन/
वाह म सूिचत मा0ा जो
ौRोिगकय आLथक, पया#वरणीय और अ@य संबंिधत ि,थितय के
तहत @यायोिचत िनHकष#ण नहP है वा,तिवक Fप से िनधा#रण के समय मान ली गई है परं तु भिवHय म ऐसा शायद ही संभव
हो ।

19.
19. आ7थक (ई1)बढती पEरशु?ता के Tम म Mयवहाय#तापूव# अNययन/Mयवहाय#ता अNययन के साधन ारा
दLशत
[ेड/गुण सिहत टन/
वाह म सूिचत मा0ा जो
ौRोिगकय आLथक, पया#वरणीय और अ@य संबंिधत ि,थितय के तहत
@यायोिचत िनHकषण# है, को अवधारण के समय वा,तिवक Fप से मान िलया गया है।
भाग-
भाग-2

गवेषण के िलए भूवै ािनक पैरामीटर


1. हवाई आवीण : सैटेलाइट इमेजरी/दूर संवेदन/एयरबोन भूभौितक सवण आद म उिचत ौोिगक का योग कया जा
रहा है (मु"यत: आवीण गवेषण (जी4) &तर के िलए यो(य) ।
2. टोपो फक तथा भूवैािनक सवण (मानिचण) : आवीण (जी4) &तर के िलए 1:50,000 अथवा लघु पैमाने पर; ारं िभक
गवेषण (जी3) &तर के िलए 1:25000 से 1:10,000 अथवा वृहत पैमाने पर; सामा*य गवेषण (जी2) के िलए 1:4000/1:
5,000 अथवा वृहत पैमाने पर; िव&तृत गवेषण (जी1) &तर के िलए 1:2000 अथवा वृहत पैमाने पर ।
3. भूिम भूभौितक तथा भूरासायिनक सवण : भूभौितक तथा भूरासायिनक सवण म आव-यकतानुसार उिचत तकनीक का
योग कया जा रहा है ।
4. "ौ#ोिगक : गवेषण तथा नमूने म दृ-यांश (आउट 2ोप), 4चेस, मुहाना, पुराने काय5 तथा वेधन िछ8 जैसे &थान9 से उिचत
तकनीक का योग कया जा रहा है । नूमूना वि&थित को अय&क िनकाय क मौजूदगी का पता लगाने के िलए तथा इसका
बाद म तथा उ;वाधर िनरंतरता का पता लगाने के िलए उिचत दूरी पर रखा गया है (जहां तक संभव हो ि<ड पैटन म तथा
अवसंरचा>मक ज?टलता के आधार पर उपांत?रत कया जाए) । अनुसूची के भाग-3 को आगामी िववरण हेतु संद@भत कया
जाए ।
गवेषण क साधारण (जी2) तथा िव&तृत (जी1) &तर के िलए खिनजीकरण क गहराई िनरं तरता पर उस सीमा तक िवचार
कया जाएगा िजसम खिनजीकरण का >य साCय ाDत Eआ है ।
संसाधन का आकलन करने के िलए अमु"य िव&तार पर िवचार कया जाएगा जो मानिचFण अथवा अ*य साधन9 Gारा
भूवैHािनक िनरंतरता Gारा कए गए भूवैHािनक िवचार-िवमश5 पर िनभर होगा तथा कसी भी मामले पर जांच Jबदु क ि<ड
&पेJसग के 50 ितशत से अिधक नहK होगा ।
िवलिगत आमापन, िवलिगत वेधन िछ8, पLड सां8ण9 के आमापन आद पर आधा?रत आकलन क िसफा?रश नहK क गई है ।
5. सै%प&लग प&लग : आवीण &तर के िलए (क) यादृिNछक पकड़ना/िचप/सतही अनावरण से चैनल
प&लग तथा उप-सै%प&लग
सैOपJलग/कगार/नाला काटना/मुहाना/चैनल आद ।
(ख) : मुहाना/4े*थेस/आउट2ॉप/वQकग आद से Rयवि&थत सैJDलग, इतना पास रखा जाए क भूवैHािनक आकलन के अ*य &तर9
के िलए भूवैHािनक तथा <ेड िनरंतरता सुिनि-चत हो ।
(ग) : िनयिमत अंतराल पर, िवशेषकर खिनजीकृ त मांग के िलए मीटर वार अथवा उससे कम, वेधन कोर/िचप सैOपल क
भूवैHािनक संलेखन तथा सLOपJलग ।
(घ) : िनयोिजत कए जाने वाली वेधन तकनीक, अिधकतम सैOपल/कोर वसूली ाDत करने के उSे-य के साथ अंतवधन कए
जाने वाले चTान9 पर िनभर होगा ।
(ड.) : गवेषण सैOपल तथा साथ ही सतही सैOपल, वेधन कोर/िचप सैOपल9 का भिवUय म योग के िलए संरित रखा जाएगा ।
6. आमापन डाटा तथा "योगशाला परीण : जांच कए जा रहे खिनज के िलए उिचत; मुख िवलण9 के िलए सृिजत सभी
सैOपल9 का िव-लेषण । बॉVसाइट म जीए, 2ोमाइट म एनआई, पीजीई, लौह अय&क म एयू, सीसा तथा ज&ता म एजी, कॉपर
आद म एयू जैसे उपो>पाद तथा जहां भी आव-यक हो अ*य हािनकारक त>व9 का िव-लेषण ।
8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

7. शैलवण+ना तथा िमनरा ाफक अ-ययन : चTान9 के कार तथा <ेन आकार, बनावट, नाप सिहत खिनज संयोजन तथा यद
आव-यक समझा जाए तो िन&तारण िवशेषताएं आद ।
8. "पुंज सघनता अ-ययन : पुंज सघनता को उस पZित से मापा जाएगा जो खिनज/अय&क िनकाय म ारं िभक शू*य ?रVत
&थान9 (वग, संर[ता आद) के िलए पयापत है ।
9. स2जीकरण
जीकरण अ-ययन3 ं नमूना करना : यद सं&करण ौोिगक परीण के िलए आव-यक हो तो पुंज नमूना
ययन3 के िलए "पुज
करना ।
10. पया+वरणीय से6टग : &थानीय अवसंरचना, &थानीय जनसं"या, ऐितहािसक &थल, वन अ]यार^य, राU4ीय पाक संबंधी िववरण
तथा ेF क पयावरणीय से_टग संबंधी सूचना एकF क जाए ।
11. अ7य संगत डाटा : भूगत जल, भूतकनीक तथा चTान क िवशेषताएं आद जो संगत हो सकती है ।

भाग-
भाग-3

िविभCन भंडार# के िलए गवेषण मानक


नीचे दी गई ि[ड ,पेfसग पEरचायक है । भंडार क भूवैCािनक जEटलता के आधार पर िनकटतम ,पेfसग आव^यक हो सकता है)
(

भंडार के कार तथा जी4 &तर जी3 &तर जी2 &तर जी1 स्तर ?टDपिणयां
मुख खिनज
ता9रत 8तरीय यद आव-यक हो चूना-प>थर,
I. सं8ता9रत चूना-प>थर, चूना-प>थर, पूवण के िविभ*न
तथा िनयिमत और
तो &काउट वेधन बॉVसाइट, पोटाश बॉVसाइट, पोटाश बॉVसाइट, पोटाश &तर9 के िलए ि<ड
अिनयिमत यवहार3 (समय-समय पर तथा नमक बेड के
:यवहार3 &पेJसग के अनुसार
क 8ीय सरकार तथा सा`ट बेड के तथा सा`ट बेड के ि<ड पैटन म सतही
Gारा िनaदUट ि<ड िलए ि<ड का अंतर िलए ि<ड का िलए ि<ड का अंतर िप_टग से 6 मी. तक
का सारणी बध
िनेप : िनयिमत Rयवहार अंतर िनयिमत िनयिमत Rयवहार क गहराई तक
के प?रेCय म)
लौह अय&क, मLगनीज वाले भंडार9 के िलए Rयवहार वाले वाले भंडार9 के िलए िनरं तर तलछट
अय&क, बॉVसाइट, 800 मी. अथवा भंडार9 के िलए 200 मी. अथवा सतही भंडार9 के
चूना प>थर, उसम कम तथा 400 मी. अथवा उसम कम तथा िलए पयाDत हो
अिनयिमत Rयवहार उसम कम तथा अिनयिमत Rयवहार सकता है । आगे क
2ोमाइट/पोटाश तथा वाले भंडार9 के िलए अिनयिमत वाले भंडार9 के िलए गहराई म भंडार9
सा`ट बेड आद 400 मी. अथवा Rयवहार वाले 100 मी. अथवा क िनरं तरता के
उससे कम; अ*य के भंडार9 के िलए उससे कम; अ*य के िलए बंधनक
िलए 400मी. अथवा 200 मी. अथवा िलए 100मी. िसफा?रश क गई है
उससे कम िनयिमत उससे कम; अ*य अथवा उससे कम ।
के िलए तथा के िलए 200मी. िनयिमत के िलए
200मी. अथवा अथवा उससे कम तथा 50मी. अथवा
उससे कम िनयिमत के िलए उससे कम
अिनयिमत Rयवहार तथा 100मी. अिनयिमत Rयवहार
वाल9 के िलए । अथवा उससे कम वाल9 के िलए ।
अिनयिमत
Rयवहार वाल9 के
िलए ।
II. एनएशलॉन यद आव-यक हो बोर होल क
वाले बोर होलक बोर होल क जी2 तथा जी1 &तर
तो & काउट वे ध न &पेJसग, &4ाइक के & पे J सग के साथ &पेJसग, &4ाइक के पर जहां कहK
िनकाय3, सम िशरा
(समय-समय पर साथ 200-100 मी. 100-50 मी. साथ 50-25 मी. आव-यक हो <ेड9
क िसिलकभूत रे खीय क 8ीय सरकार अथवा उससे कम अथवा उससे कम अथवा उससे कम क ब`क िनधारण के
जोन3 का भसूराकृ ितक Gारा िनaदUट ि<ड
दूरी के अंतराल पर दूरी पर रखा जाए । दूरी के अंतराल रखा साथ गवेषणा>मक
&पड । ल>सस
े , पॉकेट,
ट, के प?रेCय म) िवशेष मामल9 म जाए । खान ओपJनग खुला
रखा जाए ।
8टॉक
टॉक काय+, लघु आव-यकता होने मुहाना अथवा
आकार वाले िनकाय3 पर इसे िवशेषकर भूिमगत
तक अिनयिमत आकार कमती धातुb के
मोडे8ट िलए 25 मी.
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 9

