3.1 Work Below Lowest Floor Level 850,929.40
3.2 Frame 7,970,143.39
3.3 Staircase 37,104.90
3.4 Staircase Finishes 37,854.14
3.5 Upper Floor Finishes 2,467,247.71
3.6 Roof 605,967.26
3.7 External Walls 5,487.00
3.8 Internals Walls 1,094.00
3.9 Doors 119.00
3.10 Ironmongeries 5,007.72
3.11 External Wall Finishes 4,831.00
3.12 Internal Wall Finishes 12,312.81
3.13 Floor Finishes 46,634.93
3.14 Ceiling Finishes 19,801.00
3.15 Painting 40,241.00
3.16 Sanitary Wares and Fittings 1,529.81
A m3 15 17.60 264.00
B m3 19 17.60 334.40
C m3 148 17.60 2,604.80
D m3 10 17.60 176.00
E m3 26 17.60 457.60
F m3 385 17.60 6,776.00
G m3 124 17.60 2,182.40
H m3 8 17.60 140.80
A m3 15 17.60 264.00
B m3 3 17.60 52.80
C m3 3 196.60 589.80
D m3 21 196.60 4,128.60
E m3 58 196.60 11,402.80
F m3 1 196.60 196.60
G m3 1 196.60 196.60
A m3 35 246.60 8,631.00
B m3 397 246.60 97,900.20
C m 131 11.00 1,441.00
D m 27 4.00 108.00
E m 54 132.00 7,128.00
F m3 56 246.60 13,809.60
G m3 373 246.60 91,981.80
H m3 16 246.60 3,945.60
J m3 2 246.60 493.20
K m3 1 246.60 246.60
L m3 2 246.60 493.20
M m3 1 246.60 246.60
A m3 1 246.60 246.60
B m3 84 246.60 20,714.40
C m3 9 246.60 2,219.40
D m3 4 246.60 986.40
E m3 85 246.60 20,961.00
F m3 25 246.60 6,165.00
G m3 4 246.60 986.40
H kg 2,753 3.20 8,809.60
J kg 1,742 3.20 5,574.40
A m2 88 30.00 2,640.00
B m 145 15.00 2,175.00
C m 47 30.00 1,410.00
D m 17 15.00 255.00
E m 184 15.00 2,760.00
F m 55 30.00 1,650.00
G m2 18 30.00 540.00
H m 131 7.50 982.50
J m 360 15.00 5,400.00
K m2 52 30.00 1,560.00
L m 34 7.50 255.00
M m2 7 30.00 210.00
-
A m 9 7.50 67.50
B m2 8 30.00 240.00
C m 13 7.50 97.50
D m2 2 30.00 60.00
E m 4 7.50 30.00
F m2 2,677 2.00 5,354.00
G item 1 3,000.00 3,000.00
A m2 12 1.00 12.00
B m2 4 1.00 4.00
C m3 826 90.00 74,340.00
D m 131 28.00 3,668.00
E m 26 132.00 3,432.00
A m3 14 246.60 3,452.40
B m3 134 246.60 33,044.40
C m3 33 246.60 8,137.80
D m3 34 246.60 8,384.40
E m3 63 246.60 15,535.80
F m3 95 246.60 23,427.00
G m3 91 246.60 22,440.60
H m3 232 246.60 57,211.20
J m3 20 246.60 4,932.00
A m3 58 246.60 14,302.80
B m3 12 246.60 2,959.20
C m3 2 246.60 493.20
D m3 13 246.60 3,205.80
E m3 2 246.60 493.20
F m3 25 246.60 6,165.00
G m3 4 246.60 986.40
H m3 443 246.60 109,243.80
J m3 36 246.60 8,877.60
A m3 4 246.60 986.40
B m3 3 246.60 739.80
C m3 9 246.60 2,219.40
D m3 1 246.60 246.60
E m3 8 246.60 1,972.80
F kg 288,353 3.20 922,729.60
G kg 39,100 3.20 125,120.00
H kg 5,593 3.20 17,897.60
J kg 31,160 3.20 99,712.00
To Carried To Collection RM 1,171,624.20
3/2/4
A kg 78 3.20 249.60
B kg 148 3.20 473.60
C kg 726 3.20 2,323.20
D kg 515 3.20 1,648.00
E kg 1,016 3.20 3,251.20
F kg 159 3.20 508.80
G kg 20,228 3.20 64,729.60
H kg 13,523 3.20 43,273.60
J kg 8,014 3.20 25,644.80
K kg 16,643 3.20 53,257.60
L kg 6,820 3.20 21,824.00
M kg 13,446 3.20 43,027.20
N kg 936 3.20 2,995.20
