1- What is the Main
Driver of Oo Project and
how You will get ite
significant activitie.
critical pat!
To get it, Just go to |
and check its drivin
then go to that orvi
and mark ifs. driving
activity.
scheduling sofiwe
Primavera Pé, Micros
etc.
Planning Engineer job interview Qa
The main driver Consists of the
Ss that are
driving the Project at the
A
ast activity
P-activity,
ING activity
also, same
9O€s untikyou reach the first
This-is typically done through
‘are like
oft Project,What is Oo Base
Project
Scheduilee
A baseline is gn
approved
Program by both
Parties which is
Usedas a
benchmark to
Measure the
Progress of q
Project.
y Planning Engineer job interview Qa AlNo. It is Possible that
certain activities with
high budgeted valué |
might have been
Progressed better than
Plan.but other
activities tAqt has less
value-are the ones
» driving the Critical
path and delays the
project completion
date,
Planning Engineer job interviewThe progress Vari
ance js
Negative y, vali
Ue and still you
ar Chieving + the
Contracty; lal c completion
date, How is
is it Possiblee
QCctivities
Planning Engineer Job interview Q&decides the
SUCCEss or failure of the
Projecte
baseline & +
baselinés#
quite ineffic
defines the
failure of q
Planning Engineer job interview
A project must havea
minimum one Project
Can go to Unlimiteay But
if you find q Humber of
the Planning team is
it! The latest baseline
hat number
hatmeans
ient ~ Avoid
SUCCEss or
ny project.
Q&°5% or less of
the Total Task
activities have
greater than 44
working days
Of float.as per
DCMA 14 point
aheaq Work ACtivitiesee
y Planning Engineer Job interview Q&What is the Clause to
din FDIC
re is entitleq
SION of time
y Planning Engineer Job interview Q& AWhat are the
different types
rawings you see ong
Construction Projecte
Drawings
2.1FC Drawings
3.Shop
Drawings
4. As-built
Drawings
Planning Engineer Job interview Q&What are }
is a tferent Task-Dependent: In
een ~ i i
Dependen; /Resource melee Soe
Depende
resources qre
scheduled based on
the activity's
Calendar itself.
Resource
Dependent: In this
Type, the assigned
resources are
scheduled based on
assigned calendars.
nt ACtivitiese
Planning Engineer job interviewthe progress is
on the non
Critical activities
which has aq
higher cost
vaiue than the
planned critical
activities.
Planning Engineer job interview QaHow YOu will Make
’ COMparison of
piferent Updates for
€ same Schedulee
| will use
Claim Digger
function that
is available in
Primavera
Pé6
y Planning Engineer Job interview Q& 4During Resource
Leveling the Project
overall duration may
be Changed ais it is
Resource Constraint
butin Resource
Smoothing, Wwe use
slack/float for
distribution and
hence no change in
Project Duration,
Planning Engineer job interviewoe C Dangling . A Dangling
Ctivitye Activity may have
both Predecessor
and successor but
is still dangling from
one end that leads
to-fake results for
Critical path and
completion dates,
y Planning Engineer job interview Qa AlA Milestone & A flag
are event Activities.
You cannot update
Flags Manuallyand
it Will Be Updated
automatically
whereas q milestone
needs to be
Updated manually,
Planning Engineer job interviewThe Progress Override
will not respect the
logic anymore if thére
is any variancé-and
hence will shorten the
critical path but with
Mostly illogical out of
Sequence activities, In
other sense, The
Retained logic is
completely otherwise.
Planning Engineer job interviewWhat's the F
Wont ast Track
delay in prose ene Resequence,
the activities
to start in
Paralle
instead of in
series way,
y Planning Engineer Job interview Q& AlWhat's the Crashin
Way to 'Esolve th
delay in Project timee
Reduces
Critical
ACTivities
durations.
y Planning Engineer Job interview Qe& Algreater, lesser
SPI greater than
OF equal to onee
one means
ahead of
schedule, less
han one-means
behind the
schedule 8 equal
fo one means as
Per schedule.
Planning Engineer job interview QaCPI greater than
one means
Under budget,
less than. one
means-over
budget 8. equal
tO one means
same as per
budget
Planning Engineer job interview Qaitis vary from an
organization to
another and from
worker nationality to
another. However, j
havesome
standards that | refer
>to when the
Organization
Productivity rate is
not available.
Planning Engineer job interview QaCana free float be
Negative jn the
Critica] Path Methode
y Planning Engineer Job interview Q& AlWhat is the difference
elween Free Float a.
