Bill No.

2 Ground Floor Facility

Main Summary
Local Contractor China Contractor
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

Collection Summary
2.1 Work Below Lowest Floor Level 242,951.13 242,204.24
2.2 Frame 237,372.50 242,979.83
2.3 Staircase 6,671.30 7,240.29
2.4 Staircase Finishes 4,445.08 4,303.40
2.5 Externall Walls 13,602.00 12,661.00
2.6 Internal Walls 62,787.00 61,271.00
2.7 Doors 14,239.00 17,745.00
2.8 Ironmongeries 3,459.37 3,151.37
2.9 External Wall Finishes 38,735.76 40,339.18
2.10 Internal Wall Finishes 33,159.08 32,203.26
2.11 Floor Finishes 90,197.47 99,937.45
2.12 Ceiling Finishes 11,771.80 11,771.80
2.13 Painting 19,337.70 19,337.70
2.14 Sanitary Wares and Fittings 6,355.40 6,217.90

Carried to summary RM 785,084.59 801,363.42


2.S/1

2.1 Work Below Lowest Level

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 8 17.60 140.80 18.00 144.00


B m3 14 17.60 246.40 18.00 252.00
C m3 161 17.60 2,833.60 18.00 2,898.00
D m3 25 17.60 440.00 18.00 450.00
E m3 10 196.60 1,966.00 220.00 2,200.00
F m3 29 196.60 5,701.40 220.00 6,380.00

To Carried To Collection RM 11,328.20 12,324.00


2/1/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 4 246.60 986.40 252.00 1,008.00


B m3 7 246.60 1,726.20 252.00 1,764.00
C m3 174 246.60 42,908.40 252.00 43,848.00
D No 3 100.00 300.00 100.00 300.00
E m3 1 246.60 246.60 252.00 252.00
F m3 2 246.60 493.20 252.00 504.00
G m3 1 246.60 246.60 252.00 252.00
H m3 5 246.60 1,233.00 252.00 1,260.00
J m3 23 246.60 5,671.80 252.00 5,796.00
K m3 1 216.60 216.60 230.00 230.00
L m3 4 216.60 866.40 230.00 920.00
M m3 2 216.60 433.20 230.00 460.00

To Carried To Collection RM 55,328.40 56,594.00


2/1/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 1 216.60 216.60 230.00 230.00


B kg 82 3.20 262.40 3.00 246.00
C kg 5,297 3.20 16,950.40 3.00 15,891.00
D kg 3,389 3.20 10,844.80 3.00 10,167.00
E kg 1,427 3.20 4,566.40 3.00 4,281.00
F kg 562 3.20 1,798.40 3.00 1,686.00
G kg 2,334 3.20 7,468.80 3.00 7,002.00
H kg 5,610 3.20 17,952.00 3.00 16,830.00
J kg 12,245 3.20 39,184.00 3.00 36,735.00
K kg 1 3.20 3.20 3.00 3.00
L kg 139 3.20 444.80 3.00 417.00
M kg 24 3.20 76.80 3.00 72.00

To Carried To Collection RM 99,768.60 93,560.00


2/1/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A kg 85 3.20 272.00 3.00 255.00


B m2 101 25.09 2,534.09 25.87 2,612.87
C m2 36 16.09 579.24 17.38 625.68
D m2 27 12.30 332.10 13.59 366.93
E m2 70 12.30 861.00 13.59 951.30
F m 247 15.00 3,705.00 21.25 5,248.75
G m 155 7.50 1,162.50 10.63 1,647.65
H m 86 15.00 1,290.00 21.25 1,827.50
J m 112 7.50 840.00 10.63 1,190.56

To Carried To Collection RM 11,575.93 14,726.24


2/1/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m 8 15.00 120.00 21.25 170.00


B m2 61 2.00 122.00 2.00 122.00
C m2 696 2.00 1,392.00 2.00 1,392.00
D m2 18 2.00 36.00 2.00 36.00
E item 1 3,000.00 3,000.00 3,000.00 3,000.00 775 4 3100

To Carried To Collection RM 4,670.00 4,720.00


2/1/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 5 1,200.00 6,000.00 1,200.00 6,000.00


B m 74 500.00 37,000.00 500.00 37,000.00
C m3 192 90.00 17,280.00 90.00 17,280.00

To Carried To Collection RM 60,280.00 60,280.00


2/1/6

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.1 Work Below Lowest Floor Level

Page No.2/1/1 11,328.20 12,324.00


Page No.2/1/2 55,328.40 56,594.00
Page No.2/1/3 99,768.60 93,560.00
Page No.2/1/4 11,575.93 14,726.24
Page No.2/1/5 4,670.00 4,720.00
Page No.2/1/6 60,280.00 60,280.00

To Carried to Collection summary RM 242,951.13 242,204.24

Bill No.2 Ground Floor Facility


2.2 Frame
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 59 281.60 16,614.40 286.00 16,874.00


B m3 6 281.60 1,689.60 286.00 1,716.00
C m3 23 281.60 6,476.80 286.00 6,578.00
D m3 49 281.60 13,798.40 286.00 14,014.00
E m3 1 281.60 281.60 286.00 286.00
F m3 3 246.60 739.80 252.00 756.00
G m3 1 246.60 246.60 252.00 252.00

