Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
1. Preliminary works. Removal All personnel 12 Avoid to use soft ground. Site Supervisor
construction Provide escort vehicle for lorry and HSSE Personnel
debris along mobile crane. Project Engineer
exaction area Follow TMP or designated road
Bad weather. access instruction
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
3. Mobilization of plant and Competent machinery HSSE Personnel
machineries to site Machinery operator/driver. Project Engineer
stuck at Good physical condition of vehicle,
muddy access 16 plant, equipment, machinery.
road Machinery with valid insurance
coverage
All personnel.
Crane 4 wheel vehicle to guide during
overturned the mobilization plant
.
Bad weather
Competent machinery
Major operator/driver. Site Supervisor
4 Delivery of work Poor access to body injury 12 Good physical condition of vehicle, HSSE Personnel
materials to site the designated All personnel plant, equipment, machinery. Project Engineer
working area Machinery with valid insurance
coverage.
4 wheel vehicle to guide during
the mobilization plant.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
5 Lifting materials by crane, Struck by 12 must be inspected and approved HSSE Personnel
excavator and backhoe falling/lifting/ All personnel. Personnel kept clear distance Project Engineer
moving objects during crane operation Crane Operator
Crane overturn Barricade lifting area and put up
Bad weather signage “LIFTING IN PROGRESS”
Do not working/passing below
suspended load
Competent riggers
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
7 into 12 restricted work area. HSSE Personnel
excavation/pit All personnel Project Engineer
area Ensure safe degree slope
cutting/platform
Deep excavation for > 1.2m depth
Failure of shall provide temporary work i.e
excavate slope strutting, timbering and etc.
Bad weather 16 Safe distance from machinery to
excavated area.
Usage of tagline to receive
material.
Excavated materials to be placed
minimum of 2m from the edge of
excavated trench.
Machinery shall be sit on top of
steel plate when perform works at
weak ground condition.
To properly level the ground
before machinery start excavation
works.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
8 materials. dust. 12 HSSE Personnel
Cut or All personnel Project Engineer
abrasion,
fingers caught
in between. Proper housekeeping at working
Bad weather area and pathway.
To use proper hand protection.
Use dust mask if necessary. Site Supervisor
Formwork Erection Exposed to Task to be carried out by trained HSSE Personnel
9 dust. 12 personnel.
Project Engineer
Hazard by Prior to start work activity, walk-
using sharp All personnel down to identify potential hazard
and handling that could result in slip and trip.
tools. Brief personal to the hazard prior
Hit by falling to start activity
objects due to
mishandling
/slip/trip.
Cut or
abrasion,
fingers caught
in between Proper housekeeping at working
area and pathway.
To use proper hand protection.
Use dust mask if necessary.
Concreting Thrust Block. Skin disease - Site Supervisor
Task to be carried out by trained
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
10 Exposure to 12 personnel. HSSE Personnel
mortar . All personnel Concrete bucket shall have nozzle Project Engineer
Noise and to reduce splash or concrete
vibration chemical to concreter.
hazard when Stand by clean water and washing
using vibration facilities.
poker.
Body contact
with concrete
chemical
Exposure to
cement dust /
silica (from
sand)
Bad weather
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
11 pipe/RCP culvert by falling/lifting/ 12 during lifting operation HSSE Personnel
excavator. moving objects All personnel Berricade lifting area and put up Project Engineer
Bad weather signage “LIFTING IN PROGRESS” Excavator Operator
Do not working/passing below
suspended load.
Usage of tagline to receive
material.
Check on site condition before
start work.
Accelerate gently to minimize load
swing when travelling with a
suspended load.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
12 Works. machinery / 12 Excavation shall be consider as HSSE Personnel
contact with All personnel restricted work area. Project Engineer
machinery. Machineries Operator
Fall of person
into pit /
excavation
area. Proper housekeeping at working
Bad weather. area and pathway.
To use proper hand protection.
Use dust mask if necessary.
Site Supervisor
Rebar Fabrication Hazard in Task to be carried out by trained
13 12 HSSE Personnel
handling sharp personnel.
Project Engineer
materials. All personnel Prior to start work activity, walk-
Hit by falling down to identify potential hazard
object due to that could result in slip and trip..
mishandling / Brief personal to the hazard prior
slip/ trip. to start activity.
Cut or
abrasion,
fingers caught
in between.
Bad weather
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
Reviewed by :
OWNER/PMC HSE :