1 Depot Site Work

1.1 Concrete casting for piles in Tank-6 (3-piles)

1.2 Concrete casting for piles in Tank-5 (2-piles)

1.3 Concrete casting for part-2 in Tank-7 (680m3)

1.4 Blinding fromwork inspection for pipe sleeper

1.5 Compaction test for slop tank-8

1.6 T-wall rebar inspection for 10 PCs

1.7 Repairing of the internal surface for slop tank-1 concrete walls

1.8 T-wall repairing inspection for 10 PCs

1.9

1.10

1.11

0
Remarks
1.1 Concrete casting for piles in Tank-6 (3-piles) 1.2 Concrete casting for piles in Tank-5 (2-pil

1.3 Concrete casting for part-2 in Tank-7 (680m3)


1.5 Compaction test for slop tank-8

1.7 Repairing of the internal surface for slop tank-1 concrete walls
1.9
1.2 Concrete casting for piles in Tank-5 (2-piles)

1.4 Blinding fromwork inspection for pipe sleeper


1.6 T-wall rebar inspection for 10 PCs

1.8 T-wall repairing inspection for 10 PCs