TNB - NEM Application Guideline PDF
TNB - NEM Application Guideline PDF
Solar Installation
Quota Meter Replacement Application & Contract submission Meter NEM bill
obtained Replacement
from SEDA • NEM Meter Application • NEM Declaration Form (TNB Contract)
Form • NEM Certificate • Meter
• NEM Certificate • Form G & Form H replacement
• Picture of TNB meter and • NEM Contract (Domestic/Commercial & will take 5 days
interconnection from the Industrial) after payment
NEMAS for grid • T&C Form done (as per
application • Picture of proposed meter • Picture of NEM Meter for each meter SLA)
>12kW location (if applicable) reading
• GST certificates (if • kW Export
Installed Capacity Fee • kVAR Export
applicable) 1st interim bill
>72kWp – 180kWp RM1,000 • Meter replacement • kW Import
application will take up to • kVAR Import
>180kWp – 425kWp RM5,000 3 days upon completed • Pictures on the same day of NEM contract
application and signing or one day before.
>425kWp – 1MWp RM8,000
documents received
• For installation more than • Submit to TNB Sub Zone
1MWp, the fee for Power (TNB’s District Office)
System Study may applies.
• NEM assessment study
will take up to 30 days
• All single phase and three phase meter are require to be replace with bi-
directional meter
• For CT metering, meter requirement will be determine by TNB Metering Department
• If there is no meter replacement required, only service charge will need to be pay
• The price above refers to meter replacement (is needed) and service charge only.
Any additional requirement (meter relocation, modem booster installation,
armored cable wiring etc. are not included in the pricing)
Extract Maximum
Demand (MD)
Data
• MD can be
extracted from
the electricity bill
• Alternatively, use
MyTNB SSP
• Consumer >1
year, average of
MD for one year
• For consumer <1
year, declared
MD will be used
• SP need to ensure
the capacity
applied match
the client’s load
profile
Commercial Eligibility
Registered consumer of DL
Clear from any disputes with TNB (Full settlement are needed)
As described in
ESA 1990 Sect
29
NEM contract
para 2(o)
Includes SIT,
customized
agreement, Co
Gen, Bulk
supply
Clarify with
applicant prior
application
• Examples of
Special
agreement
• Check with client
prior application
• Read all the guidelines • Submit incomplete documents
• Ensure client to settle any • Submit photocopy/scanned
outstanding bills. application
• Submit contract on time, within three • Late for payment (meter
days after meter replacement invoice/NEMAS fee)
• Ensure all required form are properly • Confuse customers between NEM
signed and FiT
• Submit colored photos in high • Over design the Solar PV system
resolution
• Submit application to relevant TNB
Sub Zone (TNB District Office)
Do’s Don’t
Event of Default
(Commercial &
Industrial)
Start NEM
Net Charges
Total amount of current import charges minus
3 current export charges. If the amount is
negative, no payment will be made. The
amount will be carried forward to the next bill
NEM Balance
4 The carried forward amount from previous bill.
NEM CONSUMER BILL FOR GST
Tempoh Bil : 01.02.2017 - 28.02.2017 (28 Hari) Faktor Prorata Untuk pertanyaan, sila
Tariff : A - 13 (Domestik) 1.00000 hubungi:
TNB Shah Aalm
Blok Tarif (kWh) Blok Prorata (kWh) Kadar (RM) Amaun (RM) xxxx
200 200 0.218 43.60 xxxx
100 100 0.334 33.40 xxxx
Tel: 03-xxxxxxxxxx
300 300 0.516 154.80
Fax - 03-xxxxxxxx
300 274 0.546 149.60
Berikut adalah maklumat tentang nilai elektrik yang telah dieksport ke TNB di sepanjang tempoh 01.02.2017 - 28.02.2017 We insert an
Nilai Eksport : 500 kWh @ RM0.31/kWh = RM155.00
information board,
Mohon majukan Invois Cukai bagi jumlah RM155.00, selepas mengambilkira GST 6%.
for customers
Invois Cukai boleh dihantar ke alamat : Revenue
46200
Management
NON REGULATED
SUBANGPetaling Jaya,
JAYASELANGOR
, Aras 17 Wisma
INVOICING MANAGEMENT
Selangor
DARUL EHSAN
TNB
SECTION ARAS , No.19
1, WISMA TNBJalan Timur,
SUBANG JAYA JLN USJ 10/1A, USJ 10 47620 reference and
Sila majukan Invois Cukai ini sebelum dd/mm/yyyy. action
EXAMPLE OF NEM CONSUMER BILL
Tidak Kena Kena GST bagi penggunaan
Keterangan Jumlah
GST GST domestik 300kWh dan
Kegunaan (kWh Import) kWh 300 574 874 ke bawah berkadar
sifar.
