FIRST DIVISION Resources ("DENR"), issued an Environmental

G.R. No. 131442 July 10, 2003 Clearance Certificate ("ECC") in favor of
BANGUS FRY FISHERFOLK, DIWATA MAGBUHOS, respondent National Power Corporation
ANGELITA BINAY, ELMA GARCIA, VIRGILIO ("NAPOCOR"). The ECC authorized NAPOCOR to
PANGUIO, ARSENIO CASTILLO, ARIEL PANGUIO, construct a temporary mooring facility in Minolo
ANTONIO PANGUIO, ANTONIO BUNQUIN, Cove, Sitio Minolo, Barangay San Isidro, Puerto
GENEROSO BUNQUIN, CHARLIE DIMAYACYAC, Galera, Oriental Mindoro. The Sangguniang Bayan
RENATO PANGUIO, ATILANO BUNQUIN, CARLOS of Puerto Galera has declared Minolo Cove, a
CHAVEZ, JUAN DIMAYACYAC, FILEMON mangrove area and breeding ground for bangus
BUNQUIN, MARIO MAGBUHOS, MAURO fry, an eco-tourist zone.3
MAGBUHOS, NORA MAGBUHOS, JEOVILYN, The mooring facility would serve as the temporary
GENALYN and JORVAN QUIMUEL, minors, docking site of NAPOCOR's power barge, which,
represented by their parents FELICIANA and due to turbulent waters at its former mooring site
SABINO QUIMUEL, MARICAR MAGBUHOS, minor, in Calapan, Oriental Mindoro, required relocation
represented by her parents CARMELITA and to a safer site like Minolo Cove. The 14.4
ANTONIO MAGBUHOS, MARLO BINAY, minor, megawatts power barge would provide the main
represented by his parents EFRENITA and source of power for the entire province of Oriental
CHARLITO BINAY, and the BANGUS, BANGUS Mindoro pending the construction of a land-based
FRY and other MARINE LIFE OF MINOLO power plant in Calapan, Oriental Mindoro. The ECC
COVE, petitioners, for the mooring facility was valid for two years
vs. counted from its date of issuance or until 30 June
THE HONORABLE ENRICO LANZANAS as Judge 1999.4
of the Regional Trial Court of Manila, Branch VII, Petitioners, claiming to be fisherfolks from Minolo,
THE DEPARTMENT OF ENVIRONMENT AND San Isidro, Puerto Galera,5 sought reconsideration
NATURAL RESOURCES — Region IV, represented of the ECC issuance. RED Principe, however,
by its Regional Executive Director and its denied petitioners' plea on 15 July 1997. On 21
Regional Director for Environment, THE July 1997, petitioners filed a complaint with the
NATIONAL POWER CORPORATION, ORIENTAL Regional Trial Court of Manila, Branch 7, for the
MINDORO ELECTRIC COOPERATIVE, PROVINCIAL cancellation of the ECC and for the issuance of a
GOVERNMENT OF ORIENTAL MINDORO, herein writ of injunction to stop the construction of the
represented by GOVERNOR RODOLFO VALENCIA, mooring facility. Impleaded as defendants were
PUERTO GALERA MAYOR GREGORIO DELGADO, the following: (1) NAPOCOR, (2) RED Principe, (3)
VICE MAYOR ARISTEO ATIENZA, and MEMBERS DENR Region IV Technical Director for
OF THE SANGGUNIANG BAYAN OF PUERTO Environment Oscar Dominguez, (4) Oriental
GALERA, JUAN ASCAN, JR., RAFAEL ROMEY, Mindoro Electric Cooperative ("ORMECO"), which
CENON SALCEDO, JERRY DALISAY, SIMON is engaged in the distribution of electricity in
BALITAAN, RENATO CATAQUIS, MARCELINO Oriental Mindoro, and (5) certain officials of Puerto
BANAAG, DANIEL ENRIQUEZ, AMELYN MARCO, Galera.6 Petitioners subsequently amended their
GABRIEL ILAGAN, MUNICIPAL ENGINEER RODEL complaint to include as additional defendants the
RUBIO, and MUNICIPAL PLANNING and elective officials of Oriental Mindoro represented
DEVELOPMENT COORDINATOR WILHELMINA by then Governor Rodolfo G. Valencia. Petitioners
LINESES, respondents. further prayed for the demolition of mooring
structures that respondents had already built.
CARPIO, J.: On 28 July 1997, prior to the filing of the amended
The Case complaint, the trial court issued a 20-day
This is a petition for review1 of the Order2 dated 7 temporary restraining order enjoining the
November 1997 of the Regional Trial Court of construction of the mooring facility. However, the
Manila, Branch 7 ("Manila RTC"), dismissing trial court lifted the same on 6 August 1997 on
petitioners' complaint for lack of cause of action NAPOCOR's manifestation that the provincial
and lack of jurisdiction. government of Oriental Mindoro was the one
The Facts undertaking the construction of the mooring
On 30 June 1997, Regional Executive Director facility.7
Antonio G. Principe ("RED Principe") of Region IV, On 28 August 1997, before filing their answers,
Department of Environment and Natural respondents ORMECO and the provincial officials
of Oriental Mindoro moved to dismiss the Resources, L-16002, May 23, 1961; Gone, et
complaint. These respondents claimed that al. vs. District Engineer, et. al., L-22782,
petitioners failed to exhaust administrative August 29, 1975; Abe-Abe, et al. vs. Manta,
remedies, rendering the complaint without cause et. al., L-4827, May 31, 1979) although it
of action. They also asserted that the Manila RTC does not affect the jurisdiction of the court
has no jurisdiction to enjoin the construction of the over the subject matter (Mun. of La Trinidad,
mooring facility in Oriental Mindoro, which lies et al. vs. CFI of Baguio-Benguet, et al., L-
outside the Manila RTC's territorial jurisdiction. 33889, June 28, 1983).
Petitioners opposed the motion on the ground that Moreover, this Court finds the Opposition of
there was no need to exhaust administrative the Petitioners highly untenable and bereft
remedies. They argued that the issuance of the of merits that the controverted act in
ECC was in patent violation of Presidential Decree question is patently illegal and there was an
No. 1605, 8 Sections 26 and 27 of Republic Act immediate need for judicial intervention.
No. 7160,9 and the provisions of DENR The ECC in question was issued by the
Department Administrative Order No. 96-37 ("DAO Regional Office of the DENR which has
96-37") on the documentation of ECC jurisdiction and authority over the same . . ..
applications. Petitioners also claimed that the And corollary to this, the issue as to whether
implementation of the ECC was in patent violation or not the Minolo Cove is within the enclosed
of its terms. coves and waters embraced by Puerto
In its order of 7 November 1997, the trial court Galera bay and protected by Medio island is
granted the motion and dismissed petitioners' a clear question of fact which the DENR may
complaint. appropriately resolve before resorting to
Hence, this petition. [the] Court[s].
The Ruling of the Trial Court This Court is likewise aware and cognizant of
The trial court's order dismissing the complaint its territorial jurisdiction in the enforcement
reads in part: of Writ of Injunction. That truly, [a] writ of
After careful evaluation and analysis, this injunction can only be enforced within [the]
Court finds the Motion to Dismiss tenable territorial jurisdiction of this Court but not for
and meritorious. acts which are being or about to be
Petitioners have clearly failed to exhaust all committed outside its territorial jurisdiction.
administrative remedies before taking this Thus, in Philippine National Bank vs. Pineda,
legal action in Court x x x. 197 SCRA 1, the Honorable Supreme Court
It is x x x worth mentioning that the decision ruled: "Regional Trial Courts can only
of the Regional Director may still be x x x enforce their writs of injunction within their
elevated to the Office of the Secretary of the respective designated territories.
DENR to fully comply with the process of Furthermore, we find the issuance of the
exhaustion of administrative remedies. And preliminary injunction directed against the
well settled is the rule in our jurisdiction that Provincial Sheriff of Negros Occidental a
before bringing an action in or resorting to jurisdictional paux [sic] pas (from Black
the Courts of Justice, all remedies of Dictionary means jurisdictional falsity) as
administrative character affecting or the Courts of First Instance now Regional
determinative of the controversy at that level Trial Court[s], can only enforce their writs of
should first be exhausted by the aggrieved injunction within their respective designated
party (Pestanas vs. Dyogi, L-25786, territories.
February 27, 1978). And petitioners' failure And finally, this Court is not unmindful of the
to exhaust administrative remedies renders relevant and square application in the case
his [sic] petition dismissible (Chia vs. Acting at bar of Presidential Decree No. 1818,
Collector of Customs, 177 SCRA 755). And a Executive Order No. 380 dated November 27,
dismissal on the ground of failure to exhaust 1989, and Circular No. 2-91 of the Supreme
administrative remedies is tantamount to a Court that the National Power Corporation
dismissal based on lack of cause of action (NPC) is a public utility, created under
(Baguiro vs. Basa, Jr., 214 SCRA 437; Pineda special legislation, engaged in the
vs. CFI of Davao, 111 Phil. 643; Sarabia vs. generation and distribution of electric power
Secretary of Agriculture & Natural and energy. The mooring site of NPC in
Puerto Galera, Oriental Mindoro is one of its NAPOCOR's ECC. If the ECC is void, then as a
infrastructure projects falling within the necessary consequence, NAPOCOR or the
mantle of Executive Order No. 380, provincial government of Oriental Mindoro could
November 27, 1989 x x x. not construct the mooring facility. The subsidiary
And as held by the Supreme Court in the case issue of non-compliance with pertinent local
of National Power Corporation vs. Honorable ordinances in the construction of the mooring
Abraham P. Vera, et al., 170 SCRA 721, facility becomes immaterial for purposes of
courts are without jurisdiction to issue granting petitioners' main prayer, which is the
injunctive writs against [the] National Power annulment of the ECC. Thus, if the court has
Corporation. The latter enjoys the protective jurisdiction to determine the validity of the
mantle of P.D. 1818, (Circular No. 2-91). xxx issuance of the ECC, then it has jurisdiction to hear
xxx xxx and decide petitioners' complaint.
Injunction in this case is not a mere ancillary Petitioners' complaint is one that is not capable of
[sic] writ but the main action itself together pecuniary estimation. It falls within the exclusive
with the Annulment of the Environmental and original jurisdiction of the Regional Trial
Clearance Certificate (ECC). Even assuming Courts under Section 19(1) of Batas Pambansa
arguendo that the court [can] annul the ECC Blg. 129, as amended by Republic Act No. 7691.
how can the latter enforce the same against The question of whether petitioners should file
the Provincial Government of Oriental their complaint in the Regional Trial Court of
Mindoro which was impleaded by the Manila or Oriental Mindoro then becomes a matter
petitioners as a necessary party together of venue, to be determined by the residence of the
with the Oriental Mindoro Electric parties.12
Cooperative and the government officials of Petitioners' main prayer is the annulment of the
Puerto Galera, Oriental Mindoro, whose acts ECC. The principal respondent, DENR Region IV,
and functions are being performed outside has its main office at the L & S Building, Roxas
the territorial jurisdiction of this court? x x x Boulevard, Manila. Regional Executive Director
Indisputably, the injunction and annulment Principe of the DENR Region IV, who issued the
of ECC as prayed for in the petition are ECC, holds office there. Plainly, the principal
inseparable x x x. respondent resides in Manila, which is within the
The conclusion, therefore, is inescapable territorial jurisdiction of the Manila RTC. Thus,
that petitioners have failed to exhaust all the petitioners filed their complaint in the proper
available administrative remedies and this venue.
Court has no jurisdiction to issue the On the other hand, the jurisdiction of Regional Trial
injunctive writ prayed for in the Amended Courts to issue injunctive writs is limited to acts
[Complaint].10 committed or about to be committed within their
The Issue judicial region.13 Moreover, Presidential Decree
The issue is whether the trial court erred in No. 1818 ("PD No. 1818") prohibited14 courts from
dismissing petitioners' complaint for lack of cause issuing injunctive writs against government
action and lack of jurisdiction. infrastructure projects like the mooring facility in
The Ruling of the Court the present case. Republic Act No. 8975 ("RA No.
The petition has no merit. 8975"), which took effect on 26 November 2000,
Jurisdiction of the Manila RTC over the Case superseded PD No. 1818 and delineates more
Jurisdiction over the subject matter of a case is clearly the coverage of the prohibition, reserves
conferred by law. Such jurisdiction is determined the power to issue such writs exclusively with this
by the allegations in the complaint, irrespective of Court, and provides penalties for its
whether the plaintiff is entitled to all or some of the violation.15 Obviously, neither the Manila RTC nor
reliefs sought.11 the Oriental Mindoro RTC can issue an injunctive
A perusal of the allegations in the complaint shows writ to stop the construction of the mooring
that petitioners' principal cause of action is the facility. Only this Court can do so under PD No.
alleged illegality of the issuance of the ECC. The 1818 and later under RA No. 8975. Thus, the
violation of laws on environmental protection and question of whether the Manila RTC has
on local government participation in the jurisdiction over the complaint considering that its
implementation of environmentally critical injunctive writ is not enforceable in Oriental
projects is an issue that involves the validity of Mindoro is academic.
Clearly, the Manila RTC has jurisdiction to injury to the aggrieved party. Frivolous
determine the validity of the issuance of the ECC, appeals shall not be countenanced.
although it could not issue an injunctive writ SECTION 3.0. Who May Appeal. — The
against the DENR or NAPOCOR. However, since the proponent or any stakeholder,
construction of the mooring facility could not including but not limited to, the LGUs
proceed without a valid ECC, the validity of the ECC concerned and affected communities,
remains the determinative issue in resolving may file an appeal.
petitioners' complaint. The DENR Procedural Manual for DAO 96-37
Exhaustion of Administrative Remedies explains these provisions thus:
The settled rule is before a party may seek the Final decisions of the RED may be
intervention of the courts, he should first avail of appealed. These decisions include those
all the means afforded by administrative relating to the issuance or non-issuance of
processes. Hence, if a remedy within the an ECC, and the imposition of fines and
administrative machinery is still available, with a penalties. By inference, the decision of the
procedure prescribed pursuant to law for an Secretary on the issuance or non-issuance
administrative officer to decide the controversy, a of the ECC may also be appealed based on
party should first exhaust such remedy before this provision. Resort to courts prior to
resorting to the courts. The premature invocation availing of this remedy would make the
of a court's intervention renders the complaint appellant's action dismissible on the ground
without cause of action and dismissible on such of non-exhaustion of administrative
ground.16 remedies.
RED Principe of the DENR Region IV Office issued The right to appeal must be exercised within
the ECC based on (1) Presidential Decree No. 1586 15 days from receipt by the aggrieved party
("PD No. 1586") and its implementing rules of such decision. Failure to file such appeal
establishing the Environmental Impact Statement within the requisite period will result in the
System, (2) DAO 96-3717 and (3) the Procedural finality of the RED's or Secretary's
Manual of DAO 96-37. Section 418 of PD No. 1586 decision(s), which can no longer be
requires a proponent of an environmentally critical disturbed.
project, or a project located within an An appeal shall not stay the effectivity of the
environmentally critical area as declared by the RED's decision, unless the Secretary directs
President, to secure an ECC prior to the project's otherwise.
operation.19 NAPOCOR thus secured the ECC The right to appeal does not prevent the
because the mooring facility in Minolo Cove, while aggrieved party from first resorting to the
not an environmentally critical project, is located filing of a motion for reconsideration with the
within an environmentally critical area under RED, to give the RED an opportunity to re-
Presidential Proclamation No. 2146, issued on 14 evaluate his decision. (Emphasis added)
December 1981.20 Instead of following the foregoing procedure,
The rules on administrative appeals from rulings of petitioners bypassed the DENR Secretary and
the DENR Regional Directors on the immediately filed their complaint with the Manila
implementation of PD No. 1586 are found in RTC, depriving the DENR Secretary the opportunity
Article VI of DAO 96-37, which provides: to review the decision of his subordinate, RED
SECTION 1.0. Appeal to the Office of Principe. Under the Procedural Manual for DAO
the Secretary. — Any party aggrieved 96-37 and applicable jurisprudence, petitioners'
by the final decision of the RED may, omission renders their complaint dismissible for
within 15 days from receipt of such lack of cause of action.21 Consequently, the Manila
decision, file an appeal with the Office RTC did not err in dismissing petitioners'
of the Secretary. The decision of the complaint for lack of cause of action.