P kg 15 3.20 48.00
A kg 14 3.20 44.80
B kg 263 3.20 841.60
C m2 1,261 16.09 20,289.49
D kg 1,836 8.80 16,156.80
E m2 4,325 30.00 129,750.00
F m2 167 6.00 1,002.00
G m2 81 30.00 2,430.00
A m 54 7.50 405.00
B m 1,297 7.50 9,727.50
C m2 149 30.00 4,470.00
D m2 340 30.00 10,200.00
E m2 3,558 30.00 106,740.00
F m2 813 30.00 24,390.00
G m2 97 30.00 2,910.00
A m3 32 246.60 7,891.20
B m3 9 246.60 2,219.40
C m3 1 246.60 246.60
D kg 2,026 3.20 6,483.20
E kg 830 3.20 2,656.00
F kg 580 3.20 1,856.00
G kg 787 3.20 2,518.40
H kg 266 3.20 851.20
J kg 158 3.20 505.60
A m2 13 30.00 390.00
A m2 10 60.50 605.00
B m 44 15.10 664.40
A m 83 6.10 506.30
Item Description % Rate
a PC Unit RM 10.93
b Wastage 1.00% RM 0.11
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 14.04
f Profit and Overhead 1.00% RM 0.14
Total Cost Per M RM 14.18
A m3 14 246.60 3,452.40
B m3 9 246.60 2,219.40
C m3 3 246.60 739.80
D m3 11 246.60 2,712.60
E m3 14 246.60 3,452.40
F m3 26 246.60 6,411.60
G m 94 17.00 1,598.00
H m3 152 246.60 37,483.20
J m3 1 246.60 246.60
K m3 813 246.60 200,485.80
L m3 55 246.60 13,563.00
M m 397 11.00 4,367.00
A m3 1 246.60 246.60
B m3 71 246.60 17,508.60
C m3 1 246.60 246.60
D m3 6 246.60 1,479.60
E m3 1,707 246.60 420,946.20
F m3 25 246.60 6,165.00
G m3 256 246.60 63,129.60
H m3 38 246.60 9,370.80
J m 102 3.00 306.00
K m 204 132.00 26,928.00
L m 325 11.00 3,575.00
M m 166 13.00 2,158.00
N m 15 17.00 255.00
P m3 8 246.60 1,972.80
A m3 27 246.60 6,658.20
B m3 1 246.60 246.60
C m3 263 246.60 64,855.80
D m 552 15.00 8,280.00
E m3 152 246.60 37,483.20
F m3 121 246.60 29,838.60
G m3 1 216.60 216.60
H m3 1 216.60 216.60
J m3 3 216.60 649.80
-
A m2 48 20.32 975.36
B m2 120 16.09 1,930.80
C m2 149 20.32 3,027.68
D m2 222 16.09 3,571.98
E m2 192 16.09 3,089.28
A m2 43 30.00 1,290.00
B m 1 7.50 7.50
C m2 103 30.00 3,090.00
D m2 68 30.00 2,040.00
E m2 4 30.00 120.00
F m2 140 30.00 4,200.00
G item 1 7,500.00 7,500.00
A m3 37 90.00 3,330.00
B m3 40 90.00 3,600.00
m 204 132.00 26,928.00
A m 82 1.00 82.00
B m 30 1.00 30.00
C no 9 1.00 9.00
A m3 5 1.00 5.00
B kg 548 1.00 548.00
C kg 346 1.00 346.00
D m2 41 1.00 41.00
A m 33 1.00 33.00
A no 6 1.00 6.00
B no 12 1.00 12.00
C no 6 1.00 6.00
D no 1 1.00 1.00
E no 1 1.00 1.00
F no 1 1.00 1.00
A no 6 1.00 6.00
B no 12 1.00 12.00
C no 6 1.00 6.00
D no 1 1.00 1.00
E no 1 1.00 1.00
F no 1 1.00 1.00
A no 2 1.00 2.00
B no 1 1.00 1.00
C no 1 1.00 1.00
D no 1 1.00 1.00
E no 1 1.00 1.00
-
A no 1 1.00 1.00
B no 1 1.00 1.00
A no 48 11.22 538.56
B no 72 11.22 807.84
C no 8 11.22 89.76
A no 6 16.89 101.34
B no 18 16.89 304.02
A no 6 64.78 388.68
Item Description % Rate
a PC Unit RM 2.23
b Wastage 1.00% RM 0.02
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 5.25
f Profit and Overhead 1.00% RM 0.05
Total Cost Per M RM 5.30
B no 6 5.30 31.80
A no 6 47.14 282.84