To Carried To Collection RM 39,847.20 40,476.00


2/2/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 1 246.60 246.60 252.00 252.00


B kg 26,899 3.20 86,076.80 3.00 80,697.00
C kg 1,524 3.20 4,876.80 3.00 4,572.00
D kg 151 3.20 483.20 3.00 453.00
E kg 2,022 3.20 6,470.40 3.00 6,066.00
F kg 5,898 3.20 18,873.60 3.00 17,694.00
G kg 2,647 3.20 8,470.40 3.00 7,941.00
H kg 3,549 3.20 11,356.80 3.00 10,647.00
J kg 103 3.20 329.60 3.00 309.00
K kg 3,740 3.20 11,968.00 3.00 11,220.00

To Carried To Collection RM 149,152.20 139,851.00


2/2/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A kg 707 3.20 2,262.40 3.00 2,121.00


B kg 119 3.20 380.80 3.00 357.00
C kg 49 3.20 156.80 3.00 147.00
D kg 144 3.20 460.80 3.00 432.00
E m2 583 30.00 17,490.00 42.50 24,777.50
F m2 167 6.00 1,002.00 8.50 1,419.50

To Carried To Collection RM 21,752.80 29,254.00


2/2/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 459 30.00 13,770.00 42.50 19,507.50


B m 5 7.50 37.50 10.63 53.15
C m 14 15.00 210.00 21.25 297.50
D m 28 15.00 420.00 21.25 595.00
E m2 39 30.00 1,170.00 42.50 1,657.50
F m 2 7.50 15.00 10.63 21.26
G m 66 7.50 495.00 10.63 701.58
H m2 5 30.00 150.00 42.50 212.50
J m 9 7.50 67.50 10.63 95.67

To Carried To Collection RM 16,335.00 23,141.66


2/2/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m 79 7.50 592.50 10.63 839.77


B kg 306 8.80 2,692.80 7.90 2,417.40
C item 1 7,000.00 7,000.00 7,000.00 7,000.00 *Allow 3% of this bill.

To Carried To Collection RM 10,285.30 10,257.17


2/2/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.2 Frame

Page No.2/2/1 39,847.20 40,476.00


Page No.2/2/2 149,152.20 139,851.00
Page No.2/2/3 21,752.80 29,254.00
Page No.2/2/4 16,335.00 23,141.66
Page No.2/2/5 10,285.30 10,257.17

To Carried to Collection summary RM 237,372.50 242,979.83 7121.175 7289.3949

Bill No.2 Ground Floor Facility


2.3 Staircase
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m3 3 246.60 739.80 252.00 756.00


B m3 4 246.60 986.40 252.00 1,008.00
C m3 1 246.60 246.60 252.00 252.00
D kg 193 3.20 617.60 3.00 579.00
E kg 106 3.20 339.20 3.00 318.00
F kg 79 3.20 252.80 3.00 237.00
G kg 277 3.20 886.40 3.00 831.00
H kg 157 3.20 502.40 3.00 471.00
J kg 97 3.20 310.40 3.00 291.00

To Carried To Collection RM 4,881.60 4,743.00


2/3/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A kg 9 3.20 28.80 3.00 27.00


B kg 10 3.20 32.00 3.00 30.00
C kg 6 3.20 19.20 3.00 18.00
D m2 13 30.00 390.00 42.50 552.50
E m 43 7.50 322.50 10.63 457.09
F m 22 12.60 277.20 17.85 392.70
G m2 20 30.00 600.00 42.50 850.00

To Carried To Collection RM 1,669.70 2,327.29


2/3/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 4 30.00 120.00 42.50 170.00

To Carried To Collection RM 120.00 170.00


2/3/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.3 Staircase

Page No.2/3/1 4,881.60 4,743.00


Page No.2/3/2 1,669.70 2,327.29
Page No.2/3/3 120.00 170.00

To Carried to Collection summary RM 6,671.30 7,240.29

Bill No.2 Ground Floor Facility


2.4 Staircase Finishes
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 13 9.00 117.00 9.00 117.00


B m2 23 9.00 207.00 9.00 207.00
C m 11 4.00 44.00 4.00 44.00
D m2 19 22.00 418.00 18.00 342.00
E m 36 7.00 252.00 6.00 216.00
F m 43 7.00 301.00 6.00 258.00
G m 36 3.00 108.00 3.00 108.00

To Carried To Collection RM 1,447.00 1,292.00


2/4/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 10.93
b Wastage 1.00% RM 0.11
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 14.04
f Profit and Overhead 1.00% RM 0.14
Total Cost Per M RM 14.18
A m 36 20.78 748.08 21.15 761.40

To Carried To Collection RM 748.08 761.40


2/4/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m 13 150.00 1,950.00 150.00 1,950.00


B no 3 50.00 150.00 50.00 150.00
C no 3 50.00 150.00 50.00 150.00

To Carried To Collection RM 2,250.00 2,250.00


2/4/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.4 Staircase Fisnishes

Page No.2/4/1 1,447.00 1,292.00


Page No.2/4/2 748.08 761.40
Page No.2/4/3 2,250.00 2,250.00

To Carried to Collection summary RM 4,445.08 4,303.40

Bill No.2 Ground Floor Facility


2.5 External Walls
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m 9 71.00 639.00 67.00 603.00


B m 1 71.00 71.00 67.00 67.00
C m 4 108.00 432.00 101.00 404.00
D m 15 171.00 2,565.00 160.00 2,400.00

