100.0 100.0
96.2 96.2 96.2 96.2
92.3 92.3 92.3 92.3
88.5 88.5
84.6
80.8 80.8
76.9 76.9
73.1
ie ar s a a rie
t ch Da
r a
el
le a
er
a ll a sa a
a-
1
a-
2
en
a
ss nd os w
Sh em in m am be as Jig
De o As Da k m i r Jim ek Ad
m w Jig ab ab or
G re Ne ba Ba
h M Se am Ha
b b b
Di Ar G sA sA el
le
ddi d di g
A A Ne
completeness Validity
branch branch
Dessie 100.0 Dessie 84.62
Gondar 100.0 Gondar 92.31
Asossa 96.2 Asossa 88.46
Dire Dawa 96.2 Dire Dawa 92.31 Re
Shrie 96.2 Shrie 65.38 120.0
Nekemt 96.2 Nekemt 80.77 100.0
Arbaminch 92.3 Arbaminch 42.31
80.0
Bahir Dar 92.3 Bahir Dar 53.85
92.3 38.46 60.0
Jimma Jimma
Mekelle 92.3 Mekelle 46.15 40.0
Dessie 84.6
Gondar 92.3
Dire Dawa 92.3
Asossa 88.5 Validi
Adama 88.5 92.3 92.3
88.5 88.5
80.8 84.6
Nekemt 80.8
92.3 92.3
88.5 88.5
84.6
80.8
76.9 76.9
73.1 65.4
61.5
46.2 46.2
42.3
38.5 38.5
26.9
0.0
-1 a-
2
en
a
ba ab or si e ar a s a a t
rie er
a
Da
r a na l le -1 ch a - 2 l la sa
s nd w os am ke
m
Sh Ji g re ke ba in m ba be as
b b De o Da As Ad
m ir J ig o e a m J im a
sA el
le G re Ne Se ah b M Ab ba Ab m
Ha
w
di g Di B
el
le is Ar s Ga
Ad
Ne g d di
N e Ad Ad
60.0
40.0
20.0
0.0
i e ar a a ie t h ar a le a ra la a a -1 -2 a
ss nd oss aw Shr kem inc ir D mm kel am me bel ass gJig ba ba ren
De Go As e D e m
N rba Bah
i
J M e d e w J i a a o
r A S m a
Ga H Ab Ab e b
Di A dis dis ell
g
Ad Ad Ne
Validity
8.5
80.8
65.4
61.5
53.8 53.8 53.8
46.2 46.2
42.3
38.5 38.5
26.9
0.0
a t
rie er
a ar a na el
le a-
1
nc
h a
a-
2 ll a sa
m
ke
m
Sh rD Ji g re m be as
m hi Ji g bo ek ab a m i im ab
Ne S e
Ba M b J b m
Ha
w
el
le sA Ar
b sA Ga
g d di ddi
Ne A A
38.5 38.5
26.9
0.0
a -2 ll a sa
m ba be as
J im Ab
a m w
is Ga Ha
d
Ad
Report
Expeted # Total # of KPI Completeness in Validity of KPIs in Timliness of
Name of the Hub of KPI Reported % (Q-1) % ( Q-2) Report (Q-1)
Adama
26 23 88% 88% Late for 3 days
Addis Ababa -1
Addis Ababa 2
Arba Minch
Assosa
26 25 96% 89% On time
Bahir Dar
Dessie
26 26 100% 85% On time
Dire Dawa
26 25 96% 92% On time
Gambela 26 22 85% 27% On time
Gondar
26 26 100% 92% On time
Jigjiga
Mekelle
26 24 92% 46% On time
Ngele B
Nekemte
Semera
almost all
2 2 26 20 12
Addis Ababa-1 June 03/2020
3 3 26 20 10
Addis Ababa-2 June 04/2020
4 3 26 23 23
Adama NR
5 2 26 24 11
Arbaminch June 03/2020
6 1 26 25 23
Asossa June 02/2020
7 2 26 24 14
Bahir Dar June 03/2020
8 2 26 26 22
Dessie June 03/2020
9 2 26 25 24
Dire Dawa June 04/2020
10 1 26 22 7
Gambella June 02/2020
11 1 26 26 24
Gondar June 02/2020
12 1 26 21 0
Hawassa June 02/2020
13 1 26 25 17
Shrie May 27/2020
14 1 26 21 14
JigJiga June 02/2020
15 3 26 24 10
Jimma NR
16 2 26 24 12
Mekelle June 03/2020
17 1 26 19 14
Negelle borena June 02/2020
18 1 26 25 21
Nekemt June 02/2020
19 2 26 23 16
Semera june 03/2020
completeness Validity Distribution costreported
, AverageKPI's lack time
delivery validity
, Dock to stock
cycle time, Vehicle Down time , Percentage of Supportive amount
supervision conducted, Percentage of trainees who are
Average
competent days
andtoskill
collect creditconducted),
(training sales, OrderSupplier
turnaround time,
fill rate
76.92 46.15 Average delivery time , Distribution cost , Vehicle Down
(for local suppliers), # of operational research conducted, 8
time , Percentage
Percentage of vehicles
of vehicles availed,availed , Forecast
Average Time foraccuracy,
cost setting