Item Description % Rate
a PC Unit RM 59.29
b Wastage 1.00% RM 0.59
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 62.88
f Profit and Overhead 1.00% RM 0.63
Total Cost Per M RM 63.51
B no 2 63.51 127.02
A no 2 24.45 48.90
Item Description % Rate
a PC Unit RM 18.53
b Wastage 1.00% RM 0.19
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 21.72
f Profit and Overhead 1.00% RM 0.22
Total Cost Per M RM 21.93
B no 72 21.93 1,578.96
A m 45 1.00 45.00
B m2 7 1.00 7.00
A m2 7 26.83 187.81
A m2 22 1.00 22.00
B m2 106 1.00 106.00
C m 2 1.00 2.00
D m2 149 1.00 149.00
E m 20 1.00 20.00
F m 14 1.00 14.00
G m2 3 1.00 3.00
H m 4 1.00 4.00
J m2 4 1.00 4.00
K m 4 1.00 4.00
L m2 3 1.00 3.00
M m2 8 1.00 8.00
N m2 14 1.00 14.00
P m 7 1.00 7.00
Q m2 91 1.00 91.00
R m 3 1.00 3.00
S m2 84 1.00 84.00
T m2 21 1.00 21.00
To Carried To Collection RM 559.00
3/13/1
A m 1 1.00 1.00
B m2 36 1.00 36.00
C m 1 1.00 1.00
D m2 20 1.00 20.00
E m2 33 1.00 33.00
F m2 33 1.00 33.00
G m2 4 1.00 4.00
H m2 62 1.00 62.00
J m2 4 1.00 4.00
K m 2 1.00 2.00
L m2 5 1.00 5.00
M m 1 1.00 1.00
N m2 29 1.00 29.00
P m 2 1.00 2.00
Q m2 5 1.00 5.00
R m 1 1.00 1.00
S m2 29 1.00 29.00
T m2 29 1.00 29.00
U m 628 1.00 628.00
A m2 10 26.83 268.30
B m 11 26.83 295.13
C m2 2 26.83 53.66
D m 1 26.83 26.83
A m2 60 37.54 2,252.40
B m 49 37.54 1,839.46
C m 6 37.54 225.24
D m 15 37.54 563.10
A m2 22 3.03 66.66
B m2 688 1.00 688.00
C m2 261 1.00 261.00
To Carried To Collection RM 1,015.66
3/13/9
A m2 39 1.00 39.00
B m2 29 1.00 29.00
C m2 136 1.00 136.00
D m2 91 1.00 91.00
E m2 1,867 1.00 1,867.00
F m 419 1.00 419.00
A no 23 1.00 23.00
B no 3 1.00 3.00
C no 45 1.00 45.00
D no 5 1.00 5.00
E no 10 1.00 10.00
F no 1 1.00 1.00
G no 1 1.00 1.00
H no 1 1.00 1.00
J no 1 1.00 1.00
K no 1 1.00 1.00
L m 2 1.00 2.00
A no 1 1.00 1.00
B no 498 1.00 498.00
C no 2 1.00 2.00
D no 99 1.00 99.00
E no 9 1.00 9.00
F no 8 1.00 8.00
G no 3 1.00 3.00
H no 13 1.00 13.00
J m 1,655 1.00 1,655.00
A no 1 1.00 1.00
B no 348 1.00 348.00
C m2 11 1.00 11.00
D no 7 1.00 7.00
E no 6 1.00 6.00
A m2 2 1.00 2.00
B m2 49 1.00 49.00
C m2 123 1.00 123.00
D m2 121 1.00 121.00
E m2 10 1.00 10.00
F m2 27 1.00 27.00
A m 24 1.00 24.00
B m2 5 1.00 5.00
C no 13 1.00 13.00
To Carried To Collection RM 42.00
3/14/3
A m2 2 1.00 2.00
B m2 12,509 1.00 12,509.00
C m2 83 1.00 83.00
D m2 862 1.00 862.00
E m2 31 1.00 31.00
F m2 1,462 1.00 1,462.00
G m2 21 1.00 21.00
H m2 88 1.00 88.00
J m2 1,411 1.00 1,411.00
K m2 2 1.00 2.00
L m2 49 1.00 49.00
M m2 123 1.00 123.00
N m 121 1.00 121.00
A m2 10 1.00 10.00
B m2 27 1.00 27.00
C m 24 1.00 24.00
D m2 5 1.00 5.00
E m2 413 2.00 826.00
1 1.00 1.00
A no 1 277.63 277.63
Item Description % Rate
a PC Unit RM 60.26
b Wastage 1.00% RM 0.60
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 63.86
f Profit and Overhead 1.00% RM 0.64
Total Cost Per M RM 64.50