Secretary shall be immediately On the Alleged Patent Illegality of the ECC
executory. Petitioners nevertheless contend that they are
SECTION 2.0. Grounds for Appeal. — exempt from filing an appeal with the DENR
The grounds for appeal shall be limited Secretary because the issuance of the ECC was in
to grave abuse of discretion and patent violation of existing laws and regulations.
serious errors in the findings of fact These are (1) Section 1 of Presidential Decree No.
which would cause grave or irreparable 1605, as amended, (2) Sections 26 and 27 of
Republic Act No. 7160 (Local Government Code of 1 of PD No. 1605. Therefore, the issuance of the
1991), and (3) the provisions of DAO 96-37 on the ECC does not violate PD No. 1605 which applies
documentary requirements for the zoning permit only to commercial structures like wharves,
and social acceptability of the mooring facility. marinas, hotels and restaurants.
Petitioners' contention is without merit. While the Sections 26 and 27 of RA No. 7160
patent illegality of an act exempts a party from Congress introduced Sections 26 and 27 in the
complying with the rule on exhaustion Of Local Government Code to emphasize the
administrative remedies,22 this does not apply in legislative concern "for the maintenance of a
the present case. sound ecology and clean environment."26 These
Presidential Decree No. 1605 provisions require every national government
Presidential Decree No. 1605 ("PD No. agency or government-owned and controlled
1605"),23 as amended by Presidential Decrees corporation to hold prior consultations with the
Nos. 1605-A and 1805, declares as ecologically local government unit concerned and to secure the
threatened zone "the coves and waters embraced prior approval of its sanggunian before
by Puerto Galera Bay as protected by Medio implementing "any project or program that may
Island." This decree provides in part: cause pollution, climatic change, depletion of non-
Section 1. Any provision of law to the renewable resources, loss of cropland, rangeland,
contrary notwithstanding, the construction or forest cover and extinction of animal or plant
of marinas, hotels, restaurants, other species." Sections 26 and 27 respectively provide:
commercial structures; commercial or semi- Section 26. Duty of National Government
commercial wharfs [sic]; commercial Agencies in the Maintenance of Ecological
docking within the enclosed coves of Puerto Balance. — It shall be the duty of every
Galera; the destruction of its mangrove national agency or government-owned or
stands; the devastation of its corals and controlled corporation authorized or
coastline by large barges, motorboats, involved in the planning and implementation
tugboat propellers, and any form of of any project or program that may cause
destruction by other human activities are pollution, climatic change, depletion of non-
hereby prohibited. renewable resources, loss of crop land,
Section 2. x x x rangeland, or forest cover and extinction of
No permit for the construction of any wharf, animal or plant species, to consult with the
marina, hotel, restaurants and other local government units, non-governmental
commercial structures in Puerto Galera shall organizations, and other sectors concerned
be issued without prior approval of the Office and explain the goals and objectives of the
of the President upon the recommendation project or program, its impact upon the
of the Philippine Tourism Authority. people and the community in terms of
(Emphasis supplied) environmental or ecological balance, and the
NAPOCOR claims that since Minolo Cove lies measures that will be undertaken to prevent
outside of "Puerto Galera Bay as protected by or minimize the adverse effects thereof.
Medio Island",24 PD No. 1605 does not apply to Section 27. Prior Consultations Required. —
this case. However, petitioners assert that Minolo No project or program shall be implemented
Cove is one of the "enclosed coves of Puerto by government authorities unless the
Galera"25 and thus protected under PD No. 1605. consultations mentioned in Section . . . 26
This is a question of fact that the DENR Secretary hereof are complied with, and prior approval
should have first resolved. In any event, there is no of the sanggunian concerned is obtained:
dispute that NAPOCOR will use the mooring facility Provided, That occupants in areas where
for its power barge that will supply 14.4 such projects are to be implemented shall
megawatts of electricity to the entire province of not be evicted unless appropriate relocation
Oriental Mindoro, including Puerto Galera. The sites have been provided, in accordance with
mooring facility is obviously a government-owned the provisions of the Constitution.
public infrastructure intended to serve a basic In Lina, Jr. v. Paño,27 the Court interpreted these
need of the people of Oriental Mindoro. The provisions in this manner:
mooring facility is not a "commercial structure; Section 27 of the Code should be read in
commercial or semi-commercial wharf or conjunction with Section 26 thereof x x x.
commercial docking" as contemplated in Section
Thus, the projects and programs mentioned remedies due to the patent illegality of the ECC, the
in Section 27 should be interpreted to mean public officer must have issued the ECC "[without
projects and programs whose effects are any] semblance of compliance, or even an attempt
among those enumerated in Sections 26 and to comply, with the pertinent laws; when
27, to wit, those that: (1) may cause manifestly, the officer has acted without
pollution; (2) may bring about climatic jurisdiction or has exceeded his jurisdiction, or has
change; (3) may cause the depletion of non- committed a grave abuse of discretion; or when his
renewable resources; (4) may result in loss act is clearly and obviously devoid of any color of
of crop land, rangeland, or forest cover; (5) authority."30
may eradicate certain animal or plant RED Principe, as chief of DENR Region IV, is the
species; and (6) other projects or programs officer duly authorized under DAO 96-3731 to issue
that may call for the eviction of a particular ECCs for projects located within environmentally
group of people residing in the locality where critical areas. RED Principe issued the ECC on the
these will be implemented. recommendation of Amelia Supetran, the Director
Again, Sections 26 and 27 do not apply to this case of the Environmental Management Bureau. Thus,
because as petitioners admit,28 the mooring RED Principe acted with full authority pursuant to
facility itself is not environmentally critical and DENR regulations. Moreover, the legal
hence does not belong to any of the six types of presumption is that he acted with the requisite
projects mentioned in the law. There is no authority.32 This clothes RED Principe's acts with
statutory requirement for the presumptive validity and negates any claim that
concerned sanggunian to approve the his actions are patently illegal or that he gravely
construction of the mooring facility. It is another abused his discretion. While petitioners may
matter if the operation of the power barge is at present proof to the contrary, they must do so
issue. As an environmentally critical project that before the proper administrative forum before
causes pollution, the operation of the power barge resorting to judicial remedies.
needs the prior approval of the On the Alleged Non-Compliance with the Terms
concerned sanggunian. However, what is before of the ECC
this Court is only the construction of the mooring Lastly, petitioners claim that they are justified in
facility, not the operation of the power barge. Thus, immediately seeking judicial recourse because
the issuance of the ECC does not violate Sections NAPOCOR is guilty of violating the conditions of
26 and 27 of RA No. 7160. the ECC, which requires it to secure a separate ECC
Documentary Requirements for ECC Applications for the operation of the power barge. The ECC also
Under DAO 96-37, an ECC applicant for a project mandates NAPOCOR to secure the usual local
located within an environmentally critical area is government permits, like zoning and building
required to submit an Initial Environment permits, from the municipal government of Puerto
Examination, which must contain a brief Galera.
description of the environmental setting and a The contention is similarly without merit. The fact
documentation of the consultative process that NAPOCOR's ECC is subject to cancellation for
undertaken, when appropriate.29 As part of the non-compliance with its conditions does not
description of the environmental setting, the ECC justify petitioners' conduct in ignoring the
applicant must submit a certificate of locational procedure prescribed in DAO 96-37 on appeals
clearance or zoning certificate. from the decision of the DENR Executive Director.
Petitioners further contend that NAPOCOR, in Petitioners vigorously insist that NAPOCOR should
applying for the ECC, did not submit to the DENR comply with the requirements of consultation and
Region IV Office the documents proving the locational clearance prescribed in DAO 96-37.
holding of consultations and the issuance of a Ironically, petitioners themselves refuse to abide
locational clearance or zoning certificate. with the procedure for filing complaints and
Petitioners assert that this omission renders the appealing decisions laid down in DAO 96-37.
issuance of the ECC patently illegal. DAO 96-37 provides for a separate administrative
The contention is also without merit. While such proceeding to address complaints for the
documents are part of the submissions required cancellation of an ECC. Under Article IX of DAO 96-
from a project proponent, their mere absence does 37, complaints to nullify an ECC must undergo an
not render the issuance of the ECC patently illegal. administrative investigation, after which the
To justify non-exhaustion of administrative hearing officer will submit his report to the EMB
Director or the Regional Executive Director, who otherwise known as the Rules of Procedure for
will then render his decision. The aggrieved party Environmental Cases, promulgated on April 29,
may file an appeal to the DENR Secretary, who has 2010.
authority to issue cease and desist orders. Article The Parties
IX also classifies the types of violations covered Petitioner Boracay Foundation, Inc. (petitioner) is
under DAO 96-37, including projects operating a duly registered, non-stock domestic corporation.
without an ECC or violating the conditions of the Its primary purpose is "to foster a united,
ECC. This is the applicable procedure to address concerted and environment-conscious
petitioners' complaint on NAPOCOR's alleged development of Boracay Island, thereby preserving
violations and not the filing of the instant case in and maintaining its culture, natural beauty and
court. ecological balance, marking the island as the
A Final Word crown jewel of Philippine tourism, a prime tourist
The Court commends petitioners for their destination in Asia and the whole world."1 It counts
courageous efforts to safeguard and maintain the among its members at least sixty (60) owners and
ecological balance of Minolo Cove. This Court representatives of resorts, hotels, restaurants, and
recognizes the utmost importance of protecting similar institutions; at least five community
the environment.33 Indeed, we have called for the organizations; and several environmentally-
vigorous prosecution of violators of environmental conscious residents and advocates.2
laws.34 Legal actions to achieve this end, however, Respondent Province of Aklan (respondent
must be done in accordance with established rules Province) is a political subdivision of the
of procedure that were intended, in the first place, government created pursuant to Republic Act No.
to achieve orderly and efficient administration of 1414, represented by Honorable Carlito S.
justice. Marquez, the Provincial Governor (Governor
WHEREFORE, we DENY the petition for lack of Marquez).
merit. SO ORDERED. Respondent Philippine Reclamation Authority
(respondent PRA), formerly called the Public
EN BANC Estates Authority (PEA), is a government entity
G.R. No. 196870 June 26, 2012 created by Presidential Decree No. 1084,3 which
BORACAY FOUNDATION, INC., Petitioner, states that one of the purposes for which
vs. respondent PRA was created was to reclaim land,
THE PROVINCE OF AKLAN, REPRESENTED BY including foreshore and submerged areas. PEA
GOVERNOR CARLITO S. MARQUEZ, THE eventually became the lead agency primarily
PHILIPPINE RECLAMATION AUTHORITY, AND responsible for all reclamation projects in the
THE DENR-EMB (REGION VI), Respondents. country under Executive Order No. 525, series of
1979. In June 2006, the President of the
DECISION Philippines issued Executive Order No. 543,
LEONARDO-DE CASTRO, J.: delegating the power "to approve reclamation
In resolving this controversy, the Court took into projects to PRA through its governing Board,
consideration that all the parties involved share subject to compliance with existing laws and rules
common goals in pursuit of certain primordial and further subject to the condition that
State policies and principles that are enshrined in reclamation contracts to be executed with any
the Constitution and pertinent laws, such as the person or entity (must) go through public
protection of the environment, the empowerment bidding."4
of the local government units, the promotion of Respondent Department of Environment and
tourism, and the encouragement of the Natural Resources – Environmental Management
participation of the private sector. The Court seeks Bureau (DENR-EMB), Regional Office VI
to reconcile the respective roles, duties and (respondent DENR-EMB RVI), is the government
responsibilities of the petitioner and respondents agency in the Western Visayas Region authorized
in achieving these shared goals within the context to issue environmental compliance certificates
of our Constitution, laws and regulations. regarding projects that require the environment’s
Nature of the Case protection and management in the region.5
This is an original petition for the issuance of an Summary of Antecedent Facts
Environmental Protection Order in the nature of a Boracay Island (Boracay), a tropical paradise
continuing mandamus under A.M. No. 09-6-8-SC, located in the Western Visayas region of the
Philippines and one of the country’s most popular Respondent Province claimed that tourist arrivals
tourist destinations, was declared a tourist zone to Boracay reached approximately 649,559 in
and marine reserve in 1973 under Presidential 2009 and 779,666 in 2010, and this was expected
Proclamation No. 1801.6 The island comprises the to reach a record of 1 million tourist arrivals in the
barangays of Manoc-manoc, Balabag, and Yapak, years to come. Thus, respondent Province
all within the municipality of Malay, in the province conceptualized the expansion of the port facilities
of Aklan.7 at Barangay Caticlan.13
Petitioner describes Boracay as follows: The Sangguniang Barangay of Caticlan, Malay
Boracay is well-known for its distinctive powdery Municipality, issued Resolution No. 13, s.
white-sand beaches which are the product of the 200814 on April 25, 2008 stating that it had learned
unique ecosystem dynamics of the area. The that respondent Province had filed an application
island itself is known to come from the uplifted with the DENR for a foreshore lease of areas along
remnants of an ancient reef platform. Its beaches, the shorelines of Barangay Caticlan, and
the sandy land strip between the water and the manifesting its strong opposition to said
area currently occupied by numerous application, as the proposed foreshore lease
establishments, is the primary draw for domestic practically covered almost all the coastlines of
and international tourists for its color, texture and said barangay, thereby technically diminishing its
other unique characteristics. Needless to state, it territorial jurisdiction, once granted, and depriving
is the premier domestic and international tourist its constituents of their statutory right of
destination in the Philippines.8 preference in the development and utilization of
More than a decade ago, respondent Province built the natural resources within its jurisdiction. The
the Caticlan Jetty Port and Passenger Terminal at resolution further stated that respondent Province
Barangay Caticlan to be the main gateway to did not conduct any consultations with the
Boracay. It also built the corresponding Cagban Sangguniang Barangay of Caticlan regarding the
Jetty Port and Passenger Terminal to be the proposed foreshore lease, which failure the
receiving end for tourists in Boracay. Respondent Sanggunian considered as an act of bad faith on
Province operates both ports "to provide structural the part of respondent Province.15
facilities suited for locals, tourists and guests and On November 20, 2008, the Sangguniang
to provide safety and security measures."9 Panlalawigan of respondent Province approved
In 2005, Boracay 2010 Summit was held and Resolution No. 2008-369,16 formally authorizing
participated in by representatives from national Governor Marquez to enter into negotiations
government agencies, local government units towards the possibility of effecting self-liquidating
(LGUs), and the private sector. Petitioner was one and income-producing development and
of the organizers and participants thereto. The livelihood projects to be financed through bonds,
Summit aimed "to re-establish a common vision of debentures, securities, collaterals, notes or other
all stakeholders to ensure the conservation, obligations as provided under Section 299 of the
restoration, and preservation of Boracay Island" Local Government Code, with the following priority
and "to develop an action plan that [would allow] projects: (a) renovation/rehabilitation of the
all sectors to work in concert among and with each Caticlan/Cagban Passenger Terminal Buildings
other for the long term benefit and sustainability and Jetty Ports; and (b) reclamation of a portion of
of the island and the community."10 The Summit Caticlan foreshore for commercial
yielded a Terminal Report11 stating that the purposes.17 This step was taken as respondent
participants had shared their dream of having Province’s existing jetty port and passenger
world-class land, water and air infrastructure, as terminal was funded through bond flotation, which
well as given their observations that government was successfully redeemed and paid ahead of the
support was lacking, infrastructure was poor, and, target date. This was allegedly cited as one of the
more importantly, the influx of tourists to Boracay LGU’s Best Practices wherein respondent Province
was increasing. The Report showed that there was was given the appropriate commendation.18
a need to expand the port facilities at Caticlan due Respondent Province included the proposed
to congestion in the holding area of the existing expansion of the port facilities at Barangay
port, caused by inadequate facilities, thus tourists Caticlan in its 2009 Annual Investment
suffered long queues while waiting for the boat Plan,19 envisioned as its project site the area
ride going to the island.12 adjacent to the existing jetty port, and identified
additional areas along the coastline of Barangay Thereafter, Governor Marquez submitted an
Caticlan as the site for future project expansion.20 Environmental Performance Report and
Governor Marquez sent a letter to respondent PRA Monitoring Program (EPRMP)28 to DENR-EMB RVI,
on March 12, 200921 expressing the interest of which he had attached to his letter29 dated
respondent Province to reclaim about 2.64 September 19, 2009, as an initial step for securing
hectares of land along the foreshores of Barangay an Environmental Compliance Certificate (ECC).
