Professional Documents
Culture Documents
5/03
C-9 HEUI
SYSTEM POWER SUPPLIES
• ECM
• Injectors and Compression Brake
• Pump Control Valve
• Analog Sensors
• Digital Sensors
• Air Intake Heater
• Service Tool
18
Introduction
• Seven system power The C-9 HEUI system has seven power supplies with various voltages as
supplies shown.
J2 J1 ECM
GROUND
6 DRIVERS BOLT
DISCONNECT SWITCH
3 RETURNS 24 V
19
• 24 Volt power supply The power supply to the ECM and the system is provided by the 24 Volt
machine battery. The principle components in this circuit are:
• Power supply
If the supply voltage exceeds 32.5 Volts or is less than 9.0 Volts, a
diagnostic message diagnostic message is logged. (See the Troubleshooting Guide for
complete details on voltage event logging.)
SERH4050 - 29 - C-9 Engine
5/03
20
• ECM power supply This schematic shows the principle components for a typical C-9 ECM
circuit power supply circuit. Battery voltage is normally connected to the ECM.
However, an input from the key start switch turns the ECM ON.
Note the seven power connections on the ECM. There are three wires
permanently connected to the ECM battery positive and three to the
battery negative. This feature is used to reduce the amperage on the
individual pins. The actual current draw with the engine stopped and with
the key off is very small.
• Battery disconnect The battery disconnect may be either on the positive or the negative cable
switch depending on the application. The relevant Troubleshooting Guide will
show the location and the polarity of the switch.
• Wiring harness The machine wiring harness can be bypassed for troubleshooting
bypass
purposes. These steps are described in the Troubleshooting Guide
procedure. A breakout harness can be used and is referenced under "C-9
Recommended Tooling" at the front of this book.
NOTE 2: The Wire Function Color Code is shown here for the first time
and is used through the presentation.
SERH4050 - 31 - C-9 Engine
5/03
1 2 3 4 5 6 8 9 10 11 12 13
13 1
23 14 14 >PEI< 23
31 24
24 31
39 32 36
47 40 40 47
57 48 48 57
70 58
58 59 60 61 62 63 65 66 67 68 69 70
21
There are two 70 pin connectors which identify the ADEM III ECM. The
previous ADEM II ECM used a pair of 40 pin connectors.
• P1/P2 70 pin ECM The 70 pin ECM connectors are vital parts of all the power supplies (and
connectors sensor circuits). This illustration shows one of the two ECM 70 pin
connectors, P1. The pins highlighted in this connector are for the ECM
power supply circuit.
• P1/J1 machine Some C-9 Engines may have a separate machine interface connector. The
interface connector P1/J1 connector performs this function and transmits the power supply
from the machine wiring to the engine wiring harnesses. OEM circuits
pass through this connector.
The Troubleshooting Guide identifies the relevant pins for each circuit in
this manner. This feature greatly simplifies troubleshooting by easily
identifying the connections in the circuit.
SERH4050 - 32 - C-9 Engine
5/03
22
• 70 volt power supply The injector and compression brake solenoids are supplied with power
from the ECM at 70 Volts. For this reason, precautions must be observed
when performing maintenance around the valve covers.
• Power supply wires The power supply wires are paired for each injector and brake solenoid.
are paired Individual return circuits are provided which contain the solenoid drivers.
An 18 pin (P300/J300) connector is used to connect the main engine
• Injectors and brake wiring harness to the injector harness within the valve cover.
solenoids are
switched on return NOTE: If an injector is replaced, it must be calibrated. Also if an
side ECM is replaced and injector calibration or copy configuration is not
performed, a fault message will be generated. (The Copy
Configuration function will transfer all calibrations to the new ECM.)
SERH4050 - 33 - C-9 Engine
5/03
PUMP CONTROL
VALVE J500 P500
P2 J2 ECM (C-9 HEUI)
SUPPLY A 61 + CONTROL VALVE
RETURN B 62 - CONTROL VALVE
23
• Pump control valve The ECM supplies a PWM signal through the J2/P2 connector to the
signal Pump Control Valve (also known as the injection actuation pressure
control valve).
• System tested using The Pump Control Valve and its power supply can be tested on the engine
ET using ET and the Hydraulic Injection Actuation Pressure Test. Using the
test, the pressure can be adjusted manually with the ET service tool from
minimum to maximum. Therefore, this function can be used to verify the
operation of the control valve, the power supply from the ECM, and the
hydraulic system.