A no 1 64.50 64.50
Item Description % Rate
a PC Unit RM 73.97
b Wastage 1.00% RM 0.74
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 77.71
f Profit and Overhead 1.00% RM 0.78
Total Cost Per M RM 78.49
B no 1 78.49 78.49
Item Description % Rate
a PC Unit RM 48.56
b Wastage 1.00% RM 0.49
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 52.05
f Profit and Overhead 1.00% RM 0.52
Total Cost Per M RM 52.57
C no 1 52.57 52.57
B no 2 44.42 88.84
A no 1 78.43 78.43
Item Description % Rate
a PC Unit RM 59.3
b Wastage 1.00% RM 0.59
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 62.89
f Profit and Overhead 1.00% RM 0.63
Total Cost Per M RM 63.52
B no 1 63.52 63.52
A no 1 29.81 29.81
B no 1 29.81 29.81
Item Description % Rate
a PC Unit RM 1.2
b Wastage 1.00% RM 0.01
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 4.21
f Profit and Overhead 1.00% RM 0.04
Total Cost Per M RM 4.25
849,629.61
8,098,993.63
41,045.03
37,035.15
2,628,111.69
575,120.86
5,487.00
1,094.00
119.00
5,008.20
4,831.00
12,312.80
46,636.15
19,801.00
40,241.00
1,530.36
12,366,996.48
M.Up 1.000
Rate Amount
(RM) (RM)
22.50 337.50
30.00 570.00
33.00 4,884.00
18.00 180.00
22.50 585.00
18.00 6,930.00
18.00 2,232.00
30.00 240.00
15,958.50
Rate Amount
(RM) (RM)
30.00 450.00
22.50 67.50
220.00 660.00
220.00 4,620.00
220.00 12,760.00
220.00 220.00
220.00 220.00
18,997.50
Rate Amount
(RM) (RM)
252.00 8,820.00
252.00 100,044.00
11.00 1,441.00
4.00 108.00
119.00 6,426.00
252.00 14,112.00
252.00 93,996.00
252.00 4,032.00
252.00 504.00
252.00 252.00
252.00 504.00
252.00 252.00
230,491.00
Rate Amount
(RM) (RM)
252.00 252.00
252.00 21,168.00
252.00 2,268.00
252.00 1,008.00
252.00 21,420.00
252.00 6,300.00
252.00 1,008.00
3.00 8,259.00
3.00 5,226.00
66,909.00
Rate Amount
(RM) (RM)
3.00 26,709.00
3.00 3,351.00
3.00 276.00
3.00 18,453.00
3.00 819.00
3.00 2,655.00
3.00 450.00
3.00 279.00
3.00 9,546.00
3.00 36,042.00
3.00 22,311.00
3.00 11,784.00
3.00 13,230.00
3.00 27,312.00
173,217.00
Rate Amount
(RM) (RM)
3.00 28,965.00
3.00 167,940.00
3.00 2,706.00
3.00 3,198.00
3.00 606.00
17.38 121.66
17.38 52.14
42.50 22,695.00
226,283.80
Rate Amount
(RM) (RM)
42.50 3,740.00
21.25 3,081.25
42.50 1,997.50
21.25 361.25
21.25 3,910.00
42.50 2,337.50
42.50 765.00
10.63 1,392.53
21.25 7,650.00
42.50 2,210.00
10.63 361.42
42.50 297.50
28,103.95
Rate Amount
(RM) (RM)
10.63 95.67
42.50 340.00
10.63 138.19
1.00 2.00
1.00 4.00
2.00 5,354.00
3,000.00 3,000.00
8,933.86
Rate Amount
(RM) (RM)
1.00 12.00
1.00 4.00
90.00 74,340.00
25.00 3,275.00
119.00 3,094.00
80,725.00
Rate Amount
(RM) (RM)
1.00 10.00
10.00
Rate Amount
(RM) (RM)
15,958.50
18,997.50
230,491.00
66,909.00
173,217.00
226,283.80
28,103.95
8,933.86
80,725.00
10.00
849,629.61
M.Up -
Rate Amount
(RM) (RM)
286.00 293,150.00
286.00 7,436.00
286.00 26,884.00
286.00 59,488.00
286.00 2,288.00