लैटरीटायड म लौह अथवा उससे कम


तथा मLगनीज अय&क रखा जा सकता
िनकाय तथा िनके ल है ।
कोबा`ट लैटेराइट,
सीयू-पीबी-जेडएन-
एसबी-एचजी क
आधार धातु स`फाइट,
पोडीफॉम 2ोमाइट,
ऑरीफे रस Vवाटज
रीफज, पीजीएम,
<ेफाइट लस9,
मॉलीबेडनम ?टन
बाडी, पायराइट
&कान, शीलाइट
िनकाय,
वोला&टोनाइट)
फलओराइट आद
वमeVयूलाइट,
मLगनेसाइट,
इं सटू सीलीमानी, तथा
Vयानाइट लस ।
III. मािण@य तथा यद आव-यक हो 8 से 10 िपट9/ 4चेस 4Jचग मु"त: 5 बोर होल क दूरी जी2 तथा जी1 &तर
दुल+भ धातु पैCमेटाइट,
टाइट,
तो &काउट वेधन ित वग क.मी. । मी. अंतराल पर जी2 &तर से कम पर जहां कहK
टाइट
(समय-समय पर 200 मी. अथवा कम 200 मी. अथवा रखा जाए । आव-यक हो <ेड9
रीफस तथा
क 8ीय सरकार अंतराल पर देशज कम अंतराल पर और वसूली क पुंज
िशरा/पाइप :
िशरा/
Gारा िनaदUट ि<ड शैल क िनरंतरता के देशज शैल क िनधारण के साथ
?टन, टंग&टन – के प?रेCय म) परीण के िलए बोर िनरंतरता के गवेषणा>मक खान
टुंटालुम, िनओिवयम हो` स परीण के िलए ओपJनग खुला
मॉलीबेडनम िशरा बोर हो`स मुहाना अथवा
तथा पैfमेटाइट, बे?रल, भू ि मगत

टोपाज, इमरा`ड
िनेप, हीरा ।
IV. Dलोट/Eलेसर
सर यद आव-यक हो िनेप के 4ड के साथ िनेप के 4ड के िनेप के 4ड के ि<ड म उथली
िनेप : तो &काउट वेधन 400 मी. तथा 200 साथ 200 मी. साथ 100 मी. तथा िनेप िप_टग के
लौह, मLगनीज अय&क
(समय-समय पर मी. से अिधक तथा 100 मी. से 50 मी. से अिधक िलए उपयुVत हो
क 8ीय सरकार अिधक सकता है । स?रत
hलोट; Dलेसर ?टन Gारा िनaदUट ि<ड अवसाद अथवा
तथा गो`ड िनेप; के प?रेCय म) Dलेसर अवसाद,
गारनेट, इलमेनाइट, >येक &तर पर
iटाइल, िजरकोन; आव-यकतानुसार ।
सां8ण का
हीरा, कोर*डस, योगशाला मापन
Vयानाइट, पृथVकरण तथा
िसिलमेनाइट hलोटस । परीण तथा
िव-लेषण ।
10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

* यद तटीय बालू, नदीय बालू आद के साथ सहायक लेसर िनेप म पुन: ाित क सूचना िमलती है तो
संसाधन" क आविधक पुन$म%ू यांकन करना आव&यक होगा ।
भाग-
भाग-IVक
IVक

खिनज संसाधन क, रपोDटग करना


हवाई, भू-भौितक, भू-रासायिनक, भूवैCािनक सवB'ण एवं
ौRोिगक अNययन के माNयम से उपादत गवेषण नमूना सं[ह
एवं जांच क सभी आंकड़ा को एकि0त कर खिनज संसाधन के आकलन एवं Eरपोoटग के िलए भूवैCािनक अNययन Eरपोट#
गवेषण के
येक चरण (जी1 से जी4 तक) के िलए कया जाए । अNययन म अ@य बात के साथ-साथ िन!निलिखत िवषय-
व,तु को शािमल कया जाना चािहए ।
2ं .सं िवषय-व&तु &पUटीकरण
.
1. &वतनाम एवं - पूवक का ई-मेल आईडी, दूरभाष सं"या सिहत नाम, पता ।
&वािम>व
- पूवण क अविध का पूण िववरण/खिनज अिधकार, यद कोई है ।
- गवेषण अिभकरण का पूण िववरण, अहता, गवेषण से जुड़े Eए तकनीक RयिVतय9 का अनुभव ।
2. ेF के kयौरे - गांव, िजला, रा(य
- भारतीय टोपोशीट सं"या का सवण, सभी कोना Jबदुb के ेF का भू-िजयो सम*वय ।
- भू-उपयोग, वन के कार के साथ वन के अंतगत ेF सिहत ेF का भूकर-मानिचF का िव&तृत
िववरण अ*वेषण के तहत खिनज ।
3. अवसंरचना एवं - &थानीय अवसंरचना, जनसं"या, ऐितहािसक &थल9, वन9, ^य-&थान, राU4ीय उान एवं ेF क
पयावरण पयावरण ि&थित ।
4. पूव म कए गए - अ*य अिभकरण/प9 Gारा कए गए पूव गवेषण का पूण kयौरे ।
गवेषण - अगर ेF मामले म पूव गवेषण ेF के अंतगत आता है तब इसे उिचत पैमाने पर नVशा म दशाया
जाना चािहए ।
5. भूिवHान - िव&तृत भूिवHान संरचना>मक ढ़ांचा क iप-रे खा दशाते Eए ेF क संिDत ेFीय भूिवHान ।
- अ;ययन ेF क िनेप क कार, भूवैHािनक गठन, नित पूव काय5, पृUठीय गटीकरण के साथ-साथ
अ;ययन ेF के आस-पास के ेF9 म भी उि`लिखत काय5 को करना यद अ;ययन ेF पर इसके भाव
क संभावना क सूचना िमलती है ।
- भू-सम*वय को दशाने वाला मु"य आि&मक ईकाईयां, संरचना एवं िववतिनक लण9 के साथ उिचत
पैमाने क भूवैHािनक मानिचF, पृUठीय खिनजन क सीमा, संरचना, वेधन िछ89 का &थान, गत, खंदक
एवं पुराने काय आद ।
- आि&मक इकाईय9 एवं खिनजन क उZव ेपण को दशानेवाला उपयुVत अंतराल पर अनु&थ
काट ।
- लंबाई म दशाई गई (नितलंब या अ*य कार से) खिनजन क सीमा एवं िविभ*नता, चौड़ाई एवं पृUठ
के नीचे से खिनज संसाधन के ऊपरी एवं िनOन सीमा तक गहराई ।
6. हवाई/भौम/भूभौतकय/ हवाई, भू-भौितकय, भूरासायिनक प?रणाम का िव&तृत िववरण यद इस कार के कोई काय कए गए
भू-रासायिनक आंकड़ा हL और उनके प?रणाम ।
7. ौोिगक अ*वेषण - ौोिगक अ*वेषण (ग>तन, खंदन, वेधन आद) का िव&तृत िववरण ।
- गवेषण प?रणाम क ?रपोoटग के िलए डाटा &पेJसग : क डाटा &पेJसग एवं बंटन अनुसूची के भाग-1
एवं भाग-2 पर आधा?रत हL और Vया यह खिनज संसाधन आकलन 2या एवं वगeकरण के िलए
भूवैHािनक अंश एवं pेणी िनरंतरता &थािपत करने के िलए पयाDत हL ।
8. आंकड़ा Jबदु के &थान - वेधन िछ89 अथात् (कॉलर एवं डाउन-होल सव) खंदक, खान काय5 एवं खिनज संसाधन आकलन म
युVत अ*य &थान9 का पता लगाने के िलए युVत सवण क स?टकता एवं गुण ।
- &थलाकृ ित िनयंFण के गुण और पयाDतता ।
9. नमूना ाDत करने क - नमूना ाDत करने क कृ ित एवं को?ट (उदाहरणाथ- कट-चैनलस, रLडम िचDस) एवं िनiपक iप म
तकनीक नमूना सुिनि-चत करने के िलए कए गए उपाय ।
10. वेधन तकनीक एवं - वेधन के कार (उहाहरणाथ – कोर, ?रवस, सकु लेसन, ओपन-होल हैमर, रोटरी, एअर-kला&ट, आगर,
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 11

