Main Summary
Local Contractor China Contractor
Item Description Rate Amount Rate Amount
Unit Qty
no. (RM) (RM) (RM) (RM)
Collection Summary
2.1 Work Below Lowest Floor Level 242,951.13 242,204.24
2.2 Frame 237,372.50 242,979.83
2.3 Staircase 6,671.30 7,240.29
2.4 Staircase Finishes 4,445.08 4,303.40
2.5 Externall Walls 13,602.00 12,661.00
2.6 Internal Walls 62,787.00 61,271.00
2.7 Doors 14,239.00 17,745.00
2.8 Ironmongeries 3,459.37 3,151.37
2.9 External Wall Finishes 38,735.76 40,339.18
2.10 Internal Wall Finishes 33,159.08 32,203.26
2.11 Floor Finishes 90,197.47 99,937.45
2.12 Ceiling Finishes 11,771.80 11,771.80
2.13 Painting 19,337.70 19,337.70
2.14 Sanitary Wares and Fittings 6,355.40 6,217.90
Fire-rated door
A no 3 900.00 2,700.00 950.00 2,850.00 LC 1hr 376.00
B no 1 900.00 900.00 950.00 950.00 2hr 559.00
C no 1 1,480.00 1,480.00 1,640.00 1,640.00 CC 1hr 397.00
D no 1 1,440.00 1,440.00 1,520.00 1,520.00 2-hr 620.00
E no 3 790.00 2,370.00 830.00 2,490.00
F no 1 570.00 570.00 860.00 860.00 Plywood flush door
LC 133.00
106.00
To Carried To Collection RM 9,460.00 10,310.00 117.00
2/7/2 88.00
CC 200.00
Item Description Rate Amount Rate Amount 167.00
Unit Qty
no. (RM) (RM) (RM) (RM) 178.00
149.00
1 - - - -
To Carried To Collection RM - -
2/14/1
Page No.2/14/1 - -
Page No.2/14/2 1,398.88 1,393.38
Page No.2/14/3 702.22 691.22
Page No.2/14/4 805.40 810.90
Page No.2/14/5 403.26 392.26
Page No.2/14/6 246.54 197.04
Page No.2/14/7 575.62 548.12
Page No.2/14/8 544.77 506.27
Page No.2/14/9 512.52 512.52
Page No.2/14/10 506.19 506.19
Page No.2/14/11 660.00 660.00