286.00 2,288.00
252.00 6,048.00
397,582.00
Rate Amount
(RM) (RM)
252.00 3,528.00
252.00 33,768.00
252.00 8,316.00
252.00 8,568.00
252.00 15,876.00
252.00 23,940.00
252.00 22,932.00
252.00 58,464.00
252.00 5,040.00
180,432.00
Rate Amount
(RM) (RM)
252.00 14,616.00
252.00 3,024.00
252.00 504.00
252.00 3,276.00
252.00 504.00
252.00 6,300.00
252.00 1,008.00
252.00 111,636.00
252.00 9,072.00
149,940.00
Rate Amount
(RM) (RM)
252.00 1,008.00
252.00 756.00
252.00 2,268.00
252.00 252.00
252.00 2,016.00
3.00 865,059.00
3.00 117,300.00
3.00 16,779.00
3.00 93,480.00
1,098,918.00
Rate Amount
(RM) (RM)
3.00 3,225.00
3.00 8,865.00
3.00 81.00
3.00 1,734.00
3.00 5,238.00
3.00 11,100.00
3.00 70,146.00
3.00 25,011.00
3.00 40,401.00
3.00 2,385.00
3.00 36,405.00
3.00 11,115.00
215,706.00
Rate Amount
(RM) (RM)
3.00 27,711.00
3.00 26,271.00
3.00 25,311.00
3.00 10,380.00
3.00 1,230.00
3.00 7,065.00
3.00 2,163.00
3.00 1,506.00
3.00 5,115.00
3.00 68,868.00
3.00 18,636.00
3.00 3,954.00
3.00 3,789.00
3.00 897.00
202,896.00
Rate Amount
(RM) (RM)
3.00 234.00
3.00 444.00
3.00 2,178.00
3.00 1,545.00
3.00 3,048.00
3.00 477.00
3.00 60,684.00
3.00 40,569.00
3.00 24,042.00
3.00 49,929.00
3.00 20,460.00
3.00 40,338.00
3.00 2,808.00
3.00 45.00
246,801.00
Rate Amount
(RM) (RM)
3.00 7,347.00
3.00 7,167.00
3.00 6,846.00
3.00 12,243.00
3.00 429.00
3.00 234.00
3.00 369.00
3.00 3,171.00
3.00 3,759.00
3.00 282.00
3.00 1,287.00
3.00 222.00
43,356.00
Rate Amount
(RM) (RM)
3.00 294.00
3.00 78.00
3.00 1,536.00
3.00 1,212.00
3.00 6,108.00
3.00 3,579.00
3.00 30.00
3.00 258.00
13,095.00
Rate Amount
(RM) (RM)
3.00 42.00
3.00 789.00
17.38 21,916.18
7.90 14,504.40
42.50 183,812.50
8.50 1,419.50
95.00 7,695.00
230,178.58
Rate Amount
(RM) (RM)
42.50 10,200.00
42.50 86,402.50
8.50 986.00
10.63 605.91
21.25 4,037.50
21.25 3,506.25
42.50 3,570.00
10.63 446.46
42.50 59,415.00
169,169.62
Rate Amount
(RM) (RM)
8.50 1,232.50
10.63 393.31
21.25 807.50
42.50 26,817.50
8.50 1,632.00
42.50 39,737.50
10.63 1,116.15
10.63 4,294.52
42.50 120,487.50
196,518.48
Rate Amount
(RM) (RM)
10.63 574.02
10.63 13,787.11
42.50 6,332.50
42.50 14,450.00
42.50 151,215.00
42.50 34,552.50
42.50 4,122.50
225,033.63
Rate Amount
(RM) (RM)
42.50 4,760.00
10.63 95.67
21.25 276.25
10.63 850.40
42.50 3,527.50
42.50 807.50
600.00 555,600.00
600.00 3,654,000.00
4,219,917.32
Rate Amount
(RM) (RM)
600.00 261,000.00
230,000.00 230,000.00 *Allow 3% of the bill
90.00 18,450.00
509,450.00
Rate Amount
(RM) (RM)
397,582.00
180,432.00
149,940.00
1,098,918.00
215,706.00
202,896.00
246,801.00
43,356.00
13,095.00
230,178.58
169,169.62
196,518.48
225,033.63
4,219,917.32
509,450.00
M.Up -
Rate Amount
(RM) (RM)
252.00 8,064.00
252.00 2,268.00
252.00 252.00
3.00 6,078.00
3.00 2,490.00
3.00 1,740.00
3.00 2,361.00
3.00 798.00
3.00 474.00
24,525.00
Rate Amount
(RM) (RM)
3.00 240.00
