The document outlines 10 technical evaluation criteria for selecting a firm for a water tariff study, including:
1) The firm's core experience and qualifications of individual experts in the relevant sector.
2) The firm's years of experience in the water sector.
3) The number of qualified persons with relevant education backgrounds at the firm.
4) The firm's experience conducting similar assignments in similar geographies.
5) The firm's technical and methodology capabilities, understanding of the objectives, and quality of proposed methodology.
6) The firm's proposed work program and schedule.
7) The firm's counterpart personnel and facilities.
8) The number of relevant key staff in the firm.
9
Original Description:
Original Title
Technical evaluation criteria for water tarrif.docx
The document outlines 10 technical evaluation criteria for selecting a firm for a water tariff study, including:
1) The firm's core experience and qualifications of individual experts in the relevant sector.
2) The firm's years of experience in the water sector.
3) The number of qualified persons with relevant education backgrounds at the firm.
4) The firm's experience conducting similar assignments in similar geographies.
5) The firm's technical and methodology capabilities, understanding of the objectives, and quality of proposed methodology.
6) The firm's proposed work program and schedule.
7) The firm's counterpart personnel and facilities.
8) The number of relevant key staff in the firm.
9
The document outlines 10 technical evaluation criteria for selecting a firm for a water tariff study, including:
1) The firm's core experience and qualifications of individual experts in the relevant sector.
2) The firm's years of experience in the water sector.
3) The number of qualified persons with relevant education backgrounds at the firm.
4) The firm's experience conducting similar assignments in similar geographies.
5) The firm's technical and methodology capabilities, understanding of the objectives, and quality of proposed methodology.
6) The firm's proposed work program and schedule.
7) The firm's counterpart personnel and facilities.
8) The number of relevant key staff in the firm.
9
Technical Evaluation Criteria for water Tariff Study
No Selection Criteria Required from the firm Mark Total mark
(%) (%) Relevant with experience 10 Core Experience of the Firm and individual 1 Non-relevant but has experience 7 10 experts Non-relevant and no-experience 0 2 Years of experience in the sector ≥ 8 years 10 5-8 years 6 10 < 5 years 4 3 No. of qualified persons with relevant 5 persons 10 10 education background 3-5 persons 7 < 3persons 4 4 Experience in similar assignments/geography >3 assignment 15 (No. of similar assignment done) 2-3 assignment 8 15 =1 assignment 5 0 0 5 Technical and Methodology capabilities Well structured 15 15 -understanding the objective of the Semi-structure 8 assignment Comment on ToR 4 - Quality and scope of methodology No structure 2 -comment on ToR 6 Work Program/Schedule with detailed Attached plan 10 tasks/activities VS Output Not attached plan 5 10 7 Counterpart personnel and facility >5 references 10 3-5 references 7 10 < 3 references 5 8 Number of relevant key staff in the firm >5 Assistant Professionals 10 3-5 Assistant Professionals 8 10 < 3 Assistant Professionals 6 9 Capacity Building Packages Training & Workshops 10 10 Either Training or Workshop 5 None 0 10 Total mark 100
NB Finally this will be converted to 80% and the Financial will