वेधन नमूना बंका, सोिनक इ>याद) एवं िव&तृत िववरण (उहाहरणाथ कोर डायमीटर, ?4पल या &टLडड टयूब, कॉलर
आरएल, एिजमुथ, इनिVलनेसन, वेधन िछ89 के का@डनेट इ>याद) ।
- कोर एवं िचप नमूना को समुिचत ढंग से अिभलेिखत एवं प?रणाम को मूल्यांकत कया गया है ।
- अिधकतम नमूना ाDत करने एवं िनiपक कृ ित के नमून9 को सुिनि-चत करने के िलए उपाय कए
गए हL ।
- क नमूना ािDत एवं <ेड म एक संबंध बनता हL एवं सूCम/&थूल पदाथ क ित/वृिZ के कारण नमूना
नित पाए गए हL ।
संलेखन : क कोर एवं िचप नमून9 को समुिचत खिनज संसाधन आकलन, खनन अ;ययन और धातुकमeय
अ;ययन के सहयोग के िलए िव&तृत &तर पर संलेिखत कया गया है ।
11. अव-नमूना िविध - कोर नमूना क ि&थित म काटा या चीरा गया है और एक चौथाई, आधा या पूरा कोर िलया गया है ।
एवं नमूना क तैयारी - यद कोर नहK है तो राइफ`ड, टयूब सैOपलड, रोटरी &पिलट और नमूना आ8 है या सूखा ।
- कृ ित, गुण एवं नमूना तैयार करने क िविध क उपयुVतता सभी कार के नमून9 के िलए ।
- सभी अव-नमूना चरण से नमूना के अिधकतम िनiपकतता तक के िलए <िहत गुण िनयंFण 2याएं।
- उपाय सुिनि-चत कए गए हL क नमूना एकिFत एवं &व&थान पदाथ के िनiपक हL ।
- क नमूना का आकार तैयार कए जा रहे नमूने, के कण के आकार के िलए उपयुVत हL ।
12. आमापन आंकड़ा के - युVत कए गए आमापन और योगशाला 2याएं क कृ ित, गुण एवं उपयुVतता एवं िविध को
Vवािलटी एवं आंिशक या पूणiपेण माना गया है ।
योगशाला म जांच
- <िहतगुण िनयंFण 2या क कृ ित (उदाहरणाथ – मानक, अपूण, िZतीयक, योगशाला से बाहर
जांच) एवं सटीकता क &वीकाय &तर (नित का न होना) तथा प?रशुZता को &थािपत कया गया है ।
- सटीकता के &वीकाय &तर तक मू`यांकन के िलए िव-लेिषत नमून9 के 10 ितशत को एनएबीएल
>यािशत तृतीय प/या िवHान एवं ौौिगक िवभाग (डीएसटी) बीआईएस से मा*यता ाDत
योगशालाb या सरकारी योगशालाb म िव-लेिषत कया जाए ।
13. आ8ता - क टनेज को िनजल आधार पर या ाकृ ितक आ8ता के साथ आकिलत कया गया है एवं आ8ता क
माFा के िनधारण क िविध ।
14. पुंज घन>व क माना या अवधा?रत है । यद माना गया है तो पूवानुमान का आधार । यद िनधा?रत कया गया है
तो उसके िलए युVत िविध, नम या िनजल, मापनक आवृित, कृ ित, आकार एवं नमूना क
िनiपकतता ।
15. संसाधना/ाVकलन - खिनजन क िनरं तरता के िनधारण के िलए पयाDत आंकड़ा घन>व पर िवचार-िवमश तथा युVत
तकनीक आकलन 2या के िलए पयाDत सं-लेिषत आंकड़ा आधार ।
- लागू कए गए आकलन तकनीक क कृ ित एवं उपयुVतता तथा अ>यंत <ेड मान, डोमेJनग,
इंटरपोलेसन पारामीटर एवं आंकड़ा Jबदु से एVस4ापोलेसन क अिधकतम दूरी ।
- खिनज संसाधन9 को िविभ*न pेिणय9 म वगeकरण का आधार ।
- गौण उ>पाद क ािDत के संबंध म कए गए पूवानुमान ।
- टनेज एवं <ेड के आकलन के िलए (सेVसन, पॉलीगॉन, इनवस िड&टस, िजयो&टै?टकल या अ*य िविध)
युVत िविध का िव&तृत िववरण और कए गए पूवानुमान ।
- संसाधन आकलन के िनयंFण के िलए भूवैHािनक िनवचन का िव&तृत िववरण ।
- उपयोग या उपभोग म न लाए गए <ेड क_टग या कै Jपग के िलए आधार पर िवचार-िवमश ।
- यद संगणक िविध को चुना गया है तो काय2म एवं युVत पैरामीटर का वणन ।
- िजयो-&टै?टकल पZित म अ>यंत बदलाव होता है इसिलए िव&तृत iप से इसका िववरण दया जाना
चािहए । चयिनत िविध औिच>यपूण होना चािहए । वे?रयो<ाम एवं भूवैHािनक िनवचन के साथ इसक
अनुकूलता सिहत िजयो-&टै?टकल पारामीटर पर िवचार-िवमश कया जाना चािहए । सदृश िनेप के
िलए युVत कए गए िजयो-&टै?टVस म ाDत अनुभव ;यान म लाया जाना चािहए ।
- आंकड़ा स>यापन और/या युVत मा*य 2या ।
16. आगे का काय - योजनाबZ अ<तर काय क कृ ित एवं पैमाना (उदाहरणाथ – पा-व िव&तार या गहराई िव&तार या
बड़े पैमाने पर वेधन के िलए जांच) ।
17. ?रपोट के िलए ?रपोट म आकलन के समथन म नVश9, काट9, संलेख9, िव-लेिषत ितवेदन, फोटो<ाफ सिहत सभी
प?रिशUट/अनुलfनक संबंिधत आंकड़ा शािमल ह9गे ।
18. कोई अ*य सूचना कोई अ*य सूचना, जैसा उपलkध होगा या यथा िविहत कसी ािधकारी Gारा अपेित हो सके ।
12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

भाग IV ख

हीरे अथवा अCय रEन पEथर#


थर# का कलन
कलन और रपोDटग करना
भाग IV क म सूचीब? मानदpड इस समूह के िलए भी लागू होते है; कनािडयन इ@सटीटयूट ऑफ माइfनग, मैटरयुज] एंड
पै8ोिलयम ारा ,थािपत क गई हीरा गवेषण सवrlच Mयवहार सिमित ारा जारी “हीरा गवेषण पEरणाम क Eरपोoटग
करने के माग#दश#क िस?ांत” म अितEरत माग#दश#क िस?ांत उपलIध है।
1 उपदशक खिनज - रासायिनक/भौितक िविशUट गान चूना पत्थर, 2ोम &पाइनल और 2ोम डाइओसाइड जैसे
सांकेितक खिनज9 क ?रपोट उिचत योfय योगशाला Gारा तैयार क जानी चािहए ।
2 हीरे के sोत - हीरे के &वiप आकृ ित, आकार और रं ग एवं हीरे के &Fोत क कृ ित (ाथिमक या गौण) का चTान
के कार और भूवैHािनक पयावरण सिहत kयौरे ।
3 नमूना सं<हण - नमून9 के कार, चाहे दृ-यांश (ऑट2ोप) गोला-म (बु`डस), tील कोर, संरित प?रसंचरण िtल
कटKग, <ेवल, &4ीम तलछट या िमTी, और उSे-य जैसे- आयतन क ित यूिनट प>थर9 को &थािपत
करने के िलए बड डायमीटर वेधन या प>थर आकार वगeकरण को सुिनि-चत करने के िलए ब`क
नमूने
- नमूना आकार वगeकरण ितिनिध>वता
4 नमूना Rयवहार - सुिवधाb के कार 4ीटमट दर और >यायन
- आकार iपांतरण के नमून,े तलीय &2न आकार शीष &2न आकार और पुन: संदिलत
- 2याएं (डस मीिडया पृथVकरण, <ीस एVसरे , pेणीबZ करना आद)
- 2या दता टेJलग ऑिड_टग और <ेनुलोमटरी
- योगशाला उपयोग, माइ2ो डायमंड और >यापन के िलए 2या के कार
5 कै रे ट एक <ाम का पांचवा भाग (0.2) (यिप मै?4क कै रेट या एमसी के iप म प?रभािषत ।
6 नमूना <ेड - इस भाग म नमूना <ेड का Rयापक ेF, अथवा आयतन के ित यूिनट9 कै रट9 के संदभ म उपयोग
कया जाता है ।
- िविनaदUट कम कट-ऑफ छलनी (सीव) आकार से अिधक नमूना <ेड के बारे म ित शुUक (tाई)
मी?4क टन कै रेट9 के iप म और/अथवा ित 100 tाई मी?4क टन कै रेट9 के iप म सूिचत करना
चािहए । एलुिवयल भंडार9 के िलए, ित वग मीटर कै रेट9 म अथवा ित Vयूिबक मीटर कै रेट9 म
कोट कए (बताए) नमूना <ेड &वीकाय होते हL, यद उनके साथ गणना करने हेतु वजन करने का
आयत संलfन हो ।
- आयतन और सघनता का आकलन करने क सामा*य मांग9 के अलावा नमूना <ेड (कै रे ट ित टन)
ाDत करने के िलए प>थर क uVवसी (प>थर ित Vयूिबक मीटर अथवा टन) को प>थर के आकार
(कै रे ट ित प>थर) के साथ सOबZ करने क जiरत है ।
7 पुंज गवेषण प?रणाम9 - सीव आकार ित फे िसस के मानक pेणी का उपयोग करते Eए सीव डाटा के पूण सेट । नमूना
क ?रपोoटग प?रणाम, फे सीस ित fलोबल सपल <ेड । &पे?टयल &4कचर ऐनाल्युिसस और <ेड वगeकरण ।
प>थर आकार और सं"या वगeकरण सैOपल हैड फड और टेJलग पाvटकल <ेनुलोमेटरी
- नमूना सघनता का अवधारण
- सां8 ितशत और ित छोटा नमूना
- &2न आकृ ित तलछट वेधन म बदलाव के साथ नमूना <ेड
- नमूना संयंF िनUपादन तथा वािणि(यक पैमाने पर िनUपादन के िलए आकार वगeकरण करने के
िलए कए गए समायोजन
- यद उपयुVत या िनयोिजत, भूसांि"यक तकनीक9 को प>थर आकार ितमान, वगeकरण या
गवेिषत हीरा नमून9 के आकार वगeकरण या गवेिषत हीरा नमून9 के आकार वगeकरण क आवृित
- हीर9 का भार ?रपोट म छोड़ दया जायेगा जब हीर9 को Rयापार के योजन से बEत छोटा माना
जायेगा । इस *यूनतम कट ऑफ साइज का उ`लेख कया जाना चािहए ।
8 खिनज संसाधन9 और - <ेड का अनुमान लगाने के िलए िडजाइन कए गए खिनज9 क िtJलग और नमूना करने के नमूना
अय&क भंडार9 क कार एवं &थानीय Rयव&था का िववरण
?रपोoटग हेतु <ेड का - नमूना संदलन (2श) आकार और वािणि(यक 4ीटमट संयंF म उस िनUपा के साथ इसका संबंध ।
अनुमान लगाना - िविनaदUट और सूिचत कए गए कम कट-ऑफ सीव आकार से बड़े हीर9 क कु ल सं"या
- िविनaदUट और सूिचत कए गए कम कट-आफ सीव आकार से बड़े हीर9 का कु ल वजन
- िविनaदUट कम कट-ऑफ सीव आकार से अिधक नमूना <ेड
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 13

