Combined Footing-7 (Cf7)
Combined Footing-7 (Cf7)
slab thk dia short sp beam width beam thk M+ dia Nos M- dia Nos Sh dia leg sp
350 16 170.0 750 900.0 25 12.0 25.0 6.0 12 4 110.0
combined footing
Col 1 x 0.85 Col 2 x 0.85
col 1 y 1.15 col 2 y 1
Beam width 0.75 m
SBC 20 T/m2
My1 3.5 Tm
My2 2.14 Tm
Mx1 3.5 Tm
Mx2 2.14 Tm
P1 175 T
P2 107 T
footArea reqd 14.1
ALONG X ALONG Y
a 1.0 1.8
b 3.5 0.0
c 1.6 1.8
L 6.1 3.6 21.98 M2
width 3.6 6.1
shear in beam
Total shear force in beam 768.12 KN