To Carried To Collection RM 3,707.00 3,474.00


2/5/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 215 41.00 8,815.00 38.00 8,170.00


B m2 21 41.00 861.00 38.00 798.00
C m 71 3.00 213.00 3.00 213.00
D m 2 3.00 6.00 3.00 6.00

To Carried To Collection RM 9,895.00 9,187.00


2/5/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.5 External Walls

Page No.2/5/1 3,707.00 3,474.00


Page No.2/5/2 9,895.00 9,187.00

To Carried to Collection summary RM 13,602.00 12,661.00

Bill No.2 Ground Floor Facility


2.6 Internal Walls
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m 11 71.00 781.00 67.00 737.00


B m 1 71.00 71.00 67.00 67.00
C m 3 108.00 324.00 101.00 303.00
D m 7 128.00 896.00 120.00 840.00
E m 4 171.00 684.00 160.00 640.00

To Carried To Collection RM 2,756.00 2,587.00


2/6/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 443 41.00 18,163.00 38.00 16,834.00


B m2 6 41.00 246.00 38.00 228.00
C m 124 3.00 372.00 3.00 372.00
D no 1 4,500.00 4,500.00 4,500.00 4,500.00
E no 1 15,000.00 15,000.00 15,000.00 15,000.00
F no 1 6,000.00 6,000.00 6,000.00 6,000.00
G no 1 9,000.00 9,000.00 9,000.00 9,000.00

To Carried To Collection RM 53,281.00 51,934.00


2/6/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A no 1 6,750.00 6,750.00 6,750.00 6,750.00

To Carried To Collection RM 6,750.00 6,750.00


2/6/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.6 Internal Walls

Page No.2/6/1 2,756.00 2,587.00


Page No.2/6/2 53,281.00 51,934.00
Page No.2/6/3 6,750.00 6,750.00

To Carried to Collection summary RM 62,787.00 61,271.00

Bill No.2 Ground Floor Facility


2.7 Doors
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A no 1 136.00 136.00 191.00 191.00 LC 20.60


B no 1 136.00 136.00 191.00 191.00 CC 29.00
C no 2 111.00 222.00 157.00 314.00
D no 1 113.00 113.00 160.00 160.00
E no 1 113.00 113.00 160.00 160.00
F no 2 119.00 238.00 168.00 336.00
G no 1 117.00 117.00 165.00 165.00
H no 2 115.00 230.00 162.00 324.00
J no 1 124.00 124.00 174.00 174.00

To Carried To Collection RM 1,429.00 2,015.00


2/7/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Fire-rated door
A no 3 900.00 2,700.00 950.00 2,850.00 LC 1hr 376.00
B no 1 900.00 900.00 950.00 950.00 2hr 559.00
C no 1 1,480.00 1,480.00 1,640.00 1,640.00 CC 1hr 397.00
D no 1 1,440.00 1,440.00 1,520.00 1,520.00 2-hr 620.00
E no 3 790.00 2,370.00 830.00 2,490.00
F no 1 570.00 570.00 860.00 860.00 Plywood flush door
LC 133.00
106.00
To Carried To Collection RM 9,460.00 10,310.00 117.00
2/7/2 88.00
CC 200.00
Item Description Rate Amount Rate Amount 167.00
Unit Qty
no. (RM) (RM) (RM) (RM) 178.00
149.00

A no 1 460.00 460.00 730.00 730.00


B no 2 160.00 320.00 250.00 500.00
C no 1 180.00 180.00 290.00 290.00
D no 1 180.00 180.00 290.00 290.00
E no 2 260.00 520.00 410.00 820.00
F no 1 230.00 230.00 370.00 370.00
G no 2 230.00 460.00 350.00 700.00

To Carried To Collection RM 2,350.00 3,700.00


2/7/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A no 4 250.00 1,000.00 430.00 1,720.00

To Carried To Collection RM 1,000.00 1,720.00


2/7/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.7 Internal Walls

Page No.2/7/1 1,429.00 2,015.00


Page No.2/7/2 9,460.00 10,310.00
Page No.2/7/3 2,350.00 3,700.00
Page No.2/7/4 1,000.00 1,720.00

To Carried to Collection summary RM 14,239.00 17,745.00

Bill No.2 Ground Floor Facility


2.8 Ironmongeries
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 8.03
b Wastage 1.00% RM 0.08
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 11.11
f Profit and Overhead 1.00% RM 0.11
Total Cost Per M RM 11.22

A no 4 14.33 57.32 12.13 48.52


B no 8 14.33 114.64 12.13 97.04
C no 16 14.33 229.28 12.13 194.08
D no 12 14.33 171.96 12.13 145.56
E no 4 14.33 57.32 12.13 48.52
F no 8 14.33 114.64 12.13 97.04

To Carried To Collection RM 745.16 630.76


2/8/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 13.59
b Wastage 1.00% RM 0.14
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 16.73
f Profit and Overhead 1.00% RM 0.17
Total Cost Per M RM 16.89
A no 1 32.55 32.55 25.95 25.95
B no 4 32.55 130.20 25.95 103.80
Item Description % Rate
a PC Unit RM 25.95
b Wastage 1.00% RM 0.26
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 29.21
f Profit and Overhead 1.00% RM 0.29
Total Cost Per M RM 29.50
C no 1 46.15 46.15 45.05 45.05
D no 4 46.15 184.60 45.05 180.20

