OFFICE NOTE Date-8-7-2020

Ref-Intra office communication-diary No –P25Dated 02-07-2020

As directed by Director NPTI, Shivpuri supporting documents related to work done during lockdown
period (COVID-19) is hereby enclosed for your reference.

S.N Work Done During Lockdown period Page


O Nos.

1 Details of Engineering colleges of Maharashtra for conduction of skill Development 1 to 6


Programmes was prepared and was submitted.
2 Details of Engineering colleges of Chhattisgarh for conduction of skill Development 7 to
Programmes was prepared and was submitted. 16
3 Details of Engineering colleges of Rajasthan for conduction of skill Development 16 to
Programmes was prepared and was submitted. 22
4 Details of Engineering colleges of Gujrat for conduction of skill Development 23 to
Programmes was prepared and was submitted. 26
5 Details of Engineering colleges of Uttar Pradesh for conduction of skill 27 to
Development Programmes was prepared and was submitted. 37
6 Details of Engineering colleges of Madhya Pradesh for conduction of skill 38 to
Development Programmes was prepared and was submitted 45
7 Details of Print Media Of Madhya Pradesh was prepared in bilingual and was 46 to
submitted. 53
8 Details of Electronic Media Of Madhya Pradesh in bilingual was prepared and was 54 to
submitted. 61
9 Details of various Social Media Reporters Of Madhya Pradesh in Bilingual was 62 to
prepared and was submitted. 63
10 Details of Magazine Reporters of Madhya Pradesh in Bilingual was prepared and 64 to
was submitted. 68
11 Tentative Program Schedule of short term training Programme Thermal Power 69 to
Plant Performance & Efficiency Monitoring was prepared and was submitted. 71
12 Tentative Program Schedule of short term training Programme Valves & Pumps 72 to
Used in Thermal Power Plant Engineering was prepared and was submitted. 74
13 All complete Training material of short term training Programme on Valves & 75 to
Pumps Used in Thermal Power Plant Engineering was prepared and was 76
submitted (Details from S.No.14 to17).
14 PPT on Maintenance of Centrifugal & Positive Displacement Pump for Short -
Term Training Programme Valves & Pumps Used in Thermal Power Plant
Engineering was prepared & was submitted.
15 PPT on Centrifugal Pump for Short Term Training Programme Valves & Pumps -
Used in Thermal Power Plant Engineering was prepared & was submitted.
16 PPT on Maintenance of Valves & Valves Actuators for Short Term Training -
Programme Valves & Pumps Used in Thermal Power Plant Engineering was
prepared & was submitted.
17 PPT on Valves, Purposes, Identification, and Installation& Floating of Safety -
valve for Short Term Training Programme Valves & Pumps Used in Thermal
Power Plant Engineering was prepared & was submitted.
18 All complete Training material of short term training Programme Thermal Power 77
Plant Performance & Efficiency Monitoring was prepared and was submitted
(Details S.No19 to S.No. 24).
19 PPT on Understanding Power Station Losses for Short Term Training -
Programme Thermal Power Plant Performance & Efficiency Monitoring was
prepared & was submitted.
20 PPT on Turbine Efficiency for Short Term Training Programme Thermal Power -
Plant Performance & Efficiency Monitoring was prepared & was submitted.
21 PPT on APC Optimization in Thermal Power Plant for Short Term Training -
Programme Thermal Power Plant Performance & Efficiency Monitoring was
prepared & was submitted.
22 PPT on Optimization of Total Boiler Air for Short Term Training Programme -
Thermal Power Plant Performance & Efficiency Monitoring was prepared &
was submitted.
23 PPT on Condenser Performance for Short Term Training Programme Thermal -
Power Plant Performance & Efficiency Monitoring was prepared & was
submitted.
24 PPT on Feed water Heaters for Short Term Training Programme Thermal Power -
Plant Performance & Efficiency Monitoring was prepared & was submitted.
25 Last Date to start new PDC (Thermal) Batch at NPTI Shivpuri was extended (3-4- 78 to
2020 to 18-5-2020) 79
26 Last Date to start new PDC (Thermal) Batch at NPTI Shivpuri was extended (up to 80
5-6-2020)
27 Permission to deliver on line lecture in skill development Programme 81
28 Other work assigned was completed 82 to
85
29 Permission to deliver on line lecture for PDC batch of NPTI Badarpur 86
30 Assignment was given to PDC 22nd Batch students NPTI (NR). 87

Besides above work With due permission, on line lectures were delivered for the students of PDC
Batch of NPTI (NR) as detail given below. Training material was also provided to the students
respectively.

1 With due permission delivered on line lecture on FBC Technology (11-5-2020)


for PDC batch of NPTI Badarpur
2 With due permission delivered on line lecture on Atmospheric Fluidised Bed
Combustion Boiler (12-5-2020) for PDC batch of NPTI Badarpur
3 With due permission delivered on line lecture on Valves Basics (8-5-2020) for PDC
batch of NPTI Badarpur
4 With due permission delivered on line lecture on Valves Classification &
Application (9-5-2020) for PDC batch of NPTI Badarpur
5 With due permission delivered on line lecture on Accidents (20-5-2020) for PDC
batch of NPTI Badarpur
6 With due permission delivered on line lecture on Fire Fighting (21-5-2020) for
PDC batch of NPTI Badarpur
7 With due permission delivered on line lecture on Compressor & Compressed Air
System (14-5-2020) for PDC Batch of NPTI Badarpur
8 With due permission delivered on line lecture on Condenser & Condensation for
UPL batch of NPTI Badarpur.
9 With due permission delivered on line lecture on Principle Of Steam Turbine for
UPL Batch of NPTI Badarpur.
10 With due permission delivered on line lecture on Steam Turbine Construction for
UPL batch at NPTI Badarpur.

Besides above following works were also completed during Lockdown period
1 Email were forwarded to Various Thermal utilities for Training at NPTI Shivpuri with
an attachment of our training calendar 2020-21
2 Follow up for conduction Skill Development Program nearby area was done through
telephonically.
3 Follow up of students to start new PDC (Thermal) batch at NPTI Shivpuri was done
4 Addresses of various Utilities for conduction of Short Term Training Programmes were
collected.
5 Invitation for conduction of Short Term Training Program at NPTI Shivpuri was send
to various Utilities
6 Follow up for conduction Short Term Training Program at NPTI Shvpuri was done
from various utilities.

A. Jain