9 मू`य का अनुमान - पूणत: िवमुVत (िलबरे शन) ऐसी पZित का उपयोग करते Eए संसािधत हीर9 के नमून9 के मू`य9 के
लगाना बारे म सूिचत नहK करना चािहए, िजसका सं&करण गवेषण नमून9 के िलए आमतौर पर उपयोग
कया जाता है।
- िजस सीमा तक ऐसी सूचना को वािणि(यक दृिUट से संवेदनशील नहK माना जाता है, उस सीमा
तक िनOनिलिखत सूचना जनता को देनी चािहए
• उपयुVत &2न आकार ित फे स अथवा गहरे हीर9 क प?रमाण ।
• कमती पासल का kयौरा
• कम आकारन कट-ऑफ ित फे स अथवा गहरे प>थर9, करे ट9 क सं"या
• चुिन*दा िनचले कट-ऑफ पर औसतन ित डालर कै रे ट और डालर कै रे ट मू`य के बारे म
अमरीक डालर म सूिचत करना चािहए । ित कै रेट मू`य का प?रयोजना मू`य को दशाने म
िववेचना>मक मह>व होता है ।
• मू`य का आधार (उदाहरण के िलए डीलर का 2य मू`य और डीलर का िव2य मू`य आद) ।
• हीरे क टू ट-फू ट का आकलन करना।
10 वगeकरण - आयतन और सघनता का आकलन करने क सामा*य मांग9 के अलावा नमूना <ेड (कै रे ट ित टन)
ाDत करने के िलए प>थर क uVवसी (प>थर ित Vयूिबक मीटर अथवा टन) को प>थर के आकार
(कै रे ट ित प>थर) के साथ सOबZ करने क जiरत है । इन अनुमान9 म अिनि-चतता के घटक के
बारे म िवचार कया जाना चािहए और वगeकरण तदनुसार कया जाना चािहए ।
भाग-
भाग-5

सा@यता
यता पूव रपोट क, िवषय वतु
-

भाग-4 के अनुसार तैयार भूवC


ै ािनक Eरपोट# पर आधाEरत खिनज भंडार के
ाकलन और Eरपोoटग के िलए साNयता पूव#
Eरपोट# क िवषय-व,तु ।
भूवैCािनक अNययन Eरपोट# साNयता पूव# Eरपोट# के भाग के Fप म भी होगी ।
2ं . सं. िवषय-व&तु &पUटीकरण
1. खिनज भंडार म प?रवतन - खिनज भंडार म बदलने के िलए खिनज संसाधन ाVकलन के िववरण का आधार के iप म
के िलए खिनज संसाधन उपयोग ।
ाVकलन - &पUट िववरण क Vया संसूिचत खिनज संसाधन, खिनज भंडार से अित?रVत अथवा उसके
सिहत है ।
- खिनज संसाधन9 को खिनज भंडार म प?रव@तत करने के िलए कए गए अ;ययन का कार
और &तर अथात् सा;यता पूव/ सा;यता &तर ।
2. कट-ऑफ मानदंड - अपनाया गया कट-ऑफ <ेड (<ेड9) अथवा लागू कए गए गुणव>ता मानदंड का आधार,
िजसम समतु`य धातु सूF और िनधा?रत wैशो`ड मू`य का आधार, यद उपयुVत हो, शािमल है

3. खनन घटक अथवा - खिनज संसाधन को खिनज भंडार म बदलने के िलए उपयोग क गई िविध और अनुमान
अनुमान (अथात या तो इUटतम Gारा समुिचत घटक9 को लागू करके अथवा खनन के िलए संक`पना>मक
योजना Gारा सम@थत ारंिभक अथवा िव&तृत िडजाइन Gारा) ।
- >यािशत अय&क का ओबी अनुपात, खान से ािDतयां, डाई`यूशन आद, खुली खान और
भूिमगत काय चालन दोन9 के िलए ।
- चयिनत खनन िविध (िविधयां) क कृ ित और उपयुVतता का िवक`प, चयिनत खनन ईकाई
का आकार (लंबाई, चौडाई और ऊंचाई) और ी-ि&4प, एVसेस आद जैसे संबंिधत िडजाईन
मुS9 सिहत अ*य खनन मानदंड ।
- भू-तकनीकय मानदंड (जैसे िपट &लोप, &टॉप साईज आद), <ेड िनयंFण और उ>पादन पूव
वेधन के बारे म लगाए गए अनुमान ।
- लगाए गए मु"य अनुमान और िपट-इUटतमता के िलए उपयोग कया गया खिनज संसाधन
मॉडल (यद उपयुVत हो) ।
- उपयोग कए गए खनन डाई`यूशन घटक, खनन ािDत घटक और *यूनतम खनन चौडाई ।
14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

- चयिनत खनन िविधय9 के िलए अपेित अवसंरचना, जहां उपलkध हो, िनUपादन मानदंड9
क ऐितहािसक िव-वसनीयता ।
4. धातु कमeय घटक अथवा - &तािवत धातु कमeय 2या और उस 2या क िनेप कार क दृिUट से उपयुVतता ।
अनुमान - कए गए धातु कमeय परीण काय क कृ ित, माFा और ितिनिध>वता और लागू कए गए
धातु कमeय ािDतयां ।
- ितकर त>व9 के िलए लगाया गया कोई अनुमान अथवा अनुHा ।
- कसी भी पुंज नमूने क िवमानता अथवा ायोिगक पैमाने परीण काय और ऐसे नमूने
कतने िड<ी तक संपूण अय&क िनकाय के ितिनिध>व के iप म है ।
- खिनज संसाधन के िलए संसिू चत टनेज और <ेड म यह &पUट उललेख होना चािहए क Vया
यह संयंF क साम<ी के संबंध म है अथवा ािDत के संबंध म । मौजूदा संयंF और उपकरण,
ित&थापन और बचाव मू`य के संकेत सिहत, पर ?टDपणी ।
5. लागत और राज&व कारक - प?रलित पूंजी और चालन लागत9 के बारे म इनका sोत, अथवा लगाया गया अनुमान ।
- हैड<ेड, धातु अथवा व&तु कमत (कमत) िविनमय दर , प?रवहन और शोधन भार, जुमाना
आद सिहत राज&व के बारे म लगाए गए अनुमान ।
- देय रॉयि`टय9 के िलए दी गई अनुमितयां, सरकार और ाइवेट दोन9 ।
- उि`लिखत अविध के िलए बुिनयादी नकदी ापण सूचना ।
- वा@षक िनयोिजत उ>पादन, िनेप क एनपीवी और आईआरआर, वा@षक प?रलित
उ>पादन के आधार पर िनेप का ताि>वक मू`य ।
6. बाज़ार आंकलन - कसी िविशUट व&तु के िलए मांग, आपू@त और &टॉक ि&थित, खपत वृित और भिवUय म
आपू@त और मांग को भािवत करने वाले संभािवत घटक ।
- <ाहक और ित&पधe िव-लेषण, उ>पाद के िलए संभािवत बाज़ार अवसर9 के पहचान सिहत ।
- कमत और माFा का पूवानुमान और इन पूवानुमान9 के िलए आधार ।
- औोिगक खिनज9 के िलए <ाहक िविशUटीकरण, परीण और आपू@त ठे के से पूव &वीकृ ित
अपेाएं ।
7. अ*य आशोधनकारी घटक - प?रयोजना क संभािवत Rयवहायता पर ाकृ ितक जोिखम, अवसंरचना, वैधािनक, िवपणन,
सामािजक अथवा सरकारी घटक9, यद कोई हो, और/अथवा खिनज भंडार9 के आंकलन और
वगeकरण पर भाव ।
- प?रयोजना क Rयवहायता के िलए मह>वपूण &वािम>व क ि&थित और अनुमोदन, जैसे क
खनन पTा, िन&सरण परिमट, सरकारी और वैधािनक अनुमोदन ।
- >यािशत दािय>व9 का पयावरणeय िववरण, खिनज अिधकार9 और &वािम>व9 क अवि&थित
योजनाएं ।
8. वगeकरण - खिनज भंडार9 को अलग-अलग िव-वसनीय pेिणय9 म वगeकृ त करने के िलए आधार ।
- &तािवत ारं िभक खान िडजाईन/संक`पना>मक योजना म िवचा?रत <ेड-वार खनन योfय
माFाb के अनुमान को इस शत के अधीन अंितम iप देना क सभी आव-यक
अनुमोदन9/संिवदाb क पुिUट कर ली गई है अथवा ऐसी यथोिचत अपेाएं है क ऐसे सभी
अनुमोदन/संिवदाएं यथोिचत समयाविध के भीतर और इस माणन के साथ क आ@थक
Rयवहायता अ`पकािलक ितकू ल बाज़ार दशाb से भािवत नहK होगी, और यह भी क
दीघाविध अनुमान अनुकूल ह9गे, ाDत कर ली जाएगी ।