Kegunaan RM 77.00 304.40 381.40
ICPT (RM0.0152-) RM -4.56 -8.72 -13.28
Kegunaan Bulan Semasa RM 72.44 295.68 368.12
6% GST (6% x RM295.68) RM 17.74
KWTBB (1.6%) RM 6.10 KWTBB - Kumpulan
Wang Tenaga Boleh
Baharu
Caj Semasa (Import) RM 391.96
TE N AG A N AS IO N AL BE RH AD (2 00 8 6 6 -W )
Pass Through /
Pelepasan Imbangan
Bacaan Meter Kos Penjanaan
No Meter Faktor Meter Kegunaan Unit
Dahulu Semasa
M98044931 1.0000 6719 7593 874 kWh Import
M98044931 1.0000 4000 4500 500 kWh Eksport Baki NEM : RM0
Berikut adalah maklumat tentang nilai elektrik yang telah dieksport ke TNB di sepanjang tempoh 01.02.2017 - 28.02.2017
Mohon majukan Invois Cukai bagi jumlah RM155.00, selepas mengambilkira GST 6%.
Invois Cukai boleh dihantar ke alamat : Revenue Management
NON REGULATED , Aras 17 Wisma
INVOICING MANAGEMENT SECTIONTNB
ARAS ,1,No.19
WISMA Jalan Timur,JAYA JLN USJ
TNB SUBANG
10/1A, USJ 10 47620 SUBANG JAYASELANGOR DARUL EHSAN
46200 Petaling Jaya, Selangor
Sila majukan Invois Cukai ini sebelum dd/mm/yyyy.
NEM Assessment Study
Introduction
2 limit
• Power Factor
Study duration 30days starting from the
day proof of payment received
NEM – Assessment Study (NEMAS)
NEMAS 1 –Evaluation
Planning (DG) or zone
& Approval by Zone
planner to compile
details and fill in: Planner
NEMAS 1 – LV Planning (DG)/
Developer submit connected customers NEMAS 2 –Evaluation
with generation≤180kW
Planner zone will
NEM Technical & Approval by
NEMAS 2 – MV issue the notification
Study Application Planner (DG).
connected customers letter
form Presentation of the
and LV customers with
generation>180kW study to the
NEM Applicant will
Payment of NEM (subject to fault current) committee is case
attach the letter
Fee by NEM by case basis
NEMAS 1 – Perform
with the NEM
Applicant
voltage rise simulation in application to SEDA
Decision on
excel format
generation capacity
NEMAS 2 – Perform
simulation using Adept will be made based
on the findings
1 2 3 4
Assessment Study
• Voltage Variation
• Power Factor
• Short Circuit violation
• Capacity compliance(Base on Criteria).
Voltage Variation
Pass Fail
Metering Requirement for NEM
• Compulsory for service provider/NEM applicant to install signal booster for RMR
• Cost of signal booster shall be bourne by customer (stipulated in NEM contract)
• Example of signal booster shown as below
Metering Requirement for NEM
Example of conduit installation for modem cable extension
Metering Requirement for NEM
• For CT metering, GROUND MOUNTED METERING KIOSK shall be prepared by service
provider/customer
1. Application different from project site. Will cause confusion and delay for meter
installation/replacement
5. All cost that need to be pay must be settle prior any meter replacement
Further information, please get in touch with us
Hidayat Fahmi bin Abdul Rahim
Manager (Distributed Generation)
Level 16, Wisma TNB
No 19, Jalan Timur
46000 Petaling Jaya
Selangor
Email: hfahmi@tnb.com.my
Mobile: 0194782540
Tel: 0379679088