• ET used to check The actual current flow can be read as a percentage of maximum using the
current flow ET Status Screen.
ANALOG SENSOR
J200/P200
POWER SUPPLY CIRCUIT
TURBO OUTLET PRESSURE SIGNAL C 5 ± 0.5 VOLTS
ANALOG SENSOR RETURN 3 B
ANALOG SENSOR POWER (+5V) 3 A
P2 J2 ECM
J204/P204
HYDRAULIC OIL PRESSURE SIGNAL C 40 TURBO OUTLET PRESSURE SIGNAL
ANALOG SENSOR RETURN 1 B 27 HYDRAULIC OIL PRESSURE SIGNAL
ANALOG SENSOR POWER (+5V) 1 A
J203/P203
ATMOSPHERIC PRESSURE SIGNAL C 14 ATMOSPHERIC PRESSURE SIGNAL
ANALOG SENSOR RETURN 1 B 3 ANALOG SENSOR RETURN 1
ANALOG SENSOR POWER (+5V) 1 A 2 ANALOG SENSOR POWER (+5V) 1
J209/P209
FUEL PRESSURE SIGNAL C 18 FUEL PRESSURE SIGNAL
ANALOG SENSOR RETURN 1 B
ANALOG SENSOR POWER (+5V) 1 A
J201/P201
ENGINE OIL PRESSURE SIGNAL C 24 ENGINE OIL PRESSURE SIGNAL
ANALOG SENSOR RETURN 3 B 42 ANALOG SENSOR RETURN 3
ANALOG SENSOR POWER (+5V) 3 A 41 ANALOG SENSOR POWER (+5V) 3
24
THROTTLE
POSITION SENSOR J405 P405 P1 J1 ECM (C-9 HEUI)
+V DIGITAL A 4 + V DIGITAL SUPPLY
DIGITAL RETURN B 5 - V DIGITAL RETURN
SIGNAL C
25
• Digital power supply The ECM supplies power at 8 ± 0.5 Volts through the J1/P1 connector to
the Throttle Position Sensor circuit.
• Power supply Like the Analog power supply, this circuit is protected against short
protection circuits, which means that a short in the sensor will not cause damage to
the ECM.
Some other C-9 applications may use this power supply to power fan
speed or exhaust temperature sensors for example.
• Digital power supply NOTE: It is necessary when checking this system power supply
voltage check voltage to use the digital return for the measurement and not the
frame ground. A difference between these values can occur if an
• Digital return
incorrect ground is used.
SERH4050 - 36 - C-9 Engine
5/03
AIR INTAKE
HEATER LAMP
24V
J648
A
B
P648
AIR INTAKE AIR INTAKE
HEATER HEATER RELAY
J501/P501 ECM
1 J2/P2
2 AIR INTAKE
850-BU 12 HEATER RELAY
26
The Air Intake Heater is used to improve the cold start ability of the
engine.
• Uses coolant and The heater is controlled by the ECM using inputs from the Air Intake
intake temperature Temperature and Coolant Temperature Sensors. The ECM sends a signal
sensors as references to the relay which controls the supply of current to the heater element.
• Modes of operation There are a various modes of operation depending on temperatures and
other conditions. These parameters and the defaults are fully described in
the C-9 Troubleshooting Guide and later in this presentation in the section
"Electronic Sensors and Systems."
SERH4050 - 37 - C-9 Engine
5/03
CATERPILLAR
TRANSMISSION ECM MONITORING SYSTEM
27
• Communication
In the past, the ECAP (Electronic Analyzer Programmer) Service Tool
adapter uses power drew it's power from the Service Tool Connector. In the same way, when
from ECM using ET, the Communicator Adapter II also requires a power supply.
This power is taken from pins A and B on the Service Tool Connector.
• Circuit is energized This illustration shows the path of the current from the ECM Key Switch
with the Key Switch Circuit to the Service Tool Connector. This power supply requires the
engine Key Switch to be ON.
Pin 70 on the J1/P1 connector, is the same terminal which is used by the
Key Switch to turn on the ECM.
SERH4050 - 38 - C-9 Engine
5/03
LAB EXERCISE
Pressure sensor
Temperature sensor
Speed/timing sensors
ECM
INSTRUCTOR NOTES
SERH4050 - 40 - C-9 Engine
5/03