[फा. सं. 7/2/2015-एम. IV]

आर. Zीधरन, अपर सिचव


¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 15

MINISTRY OF MINES
NOTIFICATION
New Delhi, the 17th April, 2015
G.S.R. 304(E).—In exercise of the powers conferred by section 13 of the Mines and Minerals
(Regulation and Development) Act, 1957 (67 of 1957), the Central Government hereby makes the following
rules, namely:—
1. Short title and commencement:
(1) These rules may be called the Minerals (Evidence of Mineral Contents) Rules, 2015.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. Application: These rules shall apply to all minerals except -
(i) petroleum and natural gas;
(ii) coal, lignite and sand for stowing;
(iii) minerals listed in Part B of the First Schedule to the Mines and Minerals (Development and
Regulation) Act, 1957 (67 of 1957); and
(iv) minor minerals.
3. Definitions and interpretation:
In these rules, unless the context otherwise requires, -
(a) “Act” means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957);
(b) “composite licence” means a prospecting licence-cum-mining lease issued under sub-section
(2) of section 10B or sub-section (3) of section 11of the Act;
(c) ‘conforming’ means in a form as near thereto as circumstances of each case may require;
(d) “evidence of mineral contents” means the existence of mineral contents established as
specified in rule 4, rule 5, or sub-rule (2) of rule 7, as the case may be;
(e) “threshold value of minerals” means the limits prescribed by the Indian Bureau of Mines
from time to time based on the beneficiability and marketability of a mineral for a given
region and given time, below which the material obtained after mining can be discarded as
waste;
(f) “Schedule” means the Schedule annexed to these rules;
(g) the expressions Reconnaissance Survey (G4), Preliminary Exploration (G3), General
Exploration (G2), Detailed Exploration (G1), Reconnaissance Mineral Resource (334),
Inferred Mineral Resource (333), Indicated Mineral Resource (332), Measured Mineral
Resource (331), Probable Mineral Reserve (121 and 122), Proved Mineral Reserve (111),
Feasibility Mineral Resource (211), Pre-Feasibility Mineral Resource (221 and 222),
Modifying Factors, Geological Study (F3), Pre-Feasibility Study (F2), Feasibility Study (F1),
Intrinsically Economic (E3), Potentially Economic (E2) and Economic (E1) used in these
rules shall have the meanings assigned to them in Part-I of the Schedule;
(h) all other words and expressions used in these rules, but not defined, shall have the same
meaning as assigned to them in the Act or the rules made thereunder.
4. Determining existence of mineral contents under sub-clause (i) of clause (b) of sub-section (2) of
section 10A of the Act:
(1) Where an application for grant of prospecting licence or mining lease to a holder of a reconnaissance
permit or prospecting licence, as the case may be, has not been submitted before the 12th January,
2015, the holder of such permit or licence shall be deemed to have established the existence of
mineral contents under sub-clause (i) of clause (b) of sub-section (2) of section 10A of the Act, if the
holder has-
16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

(a) In the case of grant of prospecting licence, -


(i) carried out Reconnaissance Survey (G4) to establish anomalous zones (areas) worthy of
further exploration; and
(ii) prepared a geological study report conforming to Part IV of the Schedule and such
geological study report has been submitted to the State Government;
(b) In the case of grant of mining lease, -
(i) carried out at least General Exploration (G2 level) over the area to establish Indicated
Mineral Resource (332); and
(ii) prepared at least a Pre-Feasibility Study (F2) report to establish Probable Mineral
Reserve (121 and 122) conforming to Part V of the Schedule, to plan mining operation
for a period of five years from the date of commencement of the mining lease, and such
report has been submitted to the State Government.
(2) Where an application for grant of prospecting licence or mining lease to a holder of a reconnaissance
permit or prospecting licence, as the case may be, has been submitted before the 12th January, 2015,
the holder of such permit or licence shall be deemed to have established the existence of mineral
contents under sub-clause (i) of clause (b) of sub-section (2) of section 10A of the Act, if the holder
has,—
(a) In the case of grant of prospecting licence,—
(i) carried out reconnaissance operations as per Scheme of Reconnaissance under Mineral
Conservation and Development Rules, 1988; and
(ii) submitted report to the State Government, after completing reconnaissance operations,
in conformity with such Scheme of Reconnaissance and satisfying the conditions laid
down in the guidelines for processing Mineral Concession proposals issued by the
Central Government in the Ministry of Mines dated 24th June, 2009 and 30th October,
2014;
(b) In the case of grant of mining lease, -
(i) carried out prospecting operations as per Scheme of Prospecting under Mineral
Conservation and Development Rules, 1988; and
(ii) submitted report to the State Government, after completing prospecting operations, in
conformity with such Scheme of Prospecting and satisfying the conditions laid down in
the guidelines for processing Mineral Concession proposals issued by the Central
Government in the Ministry of Mines dated 24th June, 2009 and 30th October, 2014.
5. Existence of mineral contents for auction of mining lease under sub-section (3) of section 10B
and sub-section (2) of section 11 of the Act. -
An area shall be considered to be having existence of mineral contents under sub-section (3) of
section 10B or sub-section (2) of section 11 of the Act, if, in respect of such area, -
(a) at least General Exploration (G2) has been completed to establish Indicated Mineral
Resource (332); and
(b) a geological study report has been prepared conforming to Part IV of the Schedule.
6. Grant of a mining lease through auction in respect of mining leases after expiry of the mining
lease period and of leases which have been surrendered, determined or lapsed. -
Before notifying any area for grant of mining lease through auction, in respect of –
(a) mining lease after expiry of the lease period; and
(b) mining lease which has been surrendered, determined or lapsed,
a detailed reassessment of resources, in the area proposed to be auctioned shall be carried out in
accordance with rule 5.
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 17