To Carried To Collection RM 393.50 355.00


2/8/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 60.53
b Wastage 1.00% RM 0.61
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 64.14
f Profit and Overhead 1.00% RM 0.64
Total Cost Per M RM 64.78
A no 1 105.08 105.08 94.08 94.08
B no 2 105.08 210.16 94.08 188.16
Item Description % Rate
a PC Unit RM 2.23
b Wastage 1.00% RM 0.02
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 5.25
f Profit and Overhead 1.00% RM 0.05
Total Cost Per M RM 5.30
C no 1 13.45 13.45 5.75 5.75

To Carried To Collection RM 328.69 287.99


2/8/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 43.24
b Wastage 1.00% RM 0.43
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 46.67
f Profit and Overhead 1.00% RM 0.47
Total Cost Per M RM 47.14
A no 1 58.56 58.56 56.36 56.36
Item Description % Rate
a PC Unit RM 59.29
b Wastage 1.00% RM 0.59
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 62.88
f Profit and Overhead 1.00% RM 0.63
Total Cost Per M RM 63.51
B no 2 103.72 207.44 92.72 185.44
C no 1 103.72 103.72 92.72 92.72

To Carried To Collection RM 369.72 334.52


2/8/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 21
b Wastage 1.00% RM 0.21
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 24.21
f Profit and Overhead 1.00% RM 0.24
Total Cost Per M RM 24.45

A no 2 34.10 68.20 34.10 68.20


B no 1 34.10 34.10 34.10 34.10
C no 4 34.10 136.40 34.10 136.40

Item Description % Rate


a PC Unit RM 9.88
b Wastage 1.00% RM 0.10
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 12.98
f Profit and Overhead 1.00% RM 0.13
Total Cost Per M RM 13.11

D no 2 21.87 43.74 21.87 43.74

To Carried To Collection RM 282.44 282.44


2/8/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 9.88
b Wastage 1.00% RM 0.10
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 12.98
f Profit and Overhead 1.00% RM 0.13
Total Cost Per M RM 13.11

A no 2 21.87 43.74 21.87 43.74

Item Description % Rate


a PC Unit RM 74.12
b Wastage 1.00% RM 0.74
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 77.86
f Profit and Overhead 1.00% RM 0.78
Total Cost Per M RM 78.64
B no 2 120.03 240.06 109.03 218.06

To Carried To Collection RM 283.80 261.80


2/8/6

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 111.17
b Wastage 1.00% RM 1.11
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 115.28
f Profit and Overhead 1.00% RM 1.15
Total Cost Per M RM 116.43

A set 1 160.79 160.79 149.79 149.79


Item Description % Rate
a PC Unit RM 18.53
b Wastage 1.00% RM 0.19
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 21.72
f Profit and Overhead 1.00% RM 0.22
Total Cost Per M RM 21.93

B no 21 31.38 658.98 29.18 612.78

To Carried To Collection RM 819.77 762.57


2/8/7

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 64.24
b Wastage 1.00% RM 0.64
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 67.88
f Profit and Overhead 1.00% RM 0.68
Total Cost Per M RM 68.56

A no 2 81.66 163.32 81.66 163.32


Item Description % Rate
a PC Unit RM 30.88
b Wastage 1.00% RM 0.31
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 34.19
f Profit and Overhead 1.00% RM 0.34
Total Cost Per M RM 34.53

B no 1 44.97 44.97 44.97 44.97

To Carried To Collection RM 208.29 208.29


2/8/8

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 15.45
b Wastage 1.00% RM 0.15
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 18.60
f Profit and Overhead 1.00% RM 0.19
Total Cost Per M RM 18.79

A no 1 28.00 28.00 28.00 28.00

To Carried To Collection RM 28.00 28.00


2/8/9

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.8 Ironmongeries


Page No.2/8/1 745.16 630.76
Page No.2/8/2 393.50 355.00
Page No.2/8/3 328.69 287.99
Page No.2/8/4 369.72 334.52
Page No.2/8/5 282.44 282.44
Page No.2/8/6 283.80 261.80
Page No.2/8/7 819.77 762.57
Page No.2/8/8 208.29 208.29
Page No.2/8/9 28.00 28.00

To Carried to Collection summary RM 3,459.37 3,151.37

Bill No.2 Ground Floor Facility


2.9 External Wall Finishes
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 404 26.00 10,504.00 22.00 8,888.00


B m2 12 26.00 312.00 22.00 264.00
C m 70 2.00 140.00 2.00 140.00
D m 91 4.00 364.00 4.00 364.00
E item 1 1,000.00 1,000.00 1,000.00 1,000.00 *Allow 10% of plaster work
F m2 204 14.80 3,019.20 15.00 3,060.00

To Carried To Collection RM 15,339.20 13,716.00


2/9/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 42.31
b Wastage 1.00% RM 0.42
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 45.73
f Profit and Overhead 1.00% RM 0.46
Total Cost Per M RM 46.19