Caticlan, Municipality of Malay, Province of Aklan. The letter reads in part:
Sometime in April 2009, respondent Province With the project expected to start its construction
entered into an agreement with the Financial implementation next month, the province hereby
Advisor/Consultant that won in the bidding assures your good office that it will give
process held a month before, to conduct the preferential attention to and shall comply with
necessary feasibility study of the proposed project whatever comments that you may have on this
for the Renovation/Rehabilitation of the Caticlan EPRMP.30 (Emphasis added.)
Passenger Terminal Building and Jetty Port, Respondent Province was then authorized to issue
Enhancement and Recovery of Old Caticlan "Caticlan Super Marina Bonds" for the purpose of
Coastline, and Reclamation of a Portion of funding the renovation of the Caticlan Jetty Port
Foreshore for Commercial Purposes (the Marina and Passenger Terminal Building, and the
Project), in Malay, Aklan.22 reclamation of a portion of the foreshore lease
Subsequently, on May 7, 2009, the Sangguniang area for commercial purposes in Malay, Aklan
Panlalawigan of respondent Province issued through Provincial Ordinance No. 2009-013,
Resolution No. 2009–110,23 which authorized approved on September 10, 2009. The said
Governor Marquez to file an application to reclaim ordinance authorized Governor Marquez to
the 2.64 hectares of foreshore area in Caticlan, negotiate, sign and execute agreements in relation
Malay, Aklan with respondent PRA. to the issuance of the Caticlan Super Marina Bonds
Sometime in July 2009, the Financial in the amount not exceeding ₱260,000,000.00.31
Advisor/Consultant came up with a feasibility Subsequently, the Sangguniang Panlalawigan of
study which focused on the land reclamation of the Province of Aklan issued Provincial Ordinance
2.64 hectares by way of beach enhancement and No. 2009-01532 on October 1, 2009, amending
recovery of the old Caticlan coastline for the Provincial Ordinance No. 2009-013, authorizing
rehabilitation and expansion of the existing jetty the bond flotation of the Province of Aklan through
port, and for its future plans – the construction of Governor Marquez to fund the Marina Project and
commercial building and wellness center. The appropriate the entire proceeds of said bonds for
financial component of the said study was Two the project, and further authorizing Governor
Hundred Sixty Million Pesos (₱260,000,000.00). Marquez to negotiate, sign and execute contracts
Its suggested financing scheme was bond or agreements pertinent to the transaction.33
flotation.24 Within the same month of October 2009,
Meanwhile, the Sangguniang Bayan of the respondent Province deliberated on the possible
Municipality of Malay expressed its strong expansion from its original proposed reclamation
opposition to the intended foreshore lease area of 2.64 hectares to forty (40) hectares in
application, through Resolution No. order to maximize the utilization of its resources
044,25 approved on July 22, 2009, manifesting and as a response to the findings of the
therein that respondent Province’s foreshore lease Preliminary Geohazard Assessment study which
application was for business enterprise purposes showed that the recession and retreat of the
for its benefit, at the expense of the local shoreline caused by coastal erosion and scouring
government of Malay, which by statutory should be the first major concern in the project site
provisions was the rightful entity "to develop, and nearby coastal area. The study likewise
utilize and reap benefits from the natural indicated the vulnerability of the coastal zone
resources found within its jurisdiction."26 within the proposed project site and the nearby
In August 2009, a Preliminary Geohazard coastal area due to the effects of sea level rise and
Assessment27 for the enhancement/expansion of climate change which will greatly affect the social,
the existing Caticlan Jetty Port and Passenger economic, and environmental situation of Caticlan
Terminal through beach zone restoration and and nearby Malay coastal communities.34
Protective Marina Developments in Caticlan, In his letter dated October 22, 2009 addressed to
Malay, Aklan was completed. respondent PRA, Governor Marquez wrote:
With our substantial compliance with the Sangguniang Bayan of Malay38 on December 9,
requirements under Administrative Order No. 2009.
2007-2 relative to our request to PRA for approval Respondent PRA approved the reclamation project
of the reclamation of the [proposed Beach Zone on April 20, 2010 in its Resolution No. 4094 and
Restoration and Protection Marine Development in authorized its General Manager/Chief Executive
Barangays Caticlan and Manoc-Manoc] and as a Officer (CEO) to enter into a MOA with respondent
result of our discussion during the [meeting with Province for the implementation of the
the respondent PRA on October 12, 2009], may we reclamation project.39
respectfully submit a revised Reclamation Project On April 27, 2010, DENR-EMB RVI issued to
Description embodying certain revisions/changes respondent Province ECC-R6-1003-096-7100
in the size and location of the areas to be (the questioned ECC) for Phase 1 of the
reclaimed. x x x. Reclamation Project to the extent of 2.64 hectares
On another note, we are pleased to inform your to be done along the Caticlan side beside the
Office that the bond flotation we have secured with existing jetty port.40
the Local Government Unit Guarantee Corporation On May 17, 2010, respondent Province entered
(LGUGC) has been finally approved last October into a MOA41 with respondent PRA. Under Article
14, 2009. This will pave the way for the III, the Project was described therein as follows:
implementation of said project. Briefly, the The proposed Aklan Beach Zone Restoration and
Province has been recognized by the Bureau of Protection Marina Development Project involves
Local Government Finance (BLGF) for its the reclamation and development of
capability to meet its loan obligations. x x x. approximately forty (40) hectares of foreshore and
With the continued increase of tourists coming to offshore areas of the Municipality of Malay x x x.
Boracay through Caticlan, the Province is The land use development of the reclamation
venturing into such development project with the project shall be for commercial, recreational and
end in view of protection and/or restoring certain institutional and other applicable
segments of the shoreline in Barangays Caticlan uses.42 (Emphases supplied.)
(Caticlan side) and Manoc-manoc (Boracay side) It was at this point that respondent Province
which, as reported by experts, has been deemed it necessary to conduct a series of what it
experiencing tremendous coastal erosion. calls "information-education campaigns," which
For the project to be self-liquidating, however, we provided the venue for interaction and dialogue
will be developing the reclaimed land for with the public, particularly the Barangay and
commercial and tourism-related facilities and for Municipal officials of the Municipality of Malay, the
other complementary uses.35 (Emphasis ours.) residents of Barangay Caticlan and Boracay, the
Then, on November 19, 2009, the Sangguniang stakeholders, and the non-governmental
Panlalawigan enacted Resolution No. 2009- organizations (NGOs). The details of the campaign
29936 authorizing Governor Marquez to enter into are summarized as follows43 :
a Memorandum of Agreement (MOA) with a. June 17, 2010 at Casa Pilar Beach Resort,
respondent PRA in the implementation of the Boracay Island, Malay, Aklan;44
Beach Zone Restoration and Protection Marina b. July 28, 2010 at Caticlan Jetty Port and
Development Project, which shall reclaim a total of Passenger Terminal;45
40 hectares in the areas adjacent to the jetty ports c. July 31, 2010 at Barangay Caticlan
at Barangay Caticlan and Barangay Manoc- Plaza;46
manoc. The Sangguniang Panlalawigan approved d. September 15, 2010 at the Office of the
the terms and conditions of the necessary Provincial Governor with Municipal Mayor of
agreements for the implementation of the bond Malay – Mayor John P. Yap;47
flotation of respondent Province to fund the e. October 12, 2010 at the Office of the
renovation/rehabilitation of the existing jetty port Provincial Governor with the Provincial
by way of enhancement and recovery of the Old Development Council Executive
Caticlan shoreline through reclamation of an area Committee;48 and
of 2.64 hectares in the amount of f. October 29, 2010 at the Office of the
₱260,000,000.00 on December 1, 2009.37 Provincial Governor with Officials of LGU-
Respondent Province gave an initial presentation Malay and Petitioner.49
of the project with consultation to the Petitioner claims that during the "public
consultation meeting" belatedly called by
respondent Province on June 17, 2010, Caticlan and petitioner as an NGO, respondent
respondent Province presented the Reclamation Province still continued with the implementation
Project and only then detailed the actions that it of the Reclamation Project.55
had already undertaken, particularly: the issuance On July 26, 2010, the Sangguniang Panlalawigan
of the Caticlan Super Marina Bonds; the execution of respondent Province set aside Resolution No.
of the MOA with respondent PRA; the alleged 046, s. 2010, of the Municipality of Malay and
conduct of an Environmental Impact Assessment manifested its support for the implementation of
(EIA) study for the reclamation project; and the the aforesaid project through its Resolution No.
expansion of the project to forty (40) hectares 2010-022.56
from 2.64 hectares.50 On July 27, 2010, the MOA was confirmed by
In Resolution No. 046, Series of 2010, adopted on respondent PRA Board of Directors under its
June 23, 2010, the Malay Municipality reiterated Resolution No. 4130. Respondent PRA wrote to
its strong opposition to respondent Province’s respondent Province on October 19, 2010,
project and denied its request for a favorable informing the latter to proceed with the
endorsement of the Marina Project.51 reclamation and development of phase 1 of site 1
The Malay Municipality subsequently issued of its proposed project. Respondent PRA attached
Resolution No. 016, Series of 2010, adopted on to said letter its Evaluation Report dated October
August 3, 2010, to request respondent PRA "not to 18, 2010.57
grant reclamation permit and notice to proceed to Petitioner likewise received a copy of respondent
the Marina Project of the [respondent] Provincial PRA’s letter dated October 19, 2010, which
Government of Aklan located at Caticlan, Malay, authorized respondent Province to proceed with
Aklan."52 phase 1 of the reclamation project, subject to
In a letter53 dated October 12, 2010, petitioner compliance with the requirements of its Evaluation
informed respondent PRA of its opposition to the Report. The reclamation project was described as:
reclamation project, primarily for the reason that, "[A] seafront development involving reclamation of
based on the opinion of Dr. Porfirio M. Aliño, an an aggregate area of more or less, forty (40)
expert from the University of the Philippines hectares in two (2) separate sites both in Malay
Marine Science Institute (UPMSI), which he Municipality, Aklan Province. Site 1 is in Brgy.
rendered based on the documents submitted by Caticlan with a total area of 36.82 hectares and
respondent Province to obtain the ECC, a full EIA Site 2 in Brgy. Manoc-Manoc, Boracay Island with
study is required to assess the reclamation a total area of 3.18 hectares. Sites 1 and 2 are on
project’s likelihood of rendering critical and lasting the opposite sides of Tabon Strait, about 1,200
effect on Boracay considering the proximity in meters apart. x x x." 58 (Emphases added.)
distance, geographical location, current and wind The Sangguniang Panlalawigan of Aklan, through
direction, and many other environmental Resolution No. 2010-034,59 addressed the
considerations in the area. Petitioner noted that apprehensions of petitioner embodied in its
said documents had failed to deal with coastal Resolution No. 001, s. 2010, and supported the
erosion concerns in Boracay. It also noted that implementation of the project. Said resolution
respondent Province failed to comply with certain stated that the apprehensions of petitioner with
mandatory provisions of the Local Government regard to the economic, social and political
Code, particularly, those requiring the project negative impacts of the projects were mere
proponent to conduct consultations with perceptions and generalities and were not
stakeholders. anchored on definite scientific, social and political
Petitioner likewise transmitted its Resolution No. studies.
001, Series of 2010, registering its opposition to In the meantime, a study was commissioned by
the reclamation project to respondent Province, the Philippine Chamber of Commerce and
respondent PRA, respondent DENR-EMB, the Industry-Boracay (PCCI-Boracay), funded by the
National Economic Development Authority Region Department of Tourism (DOT) with the assistance
VI, the Malay Municipality, and other concerned of, among others, petitioner. The study was
entities.54 conducted in November 2010 by several marine
Petitioner alleges that despite the Malay biologists/experts from the Marine Environmental
Municipality’s denial of respondent Province’s Resources Foundation (MERF) of the UPMSI. The
request for a favorable endorsement, as well as the study was intended to determine the potential
strong opposition manifested both by Barangay impact of a reclamation project in the
hydrodynamics of the strait and on the coastal On June 1, 2011, petitioner filed the instant
erosion patterns in the southern coast of Boracay Petition for Environmental Protection
Island and along the coast of Caticlan.60 Order/Issuance of the Writ of Continuing
After noting the objections of the respective LGUs Mandamus. On June 7, 2011, this Court issued a
of Caticlan and Malay, as well as the Temporary Environmental Protection Order (TEPO)
apprehensions of petitioner, respondent Province and ordered the respondents to file their
issued a notice to the contractor on December 1, respective comments to the petition.67
2010 to commence with the construction of the After receiving a copy of the TEPO on June 9,
project.61 2011, respondent Province immediately issued an
On April 4, 2011, the Sangguniang Panlalawigan of order to the Provincial Engineering Office and the
Aklan, through its Committee on Cooperatives, concerned contractor to cease and desist from
Food, Agriculture, and Environmental Protection conducting any construction activities until further
and the Committee on Tourism, Trade, Industry orders from this Court.
and Commerce, conducted a joint committee The petition is premised on the following grounds:
hearing wherein the study undertaken by the I.
MERF-UPMSI was discussed.62 In attendance were The respondent Province, proponent of the
Mr. Ariel Abriam, President of PCCI-Boracay, reclamation project, failed to comply with relevant
representatives from the Provincial Government, rules and regulations in the acquisition of an ECC.
and Dr. Cesar Villanoy, a professor from the A. The reclamation project is co-located
UPMSI. Dr. Villanoy said that the subject project, within environmentally critical areas
consisting of 2.64 hectares, would only have requiring the performance of a full, or
insignificant effect on the hydrodynamics of the programmatic, environmental impact
strait traversing the coastline of Barangay Caticlan assessment.
and Boracay, hence, there was a distant possibility B. Respondent Province failed to obtain the
that it would affect the Boracay coastline, which favorable endorsement of the LGU
includes the famous white-sand beach of the concerned.
island.63 C. Respondent Province failed to conduct the
Thus, on April 6, 2011, the Sangguniang required consultation procedures as
Panlalawigan of Aklan enacted Resolution No. required by the Local Government Code.