7. Existence of mineral contents for grant of composite licence. -


(1) An area may be notified for auction to grant a composite licence under sub-section (2) of section
10B or sub-section (3) of section 11 of the Act, if, in respect of such area, -
(a) Preliminary Exploration (G3) has been completed to establish Inferred Mineral
Resource (333); and
(b) a geological study report has been prepared conforming to Part-IVA and Part IV-B
of the Schedule.
(2) An area shall be considered to be having existence of mineral contents under sub-section (10) of
section 11 of the Act, if, in respect of such area, -
(a) at least General Exploration (G2) has been completed to establish Indicated Mineral
Resource (332); and
(b) at least a Pre-Feasibility Study (F2) report has been prepared to establish Probable
Mineral Reserve (121 and 122) conforming to Part V of the Schedule, to plan mining
operation for a period of five years from the date of commencement of mining lease
and such report has been submitted to the State Government.
8. Relaxation. -
Depending upon the local geological setup, mode of occurrence and nature of mineralisation, the
State Government may, with the previous approval of the Central Government, relax the exploration
norms as specified in Part III of the Schedule, in whole or in part for any mineral or any area.
SCHEDULE
[See rule 3(f), 3(g), 4(1)(a)(ii), 4(1)(b)(ii), 5(b), 7(1)(b), 7(2)(b)]
The terms used, pertaining to levels of exploration and the category of resources and reserves achieved
through various levels of exploration have been defined in Part-I of the Schedule. The parameters for
establishing the existence of mineral content in an area in terms of quantity and grade have been specified in
Part-II, Part-III, Part-IVA, Part-IVB, and Part-V of the Schedule.
Part – I
Definitions
1. The definitions and codes used in Part I of the schedule are drawn mainly from the United Nations
Framework Classification (UNFC) version-1997 and Committee for Mineral Reserves International
Reporting Standards (CRIRSCO) Template. To the extent found necessary, the definitions given here may be
supplemented by reference to UNFC or CRIRSCO.
2. The exploration for any mineral deposit involves four stages namely, Reconnaissance Survey (G4),
Preliminary Exploration (G3), General Exploration (G2) and Detailed Exploration (G1). These stages of
exploration lead to four resource categories namely Reconnaissance Mineral Resource, Inferred Mineral
Resource, Indicated Mineral Resource and Measured Mineral Resource respectively reflecting the degree of
geological assurance.
3. Reconnaissance Survey (G4) identifies areas of enhanced mineral potential based primarily on results of
regional geological studies, regional geological mapping, airborne and indirect methods, preliminary field
inspection, as well as geological inference and extrapolation. The objective is to identify mineralised areas
worthy of further investigation towards deposit identification. Estimates of quantities should only be made if
sufficient data are available and when an analogy with known deposits of similar geological character is
possible, and then only within an order of magnitude.
4. Preliminary Exploration (G3) is the systematic process of searching for a mineral deposit by narrowing
down areas of promising enhanced mineral potential. The methods utilised are outcrop identification,
geological mapping, and indirect methods such as geophysical and geochemical studies. Limited wide
spaced pitting/ trenching/drilling with sampling is made to identify a deposit which will be the target for
further exploration. Estimates of quantities are inferred, based on interpretation of geological, geophysical,
geochemical and geo-technical investigation results.
18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

5. General Exploration (G2) involves the initial delineation of an identified deposit. Methods used include
surface mapping, pitting/ trenching/drilling, followed by sampling for evaluation of mineral quantity and
quality (including mineralogical tests on laboratory scale if required), and limited interpolation based on
indirect methods of investigation. The objective is to establish the main geological features of a deposit,
giving a reasonable indication of continuity and providing an initial estimate of size, shape, structure and
grade.
6. Detailed Exploration (G1) involves the detailed three-dimensional delineation of a known deposit
achieved through sampling, such as from outcrops, pits, trenches, boreholes, shafts and tunnels etc. Sampling
grids are closely spaced such that size, shape, structure, grade, and other relevant characteristics of the deposit
are established with a high degree of accuracy. Processing tests involving bulk sampling may be required.
7. Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the
earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual
economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics
of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge,
including sampling. Mineral Resources are subdivided, in order of increasing geological confidence into
Reconnaissance, Inferred, Indicated and Measured resource categories.
8. Reconnaissance Mineral Resource (334) are estimates based primarily on indirect evidence and includes
data and information generated through a reconnaissance survey. The quantity of data available is generally
not sufficient to allow any reasonable estimates of Mineral Resource.
9. Inferred Mineral Resource (333) is that part of a Mineral Resource for which quantity and grade or
quality are estimated on the basis of limited geological evidence and sampling achieved through a stage of
preliminary exploration. An Inferred Resource has a lower level of confidence than that applying to an
Indicated Mineral Resource and shall not be converted to a Mineral Reserve. The majority of Inferred
Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
10. Indicated Mineral Resource (332) is that part of a Mineral Resource for which quantity, grade or
quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the
application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic
viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration,
sampling and testing and is sufficient to assume geological and grade or quality continuity between points of
observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured
Mineral Resource and may only be converted to a Probable Mineral Reserve.
11. Measured Mineral Resource (331) is that part of a Mineral Resource for which quantity, grade or
quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the
application of Modifying Factors to support detailed mine planning and final evaluation of the economic
viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and
testing and is sufficient to confirm geological and grade or quality continuity between points of observation.
A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated
Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proved Mineral Reserve or to a
Probable Mineral Reserve.
12. Mineral Reserve is the economically mineable part of a Measured and Indicated Mineral Resource.
It includes diluting materials and allowances for losses, which may occur when the material is mined or
extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include
application of Modifying Factors.
Probable Mineral Reserve (121 and 122) is the economically mineable part of an Indicated, and in
some circumstances, a Measured Mineral Resource.
The confidence in the Modifying Factors applying to a Probable Mineral Reserve is lower than that
applying to a Proved Mineral Reserve.
Proved Mineral Reserve (111) is the economically mineable part of a Measured Mineral Resource. A
Proved Mineral Reserve implies a high degree of confidence in the Modifying Factors.
Feasibility Mineral Resource (211) A ‘Feasibility Mineral Resource' is that part of Measured Mineral
Resource which is not economically mineable as , defined by studies at feasibility level. This material
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 19

is identified as being possibly economically viable subject to changes in technological, economic, and
environmental and/or other relevant conditions.
Pre-Feasibility Mineral Resource (221 and 222) A ‘Prefeasibility Mineral Resource' is that part of an
Indicated, and in some circumstances, Measured Mineral Resource, that has been found, by studies at
Pre-feasibility level, as not economically viable. This material is identified as being possibly
economically viable subject to changes in technological, economic, and environmental and/or other
relevant conditions.
13. A Geological Study (F3) is an initial evaluation of Economic Viability. This is obtained by applying
meaningful cut off values for grade, thickness, depth, and costs estimated from comparable mining
operations. The purpose of the Geological Study is to identify mineralization, to establish continuity,
quantity, and quality of a mineral deposit, and thereby define an investment opportunity.
Economic viability categories, however, cannot in general be defined from the Geological Study because of
the lack of details necessary for an Economic Viability evaluation. The resource quantities estimated may
indicate that the deposit is of intrinsic economic interest, i.e. in the range of economic to potentially
economic.
14. Modifying Factors are those factors which are taken into consideration while conducting a Pre-
feasibility or feasibility study so as to convert Mineral Resources to Mineral Reserves. These include, but are
not restricted to, mining, processing, end use, cut off grade, threshold value, metallurgical, infrastructure,
economic, marketing, legal, environmental, social and governmental factors.
15. A Pre-Feasibility Study (F2) is a study of a range of options for the economic viability of a mineral
project that has advanced to a stage where a preferred mining method, in the case of underground mining, or
the pit configuration, in the case of an open pit, is established and an effective method of mineral processing
is determined. It includes a financial analysis based on reasonable assumptions on the Modifying Factors and
the evaluation of any other relevant factors which are sufficient, to determine if all or part of the Mineral
Resource may be converted to a Mineral Reserve at the time of reporting. A Pre-Feasibility Study is at a
lower confidence level than a Feasibility Study.
16. A Feasibility Study (F1) is a detailed comprehensive economic study of the selected development
option for a mineral project that includes appropriately detailed assessments of applicable Modifying Factors
together with any other relevant operational factors and detailed financial analysis that are necessary to
demonstrate at the time of reporting that extraction is reasonably justified (economically mineable). The
confidence level of the study will be higher than that of a Pre-Feasibility Study.
17. Intrinsically Economic (E3) Quantities, reported in tonnes or volume with grade/quality, estimated
by means of a Geological Study to be of intrinsic economic interest. Since the Geological Study includes
only a preliminary evaluation of Economic Viability, no distinction can be made between economic and
potentially economic. These Resources are therefore said to lie in the range of economic to potentially
economic.
18. Potentially Economic (E2) Quantities, reported in tonnes/volume with grade/quality, demonstrated
by means of a Prefeasibility Study or Feasibility Study in order of increasing accuracy, not justifying
extraction under the technological economic, environmental and other relevant conditions, realistically
assumed at the time of the determination, but possibly so in the future.
19. Economic (E1) Quantities, reported in tonnes or volume with grade/quality, demonstrated by means
of a Prefeasibility Study or Feasibility Study in order of increasing accuracy, that justify extraction under the
technological, economic, environmental and other relevant conditions, realistically assumed at the time of the
determination.
Part-II
Geological Parameters for exploration
1 Aerial reconnaissance: Satellite imagery/ remote sensing/ airborne geophysical survey etc. using appropriate
technology (applicable mainly for reconnaissance exploration (G4) stage).
2 Topographic & Geological survey (Mapping): On 1 : 50,000 or smaller scale for reconnaissance (G4) stage; on
1:25000 to 1 : 10,000 or larger scale for preliminary exploration (G3) stage; 1:4000/1 : 5,000 or larger scale for
general exploration(G2) stage; on 1 : 2,000 or larger scale for detailed exploration (G1) stage.
20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