A m2 171 75.01 12,826.71 91.22 15,598.62


B m 23 7.50 172.50 9.12 209.76

To Carried To Collection RM 12,999.21 15,808.38


2/9/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 150.00 *Allow RM150/m2
b Wastage 1.00% RM 1.50
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 154.50
f Profit and Overhead 1.00% RM 1.55
Total Cost Per M RM 156.05

A m2 29 202.95 5,885.55 215.60 6,252.40


B m2 4 202.95 811.80 215.60 862.40
C m 74 50.00 3,700.00 50.00 3,700.00

To Carried To Collection RM 10,397.35 10,814.80


2/9/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.9 External Wall Finishes

Page No.2/9/1 15,339.20 13,716.00


Page No.2/9/2 12,999.21 15,808.38
Page No.2/9/3 10,397.35 10,814.80

To Carried to Collection summary RM 38,735.76 40,339.18

Bill No.2 Ground Floor Facility


2.10 Internal Wall Finishes
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 825 24.00 19,800.00 22.00 18,150.00


B m2 199 24.00 4,776.00 22.00 4,378.00
C m2 11 24.00 264.00 22.00 242.00
D m2 7 24.00 168.00 22.00 154.00
E item 1 2,500.00 2,500.00 2,500.00 2,500.00 *Allow 10% of plaster work

To Carried To Collection RM 27,508.00 25,424.00


2/10/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 68 14.80 1,006.40 15.00 1,020.00

To Carried To Collection RM 1,006.40 1,020.00


2/10/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 33.83
b Wastage 1.00% RM 0.34
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 37.17
f Profit and Overhead 1.00% RM 0.37
Total Cost Per M RM 37.54

A m2 3 64.94 194.82 81.42 244.26

To Carried To Collection RM 194.82 244.26


2/10/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 23.33
b Wastage 1.00% RM 0.23
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 26.56
f Profit and Overhead 1.00% RM 0.27
Total Cost Per M RM 26.83

A m2 15 52.47 787.05 69.30 1,039.50

To Carried To Collection RM 787.05 1,039.50


2/10/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 40.83
b Wastage 1.00% RM 0.41
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 44.24
f Profit and Overhead 1.00% RM 0.44
Total Cost Per M RM 44.68

A m2 16 73.26 1,172.10 89.51 1,432.16


B m2 16 73.26 1,172.10 89.51 1,432.16
C m2 18 73.26 1,318.61 89.51 1,611.18

To Carried To Collection RM 3,662.81 4,475.50


2/10/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.10 Internal Wall Finishes

Page No.2/10/1 27,508.00 25,424.00


Page No.2/10/2 1,006.40 1,020.00
Page No.2/10/3 194.82 244.26
Page No.2/10/4 787.05 1,039.50
Page No.2/10/5 3,662.81 4,475.50

To Carried to Collection summary RM 33,159.08 32,203.26

Bill No.2 Ground Floor Facility


2.11 Floor Finishes
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 16 22.00 352.00 18.00 288.00


B m 1 2.00 2.00 2.00 2.00
C m2 1 22.00 22.00 18.00 18.00
D m2 1 22.00 22.00 18.00 18.00
E m2 1 22.00 22.00 18.00 18.00
F m 1 2.00 2.00 2.00 2.00
G m2 1 22.00 22.00 18.00 18.00
H m 1 2.00 2.00 2.00 2.00
J m2 2 22.00 44.00 18.00 36.00
K m 1 2.00 2.00 2.00 2.00
L m2 572 14.80 8,465.60 15.00 8,580.00
M m 257 3.00 771.00 3.00 771.00
N m 5 3.00 15.00 3.00 15.00
P m 10 3.00 30.00 3.00 30.00

To Carried To Collection RM 9,773.60 9,800.00


2/11/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 28 14.80 414.40 15.00 420.00

To Carried To Collection RM 414.40 420.00


2/11/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 116.7
b Wastage 1.00% RM 1.17
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 120.87
f Profit and Overhead 1.00% RM 1.21
Total Cost Per M RM 122.08

A m2 49 163.39 8,006.11 177.14 8,679.86


B m 7 16.34 114.38 17.71 123.97
C m2 49 163.39 8,006.11 177.14 8,679.86
D m2 8 163.39 1,307.12 177.14 1,417.12

To Carried To Collection RM 17,433.72 18,900.81


2/11/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 42.31
b Wastage 1.00% RM 0.42
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 45.73
f Profit and Overhead 1.00% RM 0.46
Total Cost Per M RM 46.19

A m2 112 75.01 8,401.12 91.22 10,216.64


B m 1 7.50 7.50 9.12 9.12
C m 53 7.50 397.50 9.12 483.36
D m2 27 75.01 2,025.27 91.22 2,462.94
E m 1 7.50 7.50 9.12 9.12
F m 28 7.50 210.00 9.12 255.36
G m2 46 75.01 3,450.46 91.22 4,196.12
H m 1 7.50 7.50 9.12 9.12
J m 42 7.50 315.00 9.12 383.04

To Carried To Collection RM 14,821.85 18,024.82


2/11/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 35 75.01 2,625.35 91.22 3,192.70


B m2 21 75.01 1,575.21 91.22 1,915.62
C m 19 7.50 142.50 9.12 173.28

Item Description % Rate


a PC Unit RM 33.83
b Wastage 1.00% RM 0.34
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 37.17
f Profit and Overhead 1.00% RM 0.37
Total Cost Per M RM 37.54