76.92 38.46 Percentage
(from GRNF to GRV) , Average payment process research
of trained employees, # of operational time,
conducted, Dock toPercentage
Forecast accuracy, stock cycleoftime,
trainees who are competent 10
and skill (training conducted), Supplier fill rate (for local
88.46 88.46 suppliers), RRF reporting rate, Order turnaround time, 3
Average delivery time , Distribution cost , # of stock
92.31 42.31 returned incident, Vehicle Down time, Percentage of
vehicles availed 13
Average
Average days
days to
to collect
collect credit
credit sales,
sales, forcasting accuracy,
# of operational research
96.15 88.46 suportive
conducted, Supplier fill rate (for local suppliers), line fill
supervission, trainning, Supplier fill rate, 3
rate, Order turnaround time, Average delivery time,
92.31 53.85 Distribution cost, # of stock returned incident, Percentage of
proof of delivery (POD) collection 11
Average days to collect credit sales, Supplier fill rate (for
100.00 84.62 local suppliers), Percentage of proof of delivery (POD)
collection, Vehicle Down time 4
96.15 92.31 Average days to collect credit sales, Average Time for cost
setting (from GRNF to GRV) 2
84.62 26.92
almost all 19
100.00 92.31 Average days to collect credit sales, Average Time for cost
setting
Average(from
time GRNF to GRV) Average Time for cost setting
for recruitment, 2
(from GRNF to GRV), Percentage of trainees who are
80.77 0.00 Percentage
competent of credit
and skill sales collected
(training , Average
conducted), Order days to collect
turnaround
all KPI's
credit doesnot have dinominator and numerator 26
time, Distribution cost, # of stock returned incident, who
sales, Forecast accuracy,Percentage of trainees
are competent
Percentage and skill
of proof (training(POD)
of delivery conducted), # of operational
collection, Vehicle
96.15 65.38 research conducted, Line Fill rate, Inventory accuracy, Order
Down time 8
turnaround
Average time time,
for Dock to stockAverage
recruitment, cycle time,
Time Average
for costdelivery
setting
80.77 53.85 time, Percentage of proof of delivery
(from GRNF to GRV), Average days to collect (POD) collection.
Vehicle Down
credit sales, time payment process time, Forecast
Average 12
accuracy, Percentage of trainees who are competent and skill
92.31 38.46 Average
(training days to collect credit sales, Forecast accuracy,rate,
almost allconducted),
Percentage of Supportive
Supplier fill rate, RRF reporting 16
Inventory accuracy, Ordersupervision
turnaround conducted,
time, DockPercentage
to stock
of trainees
cycle time, who are competent
Distribution and skill
cost, Vehicle (training
Down timeconducted),
,
92.31 46.15 Supplier fillofrate (foroflocal suppliers),
Percentage proof delivery (POD)#collection
of operational 14
research conducted, Order turnaround time, Dock to stock
73.08 53.85 cycle time, Average delivery time, Distribution cost, Vehicle
Down time, Percentage of proof of delivery (POD) collection 12
Average
Average time
time for
for recruitment,Average
recruitment, Averagedays daysto
tocollect
collectcredit
96.15 80.77 sales, Forecast accuracy, Supplier fill rate, Line Fill rate, # of
credit sales, Supplier fill rate, Line Fill rate 4
operational research conducted, Stock according to the plan,
88.46 61.54 Order turnaround time, Dock to stock cycle time,
Distribution cost 10