3.00 270.00
3.00 93.00
42.50 5,440.00
10.63 4,368.93
17.85 3,855.60
42.50 1,700.00
15,967.53
Rate Amount
(RM) (RM)
42.50 552.50
552.50
Rate Amount
(RM) (RM)
24,525.00
15,967.53
552.50
41,045.03
M.Up -
Rate Amount
(RM) (RM)
9.00 1,152.00
9.00 468.00
4.00 432.00
18.00 720.00
6.00 1,944.00
6.00 2,202.00
3.00 249.00
3.00 117.00
3.00 132.00
3.00 1,089.00
8,505.00
Rate Amount
(RM) (RM)
50.27 502.70
12.57 553.08
1,055.78
Rate Amount
(RM) (RM)
5.03 417.49
21.15 7,677.45
7,677.45
Rate Amount
(RM) (RM)
150.00 18,300.00
50.00 500.00
50.00 800.00
50.00 450.00
50.00 300.00
20,350.00
Rate Amount
(RM) (RM)
8,505.00
502.70
7,677.45
20,350.00
37,035.15
M.Up -
Rate Amount
(RM) (RM)
252.00 3,528.00
252.00 2,268.00
252.00 756.00
252.00 2,772.00
252.00 3,528.00
252.00 6,552.00
24.00 2,256.00
252.00 38,304.00
252.00 252.00
252.00 204,876.00
252.00 13,860.00
15.00 5,955.00
284,907.00
Rate Amount
(RM) (RM)
252.00 252.00
252.00 17,892.00
252.00 252.00
252.00 1,512.00
252.00 430,164.00
252.00 6,300.00
252.00 64,512.00
252.00 9,576.00
5.00 510.00
119.00 24,276.00
15.00 4,875.00
18.00 2,988.00
24.00 360.00
252.00 2,016.00
565,485.00
Rate Amount
(RM) (RM)
252.00 6,804.00
252.00 252.00
252.00 66,276.00
21.00 11,592.00
252.00 38,304.00
252.00 30,492.00
230.00 230.00
230.00 230.00
230.00 690.00
154,870.00
Rate Amount
(RM) (RM)
3.00 14,844.00
3.00 69,348.00
3.00 59,955.00
3.00 157,641.00
3.00 123,795.00
3.00 3,042.00
3.00 1,158.00
3.00 9.00
3.00 2,826.00
3.00 12,711.00
3.00 6,897.00
3.00 7,413.00
3.00 34,326.00
3.00 28,788.00
3.00 11,145.00
533,898.00
Rate Amount
(RM) (RM)
3.00 128,700.00
3.00 3,354.00
3.00 9,081.00
3.00 3,390.00
3.00 3,786.00
3.00 6,129.00
3.00 3.00
17.38 15,103.22
13.59 5,571.90
175,118.12
Rate Amount
(RM) (RM)
22.46 1,078.08
17.38 2,085.60
22.46 3,346.54
17.38 3,858.36
17.38 3,336.96
13,705.54
Rate Amount
(RM) (RM)
11.00 247,269.00
42.50 16,915.00
42.50 322,022.50
10.63 7,334.70
21.25 743.75
42.50 85.00
594,369.95
Rate Amount
(RM) (RM)
42.50 170,212.50
42.50 765.00
42.50 340.00
10.63 1,753.95
42.50 31,067.50
21.25 3,442.50
42.50 42,032.50
42.50 1,912.50
251,526.45
Rate Amount
(RM) (RM)
42.50 1,827.50
10.63 10.63
42.50 4,377.50
42.50 2,890.00
42.50 170.00
42.50 5,950.00
7,800.00 7,800.00 *Allow 3% of the bill
23,025.63
Rate Amount
(RM) (RM)
90.00 3,330.00
90.00 3,600.00
119.00 24,276.00
31,206.00
Rate Amount
(RM) (RM)
284,907.00
565,485.00
154,870.00
533,898.00
175,118.12
13,705.54
594,369.95
251,526.45
23,025.63
31,206.00
M.Up -
Rate Amount
(RM) (RM)
252.00 32.76
3.00 90.00
42.50 595.00
717.76
Rate Amount
(RM) (RM)
7.90 48,324.30
7.90 29,324.80
7.90 32,950.90
7.90 671.50
7.90 7,520.80
177.00 75,933.00
102.00 25,092.00
7.90 12,181.80
7.90 2,322.60
7.90 5,166.60
7.90 782.10
7.90 13,532.70
7.90 10,894.10
264,697.20
Rate Amount
(RM) (RM)
7.90 6,722.90
15.00 60.00
43.00 2,666.00
6.00 60.00