Total FI
Free Float - the amount
of time we can delay
On activity without
affecting the early\start
date of its SUCCEssor
activity,
Total Floatsthe amount
OF time Wwe can delay
&N-activity from its early
start date without
delaying the whole
Project finish,
oate
y Planning Engineer job interview|
Phase /s tage js
starter, Stage Planning
O72 fora Frojecte should be
Started as
Soon as the
Project life
cycle starts.
y Planning Engineer Job interview Q& AlWhat are the Methods
of calculating EV
earned value) 2
loading the
Activities with the
budget ,then
Update the time
schedule
QCcording to the
Progress of work
Planning Engineer Job interview Q&pati is es piclference
Plan
clwee Ner & q
Schoen
Planning
engineer put
the plan,
scheduler
turning the
Plan into time
schedule .
y Planning Engineer Job interview Q& AlWhat is the Standarq
deviation of the
activity equal?
(Pessimistic
duration -
Optimistic
duration )
/6
y Planning Engineer Job interview Q& AlHow Much Auration
a Milestone OCtivity
Normally hase
there are
different types
Of milestones
are there like
Start milestone,
finish milestone,
etc. but all have
O duration.
Planning Engineer job interview Qacontract
y Planning Engineer Job interview Qk AlWhat you know ab
Out
the Stakeholders °
any Projecte
The
Stakeholder js
any entity that
is being or will
be affected
either Positively
OF Negatively
by that Project,
y Planning Engineer job interview Qa AlNegative flog}
indicates tha}
the ACtivity is
already
delayed. use
Proper logic
to deal with it
y Planning Engineer job interview ,Q & AlWhat is the difference
betwee EN Negative
lag &le €ade
There is no
difference,
It is two
Cifferent
words of
same
meaning.
y Planning Engineer job interview Qa Aby site visit
and develop
forms to’ be
filled by
Project ecm
in weekly
basis
y Planning Engineer Job interview Q& Al
nto Update
your schedulezDuration.
y Planning Engineer Job interview Q& AlHow Can you
define the Critica]
‘ath in Primaverge
filter the
Activities
with Zero
Total
Float.
y Planning Engineer Job interview Q& AWhat is different
Avration type in
Primaverg Pé2
Fixed Units,
Fixed
Units/time,
Fixed Duration
& Units, Fixed
Duration &
Units/Time..
y Planning Engineer Job interview Q& AlWhat is the
in
duty of the Project
Controllere
Project
contro]
ensures
that the
plan is
controlled
y Planning Engineer Job interview Q& AlA KPlis type
performance
Measurement on a
Particular Activity where
engaged,
KPI's are defined by
keeping.g factor “What
matters the Most",
A-careful study and
analysis are required to
define because it differs
from organization to
Planning Engineer job interview1.Change in the Scope
- Either Additions or
reductions,
2.Change in Cost-
Either plus, negative or
even zéro,
3. Change in time
4:signed by authorized
Parties
5. The signature date
Planning Engineer job interviewWhat you
Present in a
€ekly Reporte
Update the Schedule with
a proper backup.
baseline Comparisons;
Critical Patt
three weeks lookahead —
EVM -réports
SCurves for Man-hours,
Cost,
Manpower Histogram,
Equipment Histogram,
y Planning Engineer job interviewee ts the
com n delay
analysis p techmejiece
Impact as Planned;
Time Impact Analysis,
AS Plannédivs'As Built,
As- Built For,
Windows Analysis
Planning Engineer Job interview Q&Project Must Finish
by
Mandatory Starhy
Mandatory Finish
Start / Finish'On or
After
Start / Finish On or
Before
Start / Finish On
Planning Engineer Job interview Q&What is the
difference between
Float 8 Slacke
y Planning Engineer Job interview Q& AlLEVEL-1: Overview
Schedule
LEVEL-2: Area Wise
Schedule
LEVEL-3: Discipline Wise
Schedule
SLEVEL-4: Major
ACtivities Schedule
LEVEL-5: Detailed
Activities Schedule
Planning Engineer job interview QaThe project owns
the float which
means “float is not
for the exclusive
Use Of. anyof the
Parties and it
serves whoever
Needs it first" qs
long as it is Used in
good faith.
Planning Engineer job interview QaOA Copy of the
Program to have |
a look at different
scenarios after
Making desirable
changes.