2011-06564 noting the report on the survey of the D. Respondent Province failed to perform a
channel between Caticlan and Boracay conducted full environmental impact assessment as
by the UPMSI in relation to the effects of the required by law and relevant regulations.
ongoing reclamation to Boracay beaches, and II.
stating that Dr. Villanoy had admitted that The reclamation of land bordering the strait
nowhere in their study was it pointed out that there between Caticlan and Boracay shall adversely
would be an adverse effect on the white-sand affect the frail ecological balance of the area.68
beach of Boracay. Petitioner objects to respondent Province’s
During the First Quarter Regular Meeting of the classification of the reclamation project as single
Regional Development Council, Region VI (RDC-VI) instead of co-located, as "non-environmentally
on April 16, 2011, it approved and supported the critical," and as a mere "rehabilitation" of the
subject project (covering 2.64 hectares) through existing jetty port. Petitioner points out that the
RDC-VI Resolution No. VI-26, series of 2011.65 reclamation project is on two sites (which are
Subsequently, Mr. Abriam sent a letter to Governor situated on the opposite sides of Tabon Strait,
Marquez dated April 25, 2011 stating that the about 1,200 meters apart):
study conducted by the UPMSI confirms that the • 36.82 hectares – Site 1, in Bgy. Caticlan
water flow across the Caticlan-Boracay channel is
primarily tide-driven, therefore, the marine
• 3.18 hectares – Site 2, in Manoc-manoc,
Boracay Island69
scientists believe that the 2.64-hectare project of
Phase 1, which was started in December 2010
respondent Province would not significantly affect
without the necessary permits,70 is located on the
the flow in the channel and would unlikely impact
Caticlan side of a narrow strait separating
the Boracay beaches. Based on this, PCCI-Boracay
mainland Aklan from Boracay. In the
stated that it was not opposing the 2.64-hectare
implementation of the project, respondent
Caticlan reclamation project on environmental
Province obtained only an ECC to conduct Phase
grounds.66
1, instead of an ECC on the entire 40 hectares.
Thus, petitioner argues that respondent Province respondent Province in its application for the ECC
abused and exploited the Revised Procedural were all dated and not current, as data was
Manual for DENR Administrative Order No. 30, gathered in the late 1990s for the ECC issued in
Series of 2003 (DENR DAO 2003-30)71 relating to 1999 for the first jetty port. Thus, petitioner alleges
the acquisition of an ECC by: that respondent DENR-EMB RVI ignored the
1. Declaring the reclamation project under environmental impact to Boracay, which involves
"Group II Projects-Non-ECP changes in the structure of the coastline that could
(environmentally critical project) in ECA contribute to the changes in the characteristics of
(environmentally critical area) based on the the sand in the beaches of both Caticlan and
type and size of the area," and Boracay.
2. Failing to declare the reclamation project Petitioner insists that reclamation of land at the
as a co-located project application which Caticlan side will unavoidably adversely affect the
would have required the Province to submit Boracay side and notes that the declared objective
a Programmatic Environmental Impact of the reclamation project is for the exploitation of
Statement (PEIS)72 or Programmatic Boracay’s tourist trade, since the project is
Environmental [Performance] Report intended to enhance support services thereto. But,
Management Plan (PE[P]RMP).73 (Emphases petitioner argues, the primary reason for Boracay’s
ours.) popularity is its white-sand beaches which will be
Petitioner further alleges that the Revised negatively affected by the project.
Procedural Manual (on which the classification Petitioner alleges that respondent PRA had
above is based, which merely requires an required respondent Province to obtain the
Environmental Impact Statement [EIS] for Group II favorable endorsement of the LGUs of Barangay
projects) is patently ultra vires, and respondent Caticlan and Malay Municipality pursuant to the
DENR-EMB RVI committed grave abuse of consultation procedures as required by the Local
discretion because the laws on EIS, namely, Government Code.75 Petitioner asserts that the
Presidential Decree Nos. 1151 and 1586, as well reclamation project is in violation not only of laws
as Presidential Proclamation No. 2146, clearly on EIS but also of the Local Government Code as
indicate that projects in environmentally critical respondent Province failed to enter into proper
areas are to be immediately considered consultations with the concerned LGUs. In fact,
environmentally critical. Petitioner complains that the Liga ng mga Barangay-Malay Chapter also
respondent Province applied for an ECC only for expressed strong opposition against the project.76
Phase 1; hence, unlawfully Petitioner cites Sections 26 and 27 of the Local
evading the requirement that co-located Government Code, which require consultations if
projects74 within Environmentally Critical Areas the project or program may cause pollution,
(ECAs) must submit a PEIS and/or a PEPRMP. climactic change, depletion of non-renewable
Petitioner argues that respondent Province resources, etc. According to petitioner, respondent
fraudulently classified and misrepresented the Province ignored the LGUs’ opposition expressed
project as a Non-ECP in an ECA, and as a single as early as 2008. Not only that, respondent
project instead of a co-located one. The impact Province belatedly called for public "consultation
assessment allegedly performed gives a patently meetings" on June 17 and July 28, 2010, after an
erroneous and wrongly-premised appraisal of the ECC had already been issued and the MOA
possible environmental impact of the reclamation between respondents PRA and Province had
project. Petitioner contends that respondent already been executed. As the petitioner saw it,
Province’s choice of classification was designed these were not consultations but mere "project
to avoid a comprehensive impact assessment of presentations."
the reclamation project. Petitioner claims that respondent Province, aided
Petitioner further contends that respondent DENR- and abetted by respondents PRA and DENR-EMB,
EMB RVI willfully and deliberately disregarded its ignored the spirit and letter of the Revised
duty to ensure that the environment is protected Procedural Manual, intended to implement the
from harmful developmental projects because it various regulations governing the Environmental
allegedly performed only a cursory and superficial Impact Assessments (EIAs) to ensure that
review of the documents submitted by the developmental projects are in line with sustainable
respondent Province for an ECC, failing to note development of natural resources. The project was
that all the information and data used by conceptualized without considering alternatives.
Further, as to its allegation that respondent the subject project consisting of 2.64 hectares and
Province failed to perform a full EIA, petitioner sought the cancellation of the ECC for alleged
argues that while it is true that as of now, only the failure of respondent Province to submit proper
Caticlan side has been issued an ECC, the entire documentation as required for its issuance. Hence,
project involves the Boracay side, which should the grounds relied upon by petitioner can be
have been considered a co-located project. addressed within the confines of administrative
Petitioner claims that any project involving processes provided by law.
Boracay requires a full EIA since it is an ECA. Phase Respondent Province believes that under Section
1 of the project will affect Boracay and Caticlan as 5.4.3 of DENR Administrative Order No. 2003-30
they are separated only by a narrow strait; thus, it (DAO 2003-30),80 the issuance of an ECC81 is an
should be considered an ECP. Therefore, the ECC official decision of DENR-EMB RVI on the
and permit issued must be invalidated and application of a project proponent.82 It cites
cancelled. Section 6 of DENR DAO 2003-30, which provides
Petitioner contends that a study shows that the for a remedy available to the party aggrieved by the
flow of the water through a narrower channel due final decision on the proponent’s ECC
to the reclamation project will likely divert sand applications.
transport off the southwest part of Boracay, Respondent Province argues that the instant
whereas the characteristic coast of the Caticlan petition is anchored on a wrong premise that
side of the strait indicate stronger sediment results to petitioner’s unfounded fears and
transport.77 The white-sand beaches of Boracay baseless apprehensions. It is respondent
and its surrounding marine environment depend Province’s contention that its 2.64-hectare
upon the natural flow of the adjacent waters. reclamation project is considered as a "stand
Regarding its claim that the reclamation of land alone project," separate and independent from the
bordering the strait between Caticlan and Boracay approved area of 40 hectares. Thus, petitioner
shall adversely affect the frail ecological balance should have observed the difference between the
of the area, petitioner submits that while the study "future development plan" of respondent Province
conducted by the MERF-UPMSI only considers the from its "actual project" being undertaken.83
impact of the reclamation project on the land, it is Respondent Province clearly does not dispute the
undeniable that it will also adversely affect the fact that it revised its original application to
already frail ecological balance of the area. The respondent PRA from 2.64 hectares to 40
effect of the project would have been properly hectares. However, it claims that such revision is
assessed if the proper EIA had been performed part of its future plan, and implementation thereof
prior to any implementation of the project. is "still subject to availability of funds,
According to petitioner, respondent Province’s independent scientific environmental study,
intended purposes do not prevail over its duty and separate application of ECC and notice to proceed
obligation to protect the environment. Petitioner to be issued by respondent PRA."84
believes that rehabilitation of the Jetty Port may Respondent Province goes on to claim that
be done through other means. "[p]etitioner’s version of the Caticlan jetty port
In its Comment78 dated June 21, 2011, respondent expansion project is a bigger project which is still
Province claimed that application for reclamation at the conceptualization stage. Although this
of 40 hectares is advantageous to the Provincial project was described in the Notice to Proceed
Government considering that its filing fee would issued by respondent PRA to have two phases,
only cost Php20,000.00 plus Value Added Tax 36.82 hectares in Caticlan and 3.18 hectares in
(VAT) which is also the minimum fee as prescribed Boracay [Island,] it is totally different from the
under Section 4.2 of Administrative Order No. [ongoing] Caticlan jetty port expansion project."85
2007-2.79 Respondent Province says that the
Respondent Province considers the instant Accomplishment Report86 of its Engineering Office
petition to be premature; thus, it must necessarily would attest that the actual project consists of
fail for lack of cause of action due to the failure of 2.64 hectares only, as originally planned and
petitioner to fully exhaust the available conceptualized, which was even reduced to 2.2
administrative remedies even before seeking hectares due to some construction and design
judicial relief. According to respondent Province, modifications.
the petition primarily assailed the decision of Thus, respondent Province alleges that from its
respondent DENR-EMB RVI in granting the ECC for standpoint, its capability to reclaim is limited to
2.64 hectares only, based on respondent PRA’s Consequently, respondent Province claims that
Evaluation Report87 dated October 18, 2010, which petitioner erred in considering the ongoing
was in turn the basis of the issuance of the Notice reclamation project at Caticlan, Malay, Aklan, as
to Proceed dated October 19, 2010, because the co-located within an ECA.
project’s financial component is ₱260,000,000.00 Respondent Province, likewise argues that the
only. Said Evaluation Report indicates that the 2.64-hectare project is not a component of the
implementation of the other phases of the project approved 40-hectare area as it is originally
including site 2, which consists of the other planned for the expansion site of the existing
portions of the 40-hectare area that includes a Caticlan jetty port. At present, it has no definite
portion in Boracay, is still within the 10-year period conceptual construction plan of the said portion in
and will depend largely on the availability of funds Boracay and it has no financial allocation to
of respondent Province.88 initiate any project on the said Boracay portion.
So, even if respondent PRA approved an area that Furthermore, respondent Province contends that
would total up to 40 hectares, it was divided into the present project is located in Caticlan while the
phases in order to determine the period of its alleged component that falls within an ECA is in
implementation. Each phase was separate and Boracay. Considering its geographical location,
independent because the source of funds was also the two sites cannot be considered as a
separate. The required documents and contiguous area for the reason that it is separated
requirements were also specific for each phase. by a body of water – a strait that traverses
The entire approved area of 40 hectares could be between the mainland Panay wherein Caticlan is
implemented within a period of 10 years but this located and Boracay. Hence, it is erroneous to
would depend solely on the availability of funds.89 consider the two sites as a co-located project
As far as respondent Province understands it, within an ECA. Being a "stand alone project" and
additional reclamations not covered by the ECC, an expansion of the existing jetty port, respondent
which only approved 2.64 hectares, should DENR-EMB RVI had required respondent Province
undergo another EIA. If respondent Province to perform an EPRMP to secure an ECC as
intends to commence the construction on the sanctioned by Item No. 8(b), page 7 of DENR DAO
other component of the 40 hectares, then it agrees 2003-30.
that it is mandated to secure a new ECC.90 Respondent Province contends that even if,
Respondent Province admits that it dreamt of a granting for the sake of argument, it had
40-hectare project, even if it had originally planned erroneously categorized its project as Non-ECP in
and was at present only financially equipped and an ECA, this was not a final determination.
legally compliant to undertake 2.64 hectares of Respondent DENR-EMB RVI, which was the
the project, and only as an expansion of its old jetty administrator of the EIS system, had the final
port.91 decision on this matter. Under DENR DAO 2003-
Respondent Province claims that it has complied 30, an application for ECC, even for a Category B2
with all the necessary requirements for securing project where an EPRMP is conducted, shall be
an ECC. On the issue that the reclamation project subjected to a review process. Respondent DENR-
is within an ECA requiring the performance of a full EMB RVI had the authority to deny said
or programmatic EIA, respondent Province application. Its Regional Director could either
reiterates that the idea of expanding the area to 40 issue an ECC for the project or deny the
hectares is only a future plan. It only secured an application. He may also require a more
ECC for 2.64 hectares, based on the limits of its comprehensive EIA study. The Regional Director
funding and authority. From the beginning, its issued the ECC based on the EPRMP submitted by
intention was to rehabilitate and expand the respondent Province and after the same went
existing jetty port terminal to accommodate an through the EIA review process.
increasing projected traffic. The subject project is Thus, respondent Province concludes that
specifically classified under DENR DAO 2003-30 petitioner’s allegation of this being a "co-located
on its Project Grouping Matrix for Determination of project" is premature if not baseless as the bigger
EIA Report Type considered as Minor Reclamation reclamation project is still on the
Projects falling under Group II – Non ECP in an conceptualization stage. Both respondents PRA
ECA. Whether 2.64 or 40 hectares in area, the and Province are yet to complete studies and
subject project falls within this classification. feasibility studies to embark on another project.
Respondent Province claims that an ocular survey resolution to harmonize its position and that of
of the reclamation project revealed that it had respondent Province.
worked within the limits of the ECC.92 Respondent Province claims that the
With regard to petitioner’s allegation that EPRMP94 would reveal that:
respondent Province failed to get the favorable [T]he area fronting the project site is practically
endorsement of the concerned LGUs in violation of composed of sand. Dead coral communities may
the Local Government Code, respondent Province be found along the vicinity. Thus, fish life at the
contends that consultation vis-à-vis the favorable project site is quite scarce due to the absence of
endorsement from the concerned LGUs as marine support systems like the sea grass beds
contemplated under the Local Government Code and coral reefs.
are merely tools to seek advice and not a power x x x [T]here is no coral cover at the existing
clothed upon the LGUs to unilaterally approve or Caticlan jetty port. [From] the deepest point of jetty
disapprove any government projects. to the shallowest point, there was no more coral
Furthermore, such endorsement is not necessary patch and the substrate is sandy. It is of public
for projects falling under Category B2 unless knowledge that the said foreshore area is being
required by the DENR-EMB RVI, under Section 5.3 utilized by the residents ever since as berthing or
of DENR DAO 2003-30. anchorage site of their motorized banca. There will
Moreover, DENR Memorandum Circular No. 08- be no possibility of any coral development therein
2007 no longer requires the issuance of permits because of its continuous utilization. Likewise, the
and certifications as a pre-requisite for the activity of the strait that traverses between the
issuance of an ECC. Respondent Province claims main land Caticlan and Boracay Island would also
to have conducted consultative activities with be a factor of the coral development. Corals [may]
LGUs in connection with Sections 26 and 27 of the only be formed within the area if there is scientific
Local Government Code. The vehement and human intervention, which is absent up to the
staunch objections of both the Sangguniang present.