3 Ground Geophysical and Geochemical survey: Geophysical and geochemical survey using appropriate
techniques as may be necessary.
4 Technological : Exploration and sampling using appropriate techniques from locations such as outcrops,
trenches, pits, old workings and drill holes. The sampling locations are spaced suitably (in a grid pattern to the
extent possible and may be modified depending on structural complexity) for establishing existence of ore body
and its lateral and vertical continuity. Part III of the schedule may be referred for further details.
For General (G2) and detailed (G1) stages of exploration the depth continuity of mineralisation may be
considered limited to the depth upto which direct evidence of mineralization is established.
The lateral extension to be considered for resource assessment shall depend on geological considerations
supplemented by geological continuity by mapping or by other means and in any case shall not be more than 50%
of the grid spacing of the probe points.
Assessment based on selected information such as isolated assays, isolated drill holes, assays of panned
concentrates etc. is not recommended.
5 Sampling & sub sampling: (a) Random grab/chip/channel sampling from surface exposure/escarpments/ nallah
cuttings/ pit/channel etc. for reconnaissance stage.
(b) Systematic sampling from pits/trenches/outcrops/workings etc. spaced closely enough to confirm geological
and grade continuity for other stages of geological assessment.
(c) Geological logging and sampling of drill core/chip samples at regular interval, preferably meter wise or less
for the mineralized portions.
(d) The drill technique to be deployed shall depend on the rock type to be penetrated and with an aim to achieve
maximum sample/core recovery.
(e) The exploration samples including surface samples, drill core/ chip samples shall be preserved, for future use.
6 Assay data & Laboratory tests: Analysis of all samples generated for major radicals appropriate to the mineral
under investigation. Analysis of byproducts such as Ga in bauxite, Ni, PGE in chromite, Au in iron ore, Ag in
lead and zinc, Au in copper ore etc. and other deleterious elements wherever necessary.
7 Petrographic & Mineragraphic studies: Petrographic analysis of mineralized portions to ascertain the rock
types and mineral assemblages including grain size, texture, gaunge and its liberation characteristics etc. if
considered necessary.
8 Bulk density study: The bulk density must be measured by methods that adequately account for incipient void
spaces (vugs, porosity, etc.)in mineral /ore body
9 Bulk Sampling for Beneficiation studies: Bulk sampling if necessary for testing processing technology.
10 Environmental setting: Details about local infrastructure, host population, historical sites, forests, sanctuaries,
national park and base line information on environmental setting of the area to be collected.
11 Any other relevant data: Groundwater, geotechnical and rock characteristics etc. that may be relevant.

Part -III
Exploration Norms for different types of deposits
(The grid spacing given below are indicative. A closer spacing may be necessary depending upon the
geological complexity of the deposit)
Type of deposit & G4 stage G3 stage G2 stage G1 stage Remarks
principal minerals
I. Bedded Stratiform Scout drilling, if For limestone, For For limestone, For shallow
and tabular deposits of necessary bauxite, potash limestone, bauxite, potash surficial
regular and irregular (In line with and salt beds the bauxite, and salt beds the deposits
habit: grid specified by grid spacing of potash and grid spacing of continuing to a
Iron ore, manganese ore, the Central bore holes may be salt beds the bore holes may depth of up to
bauxite, limestone, Government 800m or closer grid spacing be 200m or 6m from
chromite/potash and salt from time to for deposits of of bore holes closer for regular surface pitting
beds etc. time) regular habit and may be 400m habit and 100m in a grid
400m or closer or closer for or closer for pattern as per
for irregular regular habit irregular habit; the grid
habit; for others and 200m or for others the spacing for
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 21

the spacing may closer for spacing may be various levels


be 400m or closer irregular 100m or closer of prospecting
for regular and habit; for regular habit may suffice.
200m or closer for others the and 50m or For deposits
for irregular spacing may closer for continuing
habit. be 200m or irregular habit. further in
closer for depth drilling
regular habit is
and 100m or recommended.
closer for
irregular
habit.
II. Lenticular bodies of Scout drilling, if Bore-hole spacing Bore-hole Bore-hole Exploratory
all dimensions necessary along strike may spacing along spacing along mine
including bodies (In line with be kept 200-100m strike may be strike may be openings- open
occurring en echelon, grid specified by or closer interval. kept 100-50m kept 50-25m or pit or
silicified linear zones of the Central or closer. In closer interval underground
composite veins. Government specific cases, with bulk
Lenses, pockets, stock- from time to depending on determination
works; irregular time) necessity, it of grades
shaped modest to small may be wherever
sized bodies brought down necessary at
Iron and manganese ore to 25m or G2 and G1
bodies in lateritoid closer, stage.
terrain, pockety bauxite especially for
and nickel-cobalt precious
laterites, base metal metals.
sulphides of Cu-Pb-Zn-
Sb-Hg, podiform
chromite, auriferous
quartz reefs, PGM,
graphite lenses,
molybdenum, tin
bodies, pyrite, skarn
bodies of scheelite,
wollastonite, fluorite
etc., vermiculite,
magnesite,
insitusilimanie and
kyanite lenses etc.
III. Gem- stones and Scout drilling, if 8 to 10 Trenching Bore hole Exploratory
rare metal pegmatites, necessary pits/trenches per preferably at spacing may be mine
reefs and veins/pipes: (In line with sq.km. Bore-holes 50m. interval kept closer to openings- open
Tin-tungsten-tantalum- grid specified by to test the Bore-hole to that of G2 stage pit or
niobium-molybdenum the Central continuity of host test continuity underground
veins and pegmatites; Government rock, at 200m or of host rock at with bulk
Beryl, topaz, emerald from time to closer interval. 100-50m or determination
deposits, diamond, time.) closer interval of grades &
wolframite deposits, recovery
pockets/lenses/veins of wherever
fluorite in carbonatites necessary at
etc. G2 and G1
stage.
IV. Float or Placer Scout drilling, if 400m along trend 200m* along 100m* along the For shallow
deposits: necessary of the deposit and trend of the trend of the deposits pitting
Iron, manganese ore (In line with 200m across deposit and deposit and 50m in grid may
float; Placer tin and gold grid specified by 100m across across suffice. Stream
deposit; garnet, ilmenite, the Central sediment or
rutile, zircon; diamond, Government placer
corundum, kyanite, from time to sediment
sillimanite floats . time) sampling as
22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

may be
required at
each stage.
Laboratory
scale
separation and
testing and
analysis of
concentrates.

*In case replenishment is reported in placer deposit associated with beach sand, river sand etc., periodic
reassessment of resources may be necessary.
Part IV-A
Reporting of Mineral Resources
A Geological Study Report for estimation and reporting of Mineral Resources integrating all data of
exploration, sampling and testing generated through aerial, geophysical, geochemical, geological surveys and
technological study may be undertaken for every stage of exploration i.e. from G4 to G1 for assessing the
resources. The study should incorporate the following contents among other things.
Sl. Contents Explanation
No.
1 Title & Ownership -Name, address of the prospector including E-mail ID, telephone number.
-Details of period of prospecting/mineral right if any.
-Details of exploration agency, qualification, experience of associated technical persons
engaged in exploration.
2 Details of the area -Village, District, State
- Survey of India Toposheet No., Geo-coordinates of the area of all corner points
- cadaster details of the area with land use, area under forest with type of forest
- mineral(s) under investigation
3 Infrastructure & -Local infrastructure, host population, historical sites, forests, sanctuaries, national park
Environment and environmental settings of the area.
4 Previous -Details of previous exploration carried out by other agencies/parties.
exploration - In case the area forms part of the area covered under earlier exploration then the same
should be shown in a map with proper scale.
5 Geology -Brief regional geology of the area outlining the broad geological, structural frame work.
-Deposit type, geological setting and details of dip, strike, old workings, surface
exposures etc. of the area under study also of adjoining nearby areas if the information is
likely to have an impact on the area under study.
-Reliable geological map of appropriate scale with geo-coordinates showing major
lithological units, structural & tectonic features; extent of surface mineralisation,
structure, location of boreholes, pits, trenches, old workings etc.
- Cross sections at suitable intervals showing vertical projections of litho-units and
mineralization.
- The extent and variability of the mineralization expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the
Mineral Resource.
6 Aerial/ground Details of aerial, geophysical & geochemical survey results taken up if any and their
geophysical/ results.
geochemical data
7 Technological -Details of technological investigation (pitting/trenching/drilling etc.)
investigation -Data spacing for reporting of Exploration Results: Whether the data spacing and
distribution is based on part I and II of the schedule and is sufficient to establish the
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 23

degree of geological and grade continuity appropriate for the Mineral Resource
estimation procedure(s) and classifications applied.
8 Location of data -Accuracy and quality of surveys used to locate drill holes (collar and down-hole
points. surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
- Quality and adequacy of topographic control.
9 Sampling Nature and quality of sampling (e.g. cut channels, random chips etc.) and measures taken
Technique to ensure sample representivity.
10 Drilling - Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
technique& drill Bangka, sonic etc.) and details (e.g. core diameter, triple or standard tube, collar R.L,
sampling employed azimuth, inclination, coordinates of bore holes etc.).
-Whether core and chip sample recoveries have been properly recorded and results
assessed.
-Measures taken to maximise sample recovery and ensure representative nature of the
samples.
- Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
Logging: -Whether core and chip samples have been logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and metallurgical studies.
11 Sub-sampling -If core, whether cut or sawn and whether quarter, half or all core taken.
techniques and -If non-core, whether riffled, tube sampled, rotary split etc. and whether sampled wet or
sample preparation dry.
-For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
-Quality control procedures adopted for all sub-sampling stages to maximize
representivity of samples.
-Measures taken to ensure that the sampling is representative of the in situ material
collected.
-Whether sample sizes are appropriate to the grain size of the material being sampled.
12 Quality of assay The nature, quality and appropriateness of the assaying and laboratory procedures used
data and laboratory and whether the technique is considered partial or total.
tests Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and
precision have been established.
Check analysis of atleast 10% of samples may be analyzed from third party NABL
accredited/or department of science & technology (DST) / BIS recognized laboratories or
government laboratories for assessing the acceptable levels of accuracy.
13 Moisture. -Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
14 Bulk Density Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements, the
nature, size and representativeness of the samples.
15 Resource - Discussion on sufficient data density to assure continuity of mineralization and
estimation synthesis adequate data base for estimation procedure used.
techniques -The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation
parameters, maximum distance of extrapolation from data points.
-The basis for the classification of the Mineral Resources into varying confidence
categories.
-The assumptions made regarding recovery of byproducts.
-Detailed description of the method used and the assumptions made to estimate tonnages
and grades (section, polygon, inverse distance, geostatistical, or other method).
24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