To Carried To Collection RM 4,343.06 5,281.60


2/11/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 13 64.94 844.22 81.42 1,058.46


B m 3 6.49 19.47 8.14 24.42
C m 12 6.49 77.88 8.14 97.68

To Carried To Collection RM 941.57 1,180.56


2/11/6

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 33.83
b Wastage 1.00% RM 0.34
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 37.17
f Profit and Overhead 1.00% RM 0.37
Total Cost Per M RM 37.54

A m2 89 64.94 5,779.66 81.42 7,246.38


B m 1 6.49 6.49 8.14 8.14
C m 43 6.49 279.07 8.14 350.02

To Carried To Collection RM 6,065.22 7,604.54


2/11/7

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 40.83
b Wastage 1.00% RM 0.41
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 44.24
f Profit and Overhead 1.00% RM 0.44
Total Cost Per M RM 44.68

A m2 6 73.26 439.56 89.51 537.06


B m 2 7.33 14.66 8.95 17.90
C m 13 7.33 95.29 8.95 116.35
D m2 5 73.26 366.30 89.51 447.55
E m 8 7.33 58.64 8.95 71.60

To Carried To Collection RM 974.45 1,190.46


2/11/8

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 34.56
b Wastage 1.00% RM 0.35
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 37.91
f Profit and Overhead 1.00% RM 0.38
Total Cost Per M RM 38.28

A m2 37 65.81 2,434.97 82.27 3,043.99


B m 25 6.58 164.50 8.23 205.75

To Carried To Collection RM 2,599.47 3,249.74


2/11/9

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 33.83
b Wastage 1.00% RM 0.34
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 37.17
f Profit and Overhead 1.00% RM 0.37
Total Cost Per M RM 37.54

A m2 7 64.94 454.58 81.42 569.94

To Carried To Collection RM 454.58 569.94


2/11/10

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 23.33
b Wastage 1.00% RM 0.23
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 26.56
f Profit and Overhead 1.00% RM 0.27
Total Cost Per M RM 26.83

A m2 3 52.47 157.41 69.30 207.90


B m 6 5.25 31.50 6.93 41.58

To Carried To Collection RM 188.91 249.48


2/11/11

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 150.00 *Allow RM150.00/m2
b Wastage 1.00% RM 1.50
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 154.50
f Profit and Overhead 1.00% RM 1.55
Total Cost Per M RM 156.05

A m2 86 202.95 17,453.70 215.60 18,541.60

To Carried To Collection RM 17,453.70 18,541.60


2/11/12

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 120.00 Assume RM120/m2
b Wastage 1.00% RM 1.20
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 124.20
f Profit and Overhead 1.00% RM 1.24
Total Cost Per M RM 125.44

A m2 14 167.31 2,342.34 180.95 2,533.30


B m2 25 95.00 2,375.00 95.00 2,375.00
C m2 3 95.00 285.00 95.00 285.00

To Carried To Collection RM 5,002.34 5,193.30


2/11/13

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 1 19.80 19.80 19.80 19.80 *Allow RM18/m2


B m 8 6.60 52.80 6.60 52.80
C no 2 22.00 44.00 22.00 44.00
D m2 17 50.60 860.20 50.60 860.20 *Allow 46/m2
E m2 46 50.60 2,327.60 50.60 2,327.60
F m2 85 50.60 4,301.00 50.60 4,301.00
G m2 37 50.60 1,872.20 50.60 1,872.20
H m2 3 50.60 151.80 50.60 151.80
J m2 2 50.60 101.20 50.60 101.20

To Carried To Collection RM 9,730.60 9,730.60


2/11/14

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.11 Floor Finishes

Page No.2/11/1 9,773.60 9,800.00


Page No.2/11/2 414.40 420.00
Page No.2/11/3 17,433.72 18,900.81
Page No.2/11/4 14,821.85 18,024.82
Page No.2/11/5 4,343.06 5,281.60
Page No.2/11/6 941.57 1,180.56
Page No.2/11/7 6,065.22 7,604.54
Page No.2/11/8 974.45 1,190.46
Page No.2/11/9 2,599.47 3,249.74
Page No.2/11/10 454.58 569.94
Page No.2/11/11 188.91 249.48
Page No.2/11/12 17,453.70 18,541.60
Page No.2/11/13 5,002.34 5,193.30
Page No.2/11/14 9,730.60 9,730.60
- -

To Carried to Collection summary RM 90,197.47 99,937.45

Bill No.2 Ground Floor Facility


2.12 Ceiling Finishes
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 1 15.60 15.60 14.30 14.30


B m2 1 9.00 9.00 9.00 9.00
C m2 1 9.00 9.00 9.00 9.00
D m2 1 9.00 9.00 9.00 9.00
E m2 1 9.00 9.00 9.00 9.00
F m2 6 9.00 54.00 9.00 54.00
G m2 3 9.00 27.00 9.00 27.00

To Carried To Collection RM 132.60 131.30


2/12/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 161 39.00 6,279.00 39.00 6,279.00


B m2 50 39.00 1,950.00 39.00 1,950.00
C m2 586 157.00 92,002.00 157.00 92,002.00
D m 230 100.00 23,000.00 100.00 23,000.00