Barangay of Caticlan and the Sangguniang Bayan In light of the foregoing premise, it casts serious
of Malay, according to respondent Province, were doubt on petitioner’s allegations pertaining to the
not rooted on its perceived impact upon the people environmental effects of Respondent-LGU’s 2.64
and the community in terms of environmental or hectares reclamation project. The alleged
ecological balance, but due to an alleged conflict environmental impact of the subject project to the
with their "principal position to develop, utilize and beaches of Boracay Island remains unconfirmed.
reap benefits from the natural resources found Petitioner had unsuccessfully proven that the
within its jurisdiction."93 Respondent Province project would cause imminent, grave and
argues that these concerns are not within the irreparable injury to the community.95
purview of the Local Government Code. Respondent Province prayed for the dissolution of
Furthermore, the Preliminary Geohazard the TEPO, claiming that the rules provide that the
Assessment Report and EPRMP as well as TEPO may be dissolved if it appears after hearing
Sangguniang Panlalawigan Resolution Nos. 2010- that its issuance or continuance would cause
022 and 2010-034 should address any irreparable damage to the party or person
environmental issue they may raise. enjoined, while the applicant may be fully
Respondent Province posits that the spirit and compensated for such damages as he may suffer
intent of Sections 26 and 27 of the Local and subject to the posting of a sufficient bond by
Government Code is to create an avenue for the party or person enjoined. Respondent Province
parties, the proponent and the LGU concerned, to contends that the TEPO would cause irreparable
come up with a tool in harmonizing its views and damage in two aspects:
concerns about the project. The duty to consult a. Financial dislocation and probable
does not automatically require adherence to the bankruptcy; and
opinions during the consultation process. It is b. Grave and imminent danger to safety and
allegedly not within the provisions to give the full health of inhabitants of immediate area,
authority to the LGU concerned to unilaterally including tourists and passengers serviced
approve or disapprove the project in the guise of by the jetty port, brought about by the abrupt
requiring the proponent of securing its favorable cessation of development works.
endorsement. In this case, petitioner is calling a As regards financial dislocation, the arguments of
halt to the project without providing an alternative respondent Province are summarized below:
1. This project is financed by bonds which 4. It might result to the total alteration of the
the respondent Province had issued to its physical landscape of the area attributing to
creditors as the financing scheme in funding environmental disturbance.
the present project is by way of credit 5. The lack of proper concrete wave
financing through bond flotation. protection or revetment would cause the
2. The funds are financed by a Guarantee total erosion of the embankment that has
Bank – getting payment from bonds, being been dumped on the accomplished area.97
sold to investors, which in turn would be paid Respondent Province claims that petitioner will
by the income that the project would realize not stand to suffer immediate, grave and
or incur upon its completion. irreparable injury or damage from the ongoing
3. While the project is under construction, project. The petitioner’s perceived fear of
respondent Province is appropriating a environmental destruction brought about by its
portion of its Internal Revenue Allotment erroneous appreciation of available data is
(IRA) budget from the 20% development unfounded and does not translate into a matter of
fund to defray the interest and principal extreme urgency. Thus, under the Rules of
amortization due to the Guarantee Bank. Procedure on Environmental Cases, the TEPO may
4. The respondent Province’s IRA, regular be dissolved.
income, and/or such other revenues or Respondent PRA filed its Comment98 on June 22,
funds, as may be permitted by law, are being 2011. It alleges that on June 24, 2006, Executive
used as security for the payment of the said Order No. 543 delegated the power "to approve
loan used for the project’s construction. reclamation projects to respondent PRA through
5. The inability of the subject project to earn its governing Board, subject to compliance with
revenues as projected upon completion will existing laws and rules and further subject to the
compel the Province to shoulder the full condition that reclamation contracts to be
amount of the obligation, starting from year executed with any person or entity (must) go
2012. through public bidding."
6. Respondent province is mandated to Section 4 of respondent PRA’s Administrative
assign its IRA, regular income and/or such Order No. 2007-2 provides for the approval
other revenues or funds as permitted by law; process and procedures for various reclamation
if project is stopped, detriment of the public projects to be undertaken. Respondent PRA
welfare and its constituents.96 prepared an Evaluation Report on November 5,
As to the second ground for the dissolution of the 200999 regarding Aklan’s proposal to increase its
TEPO, respondent Province argues: project to 40 hectares.
1. Non-compliance with the guidelines of the Respondent PRA contends that it was only after
ECC may result to environmental hazards respondent Province had complied with the
most especially that reclaimed land if not requirements under the law that respondent PRA,
properly secured may be eroded into the sea. through its Board of Directors, approved the
2. The construction has accomplished 65.26 proposed project under its Board Resolution No.
percent of the project. The embankment that 4094.100 In the same Resolution, respondent PRA
was deposited on the project has no proper Board authorized the General Manager/CEO to
concrete wave protection that might be execute a MOA with the Aklan provincial
washed out in the event that a strong government to implement the reclamation project
typhoon or big waves may occur affecting under certain conditions.
the strait and the properties along the The issue for respondent PRA was whether or not
project site. It is already the rainy season and it approved the respondent Province’s 2.64-
there is a big possibility of typhoon hectare reclamation project proposal in willful
occurrence. disregard of alleged "numerous irregularities" as
3. If said incident occurs, the aggregates of claimed by petitioner.101
the embankment that had been washed out Respondent PRA claims that its approval of the
might be transferred to the adjoining Aklan Reclamation Project was in accordance with
properties which could affect its natural law and its rules. Indeed, it issued the notice to
environmental state. proceed only after Aklan had complied with all the
requirements imposed by existing laws and
regulations. It further contends that the 40
hectares involved in this project remains a plan DENR-EMB-issued ECC "and/or comply with
insofar as respondent PRA is concerned. What has pertinent local and international commitments of
been approved for reclamation by respondent PRA the Republic of the Philippines to ensure
thus far is only the 2.64-hectare reclamation environmental protection."105
project. Respondent PRA reiterates that it In its August 11, 2010 letter,106 respondent PRA
approved this reclamation project after referred for respondent Province’s appropriate
extensively reviewing the legal, technical, action petitioner’s Resolution 001, series of 2010
financial, environmental, and operational aspects and Resolution 46, series of 2010, of the
of the proposed reclamation.102 Sangguniang Bayan of Malay. Governor Marquez
One of the conditions that respondent PRA Board wrote respondent PRA107 on September 16, 2010
imposed before approving the Aklan project was informing it that respondent Province had already
that no reclamation work could be started until met with the different officials of Malay, furnishing
respondent PRA has approved the detailed respondent PRA with the copies of the minutes of
engineering plans/methodology, design and such meetings/presentations. Governor Marquez
specifications of the reclamation. Part of the also assured respondent PRA that it had complied
required submissions to respondent PRA includes with the consultation requirements as far as Malay
the drainage design as approved by the Public was concerned.
Works Department and the ECC as issued by the Respondent PRA claims that in evaluating
DENR, all of which the Aklan government must respondent Province’s project and in issuing the
submit to respondent PRA before starting any necessary NTP for Phase 1 of Site 1 (2.64
reclamation works.103 Under Article IV(B)(3) of the hectares) of the Caticlan Jetty Port expansion and
MOA between respondent PRA and Aklan, the modernization, respondent PRA gave considerable
latter is required to submit, apart from the ECC, the weight to all pertinent issuances, especially the
following requirements for respondent PRA’s ECC issued by DENR-EMB RVI.108 Respondent PRA
review and approval, as basis for the issuance of a stresses that its earlier approval of the 40-hectare
Notice to Proceed (NTP) for Reclamation Works: reclamation project under its Resolution No. 4094,
(a) Land-form plan with technical series of 2010, still requires a second level of
description of the metes and bounds of the compliance requirements from the proponent.
same land-form; Respondent Province could not possibly begin its
(b) Final master development and land use reclamation works since respondent PRA had yet
plan for the project; to issue an NTP in its favor.
(c) Detailed engineering studies, detailed Respondent PRA alleges that prior to the issuance
engineering design, plans and specification of the NTP to respondent Province for Phase 1 of
for reclamation works, reclamation plans Site 1, it required the submission of the following
and methodology, plans for the sources of fill pre-construction documents:
materials; (a) Land-Form Plan (with technical
(d) Drainage plan vis-a-vis the land-form description);
approved by DPWH Regional Office to (b) Site Development Plan/Land Use Plan
include a cost effective and efficient including,
drainage system as may be required based (i) sewer and drainage systems and
on the results of the studies; (ii) waste water treatment;
(e) Detailed project cost estimates and (c) Engineering Studies and Engineering
quantity take-off per items of work of the Design;
rawland reclamation components, e.g. (d) Reclamation Methodology;
reclamation containment structures and soil (e) Sources of Fill Materials, and,
consolidation; (f) The ECC.109
(f) Organizational chart of the construction Respondent PRA claims that it was only after the
arm, manning table, equipment schedule for evaluation of the above submissions that it issued
the project; and, to respondent Province the NTP, limited to the
(g) Project timetable (PERT/CPM) for the 2.64-hectare reclamation project. Respondent
entire project construction period.104 PRA even emphasized in its evaluation report that
In fact, respondent PRA further required should respondent Province pursue the other
respondent Province under Article IV (B)(24) of the phases of its project, it would still require the
MOA to strictly comply with all conditions of the
submission of an ECC for each succeeding phases Respondent DENR-EMB RVI claims that the issues
before the start of any reclamation works.110 raised by the LGUs of Caticlan and Malay had been
Respondent PRA, being the national government’s considered by the DENR-Provincial Environment
arm in regulating and coordinating all reclamation and Natural Resources Office (PENRO), Aklan in
projects in the Philippines – a mandate conferred the issuance of the Order115 dated January 26,
by law – manifests that it is incumbent upon it, in 2010, disregarding the claim of the Municipality of
the exercise of its regulatory functions, to Malay, Aklan of a portion of the foreshore land in
diligently evaluate, based on its technical Caticlan covered by the application of the Province
competencies, all reclamation projects submitted of Aklan; and another Order of Rejection dated
to it for approval. Once the reclamation project’s February 5, 2010 of the two foreshore
requirements set forth by law and related rules applications, namely FLA No. 060412-43A and
have been complied with, respondent PRA is FLA No. 060412-43B, of the Province of Aklan.116
mandated to approve the same. Respondent PRA Respondent DENR-EMB RVI contends that the
claims, "[w]ith all the foregoing rigorous and supporting documents attached to the EPRMP for
detailed requirements submitted and complied the issuance of an ECC were merely for the
with by Aklan, and the attendant careful and expansion and modernization of the old jetty port
meticulous technical and legal evaluation by in Barangay Caticlan covering 2.64 hectares, and
respondent PRA, it cannot be argued that the not the 40-hectare reclamation project in
reclamation permit it issued to Aklan is ‘founded Barangay Caticlan and Boracay. The previous
upon numerous irregularities;’ as recklessly and letter of respondent Province dated October 14,
baselessly imputed by BFI."111 2009 addressed to DENR-EMB RVI Regional
In its Comment112 dated July 1, 2011, respondent Executive Director, would show that the
DENR-EMB RVI asserts that its act of issuing the reclamation project will cover approximately 2.6
ECC certifies that the project had undergone the hectares.117 This application for ECC was not
proper EIA process by assessing, among others, officially accepted due to lack of requirements or
the direct and indirect impact of the project on the documents.
biophysical and human environment and ensuring Although petitioner insists that the project
that these impacts are addressed by appropriate involves 40 hectares in two sites, respondent
environmental protection and enhancement DENR-EMB RVI looked at the documents
measures, pursuant to Presidential Decree No. submitted by respondent Province and saw that
1586, the Revised Procedural Manual for DENR the subject area covered by the ECC application
DAO 2003-30, and the existing rules and and subsequently granted with ECC-R6-1003-
regulations.113 096-7100 consists only of 2.64 hectares; hence,
Respondent DENR-EMB RVI stresses that the respondent DENR-EMB RVI could not comment on
declaration in 1978 of several islands, which the excess area.118
includes Boracay as tourist zone and marine Respondent DENR-EMB RVI admits that as
reserve under Proclamation No. 1801, has no regards the classification of the 2.64-hectare
relevance to the expansion project of Caticlan reclamation project under "Non ECP in ECA," this
Jetty Port and Passenger Terminal for the very does not fall within the definition of a co-located
reason that the project is not located in the Island project because the subject project is merely an
of Boracay, being located in Barangay Caticlan, expansion of the old Caticlan Jetty Port, which had
Malay, which is not a part of mainland Panay. It a previously issued ECC (ECC No. 0699-1012-171
admits that the site of the subject jetty port falls on October 12, 1999). Thus, only an EPRMP, not a
within the ECA under Proclamation No. 2146 PEIS or PEPRMP, is required.119
(1981), being within the category of a water body. Respondent Province submitted to respondent
This was why respondent Province had faithfully DENR-EMB RVI the following documents
secured an ECC pursuant to the Revised contained in the EPRMP:
Procedural Manual for DENR DAO 2003-30 by a. The Observations on the Floor Bottom and
submitting the necessary documents as contained its Marine Resources at the Proposed Jetty
in the EPRMP on March 19, 2010, which were the Ports at Caticlan and Manok-manok,
bases in granting ECC No. R6-1003-096-7100 Boracay, Aklan, conducted in 1999 by the
(amended) on April 27, 2010 for the expansion of Bureau of Fisheries Aquatic Resources
Caticlan Jetty Port and Passenger Terminal, (BFAR) Central Office, particularly in Caticlan
covering 2.64 hectares.114 site, and
b. The Study conducted by Dr. Ricarte S. Meanwhile, on September 8, 2011, respondent
Javelosa, Ph. D, Mines and Geosciences Province filed a Manifestation and
Bureau (MGB), Central Office and Engr. Motion124 praying for the dismissal of the petition,
Roger Esto, Provincial Planning and as the province was no longer pursuing the
Development Office (PPDO), Aklan in 2009 implementation of the succeeding phases of the
entitled "Preliminary Geo-hazard project due to its inability to comply with Article IV
Assessment for the Enhancement of the B.2(3) of the MOA; hence, the issues and fears
Existing Caticlan Jetty Port Terminal through expressed by petitioner had become moot.
Beach Zone Restoration and Protective Respondent Province alleges that the petition is
Marina Development in Malay, Aklan." "premised on a serious misappreciation of the real
Respondent DENR-EMB RVI claims that the above extent of the contested reclamation project" as
two scientific studies were enough for it to arrive certainly the ECC covered only a total of 2,691
at a best professional judgment to issue an square meters located in Barangay Caticlan,
amended ECC for the Aklan Marina Project Malay, Aklan; and although the MOA spoke of 40
covering 2.64 hectares.120 Furthermore, to confirm hectares, respondent Province’s submission of
that the 2.64-hectare reclamation has no documents to respondent PRA pertaining to said
significant negative impact with the surrounding area was but the first of a two-step process of
environment particularly in Boracay, a more recent approval. Respondent Province claims that its
study was conducted, and respondent DENR-EMB failure to comply with the documentary
RVI alleges that "[i]t is very important to highlight requirements of respondent PRA within the period
that the input data in the [MERF- UPMSI] study provided, or 120 working days from the effectivity
utilized the [40-hectare] reclamation and [200- of the MOA, indicated its waiver to pursue the
meter] width seaward using the tidal and wave remainder of the project.125 Respondent Province
modelling."121 The study showed that the further manifested:
reclamation of 2.64 hectares had no effect to the Confirming this in a letter dated 12 August
hydrodynamics of the strait between Barangay 2011,126 Governor Marquez informed respondent
Caticlan and Boracay. PRA that the Province of Aklan is no longer
Respondent DENR-EMB RVI affirms that no "pursuing the implementation of the succeeding
permits and/or clearances from National phases of the project with a total area of 37.4
Government Agencies (NGAs) and LGUs are hectares for our inability to comply with Article IV
required pursuant to the DENR Memorandum B.2 (3) of the MOA; hence, the existing MOA will
Circular No. 2007-08, entitled "Simplifying the cover only the project area of 2.64 hectares."
