PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE


DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person

1. Preliminary works.  Removal All personnel 12  Avoid to use soft ground.  Site Supervisor
construction  Provide escort vehicle for lorry and  HSSE Personnel
debris along mobile crane.  Project Engineer
exaction area  Follow TMP or designated road
 Bad weather. access instruction

 Wear approved reflective vest and  Site Supervisor


2. Survey Works – Setting  Struck by 16 other PPE i.e safety helmet, safety  HSSE Personnel
Out Works moving shoe etc..  Project Engineer
vehicles i.e car,  Walking facing incoming traffic
lorry truck flow/inside barricade area.
and etc  Practice buddy system. (min of 2
persons)
All personnel
 Provide shelter/shade/cover.
 Exposed to 12  Drink more water
heat. .
 Wear dust mask.
 Ground watering.
 Exposed to 12
dust  Stop work during bad weather.
 Provide proper and safe rest area
 Bad weather 16 with lightning arrestor
 Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
3. Mobilization of plant and  Competent machinery  HSSE Personnel
machineries to site  Machinery operator/driver.  Project Engineer
stuck at  Good physical condition of vehicle,
muddy access 16 plant, equipment, machinery.
road  Machinery with valid insurance
coverage
All personnel.
 Crane  4 wheel vehicle to guide during
overturned the mobilization plant
.
 Bad weather
 Competent machinery
Major operator/driver.  Site Supervisor
4 Delivery of work  Poor access to body injury 12  Good physical condition of vehicle,  HSSE Personnel
materials to site the designated All personnel plant, equipment, machinery.  Project Engineer
working area  Machinery with valid insurance
coverage.
 4 wheel vehicle to guide during
the mobilization plant.

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
5 Lifting materials by crane,  Struck by 12 must be inspected and approved  HSSE Personnel
excavator and backhoe falling/lifting/ All personnel.  Personnel kept clear distance  Project Engineer
moving objects during crane operation  Crane Operator
 Crane overturn  Barricade lifting area and put up
 Bad weather signage “LIFTING IN PROGRESS”
 Do not working/passing below
suspended load
 Competent riggers

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and
Installation of pipes/RCP  Struck by  Site Supervisor
must be inspected and approved
 HSSE Personnel
6 culvert/lifting materials falling/lifting/ 12  Personnel kept clear distance
by excavator. moving objects  Project Engineer
during lifting operation
 Excavator  Excavator Operator
All personnel  Barricade lifting area and put up
collapse due to signage “LIFTING IN PROGRESS”
uneven  Do not working/passing below
surface suspended load
 Bad weather  Accelerate gently to minimize load
swing when travelling with a
suspended load.
 Installation of safety barrier
surrounding excavation area.
 Put up safety/warning signage
Excavation works.  Fall of person  Site Supervisor
 Excavation shall be consider as
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
7 into 12 restricted work area.  HSSE Personnel
excavation/pit All personnel  Project Engineer
area  Ensure safe degree slope
cutting/platform
 Deep excavation for > 1.2m depth
 Failure of shall provide temporary work i.e
excavate slope strutting, timbering and etc.
 Bad weather 16  Safe distance from machinery to
excavated area.
 Usage of tagline to receive
material.
 Excavated materials to be placed
minimum of 2m from the edge of
excavated trench.
 Machinery shall be sit on top of
steel plate when perform works at
weak ground condition.
 To properly level the ground
before machinery start excavation
works.

 Wear dust mask.


 Ground watering.
 Prior to start work activity, walk-
down to identify potential hazard
Laying of bedding  Exposed to that could result in slip and trip.  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
8 materials. dust. 12  HSSE Personnel
 Cut or All personnel  Project Engineer
abrasion,
fingers caught
in between.  Proper housekeeping at working
 Bad weather area and pathway.
 To use proper hand protection.
 Use dust mask if necessary.  Site Supervisor
Formwork Erection  Exposed to  Task to be carried out by trained  HSSE Personnel
9 dust. 12 personnel.
 Project Engineer
 Hazard by  Prior to start work activity, walk-
using sharp All personnel down to identify potential hazard
and handling that could result in slip and trip.
tools.  Brief personal to the hazard prior
 Hit by falling to start activity
objects due to
mishandling
/slip/trip.
 Cut or
abrasion,
fingers caught
in between  Proper housekeeping at working
area and pathway.
 To use proper hand protection.
 Use dust mask if necessary.
Concreting Thrust Block.  Skin disease -  Site Supervisor
 Task to be carried out by trained
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
10 Exposure to 12 personnel.  HSSE Personnel
mortar . All personnel  Concrete bucket shall have nozzle  Project Engineer
 Noise and to reduce splash or concrete
vibration chemical to concreter.
hazard when  Stand by clean water and washing
using vibration facilities.
poker.
 Body contact
with concrete
chemical
 Exposure to
cement dust /
silica (from
sand)
 Bad weather

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and
must be inspected and approved
Installation of HDPE  Struck by  Personnel kept clear distance  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
11 pipe/RCP culvert by falling/lifting/ 12 during lifting operation  HSSE Personnel
excavator. moving objects All personnel  Berricade lifting area and put up  Project Engineer
 Bad weather signage “LIFTING IN PROGRESS”  Excavator Operator
 Do not working/passing below
suspended load.
 Usage of tagline to receive
material.
 Check on site condition before
start work.
 Accelerate gently to minimize load
swing when travelling with a
suspended load.

 Ensure adequate working


clearance space.
 Installation of safety barrier
surrounding excavation area.
Backlifting & Compacting  Movement of  Put up safety / warning signage.  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
12 Works. machinery / 12  Excavation shall be consider as  HSSE Personnel
contact with All personnel restricted work area.  Project Engineer
machinery.  Machineries Operator
 Fall of person
into pit /
excavation
area.  Proper housekeeping at working
 Bad weather. area and pathway.
 To use proper hand protection.
 Use dust mask if necessary.
 Site Supervisor
Rebar Fabrication  Hazard in  Task to be carried out by trained
13 12  HSSE Personnel
handling sharp personnel.
 Project Engineer
materials. All personnel  Prior to start work activity, walk-
 Hit by falling down to identify potential hazard
object due to that could result in slip and trip..
mishandling /  Brief personal to the hazard prior
slip/ trip. to start activity.
 Cut or
abrasion,
fingers caught
in between.
 Bad weather
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person

Prepared By; Reviewed by: Approved by:


Name : Mohd Suhaimi Bin Che Yaacob. Name: Name:
Position : Site Safety Supervisor Position : HSE Officer / HSE Manager Position: Construction Manager/Project Manager
Signature: Signature: Signature:

Date: Date: Date:

Reviewed by :

OWNER/PMC HSE :

OWNER /PMC CONSTRUCTION :