7:1 _|Develop scope and lan [Prepare the Statement of Work, Project Cost Estimate, Shedule and other Baseline Documents
112 [engage Staleholders [communication with Projet Stakeholders including talus repr, dacusions on scope, ec.
uaa [ese rnd [a actives associated with fund raising not covered in Engage Stakeholders. Thisindudes meeting wth
rite spective contributors, preparation of bechutes,peparation of mail ous and related ates
7a |Weekiy nesting Orone tech ropramming of weekly meeting to share and improve the weely advance with team members
115 |Weekiy meetings Wimont's [Programmation of wet meeting to shoe and improve the weekly aduonce with Wimonts team
a6
72 [PANNING
[engineering and athe aciviies to design the general svaclre and ystems including speaTying he quIpmeT a]
121 [Systems Design materials. Preparation of related documents for approval
aaa Icon tamate regener ee con etre eco of TSS Te A EOE oT
73 [ropa [actives elated to gaining approval of he budget internally and te design withthe Design.
1:24 |Work areas nie]. [creation or adaptation of offices, warehouse and another spaces to team members work
225 | Work aeeas outside]. [creation or adaptation of outside open spaces to team member werk and probe testing =
126 [Procurement contracts nd quotes search and quote citferent contact and distributor to find the best prices fo allcamponents to buy
Ta [BETGN & CONSTRUCTION.
‘saa procurement [Generate a the procurements including drones, material to adapt, computers to generate the software
development another equipment to generate a work definition.
Tia [Rent Eauipment [Ren eauipment thats necestary to develop the projec, bu is unneceatany to Baby afore sepece
253 [epenioncie orl eet srin esr cre rt twa et Cr
134 [compete Assembiy [assem the complete drone with a functional software, with and specie adaptations to meet the achieve
rwroeanl [Develop the complete prosramiming sare and hardware to crest #Tunctonal rome tat peor ae
18S _poteeunemenane wtmonts requirements
Tae |aevelopment i develo the complete Tunional prof itware
759, emuiaaepas ora eration nd design of drone adaptations to create a product That achieve the wirnonisrequremeris (neasue
temperature)
Jcorstrction of drone adaptation to eeatea produ that achieve the wirmonts requirements (measure of
138 [one adaptation construction
nt hemperature)Tarte.
141 |omponent Test
testing of spcic components before drone testing (measurement of temperature, medicine storage, etc)
Drone fying testing dude performance of each done, empty and fll storage. How takeoff how landing, how
343 [pees ake the medicine, how control the temperature
a3 _[tftware snd hardware correction [correction to software development to improve te done characierss
1.44 [drone adaptation correction/sorage [correction to adaptations storage development to improve the drone characterises
145 [Rngoge Specie scree Power syne act or he ene rrr rs eon STP
1.46 |component Testing 2 testing of spcitc components Betore drone testing (measurement of temperature, medicine storage, etc)
Drone tying testing mae perlrmance leach done, amply and hil storage How takeol Row lading how
ae7 [peewee ake the medicine, how control the temperature
Tas [sofware ond hardware covrecion? [correction to software development to improve the drone characters
1149 drone adaptaven covrecuon 2 [corection to adaptations storage development to improve the drone charlene
[the cost af a Powe System: splat to review the design and perform specaly instalation tals Tor the Power
1.410 [Engage Specaist2 [races eee pen erm seeoeny
TS [PHARMACY ADAPTATION
15.1_Pltform adaptations Patiorm cretion 1 mstallin each pharmacy point
1.5.2 [Fyn drone installations instal the platform created in each pharmacy point Eath platform should be farcional
15.3 storage and cleave charge [adapt and speci pace into each pharmacy to storage, charge nd save safety the drone
154 [takeoff nd lancings zone |»daptation and construction of spectc zone to take of landings and drone garage to put the medicine inside
755 [Sofware and hardware nstalaton nwalnion and adpiation of Software and hardware in each pharmacy paint
Ts Jase our
161 [Final cost Fina cost to Wish the work all drones are functional
1.6.2 [fina stakeholders review Fina review points to close the wilnonts requiremeni