Requirements of ECC or CNC Applications;" that In his reply-letter dated August 22,
the EPRMP was evaluated and processed based on 2011,127 [respondent] PRA General Manager
the Revised Procedural Manual for DENR DAO informed Governor Marquez that the [respondent]
2003-30 which resulted to the issuance of ECC- PRA Board of Directors has given [respondent]
R6-1003-096-7100; and that the ECC is not a PRA the authority to confirm the position of the
permit per se but a planning tool for LGUs to Province of Aklan that the "Aklan Beach Zone
consider in its decision whether or not to issue a Restoration and Protection Marine Development
local permit.122 Project will now be confined to the reclamation
Respondent DENR-EMB RVI concludes that in and development of the 2.64 hectares, more or
filing this case, petitioner had bypassed and less.
deprived the DENR Secretary of the opportunity to It is undisputed from the start that the coverage of
review and/or reverse the decision of his the Project is in fact limited to 2.64 hectares, as
subordinate office, EMB RVI pursuant to the evidenced by the NTP issued by respondent PRA.
Revised Procedural Manual for DENR DAO 2003- The recent exchange of correspondence between
30. There is no "extreme urgency that necessitates respondents Province of Aklan and [respondent]
the granting of Mandamus or issuance of TEPO PRA further confirms the intent of the parties all
that put to balance between the life and death of along. Hence, the Project subject of the petition,
the petitioner or present grave or irreparable without doubt, covers only 2.64 and not 40
damage to environment."123 hectares as feared. This completely changes the
After receiving the above Comments from all the extent of the Project and, consequently, moots the
respondents, the Court set the case for oral issues and fears expressed by the
arguments on September 13, 2011. petitioner.128 (Emphasis supplied.)
Based on the above contentions, respondent 1. The Temporary Environmental Protection
Province prays that the petition be dismissed as no Order (TEPO) it issued on June 7, 2011 be
further justiciable controversy exists since the lifted/dissolved.
feared adverse effect to Boracay Island’s ecology 2. The instant petition be dismissed for being
had become academic all together.129 moot and academic.
The Court heard the parties’ oral arguments on 3. Respondent Province of Aklan prays for
September 13, 2011 and gave the latter twenty such other reliefs that are just and equitable
(20) days thereafter to file their respective under the premises. (Emphases in the
memoranda. original.)
Respondent Province filed another Manifestation ISSUES
and Motion,130 which the Court received on April 2, The Court will now resolve the following issues:
2012 stating that: I. Whether or not the petition should be
1. it had submitted the required documents dismissed for having been rendered moot
and studies to respondent DENR-EMB RVI and academic
before an ECC was issued in its favor; II. Whether or not the petition is premature
2. it had substantially complied with the because petitioner failed to exhaust
requirements provided under PRA administrative remedies before filing this
Administrative Order 2007-2, which case
compliance caused respondent PRA’s Board III. Whether or not respondent Province
to approve the reclamation project; and failed to perform a full EIA as required by
3. it had conducted a series of "consultative laws and regulations based on the scope and
[presentations]" relative to the reclamation classification of the project
project before the LGU of Malay Municipality, IV. Whether or not respondent Province
the Barangay Officials of Caticlan, and complied with all the requirements under the
stakeholders of Boracay Island. pertinent laws and regulations
Respondent Province further manifested that the V. Whether or not there was proper, timely,
Barangay Council of Caticlan, Malay, Aklan and sufficient public consultation for the
enacted on February 13, 2012 Resolution No. 003, project
series of 2012, entitled "Resolution Favorably DISCUSSION
Endorsing the 2.6 Hectares Reclamation/MARINA On the issue of whether or not the Petition should
Project of the Aklan Provincial Government at be dismissed for having been rendered moot and
Caticlan Coastline"131 and that the Sangguniang academic
Bayan of the Municipality of Malay, Aklan enacted Respondent Province claims in its Manifestation
Resolution No. 020, series of 2012, entitled and Motion filed on April 2, 2012 that with the
"Resolution Endorsing the 2.6 Hectares alleged favorable endorsement of the reclamation
Reclamation Project of the Provincial Government project by the Sangguniang Barangay of Caticlan
of Aklan Located at Barangay Caticlan, Malay, and the Sangguniang Bayan of the Municipality of
Aklan."132 Malay, all the issues raised by petitioner had
Respondent Province claims that its compliance already been addressed, and this petition should
with the requirements of respondents DENR-EMB be dismissed for being moot and academic.
RVI and PRA that led to the approval of the On the contrary, a close reading of the two LGUs’
reclamation project by the said government respective resolutions would reveal that they are
agencies, as well as the recent enactments of the not sufficient to render the petition moot and
Barangay Council of Caticlan and the Sangguniang academic, as there are explicit conditions imposed
Bayan of the Municipality of Malay favorably that must be complied with by respondent
endorsing the said project, had "categorically Province. In Resolution No. 003, series of 2012, of
addressed all the issues raised by the Petitioner in the Sangguniang Barangay of Caticlan it is stated
its Petition dated June 1, 2011." Respondent that "any vertical structures to be constructed
Province prays as follows: shall be subject for barangay
WHEREFORE, premises considered, it is most endorsement."133 Clearly, what the barangay
respectfully prayed of this Honorable Court that endorsed was the reclamation only, and not the
after due proceedings, the following be rendered: entire project that includes the construction of a
commercial building and wellness center, and
other tourism-related facilities. Petitioner’s
objections, as may be recalled, pertain not only to 5. The Provincial Government of Aklan
the reclamation per se, but also to the building to conduct a simultaneous comprehensive
be constructed and the entire project’s perceived study on the environmental impact of the
ill effects to the surrounding environment. reclamation project especially during
Resolution No. 020, series of 2012, of the Habagat and Amihan seasons and put in
Sangguniang Bayan of Malay134 is even more place as early as possible mitigating
specific. It reads in part: measures on the effect of the project to the
WHEREAS, noble it seems the reclamation project environment.
to the effect that it will generate scores of benefits WHEREAS, having presented these stipulations,
for the Local Government of Malay in terms of failure to comply herewith will leave this August
income and employment for its constituents, but Body no choice but to revoke this endorsement,
the fact cannot be denied that the project will take hence faithful compliance of the commitment of
its toll on the environment especially on the nearby the Provincial Government is highly appealed
fragile island of Boracay and the fact also remains for[.]135 (Emphases added.)
that the project will eventually displace the local The Sangguniang Bayan of Malay obviously
transportation operators/cooperatives; imposed explicit conditions for respondent
WHEREAS, considering the sensitivity of the Province to comply with on pain of revocation of
project, this Honorable Body through the its endorsement of the project, including the need
Committee where this matter was referred to conduct a comprehensive study on the
conducted several consultations/committee environmental impact of the reclamation project,
hearings with concerned departments and the which is the heart of the petition before us.
private sector specifically Boracay Foundation, Therefore, the contents of the two resolutions
Inc. and they are one in its belief that this Local submitted by respondent Province do not support
Government Unit has never been against its conclusion that the subsequent favorable
development so long as compliance with the law endorsement of the LGUs had already addressed
and proper procedures have been observed and all the issues raised and rendered the instant
that paramount consideration have been given to petition moot and academic.
the environment lest we disturb the balance of On the issue of failure to exhaust administrative
nature to the end that progress will be brought to remedies
naught; Respondents, in essence, argue that the present
WHEREAS, time and again, to ensure a healthy petition should be dismissed for petitioner’s
intergovernmental relations, this August Body failure to exhaust administrative remedies and
requires no less than transparency and faithful even to observe the hierarchy of courts.
commitment from the Provincial Government of Furthermore, as the petition questions the
Aklan in the process of going through these issuance of the ECC and the NTP, this involves
improvements in the Municipality because it once factual and technical verification, which are more
fell prey to infidelities in matters of governance; properly within the expertise of the concerned
WHEREAS, as a condition for the grant of this government agencies.
endorsement and to address all issues and Respondents anchor their argument on Section 6,
concerns, this Honorable Council necessitates a Article II of DENR DAO 2003-30, which provides:
sincere commitment from the Provincial Section 6. Appeal
Government of Aklan to the end that: Any party aggrieved by the final decision on the
1. To allocate an office space to LGU-Malay ECC / CNC applications may, within 15 days from
within the building in the reclaimed area; receipt of such decision, file an appeal on the
2. To convene the Cagban and Caticlan Jetty following grounds:
Port Management Board before the a. Grave abuse of discretion on the part of
resumption of the reclamation project; the deciding authority, or
3. That the reclamation project shall be b. Serious errors in the review findings.
limited only to 2.6 hectares in Barangay The DENR may adopt alternative conflict/dispute
Caticlan and not beyond; resolution procedures as a means to settle
4. That the local transportation grievances between proponents and aggrieved
operators/cooperatives will not be parties to avert unnecessary legal action.
displaced; and Frivolous appeals shall not be countenanced.
The proponent or any stakeholder may file an been a party or has been made a party in the
appeal to the following: proceedings wherein the decision to be appealed
Where to file the was rendered. It has been established by the facts
Deciding Authority that petitioner was never made a party to the
appeal
proceedings before respondent DENR-EMB RVI.
EMB Regional Office Office of the EMB Petitioner was only informed that the project had
Director Director already been approved after the ECC was already
granted.138 Not being a party to the said
EMB Central Office Office of the DENR proceedings, it does not appear that petitioner was
Director Secretary officially furnished a copy of the decision, from
which the 15-day period to appeal should be
DENR Secretary Office of the President reckoned, and which would warrant the application
(Emphases supplied.) of Section 6, Article II of DENR DAO 2003-30.
Respondents argue that since there is an Although petitioner was not a party to the
administrative appeal provided for, then petitioner proceedings where the decision to issue an ECC
is duty bound to observe the same and may not be was rendered, it stands to be aggrieved by the
granted recourse to the regular courts for its decision,139 because it claims that the reclamation
failure to do so. of land on the Caticlan side would unavoidably
We do not agree with respondents’ appreciation of adversely affect the Boracay side, where
the applicability of the rule on exhaustion of petitioner’s members own establishments
administrative remedies in this case. We are engaged in the tourism trade. As noted earlier,
reminded of our ruling in Pagara v. Court of petitioner contends that the declared objective of
Appeals,136 which summarized our earlier the reclamation project is to exploit Boracay’s
decisions on the procedural requirement of tourism trade because the project is intended to
exhaustion of administrative remedies, to wit: enhance support services thereto; however, this
The rule regarding exhaustion of administrative objective would not be achieved since the white-
remedies is not a hard and fast rule. It is not sand beaches for which Boracay is famous might
applicable (1) where the question in dispute is be negatively affected by the project. Petitioner’s
purely a legal one, or (2) where the controverted conclusion is that respondent Province, aided and
act is patently illegal or was performed without abetted by respondents PRA and DENR-EMB RVI,
jurisdiction or in excess of jurisdiction; or (3) ignored the spirit and letter of our environmental
where the respondent is a department secretary, laws, and should thus be compelled to perform
whose acts as an alter ego of the President bear their duties under said laws.
the implied or assumed approval of the latter, The new Rules of Procedure for Environmental
unless actually disapproved by him, or (4) where Cases, A.M. No. 09-6-8-SC, provides a relief for
there are circumstances indicating the urgency of petitioner under the writ of continuing mandamus,
judicial intervention, - Gonzales vs. Hechanova, L- which is a special civil action that may be availed
21897, October 22, 1963, 9 SCRA 230; Abaya vs. of "to compel the performance of an act
Villegas, L-25641, December 17, 1966, 18 SCRA; specifically enjoined by law"140 and which provides
Mitra vs. Subido, L-21691, September 15, 1967, for the issuance of a TEPO "as an auxiliary remedy
21 SCRA 127. prior to the issuance of the writ itself."141 The
Said principle may also be disregarded when it Rationale of the said Rules explains the writ in this
does not provide a plain, speedy and adequate wise:
remedy, (Cipriano vs. Marcelino, 43 SCRA 291), Environmental law highlights the shift in the focal-
when there is no due process observed (Villanos point from the initiation of regulation by Congress
vs. Subido, 45 SCRA 299), or where the protestant to the implementation of regulatory programs by
has no other recourse (Sta. Maria vs. Lopez, 31 the appropriate government agencies.
SCRA 637).137 (Emphases supplied.) Thus, a government agency’s inaction, if any, has
As petitioner correctly pointed out, the appeal serious implications on the future of
provided for under Section 6 of DENR DAO 2003- environmental law enforcement. Private
30 is only applicable, based on the first sentence individuals, to the extent that they seek to change
thereof, if the person or entity charged with the the scope of the regulatory process, will have to
duty to exhaust the administrative remedy of rely on such agencies to take the initial incentives,
appeal to the appropriate government agency has which may require a judicial component.
Accordingly, questions regarding the propriety of exercising jurisdiction over the territory where the
an agency’s action or inaction will need to be actionable neglect or omission occurred or with
analyzed. the Court of Appeals or the Supreme Court.
This point is emphasized in the availability of the Petitioner had three options where to file this case
remedy of the writ of mandamus, which allows for under the rule: the Regional Trial Court exercising
the enforcement of the conduct of the tasks to jurisdiction over the territory where the actionable
which the writ pertains: the performance of a legal neglect or omission occurred, the Court of
duty.142 (Emphases added.) Appeals, or this Court.