To Carried To Collection RM 123,231.00 123,231.00


2/12/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 3 40.00 120.00 40.00 120.00


B m2 3 40.00 120.00 40.00 120.00
C m2 5 40.00 200.00 40.00 200.00
D m2 8 36.00 288.00 36.00 288.00
E m2 3 36.00 108.00 36.00 108.00
F m 12 100.00 1,200.00 100.00 1,200.00
G m2 45 36.00 1,620.00 36.00 1,620.00

To Carried To Collection RM 3,656.00 3,656.00


2/12/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 37 36.00 1,332.00 36.00 1,332.00


B m2 21 36.00 756.00 36.00 756.00
C m2 3 36.00 108.00 36.00 108.00
D m2 46 36.00 1,656.00 36.00 1,656.00
E m2 90 36.00 3,240.00 36.00 3,240.00
F m 11 100.00 1,100.00 100.00 1,100.00
G m2 13 39.00 507.00 36.00 468.00
H m2 26 39.00 1,014.00 36.00 936.00
J m2 26 39.00 1,014.00 36.00 936.00

To Carried To Collection RM 10,727.00 10,532.00


2/12/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A No 6 66.00 396.00 66.00 396.00


B m 11 220.00 2,420.00 220.00 2,420.00

To Carried To Collection RM 2,816.00 2,816.00


2/12/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.12 Ceiling Finishes

Page No.2/12/1 132.60 131.30


Page No.2/12/2 123,231.00 123,231.00
Page No.2/12/3 3,656.00 3,656.00
Page No.2/12/4 10,727.00 10,532.00
Page No.2/12/5 2,816.00 2,816.00

To Carried to Collection summary RM 140,562.60 140,366.30

Bill No.2 Ground Floor Facility


2.13 Painting
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 404 7.60 3,070.40 7.60 3,070.40


B m2 12 7.60 91.20 7.60 91.20
C m 161 3.00 483.00 3.00 483.00
D m2 161 7.60 1,223.60 7.60 1,223.60
E m2 50 7.60 380.00 7.60 380.00
F m2 586 7.60 4,453.60 7.60 4,453.60
G m 230 9.00 2,070.00 9.00 2,070.00

To Carried To Collection RM 11,771.80 11,771.80


2/13/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 10 7.60 76.00 7.60 76.00


B m2 825 2.90 2,392.50 2.90 2,392.50
C m2 199 2.90 577.10 2.90 577.10
D m2 11 2.90 31.90 2.90 31.90
E m2 7 2.90 20.30 2.90 20.30
F m2 13 2.90 37.70 2.90 37.70
G m2 23 2.90 66.70 2.90 66.70
H m2 1 2.90 2.90 2.90 2.90
J m 11 6.00 66.00 6.00 66.00

To Carried To Collection RM 3,271.10 3,271.10


2/13/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 1 2.90 2.90 2.90 2.90


B m2 1 2.90 2.90 2.90 2.90
C m2 1 2.90 2.90 2.90 2.90
D m2 1 2.90 2.90 2.90 2.90
E m2 6 2.90 17.40 2.90 17.40
F m2 3 2.90 8.70 2.90 8.70
G m2 3 2.90 8.70 2.90 8.70
H m2 3 2.90 8.70 2.90 8.70
J m2 5 2.90 14.50 2.90 14.50
K m2 8 2.90 23.20 2.90 23.20
L m2 3 2.90 8.70 2.90 8.70
M m 12 6.00 72.00 6.00 72.00
N m2 45 2.90 130.50 2.90 130.50
P m2 37 2.90 107.30 2.90 107.30
Q m2 21 2.90 60.90 2.90 60.90

To Carried To Collection RM 472.20 472.20


2/13/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m2 90 2.90 261.00 2.90 261.00


B m 11 6.00 66.00 6.00 66.00
C m2 13 5.90 76.70 5.90 76.70
D m2 26 5.90 153.40 5.90 153.40
E m2 26 5.90 153.40 5.90 153.40
F m2 97 14.30 1,387.10 14.30 1,387.10

To Carried To Collection RM 2,097.60 2,097.60


2/13/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A m 115 15.00 1,725.00 15.00 1,725.00

To Carried To Collection RM 1,725.00 1,725.00


2/13/5

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.13 Painting

Page No.2/13/1 11,771.80 11,771.80


Page No.2/13/2 3,271.10 3,271.10
Page No.2/13/3 472.20 472.20
Page No.2/13/4 2,097.60 2,097.60
Page No.2/13/5 1,725.00 1,725.00

To Carried to Collection summary RM 19,337.70 19,337.70

Bill No.2 Ground Floor Facility


2.14 Sanitary Wares And Fittings
M.Up -
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

1 - - - -

To Carried To Collection RM - -
2/14/1

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 1221.71
b Wastage 1.00% RM 12.22
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 1236.93
f Profit and Overhead 1.00% RM 12.37
Total Cost Per M RM 1249.30

A no 1 1,398.88 1,398.88 1,393.38 1,393.38

To Carried To Collection RM 1,398.88 1,393.38


2/14/2

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 269.19
b Wastage 1.00% RM 2.69
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 274.88
f Profit and Overhead 1.00% RM 2.75
Total Cost Per M RM 277.63

