You are on page 1of 2

Refer to shop drawings for cutting details

Marks list from:29/07/20 Cut-off list


Project M114 Phase
Customer ADESA Drawing weight
Object ATU MEZZZANINE Revision 0
Site Delivery
Description Blasting
Proj.Resp Galvanization
Department Primary painting
Draftman Final painting

Weight Tot Wgt Tot Surf.


Mark Qty Profile Material Length mm kg kg m²
m13 2 EA50*50*5 300 1190 4.1 8.2 0.48
Total EA50*50*5 300 2380 8.2 0.48

m2 1 EA90*90*10 300 11285 143.49 143.49 3.95


m3 1 EA90*90*10 300 4025 51.18 51.18 1.41
m4 1 EA90*90*10 300 2460 31.28 31.28 0.86
Total EA90*90*10 300 17770 225.95 6.22

m6 1 LYS-C20024 G450 5271 37.85 37.85 4.04


m7 1 LYS-C20024 G450 5271 37.85 37.85 4.04
m8 1 LYS-C20024 G450 123 0.52 0.52 0.06
m9 1 LYS-C20024 G450 123 0.52 0.52 0.06
m10 1 LYS-C20024 G450 1114 7.89 7.89 0.84
m11 1 LYS-C20024 G450 1114 7.89 7.89 0.84
Total LYS-C20024 G450 13015 92.52 9.89

m12 1 PFC200*75 300 1409 31.58 31.58 0.96


Total PFC200*75 300 1409 31.58 0.96
SHS100*100*5.
m5 4 0
SHS100*100*5. 350 2913 43.45 173.79 4.42
Total 0 350 11652 173.79 4.42

m1 1 UB310*32 300 9623 297.25 297.25 11.16


m14 1 UB310*32 300 9655 298.24 298.24 11.2
Total UB310*32 300 19278 595.49 22.36

Total 1127.53 44.33


Cut-off list

Notice
STRINGER

RACKER ANGLE
RACKER ANGLE
RACKER ANGLE

STRINGER
STRINGER
STRINGER
STRINGER
STRINGER
STRINGER

MISC

COLUMN

BEAM
BEAM

You might also like