-Description of how the geological interpretation was used to control the resource
estimates.
-Discussion of basis for using or not using grade cutting or capping. If a computer
method was chosen, description of programmes and parameters used.
-Geostatistical methods are extremely varied and should be described in detail. The
method chosen should be justified. The geostatistical parameters, including the
variogram, and their compatibility with the geological interpretation should be discussed.
Experience gained in applying geostatistics to similar deposits should be taken into
account.
-Data verification and /or validation procedures used.
16 Further work -The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large scale step-out drilling).
17 Annexures/ The report shall include all relevant data including maps, sections, logs, analysis reports,
enclosures to the photographs etc. in support of the estimates made.
report
18 Any other Any other information as may be available or required by any authority as prescribed
information
Part IV-B
Estimation and Reporting of Diamonds and other Gemstones
Criteria listed in Part IVA also apply to this group; additional guidelines are available in the ‘Guidelines for
the Reporting of Diamond Exploration Results’ issued by the Diamond Exploration Best Practices Committee
established by the Canadian Institute of Mining, Metallurgy and Petroleum.
1 Indicator minerals - Reports of indicator minerals, such as chemically/physically distinctive garnet, ilmenite,
chrome spinel and chrome diopside, should be prepared by a suitably qualified
laboratory.
2 Source of - Details of the form, shape, size and colour of the diamonds and the nature of the source
diamonds. of diamonds (primary or secondary) including the rock type and geological environment.
3 Sample collection. - Type of sample, whether outcrop, boulders, drill core, reverse circulation drill cuttings,
gravel, stream sediment or soil, and purpose, e.g. large diameter drilling to establish stones
per unit of volume or bulk samples to establish stone size distribution.
- Sample size, distribution and representativity.
4 Sample treatment. -Type of facility, treatment rate, and accreditation.
- Sample size reduction. Bottom screen size, top screen size and re-crush.
- Processes (dense media separation, grease, X-ray, hand-sorting etc.).
- Process efficiency, tailings auditing and granulometry.
- Laboratory used, type of process for micro diamonds and accreditation.
5 Carat. One fifth (0.2) of a gram (often defined as a metric carat or MC).
6 Sample grade. - Sample grade in this section is used in the context of carats per units of mass, area or
volume.
- The sample grade above the specified lower cut-off sieve size should be reported as
carats per dry metric tonne and/or carats per 100 dry metric tonnes. For alluvial deposits,
sample grades quoted in carats per square metre or carats per cubic metre are acceptable if
accompanied by a volume to weight basis for calculation.
- In addition to general requirements to assess volume and density there is a need to relate
stone frequency (stones per cubic metre or tonne) to stone size (carats per stone) to derive
sample grade (carats per tonne).
7 Reporting of Bulk - Complete set of sieve data using a standard progression of sieve sizes per facies.
Exploration sampling results, global sample grade per facies. Spatial structure analysis and grade
Results. distribution. Stone size and number distribution. Sample head feed and tailings particle
granulometry.
- Sample density determination.
- Per cent concentrate and undersize per sample.
¹Hkkx IIµ[k.M 3 (i)º Hkkjr dk jkti=k % vlk/kj.k 25

- Sample grade with change in bottom cut-off screen size.


- Adjustments made to size distribution for sample plant performance and performance on
a commercial scale.
- If appropriate or employed, geostatistical techniques applied to model stone size,
distribution or frequency from size distribution of exploration diamond samples.
- The weight of diamonds may only be omitted from the report when the diamonds are
considered too small to be of commercial significance. This lower cut-off size should be
stated.
8 Grade estimation - Description of the sample type and the spatial arrangement of drilling or sampling
for reporting reporting Mineral designed for grade estimation.
Mineral Resources - The sample crush size and its relationship to that achievable in a commercial treatment
and Ore Reserves. plant.
- Total number of diamonds greater than the specified and reported lower cut-off sieve
size.
- Total weight of diamonds greater than the specified and reported lower cut-off sieve size.
- The sample grade above the specified lower cut-off sieve size.
9 Value estimation. - Valuations should not be reported for samples of diamonds processed using total
liberation method, which is commonly used for processing exploration samples.
- To the extent that such information is not deemed commercially sensitive, Public Reports
should include:
• Diamonds quantities by appropriate screen size per facies or depth.
• Details of parcel valued.
• Number of stones, carats, lower size cut-off per facies or depth.
• The average $/carat and $/tonne value at the selected bottom cut-off should be reported in
US Dollars. The value per carat is of critical importance in demonstrating project value.
• The basis for the price (e.g. dealer buying price, dealer selling price etc.).
• An assessment of diamond breakage.
10 Classification. - In addition to general requirements to assess volume and density there is a need to relate
stone frequency (stones per cubic metre or tonne) to stone size (carats per stone) to derive
grade (carats per tonne). The elements of uncertainty in these estimates should be
considered, and classification developed accordingly.
Part-V
Contents of Prefeasibility Report
Contents of a Prefeasibility Report for Estimation and Reporting of Mineral Reserves based on a Geological
Report prepared as per Part IV-A and Part IV-B. The Geological Study Report shall also form a part of the
Prefeasibility Report.
Sl. Contents Explanation
No.
1 Mineral - Description of Mineral Resource estimate used as a basis for the conversion to a Mineral
Resource reserve.
estimate for - Clear statement as to whether the Mineral Resources are reported additional to, or inclusive
conversion to of, the Mineral Reserves.
Mineral
Reserve -The type and level of study undertaken to enable Mineral Resources to be converted to
Mineral Reserves i.e. Prefeasibility/Feasibility level.
2 Cut off -The basis of the adopted cut-off grade(s) or quality parameters applied, including the basis, if
Parameters appropriate, of equivalent metal formulae& the threshold values prescribed.
3 Mining -The method and assumptions used to convert the Mineral Resource to a Mineral Reserve (i.e.
factors either by application of appropriate factors by optimisation or by preliminary or detailed design
or supported with Conceptual plan for mining).
assumptions. - Anticipated Ore to OB ratio, mine recoveries, dilutions etc. for both open cast and U/G
workings.
26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

-The choice of, the nature and the appropriateness of the selected mining method(s), the size of
the selected mining unit (length, width, height) and other mining parameters including
associated design issues such as pre-strip, access, etc.
-The assumptions made regarding geotechnical parameters (eg. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
-The major assumptions made and Mineral Resource model used for pit optimisation (if
appropriate).
-The mining dilution factors, mining recovery factors, and minimum mining widths used.
-The infrastructure requirements of the selected mining methods. Where available, the historic
reliability of the performance parameters.
4 Metallurgical -The metallurgical process proposed and the appropriateness of that process to the type of
factors or deposit.
assumptions. -The nature, amount and representativeness of metallurgical test work undertaken and the
metallurgical recovery factors applied.
-Any assumptions or allowances made for deleterious elements.
-The existence of any bulk sample or pilot scale test work and the degree to which such
samples are representative of the ore body as a whole.
-The tonnages and grades reported for Mineral Reserves should state clearly whether these are
in respect of material to the plant or after recovery. Comment on existing plant and equipment,
including an indication of replacement and salvage value.
5 Cost and -The derivation of, or assumptions made, regarding projected capital and operating costs.
revenue - The assumptions made regarding revenue including head grade, metal or commodity price(s)
factors exchange rates, transportation and treatment charges, penalties, etc.
- The allowances made for royalties payable, both Government and private.
- Basic cash flow inputs for a stated period.
-Yearly planned production, Net Present Value (NPV) and Internal Rate of Return (IRR) of the
deposit, intrinsic value of the deposit based on annual projected production.
6 Market -The demand, supply and stock situation for the particular commodity, consumption trends and
assessment factors likely to affect supply and demand into the future.
-A customer and competitor analysis along with the identification of likely market windows for
the product.
-Price and volume forecasts and the basis for these forecasts.
-For industrial minerals the customer specification, testing and acceptance requirements prior
to a supply contract.
7 Other -The effect, if any, of natural risk, infrastructure, environmental, legal, marketing, social or
modifying governmental factors on the likely viability of a project and/or on the estimation and
factors classification of the Mineral Reserves.
-The status of titles and approvals critical to the viability of the project, such as mining leases,
discharge permits, government and statutory approvals.
-Environmental descriptions of anticipated liabilities. Location plans of mineral rights and
titles.
8 Classification. -The basis for the classification of the Mineral Reserves into varying confidence categories.
- Finalization of estimates of grade wise mineable quantities in contemplation with proposed
preliminary mine design/conceptual plan subject to all necessary approvals/contracts have been
confirmed or there are reasonable expectations that all such approvals/contracts will be
obtained within a reasonable timeframe and with certification that that Economic viability is
not affected by short‐term adverse market conditions provided that longer‐term forecasts
remain positive.

[F. No. 7/2/2015-M.IV]


R. SRIDHARAN, Addl. Secy.