Once satisfied
just merge in the
native Program.
y Planning Engineer job interview .Q AlWhat are
UNdesirable in any
ime Schedule 2
Constraints, SF
(Start to Finish)
relationship,
Logilags or
leads,
Negative
Float, etc,
y Planning Engineer Job interview Q& ARolling wave planning
is done at the
deliverable level,
It can be like
lookahead weekly
base oreven is done
dailyon foreman
- levels.
iVcould be monthly as
per stakeholders
requirements
Planning Engineer Job interview Q&the Contract documents
to understand the
scope, the schedule
drawings to know.about
areas, Bill of Quantity-
BOQ including cost,
scheduling software
access. Yes, | need to
mestmy Project team to
know about q little
Productivity rate if I don't
know in case of any
SPeCific activity,
y Planning Engineer job interviewWhat are the
Leve| Of Effort
OCtivitiese
This type of
activity goes
with
dependent
Activities like
administrative
issues,
y Planning Engineer Job interview Q& Altechnique in
which lower and
UPPer values oF
Oo parameter are
specified against
Which project
data can be
€valuated and
Monitored,
y Planning Engineer Job interview Q& AlHow do you
estimate oneness
Qurations
Duration =
budget
quantity /
Productivty*No,
crews
y Planning Engineer Job interview Q& AHave do you
Apply for
Extension Of Timee
determine the
delay causes ;
performe the
delay analysis ,
gathering the
sUpporting
Ocuments ,
submit the EOT
claim.
y Planning Engineer Job interview Q& AlHave do yoy
Opply for
determine the
Nsion of Timee
delay causes ;
berforme the
delay analysis ,
gathering the
sUpporting
documents of
the EOT claim.
y Planning Engineer Job interview Q& Al
ExteEarly Dates in a
network is
determined by
Forward
Calculations And
late dates is
determined by
backward
Calculations.
y Planning Engineer Job interview Q& Al
determi
nedeWhat you know
about Triple
Constraintse
Cost, Time
and Scope
with Quality
asthe
fundamental
theme.
y Planning Engineer Job interview Q& AlDCMA is 14-
Point
Assessment
Metrics GUIDE
to evaluate the
Progress toward
the baseline
schedule.
y Planning Engineer Job interview Q& AlThere are three
ways to track
the Progressof
OA project
Man_hours-
Cost —
Quantities
y Planning Engineer Job interview Q& AlExplain What q
gOod Schedule
Meanse2
time
schedule to
be prepared
according
to the CPM
Specs .
y Planning Engineer Job interview Q& AlMan Hours ‘=
QTY /
(Productivity
Rate)
y Planning Engineer Job interview Q& AWhat is the
Project Critica}
Path
critical path is the
sequence of Project
network activities
which add up\fosthe
longest Overall
duration, his
‘determines the
Shortest time Possible
to complete the
Project,
y Planning Engineer job interview QaWhat is the
recove
schedule 2
Recovery
schedule keeps
the same finish
date with some
corrective
SaACtions to
recover the
delay
y Planning Engineer job interview Qa AlRedundancy—
A duplication in
depicting logical
relationships. Por
example, ifA andB
ore predecessors to
C but Aisa
Predecessor to B,
then the relationship
between A and C is
redundant.
Planning Engineer job interview QaWhat are the
1a Good
MOnitoring Skills2
Communication
and ability.to
gather data
abourthe
project Progress
>analize skilss,
Ability of
forecasting,
y Planning Engineer job interview Qa AlWhat does trend
analysis Meanse2
technical
analysis that
tries.to
Predict the
Foject status
at
Completion.
y Planning Engineer Job interview Q& AlCV and SV,
SV=the difference
between the
Carmed value and
the planned value,
CV the difference
between the
€arned value and
the actual cost
Planning Engineer job interview .QThe baseline
become
Nonrealistic due to
delays anid we
AVe.a New finish
date because of
claims or adding a
FEW scope of work
(amendment).
Planning Engineer Job interview Q&Network
diagrams display
the project work
Os linkages
through the
chronological
flow of work from
Start to finish.
y Planning Engineer job interview Qa AlNetwork
diagrams display
the project work
Os linkages
through the
chronological
flow of work from
Start to finish.
y Planning Engineer job interview Qa AlWhat is an Open
end ACtivitye EG ey
without
Predecessor
Or SUCCessor
relationship is
Called Open-
End activity.
y Planning Engineer Job interview Q& AlWhat is Re
SOurce . .
locationg Assigning
resources to
Activities;
determine the
AMount of labor,
equipment and
Money required
for any activity.