The writ of continuing mandamus "permits the Petitioner had no other plain, speedy, or adequate
court to retain jurisdiction after judgment in order remedy in the ordinary course of law to determine
to ensure the successful implementation of the the questions of unique national and local
reliefs mandated under the court’s decision" and, importance raised here that pertain to laws and
in order to do this, "the court may compel the rules for environmental protection, thus it was
submission of compliance reports from the justified in coming to this Court.
respondent government agencies as well as avail Having resolved the procedural issue, we now
of other means to monitor compliance with its move to the substantive issues.
decision."143 On the issues of whether, based on the scope and
According to petitioner, respondent Province classification of the project, a full EIA is required
acted pursuant to a MOA with respondent PRA that by laws and regulations, and whether respondent
was conditioned upon, among others, a properly- Province complied with all the requirements under
secured ECC from respondent DENR-EMB RVI. For the pertinent laws and regulations
this reason, petitioner seeks to compel respondent Petitioner’s arguments on this issue hinges upon
Province to comply with certain environmental its claim that the reclamation project is
laws, rules, and procedures that it claims were misclassified as a single project when in fact it is
either circumvented or ignored. Hence, we find co-located. Petitioner also questions the
that the petition was appropriately filed with this classification made by respondent Province that
Court under Rule 8, Section 1, A.M. No. 09-6-8-SC, the reclamation project is merely an expansion of
which reads: the existing jetty port, when the project
SECTION 1. Petition for continuing mandamus.— descriptions embodied in the different documents
When any agency or instrumentality of the filed by respondent Province describe commercial
government or officer thereof unlawfully neglects establishments to be built, among others, to raise
the performance of an act which the law revenues for the LGU; thus, it should have been
specifically enjoins as a duty resulting from an classified as a new project. Petitioner likewise
office, trust or station in connection with the cries foul to the manner by which respondent
enforcement or violation of an environmental law Province allegedly circumvented the documentary
rule or regulation or a right therein, or unlawfully requirements of the DENR-EMB RVI by the act of
excludes another from the use or enjoyment of connecting the reclamation project with its
such right and there is no other plain, speedy and previous project in 1999 and claiming that the new
adequate remedy in the ordinary course of law, the project is a mere expansion of the previous one.
person aggrieved thereby may file a verified As previously discussed, respondent Province filed
petition in the proper court, alleging the facts with a Manifestation and Motion stating that the ECC
certainty, attaching thereto supporting evidence, issued by respondent DENR-EMB RVI covered an
specifying that the petition concerns an area of 2,691 square meters in Caticlan, and its
environmental law, rule or regulation, and praying application for reclamation of 40 hectares with
that judgment be rendered commanding the respondent PRA was conditioned on its
respondent to do an act or series of acts until the submission of specific documents within 120
judgment is fully satisfied, and to pay damages days. Respondent Province claims that its failure
sustained by the petitioner by reason of the to comply with said condition indicated its waiver
malicious neglect to perform the duties of the to pursue the succeeding phases of the
respondent, under the law, rules or regulations. reclamation project and that the subject matter of
The petition shall also contain a sworn this case had thus been limited to 2.64 hectares.
certification of non-forum shopping. Respondent PRA, for its part, declared through its
SECTION 2. Where to file the petition.—The General Manager that the "Aklan Beach Zone
petition shall be filed with the Regional Trial Court Restoration and Protection Marine Development
Project will now be confined to the reclamation co-located. Under the Revised Procedural Manual,
and development of the 2.64 hectares, more or the "Summary List of Additional Non-
less."144 Environmentally-Critical Project (NECP) Types in
The Court notes such manifestation of respondent ECAs Classified under Group II" (Table I-2) lists
Province. Assuming, however, that the area "buildings, storage facilities and other structures"
involved in the subject reclamation project has as a separate item from "transport terminal
been limited to 2.64 hectares, this case has not facilities." This creates the question of whether
become moot and academic, as alleged by this project should be considered as consisting of
respondents, because the Court still has to check more than one type of activity, and should more
whether respondents had complied with all properly be classified as "co-located," under the
applicable environmental laws, rules, and following definition from the same Manual, which
regulations pertaining to the actual reclamation reads:
project. f) Group IV (Co-located Projects in either ECA or
We recognize at this point that the DENR is the NECA): A co-located project is a group of single
government agency vested with delegated powers projects, under one or more proponents/locators,
to review and evaluate all EIA reports, and to grant which are located in a contiguous area and
or deny ECCs to project proponents.145 It is the managed by one administrator, who is also the
DENR that has the duty to implement the EIS ECC applicant. The co-located project may be an
system. It appears, however, that respondent economic zone or industrial park, or a mix of
DENR-EMB RVI’s evaluation of this reclamation projects within a catchment, watershed or river
project was problematic, based on the valid basin, or any other geographical, political or
questions raised by petitioner. economic unit of area. Since the location or
Being the administrator of the EIS System, threshold of specific projects within the
respondent DENR-EMB RVI’s submissions bear contiguous area will yet be derived from the EIA
great weight in this case. However, the following process based on the carrying capacity of the
are the issues that put in question the wisdom of project environment, the nature of the project is
respondent DENR-EMB RVI in issuing the ECC: called "programmatic." (Emphasis added.)
1. Its approval of respondent Province’s Respondent DENR-EMB RVI should conduct a
classification of the project as a mere thorough and detailed evaluation of the project to
expansion of the existing jetty port in address the question of whether this could be
Caticlan, instead of classifying it as a new deemed as a group of single projects (transport
project; terminal facility, building, etc.) in a contiguous
2. Its classification of the reclamation area managed by respondent Province, or as a
project as a single instead of a co-located single project.
project; The third item in the above enumeration will be
3. The lack of prior public consultations and discussed as a separate issue.
approval of local government agencies; and The answer to the fourth question depends on the
4. The lack of comprehensive studies final classification of the project under items 1 and
regarding the impact of the reclamation 3 above because the type of EIA study required
project to the environment. under the Revised Procedural Manual depends on
The above issues as raised put in question the such classification.
sufficiency of the evaluation of the project by The very definition of an EIA points to what was
respondent DENR-EMB RVI. most likely neglected by respondent Province as
Nature of the project project proponent, and what was in turn
The first question must be answered by overlooked by respondent DENR-EMB RVI, for it is
respondent DENR-EMB RVI as the agency with the defined as follows:
expertise and authority to state whether this is a An [EIA] is a ‘process that involves predicting and
new project, subject to the more rigorous evaluating the likely impacts of a project
environmental impact study requested by (including cumulative impacts) on the
petitioner, or it is a mere expansion of the existing environment during construction, commissioning,
jetty port facility. operation and abandonment. It also includes
The second issue refers to the classification of the designing appropriate preventive, mitigating and
project by respondent Province, approved by enhancement measures addressing these
respondent DENR-EMB RVI, as single instead of
consequences to protect the environment and the constructions and their environmental effects
community’s welfare.146 (Emphases supplied.) were not covered by the old studies that
Thus, the EIA process must have been able to respondent Province previously submitted for the
predict the likely impact of the reclamation project construction of the original jetty port in 1999, and
to the environment and to prevent any harm that which it re-submitted in its application for ECC in
may otherwise be caused. this alleged expansion, instead of conducting
The project now before us involves reclamation of updated and more comprehensive studies.
land that is more than five times the size of the Any impact on the Boracay side cannot be totally
original reclaimed land. Furthermore, the area ignored, as Caticlan and Boracay are separated
prior to construction merely contained a jetty port, only by a narrow strait. This becomes more
whereas the proposed expansion, as described in imperative because of the significant
the EPRMP submitted by respondent Province to contributions of Boracay’s white-sand beach to
respondent DENR-EMB RVI involves so much the country’s tourism trade, which requires
more, and we quote: respondent Province to proceed with utmost
The expansion project will be constructed at the caution in implementing projects within its
north side of the existing jetty port and terminal vicinity.
that will have a total area of 2.64 hectares, more We had occasion to emphasize the duty of local
or less, after reclamation. The Phase 1 of the government units to ensure the quality of the
project construction costing around ₱260 million environment under Presidential Decree No. 1586
includes the following: in Republic of the Philippines v. The City of
1. Reclamation - 3,000 sq m (expansion of Davao,148 wherein we held:
jetty port) Section 15 of Republic Act 7160, otherwise known
2. Reclamation - 13,500 sq m (buildable as the Local Government Code, defines a local
area) government unit as a body politic and corporate
3. Terminal annex building - 250 sq m endowed with powers to be exercised by it in
4. 2-storey commercial building – 2,500 sq conformity with law. As such, it performs dual
m (1,750 sq m of leasable space) functions, governmental and proprietary.
5. Health and wellness center Governmental functions are those that concern
6. Access road - 12 m (wide) the health, safety and the advancement of the
7. Parking, perimeter fences, lighting and public good or welfare as affecting the public
water treatment sewerage system generally. Proprietary functions are those that
8. Rehabilitation of existing jetty port and seek to obtain special corporate benefits or earn
terminal pecuniary profit and intended for private
xxxx advantage and benefit. When exercising
The succeeding phases of the project will consist governmental powers and performing
of [further] reclamation, completion of the governmental duties, an LGU is an agency of the
commercial center building, bay walk commercial national government. When engaged in corporate
strip, staff building, ferry terminal, a cable car activities, it acts as an agent of the community in
system and wharf marina. This will entail an the administration of local affairs.
additional estimated cost of ₱785 million bringing Found in Section 16 of the Local Government Code
the total investment requirement to about ₱1.0 is the duty of the LGUs to promote the people’s
billion.147 (Emphases added.) right to a balanced ecology. Pursuant to this, an
As may be gleaned from the breakdown of the 2.64 LGU, like the City of Davao, can not claim
hectares as described by respondent Province exemption from the coverage of PD 1586. As a
above, a significant portion of the reclaimed area body politic endowed with governmental
would be devoted to the construction of a functions, an LGU has the duty to ensure the
commercial building, and the area to be utilized for quality of the environment, which is the very same
the expansion of the jetty port consists of a mere objective of PD 1586.
3,000 square meters (sq. m). To be true to its xxxx
definition, the EIA report submitted by respondent Section 4 of PD 1586 clearly states that "no
Province should at the very least predict the person, partnership or corporation shall undertake
impact that the construction of the new buildings or operate any such declared environmentally
on the reclaimed land would have on the critical project or area without first securing an
surrounding environment. These new Environmental Compliance Certificate issued by
the President or his duly authorized issuance of the ECC that is a prerequisite to
representative." The Civil Code defines a person as projects covered by environmental laws such as
either natural or juridical. The state and its political the one at bar.
subdivisions, i.e., the local government units are This project can be classified as a national project
juridical persons. Undoubtedly therefore, local that affects the environmental and ecological
government units are not excluded from the balance of local communities, and is covered by
coverage of PD 1586. the requirements found in the Local Government
Lastly, very clear in Section 1 of PD 1586 that said Code provisions that are quoted below:
law intends to implement the policy of the state to Section 26. Duty of National Government Agencies
achieve a balance between socio-economic in the Maintenance of Ecological Balance. - It shall
development and environmental protection, which be the duty of every national agency or
are the twin goals of sustainable development. The government-owned or controlled corporation
above-quoted first paragraph of the Whereas authorizing or involved in the planning and
clause stresses that this can only be possible if we implementation of any project or program that
adopt a comprehensive and integrated may cause pollution, climatic change, depletion of
environmental protection program where all the non-renewable resources, loss of crop land,
sectors of the community are involved, i.e., the rangeland, or forest cover, and extinction of animal
government and the private sectors. The local or plant species, to consult with the local
government units, as part of the machinery of the government units, nongovernmental
government, cannot therefore be deemed as organizations, and other sectors concerned and
outside the scope of the EIS system.149 (Emphases explain the goals and objectives of the project or
supplied.) program, its impact upon the people and the
The Court chooses to remand these matters to community in terms of environmental or
respondent DENR-EMB RVI for it to make a proper ecological balance, and the measures that will be
study, and if it should find necessary, to require undertaken to prevent or minimize the adverse
respondent Province to address these effects thereof.
environmental issues raised by petitioner and Section 27. Prior Consultations Required. - No
submit the correct EIA report as required by the project or program shall be implemented by
project’s specifications. The Court requires government authorities unless the consultations
respondent DENR-EMB RVI to complete its study mentioned in Sections 2 (c) and 26 hereof are
and submit a report within a non-extendible period complied with, and prior approval of the
of three months. Respondent DENR-EMB RVI sanggunian concerned is obtained: Provided, That
should establish to the Court in said report why the occupants in areas where such projects are to be
ECC it issued for the subject project should not be implemented shall not be evicted unless
canceled. appropriate relocation sites have been provided, in
Lack of prior public consultation accordance with the provisions of the
The Local Government Code establishes the duties Constitution.
of national government agencies in the In Lina, Jr. v. Paño,150 we held that Section 27 of
maintenance of ecological balance, and requires the Local Government Code applies only to
them to secure prior public consultation and "national programs and/or projects which are to be
approval of local government units for the projects implemented in a particular local
described therein. community"151 and that it should be read in
In the case before us, the national agency involved conjunction with Section 26. We held further in
is respondent PRA. Even if the project proponent is this manner:
the local government of Aklan, it is respondent Thus, the projects and programs mentioned in
PRA which authorized the reclamation, being the Section 27 should be interpreted to mean projects
exclusive agency of the government to undertake and programs whose effects are among those
reclamation nationwide. Hence, it was necessary enumerated in Section 26 and 27, to wit, those
for respondent Province to go through respondent that: (1) may cause pollution; (2) may bring about
PRA and to execute a MOA, wherein respondent climatic change; (3) may cause the depletion of
PRA’s authority to reclaim was delegated to non-renewable resources; (4) may result in loss of
respondent Province. Respondent DENR-EMB RVI, crop land, range-land, or forest cover; (5) may
regional office of the DENR, is also a national eradicate certain animal or plant species from the
government institution which is tasked with the face of the planet; and (6) other projects or
programs that may call for the eviction of a particularly in populous centers; and
particular group of people residing in the locality regulating the construction, repair or
where these will be implemented. Obviously, none modification of buildings within said fire
of these effects will be produced by the limits or zones in accordance with the
introduction of lotto in the province of provisions of this Code; [Section 447 (2)(vi-
Laguna.152 (Emphasis added.) ix)]
During the oral arguments held on September 13, (3) Approving ordinances which shall ensure
2011, it was established that this project as the efficient and effective delivery of the
described above falls under Section 26 because basic services and facilities as provided for
the commercial establishments to be built on under Section 17 of this Code, and in
phase 1, as described in the EPRMP quoted above, addition to said services and facilities,
could cause pollution as it could generate garbage, …providing for the establishment,
sewage, and possible toxic fuel discharge.153 maintenance, protection, and conservation
Our ruling in Province of Rizal v. Executive of communal forests and watersheds, tree
Secretary154 is instructive: parks, greenbelts, mangroves, and other
We reiterated this doctrine in the recent case similar forest development projects …and,
of Bangus Fry Fisherfolk v. Lanzanas, where we subject to existing laws, establishing and
held that there was no statutory requirement for providing for the maintenance, repair and
the sangguniang bayan of Puerto Galera to operation of an efficient waterworks system
approve the construction of a mooring facility, as to supply water for the inhabitants and
Sections 26 and 27 are inapplicable to projects purifying the source of the water supply;
which are not environmentally critical. regulating the construction, maintenance,
Moreover, Section 447, which enumerates the repair and use of hydrants, pumps, cisterns
powers, duties and functions of the municipality, and reservoirs; protecting the purity and
grants the sangguniang bayan the power to, quantity of the water supply of the
among other things, "enact ordinances, approve municipality and, for this purpose, extending
resolutions and appropriate funds for the general the coverage of appropriate ordinances over
welfare of the municipality and its inhabitants all territory within the drainage area of said
pursuant to Section 16 of th(e) Code." These water supply and within one hundred (100)
include: meters of the reservoir, conduit, canal,
(1) Approving ordinances and passing aqueduct, pumping station, or watershed
resolutions to protect the environment and used in connection with the water service;
impose appropriate penalties for acts which and regulating the consumption, use or
endanger the environment, such as wastage of water." [Section 447 (5)(i) & (vii)]
dynamite fishing and other forms of Under the Local Government Code, therefore, two
destructive fishing, illegal logging and requisites must be met before a national project
smuggling of logs, smuggling of natural that affects the environmental and ecological
resources products and of endangered balance of local communities can be implemented:
species of flora and fauna, slash and burn prior consultation with the affected local
farming, and such other activities which communities, and prior approval of the project by
result in pollution, acceleration of the appropriate sanggunian. Absent either of these
eutrophication of rivers and lakes, or of mandatory requirements, the project’s
ecological imbalance; [Section 447 (1)(vi)] implementation is illegal.155 (Emphasis added.)
(2) Prescribing reasonable limits and Based on the above, therefore, prior consultations
restraints on the use of property within the and prior approval are required by law to have been
jurisdiction of the municipality, adopting a conducted and secured by the respondent
comprehensive land use plan for the Province. Accordingly, the information
municipality, reclassifying land within the dissemination conducted months after the ECC
jurisdiction of the city, subject to the had already been issued was insufficient to
pertinent provisions of this Code, enacting comply with this requirement under the Local
integrated zoning ordinances in consonance Government Code. Had they been conducted
with the approved comprehensive land use properly, the prior public consultation should have
plan, subject to existing laws, rules and considered the ecological or environmental
regulations; establishing fire limits or zones, concerns of the stakeholders and studied
measures alternative to the project, to avoid or The lack of prior public consultation and approval
minimize adverse environmental impact or is not corrected by the subsequent endorsement of
damage. In fact, respondent Province once tried to the reclamation project by the Sangguniang
obtain the favorable endorsement of the Barangay of Caticlan on February 13, 2012, and
Sangguniang Bayan of Malay, but this was denied the Sangguniang Bayan of the Municipality of
by the latter. Malay on February 28, 2012, which were both
Moreover, DENR DAO 2003-30 provides: undoubtedly achieved at the urging and insistence
5.3 Public Hearing / Consultation Requirements of respondent Province. As we have established
For projects under Category A-1, the conduct of above, the respective resolutions issued by the
public hearing as part of the EIS review is LGUs concerned did not render this petition moot
mandatory unless otherwise determined by EMB. and academic.