12.00 180,432.00
12.00 8,112.00
12.00 78,372.00
12.00 912.00
30,000.00 30,000.00 *Allow 10% of steel structure
305222.2 274206.1
30522.22 27420.61
307,336.90
Rate Amount
(RM) (RM)
1.00 327.00
1.00 376.00
1.00 327.00
1.00 376.00
1.00 327.00
1.00 376.00
1.00 139.00
2,248.00
Rate Amount
(RM) (RM)
1.00 82.00
1.00 30.00
1.00 9.00
121.00
Rate Amount
(RM) (RM)
717.76
264,697.20
307,336.90
2,248.00
121.00
575,120.86
M.Up -
Rate Amount
(RM) (RM)
1.00 5.00
1.00 548.00
1.00 346.00
1.00 41.00
940.00
Rate Amount
(RM) (RM)
1.00 135.00
1.00 540.00
1.00 483.00
1.00 14.00
1.00 22.00
1.00 748.00
1,942.00
Rate Amount
(RM) (RM)
1.00 785.00
1.00 1,138.00
1.00 682.00
2,605.00
Rate Amount
(RM) (RM)
940.00
1,942.00
2,605.00
5,487.00
M.Up -
Rate Amount
(RM) (RM)
1.00 113.00
1.00 55.00
1.00 854.00
1.00 30.00
1.00 9.00
1,061.00
Rate Amount
(RM) (RM)
1.00 33.00
33.00
Rate Amount
(RM) (RM)
1,061.00
33.00
1,094.00
M.Up -
Rate Amount
(RM) (RM)
1.00 6.00
1.00 12.00
1.00 6.00
1.00 1.00
1.00 1.00
1.00 1.00
27.00
Rate Amount
(RM) (RM)
1.00 27.00
1.00 12.00
1.00 6.00
1.00 1.00
1.00 4.00
1.00 1.00
1.00 6.00
57.00
Rate Amount
(RM) (RM)
1.00 6.00
1.00 12.00
1.00 6.00
1.00 1.00
1.00 1.00
1.00 1.00
27.00
Rate Amount
(RM) (RM)
1.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
6.00
Rate Amount
(RM) (RM)
1.00 1.00
1.00 1.00
2.00
Rate Amount
(RM) (RM)
27.00
57.00
27.00
6.00
2.00
119.00
M.Up -
Rate Amount
(RM) (RM)
11.22 538.63
11.22 807.94
11.22 89.77
1,436.34
Rate Amount
(RM) (RM)
16.89 101.36
16.89 304.08
29.50 177.01
29.50 531.03
1,113.48
Rate Amount
(RM) (RM)
64.78 388.66
5.30 31.83
420.49
Rate Amount
(RM) (RM)
47.14 282.83
63.51 127.02
409.85
Rate Amount
(RM) (RM)
24.45 48.90
21.93 1,579.14
1,628.04
Rate Amount
(RM) (RM)
1,436.34
1,113.48
420.49
409.85
1,628.04
5,008.20
M.Up -
Rate Amount
(RM) (RM)
1.00 1,240.00
1.00 305.00
1.00 2,896.00
1.00 7.00
1.00 382.00
1.00 1.00
4,831.00
Rate Amount
(RM) (RM)
4,831.00
4,831.00
M.Up -
Rate Amount
(RM) (RM)
1.00 3,021.00
1.00 882.00
1.00 3,238.00
1.00 1,825.00
1.00 65.00
1.00 531.00
1.00 2,510.00
1.00 1.00
12,073.00
Rate Amount
(RM) (RM)
1.00 45.00
1.00 7.00
52.00
Rate Amount
(RM) (RM)
26.83 187.80
187.80
Rate Amount
(RM) (RM)
12,073.00
52.00
187.80
12,312.80
M.Up -
Rate Amount
(RM) (RM)
1.00 22.00
1.00 106.00
1.00 2.00
1.00 149.00
1.00 20.00
1.00 14.00
1.00 3.00
1.00 4.00
1.00 4.00
1.00 4.00
1.00 3.00
1.00 8.00
1.00 14.00
1.00 7.00
1.00 91.00
1.00 3.00
1.00 84.00
1.00 21.00
559.00
Rate Amount
(RM) (RM)
1.00 1.00
1.00 36.00
1.00 1.00
1.00 20.00
1.00 33.00
1.00 33.00
1.00 4.00
1.00 62.00
1.00 4.00
1.00 2.00
1.00 5.00
1.00 1.00
1.00 29.00
1.00 2.00
1.00 5.00
1.00 1.00
1.00 29.00
1.00 29.00
1.00 628.00
925.00
Rate Amount
(RM) (RM)
1.00 853.00
1.00 166.00
1.00 94.00
1.00 15.00
1.00 14,232.00
15,360.00
Rate Amount
(RM) (RM)
1.00 1,001.00
1.00 91.00
1.00 1,862.00
1.00 275.00