Planning Engineer job interview Qait’s a Cost Performance
Indicator and it
evaluates the t
Performance in the
sense if the ProjecPis
under-budget, Over-
budgeted or on track,
The formula is for CPI is
the ratio of earned
value “Ey” Over actual
Costs “ AC" that is
CPI =EV/AC
Planning Engineer job interviewIt is the Schedule
Performance Indicator
and indicates the, |!
performance of project
work is completed to
the baseline schedule,
Itis Calevlated by
Gividing the earned
value by the planned
value that is
SPI = Ev/py
Planning Engineer job interviewWhat do you
Mean by 'TIA"2
One of the ,
recommended
delay analysis
techniques
TIA = Time
Impact analysis
Planning Engineer Job interview Q& AlEOT= Extension of
Time
Construction
contracts generally
allow-the
Construction period
tobe extended
where there is a
delay that is not the
contractor's fault.
Planning Engineer job interview QaWhat is
Concurrent
delaye
Concurrent
delay happens.
when two of
More delays
resulting from
independent
Causes Overlap
during the same
time period.
Planning Engineer job interview Qa AlTotal float
represents the:
number of days
that can be
delayed without
affecting the
Completion of
the project
Planning Engineer job interview ,Q Alfree float
determines the;
number of days
that can be
delayed without
affecting the
SUCCessor
activity,
Planning Engineer job interview Qa Alis the lowest level
of any work
breakdown
Structure from
we can manage
the cost and
duration
estimation.
Planning Engineer job interview Qa AGantt charts
Graphically
display Primarily
the work
breakdown
and the
associated
durations.
Planning Engineer job interview Qa AlWhat is
Productivity
Ratee
is the
Qmount of
Output
Produced
iN an hour
Of work.
Planning Engineer Job interview Q& Alit is
limitation: |
may bein
resources or
IN activities
dates,
Planning Engineer Job interview Q& AA milestone
isan activity:
that has zero
duration. It is
just like q
flag.
Planning Engineer Job interview Q& AlGraphical
representation
of ‘anything’
like-Man-
hours, Cost,
etc. plotted
against time.
Planning Engineer job interview Qa AlThe baseline isaq
point of reference:
IN project
managemeént
there.are three
baselines —
schedule baseline,
COst baseline and
scope baseline.
Planning Engineer job interview Qa AlWhat is
Activity 2
A discrete,
planned
Portion of
work to be
berformed
ina Project,
Planning Engineer Job interview Q& AlACWP
IS
The Actual
Cost of Work
Performed
Planning Engineer Job interview Q& AlBCWwpP
is Budgeted
Cost of Work
Performed
= Ey
Planning Engineer Job interview Qk AlBCWS
is Budgeted
Costof Work
Scheduled.
=P ove
Planning Engineer Job interview Q& AlWork Breakdown
Structure
A decomposition ofall
the works to complete
any project
A WBS.is arenged ina
hierarehy having a
clear and logical
group.
A WBS is q deliverable-
Oriented,
Planning Engineer job interviewWork Breakdown
Structure
A decomposition of all
the works to complete
any project
A WBS.is arenged ina
hierarehy having a
clear and logical
group.
A WBS is q deliverable-
oriented.
Planning Engineer job interviewSchedule
variance. |
(SV) =
Earned value
(EV) -
Planned
value (PY)
Planning Engineer Job interview Q& ACost
variance
(CY) =
Earned value
(EV) —- Actual
Cost (AC)
Planning Engineer Job interview Q& AlThe Estimate To
Complete
is the expected
remaining cost
to complete
the project.
=PF*(BAC-EV)
Planning Engineer job interview ,Q AlThe Estimate To
Complete
is the expected
remaining cost
to complete
the project.
=PF*(BAC-EV)
Planning Engineer job interview ,Q AlThe Estimate
At
Completion
=actual cost
+Estimate to
complete
Planning Engineer Job interview Q& AlA loss of
Productivity:
due to
hindrance of
the progress
Of Work
Planning Engineer Job interview Q& AlWhat is Out of
quence
ACtivitye
is
ONy activity that
is in-progress or
has completed
efore one or
More of its
Predecessors
Planning Engineer Job interview Qk Al1-Fixed Price
(lump sum).
2-Unit price.
3-Cost pigs
(with fixed, incentive, or
ward fees).
4-Time and materials
(T and M).
5- Guaranteed
maximum price (GMP)
Planning Engineer job interview1-Design-build.
2-Design-bid-build:
3-EPG
(Engineering-
Procurement-
Construction).
4-Design-builg-
Operate.
Planning Engineer Job interview Q& Al