A no 2 351.11 702.22 345.61 691.22


Item Description % Rate
a PC Unit RM 60.26
b Wastage 1.00% RM 0.60
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 63.86
f Profit and Overhead 1.00% RM 0.64
Total Cost Per M RM 64.50

To Carried To Collection RM 702.22 691.22


2/14/3

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A no 1 77.29 77.29 77.29 77.29


B no 2 77.29 154.58 77.29 154.58
Item Description % Rate
a PC Unit RM 486.39
b Wastage 1.00% RM 4.86
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 494.25
f Profit and Overhead 1.00% RM 4.94
Total Cost Per M RM 499.20

C no 1 573.53 573.53 579.03 579.03

To Carried To Collection RM 805.40 810.90


2/14/4

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 73.97
b Wastage 1.00% RM 0.74
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 77.71
f Profit and Overhead 1.00% RM 0.78
Total Cost Per M RM 78.49

A no 2 119.87 239.74 125.37 250.74


Item Description % Rate
a PC Unit RM 113.65
b Wastage 1.00% RM 1.14
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 117.79
f Profit and Overhead 1.00% RM 1.18
Total Cost Per M RM 118.96

B no 1 163.52 163.52 141.52 141.52

To Carried To Collection RM 403.26 392.26


2/14/5
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 48.56
b Wastage 1.00% RM 0.49
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 52.05
f Profit and Overhead 1.00% RM 0.52
Total Cost Per M RM 52.57

A no 2 91.92 183.84 69.92 139.84


Item Description % Rate
a PC Unit RM 42
b Wastage 1.00% RM 0.42
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 45.42
f Profit and Overhead 1.00% RM 0.45
Total Cost Per M RM 45.87

B no 1 62.70 62.70 57.20 57.20

To Carried To Collection RM 246.54 197.04


2/14/6

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 18.53
b Wastage 1.00% RM 0.19
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 21.72
f Profit and Overhead 1.00% RM 0.22
Total Cost Per M RM 21.93

A no 2 36.88 73.76 31.38 62.76


Item Description % Rate
a PC Unit RM 421.24
b Wastage 1.00% RM 4.21
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 428.45
f Profit and Overhead 1.00% RM 4.28
Total Cost Per M RM 432.74

B no 1 501.86 501.86 485.36 485.36

To Carried To Collection RM 575.62 548.12


2/14/7

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 118.84
b Wastage 1.00% RM 1.19
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 123.03
f Profit and Overhead 1.00% RM 1.23
Total Cost Per M RM 124.26

A no 2 169.22 338.44 152.72 305.44


Item Description % Rate
a PC Unit RM 172.57
b Wastage 1.00% RM 1.73
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 177.30
f Profit and Overhead 1.00% RM 1.77
Total Cost Per M RM 179.07

B no 1 206.33 206.33 200.83 200.83

To Carried To Collection RM 544.77 506.27


2/14/8

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 61.16
b Wastage 1.00% RM 0.61
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 64.77
f Profit and Overhead 1.00% RM 0.65
Total Cost Per M RM 65.42

A no 4 78.28 313.12 78.28 313.12


Item Description % Rate
a PC Unit RM 26.25
b Wastage 1.00% RM 0.26
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 29.51
f Profit and Overhead 1.00% RM 0.30
Total Cost Per M RM 29.81

B no 1 39.88 39.88 39.88 39.88


C no 2 39.88 79.76 39.88 79.76
D no 2 39.88 79.76 39.88 79.76

To Carried To Collection RM 512.52 512.52


2/14/9

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Item Description % Rate


a PC Unit RM 1.2
b Wastage 1.00% RM 0.01
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 4.21
f Profit and Overhead 1.00% RM 0.04
Total Cost Per M RM 4.25

A no 2 12.32 24.64 12.32 24.64

Item Description % Rate


a PC Unit RM 77.55
b Wastage 1.00% RM 0.78
c Loading/Unloading on Site RM 1.00
d Labour (Laying) RM 1.00
e Adhesive RM 1.00
Sub-Total RM 81.33
f Profit and Overhead 1.00% RM 0.81
Total Cost Per M RM 82.14

B no 1 96.31 96.31 96.31 96.31


C no 2 96.31 192.62 96.31 192.62
D no 2 96.31 192.62 96.31 192.62

To Carried To Collection RM 506.19 506.19


2/14/10

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

A no 2 180.00 360.00 180.00 360.00


B no 1 300.00 300.00 300.00 300.00

To Carried To Collection RM 660.00 660.00


2/14/11

Item Description Rate Amount Rate Amount


Unit Qty
no. (RM) (RM) (RM) (RM)

Collection BQ 2.14 Sanitary Wares & Fittings

Page No.2/14/1 - -
Page No.2/14/2 1,398.88 1,393.38
Page No.2/14/3 702.22 691.22
Page No.2/14/4 805.40 810.90
Page No.2/14/5 403.26 392.26
Page No.2/14/6 246.54 197.04
Page No.2/14/7 575.62 548.12
Page No.2/14/8 544.77 506.27
Page No.2/14/9 512.52 512.52
Page No.2/14/10 506.19 506.19
Page No.2/14/11 660.00 660.00

To Carried to Collection summary RM 6,355.40 6,217.90