1.00 195.00
3,424.00
Rate Amount
(RM) (RM)
1.00 21.00
1.00 15.00
36.00
Rate Amount
(RM) (RM)
26.83 268.29
26.83 295.12
26.83 53.66
26.83 26.83
643.90
Rate Amount
(RM) (RM)
38.73 6,700.90
38.73 3,795.88
38.73 581.00
38.73 1,200.74
38.73 1,471.87
13,750.39
Rate Amount
(RM) (RM)
37.54 2,252.40
37.54 1,839.46
37.54 225.24
37.54 563.10
4,880.20
Rate Amount
(RM) (RM)
3.03 66.66
1.00 688.00
1.00 261.00
1,015.66
Rate Amount
(RM) (RM)
1.00 39.00
1.00 29.00
1.00 136.00
1.00 91.00
1.00 1,867.00
1.00 419.00
2,581.00
Rate Amount
(RM) (RM)
1.00 23.00
1.00 3.00
1.00 45.00
1.00 5.00
1.00 10.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 2.00
93.00
Rate Amount
(RM) (RM)
1.00 1.00
1.00 498.00
1.00 2.00
1.00 99.00
1.00 9.00
1.00 8.00
1.00 3.00
1.00 13.00
1.00 1,655.00
2,288.00
Rate Amount
(RM) (RM)
1.00 692.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 3.00
1.00 1.00
1.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 2.00
707.00
Rate Amount
(RM) (RM)
1.00 1.00
1.00 348.00
1.00 11.00
1.00 7.00
1.00 6.00
373.00
Rate Amount
(RM) (RM)
559.00
925.00
15,360.00
3,424.00
36.00
643.90
13,750.39
4,880.20
1,015.66
2,581.00
93.00
2,288.00
707.00
373.00
46,636.15
M.Up -
Rate Amount
(RM) (RM)
1.00 2,582.00
1.00 2.00
1.00 12,509.00
1.00 83.00
1.00 862.00
1.00 31.00
1.00 1,462.00
1.00 21.00
1.00 88.00
1.00 1,411.00
19,051.00
Rate Amount
(RM) (RM)
1.00 2.00
1.00 49.00
1.00 123.00
1.00 121.00
1.00 10.00
1.00 27.00
332.00
Rate Amount
(RM) (RM)
1.00 24.00
1.00 5.00
1.00 13.00
42.00
Rate Amount
(RM) (RM)
1.00 376.00
376.00
Rate Amount
(RM) (RM)
19,051.00
332.00
42.00
376.00
19,801.00
M.Up -
Rate Amount
(RM) (RM)
1.00 1,240.00
1.00 305.00
1.00 2,896.00
1.00 7.00
1.00 1,145.00
1.00 278.00
1.00 104.00
1.00 1.00
5,976.00
Rate Amount
(RM) (RM)
1.00 2,979.00
1.00 882.00
1.00 3,238.00
1.00 1,748.00
1.00 65.00
1.00 531.00
1.00 2,510.00
1.00 650.00
1.00 128.00
1.00 52.00
1.00 108.00
1.00 2,582.00
1.00 2.00
1.00 544.00
1.00 90.00
1.00 11.00
16,120.00
Rate Amount
(RM) (RM)
1.00 2.00
1.00 12,509.00
1.00 83.00
1.00 862.00
1.00 31.00
1.00 1,462.00
1.00 21.00
1.00 88.00
1.00 1,411.00
1.00 2.00
1.00 49.00
1.00 123.00
1.00 121.00
16,764.00
Rate Amount
(RM) (RM)
1.00 10.00
1.00 27.00
1.00 24.00
1.00 5.00
2.00 826.00
892.00
Rate Amount
(RM) (RM)
1.00 489.00
489.00
Rate Amount
(RM) (RM)
5,976.00
16,120.00
16,764.00
892.00
489.00
40,241.00
M.Up -
Rate Amount
(RM) (RM)
1.00 1.00
1.00
Rate Amount
(RM) (RM)
277.63 277.63
277.63
Rate Amount
(RM) (RM)
64.50 64.50
78.49 78.49
52.57 52.57
195.56
Rate Amount
(RM) (RM)
21.93 21.93
44.42 88.83
110.76
Rate Amount
(RM) (RM)
78.43 78.43
63.52 63.52
141.95
Rate Amount
(RM) (RM)
29.81 29.81
29.81 29.81
4.25 519.00
4.25 51.05
4.25 8.51
638.18
Rate Amount
(RM) (RM)
82.14 82.14
82.14 82.14
1.00 1.00
165.28
Rate Amount
(RM) (RM)
1.00
277.63
195.56
110.76
141.95
638.18
165.28
1,530.36