For all other undertakings, a public hearing is not It is clear that both petitioner and respondent
mandatory unless specifically required by EMB. Province are interested in the promotion of
Proponents should initiate public consultations tourism in Boracay and the protection of the
early in order to ensure that environmentally environment, lest they kill the proverbial hen that
relevant concerns of stakeholders are taken into lays the golden egg. At the beginning of this
consideration in the EIA study and the formulation decision, we mentioned that there are common
of the management plan. All public consultations goals of national significance that are very
and public hearings conducted during the EIA apparent from both the petitioner’s and the
process are to be documented. The public respondents’ respective pleadings and
hearing/consultation Process report shall be memoranda.
validated by the EMB/EMB RD and shall constitute The parties are evidently in accord in seeking to
part of the records of the EIA process. (Emphasis uphold the mandate found in Article II, Declaration
supplied.) of Principles and State Policies, of the 1987
In essence, the above-quoted rule shows that in Constitution, which we quote below:
cases requiring public consultations, the same SECTION 16. The State shall protect and advance
should be initiated early so that concerns of the right of the people to a balanced and healthful
stakeholders could be taken into consideration in ecology in accord with the rhythm and harmony of
the EIA study. In this case, respondent Province nature.
had already filed its ECC application before it met xxxx
with the local government units of Malay and SECTION 20. The State recognizes the
Caticlan. indispensable role of the private sector,
The claim of respondent DENR-EMB RVI is that no encourages private enterprise, and provides
permits and/or clearances from National incentives to needed investments.
Government Agencies (NGAs) and LGUs are The protection of the environment in accordance
required pursuant to the DENR Memorandum with the aforesaid constitutional mandate is the
Circular No. 2007-08. However, we still find that aim, among others, of Presidential Decree No.
the LGC requirements of consultation and 1586, "Establishing an Environmental Impact
approval apply in this case. This is because a Statement System, Including Other Environmental
Memorandum Circular cannot prevail over the Management Related Measures and For Other
Local Government Code, which is a statute and Purposes," which declared in its first Section that
which enjoys greater weight under our hierarchy of it is "the policy of the State to attain and maintain
laws. a rational and orderly balance between socio-
Subsequent to the information campaign of economic growth and environmental protection."
respondent Province, the Municipality of Malay The parties undoubtedly too agree as to the
and the Liga ng mga Barangay-Malay Chapter still importance of promoting tourism, pursuant to
opposed the project. Thus, when respondent Section 2 of Republic Act No. 9593, or "The
Province commenced the implementation project, Tourism Act of 2009," which reads:
it violated Section 27 of the LGC, which clearly SECTION 2. Declaration of Policy. – The State
enunciates that "[no] project or program shall be declares tourism as an indispensable element of
implemented by government authorities unless the national economy and an industry of national
the consultations mentioned in Sections 2(c) and interest and importance, which must be harnessed
26 hereof are complied with, and prior approval of as an engine of socioeconomic growth and
the sanggunian concerned is obtained." cultural affirmation to generate investment,
foreign exchange and employment, and to 2. Respondent Province of Aklan shall
continue to mold an enhanced sense of national perform the following:
pride for all Filipinos. (Emphasis ours.) a. fully cooperate with respondent
The primordial role of local government units DENR-EMB RVI in its review of the
under the Constitution and the Local Government reclamation project proposal and
Code of 1991 in the subject matter of this case is submit to the latter the appropriate
also unquestionable. The Local Government Code report and study; and
of 1991 (Republic Act No. 7160) pertinently b. secure approvals from local
provides: government units and hold proper
Section 2. Declaration of Policy. - (a) It is hereby consultations with non-governmental
declared the policy of the State that the territorial organizations and other stakeholders
and political subdivisions of the State shall enjoy and sectors concerned as required by
genuine and meaningful local autonomy to enable Section 27 in relation to Section 26 of
them to attain their fullest development as self- the Local Government Code.
reliant communities and make them more 3. Respondent Philippine Reclamation
effective partners in the attainment of national Authority shall closely monitor the
goals. Toward this end, the State shall provide for submission by respondent Province of the
a more responsive and accountable local requirements to be issued by respondent
government structure instituted through a system DENR-EMB RVI in connection to the
of decentralization whereby local government environmental concerns raised by petitioner,
units shall be given more powers, authority, and shall coordinate with respondent
responsibilities, and resources. The process of Province in modifying the MOA, if necessary,
decentralization shall proceed from the national based on the findings of respondent DENR-
government to the local government EMB RVI.
units.156 (Emphases ours.) 4. The petitioner Boracay Foundation, Inc.
As shown by the above provisions of our laws and and the respondents The Province of Aklan,
rules, the speedy and smooth resolution of these represented by Governor Carlito S. Marquez,
issues would benefit all the parties. Thus, The Philippine Reclamation Authority, and
respondent Province’s cooperation with The DENR-EMB (Region VI) are mandated to
respondent DENR-EMB RVI in the Court-mandated submit their respective reports to this Court
review of the proper classification and regarding their compliance with the
environmental impact of the reclamation project is requirements set forth in this Decision no
of utmost importance. later than three (3) months from the date of
WHEREFORE, premises considered, the petition is promulgation of this Decision.
hereby PARTIALLY GRANTED.1âwphi1 The TEPO 5. In the meantime, the respondents, their
issued by this Court is hereby converted into a writ concerned contractor/s, and/or their agents,
of continuing mandamus specifically as follows: representatives or persons acting in their
1. Respondent Department of Environment place or stead, shall immediately cease and
and Natural Resources-Environmental desist from continuing the implementation
Management Bureau Regional Office VI shall of the project covered by ECC-R6-1003-
revisit and review the following matters: 096-7100 until further orders from this
a. its classification of the reclamation Court. For this purpose, the respondents
project as a single instead of a co- shall report within five (5) days to this Court
located project; the status of the project as of their receipt of
b. its approval of respondent this Decision, copy furnished the petitioner.
Province’s classification of the project This Decision is immediately executory. SO
as a mere expansion of the existing ORDERED.
jetty port in Caticlan, instead of
classifying it as a new project; and EN BANC
c. the impact of the reclamation
project to the environment based on G.R. No. 209271 July 26, 2016
new, updated, and comprehensive INTERNATIONAL SERVICE FOR THE ACQUISITION
studies, which should forthwith be OF AGRI-BIOTECH APPLICATIONS,
ordered by respondent DENR-EMB RVI. INC., Petitioner
vs. EDWARD S. HAGEDORN, and EDWIN MARTHINE
GREENPEACE SOUTHEAST ASIA (PHILIPPINES), LOPEZ, Respondents.
MAGSASAKA AT SIYENTIPIKO SA x-----------------------x
PAGPAPAUNLAD NG AGRIKULTURA (MASIPAG), G.R. No. 209430
REP. TEODORO CASINO, DR. BEN MALAYANG III, UNIVERSITY OF THE PHILIPPINES LOS
DR. ANGELINA GALANG, LEONARDO AVILA III, BAÑOS, Petitioner,
CATHERINE UNTALAN, ATTY. MARIA PAZ LUNA, vs.
JUANITO MODINA, DAGOHOY MAGAWAY, DR. GREENPEACE SOUTHEAST ASIA (PHILIPPINES),
ROMEO QUIJANO, DR. WENCESLAO KIAT, JR., MAGSASAKA AT SIYENTIPIKO SA
ATTY. H. HARRY ROQUE., JR., FORMER SEN. PAGPAPAUNLAD NG AGRIKULTURA (MASIPAG),
ORLANDO MERCADO, NOEL CABANGON, MAYOR REP. TEODORO CASINO, DR. BEN MALAYANG III,
EDWARD S. HAGEDORN, and EDWIN MARTHINE DR. ANGELINA GALANG, LEONARDO AVILA III,
LOPEZ, Respondents. CATHERINE UNTALAN, ATTY. MARIA PAZ LUNA,
CROP LIFE PHILIPPINES, INC., Petitioner-in- JUANITO MODINA, DAGOHOY MAGAWAY, DR.
Intervention ROMEO QUIJANO, DR. WENCESLAO KIAT, JR.,
x-----------------------x ATTY. H. HARRY L. ROQUE, JR., FORMER SEN.
G.R. No. 209276 ORLANDO MERCADO, NOEL CABANGON, MAYOR
ENVIRONMENTAL MANAGEMENT BUREAU OF EDWARD S. HAGEDORN, and EDWIN MARTHINE
THE DEPARTMENT OF ENVIRONMENT AND LOPEZ, Respondents.
NATURAL RESOURCES, BUREAU OF PLANT
INDUSTRY AND THE FERTILIZER AND PESTICIDE RESOLUTION
AUTHORITY OF THE DEPARTMENT OF PERLAS-BERNABE, J.:
AGRICULTURE, Petitioners, Before the Court are nine (9) Motions for
vs. Reconsideration1 assailing the Decision2 dated
COURT OF APPEALS, GREENPEACE SOUTHEAST December 8, 2015 of the Court (December 8, 2015
ASIA (PHILIPPINES), MAGSASAKA AT Decision), which upheld with modification the
SIYENTIPIKO SA PAGPAPAUNLAD NG Decision3 dated May 17, 2013 and the
AGRIKULTURA (MASIPAG), REP. TEODORO Resolution4 dated September 20, 2013 of the
CASINO, DR. BEN MALAYANG III, DR. ANGELINA Court of Appeals (CA) in CA-G.R. SP No. 00013.
GALANG, LEONARDO AVILA III, CATHERINE The Facts
UNTALAN, ATTY. MARIA PAZ LUNA, JUANITO The instant case arose from the conduct of field
MODINA, DAGOHOY MAGAWAY, DR. ROMEO trials for "bioengineered eggplants," known
QUIJANO, DR. WENCESLAO as Bacillus thuringiensis (Bt) eggplant (Bt
KIAT, JR., ATTY. H. HARRY ROQUE, JR., FORMER talong), administered pursuant to the
SEN. ORLANDO MERCADO, NOEL CABANGON, Memorandum of Undertaking5 (MOU) entered into
MAYOR EDWARD S. HAGEDORN, and EDWIN by herein petitioners University of the Philippines
MARTHINE LOPEZ, Respondents. Los Baños Foundation, Inc. (UPLBFI) and
CROP LIFE PHILIPPINES, INC., Petitioner-in- International Service for the Acquisition of Agri-
Intervention. Biotech Applications, Inc. (ISAAA), and the
x-----------------------x University of the Philippines Mindanao
G.R. No. 209301 Foundation, Inc. (UPMFI), among others. Bt
UNIVERSITY OF THE PHILIPPINES LOS BANOS talong contains the crystal toxin genes from the
FOUNDATION, INC., Petitioner, soil bacterium Bt, which produces
vs. the CrylAc protein that is toxic to target insect
GREENPEACE SOUTHEAST ASIA (PHILIPPINES), pests. The Cry1Ac protein is said to be highly
MAGSASAKA AT SIYENTIPIKO SA specific to lepidopteran larvae such as the fruit
PAGPAPAUNLAD NG AGRIKULTURA (MASIPAG), and shoot borer, the most destructive insect pest
REP. TEODORO CASINO, DR. BEN MALAYANG III, to eggplants.6
DR. ANGELINA GALANG, LEONARDO AVILA III, From 2007 to 2009, petitioner University of the
CATHERINE UNTALAN, ATTY. MARIA PAZLUNA, Philippines Los Banos (UPLB), the implementing
JUANITO MODINA, DAGOHOY MAGAWAY, DR. institution of the field trials, conducted a
ROMEO QUIJANO, DR. WENCESLAO KIAT, JR., contained experiment on Bt talong under the
ATTY. H. HARRY L. ROQUE, JR., FORMER SEN. supervision of the National Committee on
ORLANDO MERCADO, NOEL CABANGON, MAYOR Biosafety of the Philippines (NCBP).7 The NCBP,
created under Executive Order No. (EO) 430,8 is the the Local Government Code (LGC) were not
regulatory body tasked to: (a) "identify and complied with;21 and (c) as a regulated article
evaluate potential hazards involved in initiating under DAO 08-2002, Bt talong is presumed
genetic engineering experiments or the harmful to human health and the environment, and
introduction of new species and genetically that there is no independent, peer-reviewed study
engineered organisms and recommend measures showing its safety for human consumption and the
to minimize risks"; and (b) ''formulate and review environment.22 Further, they contended that since
national policies and guidelines on biosafety, such the scientific evidence as to the safety of Bt
as the safe conduct of work on genetic talong remained insufficient or uncertain, and that
engineering, pests and their genetic materials for preliminary scientific evaluation shows
the protection of public health, environment[,] and reasonable grounds for concern, the precautionary
personnel[,] and supervise the implementation principle should be applied and, thereby, the field
thereof."9 Upon the completion of the contained trials be enjoined.23
experiment, the NCBP issued a On May 2, 2012, the Court issued24 a Writ
Certificate10 therefor stating that all biosafety of Kalikasan against petitioners (except UPLB25)
measures were complied with, and no untoward and UPMFI, ordering them to make a verified return
incident had occurred.11 within a non-extendible period of ten (10) days, as
On March 16, 2010 and June 28, 2010, the Bureau provided for in Section 8, Rule 7 of the Rules of
of Plant Industries (BPI) issued two (2)-year Procedure for Environmental Cases.26 Thus, in
Biosafety Permits12 for field testing of Bt compliance therewith, ISAAA, EMB/BPI/FPA,
talong13after UPLB's field test proposal UPLBFI, and UPMFI27 filed their respective verified
satisfactorily completed biosafety risk returns,28 and therein maintained that: (a) all
assessment for field testing pursuant to the environmental laws were complied with, including
Department of Agriculture's (DA) Administrative the required public consultations in the affected
Order No. 8, series of 200214 (DAO 08- communities; (b) an ECC was not required for the
2002),15 which provides for the rules and field trials as it will not significantly affect the
regulations for the importation and release into the environment nor pose a hazard to human health;
environment of plants and plant products derived (c) there is a plethora of scientific works and
from the use of modern literature, peer-reviewed, on the safety of Bt
biotechnology.16 Consequently, field testing talong for human consumption; (d) at any rate, the
proceeded in approved trial sites in North safety of Bt talong for human consumption is
Cotabato, Pangasinan, Camarines Sur, Davao City, irrelevant because none of the eggplants will be
and Laguna.17 consumed by humans or animals and all materials
On April 26, 2012, respondents Greenpeace not used for analyses will be chopped, boiled, and
Southeast Asia (Philippines) buried following the conditions of the Biosafety
(Greenpeace), Magsasaka at Siyentipiko sa Permits; and (e) the precautionary principle could
Pagpapaunlad ng Agrikultura (MASIPAG), and not be applied as the field testing was only a part
others (respondents) filed before the Court a of a continuing study to ensure that such trials
Petition for Writ of Continuing Mandamus and Writ have no significant and negative impact on the
of Kalikasan with Prayer for the Issuance of a environment.29
Temporary Environmental Protection Order On July 10, 2012, the Court issued a
(TEPO)18 (petition for Writ of Kalikasan) against Resolution30 referring the case to the Court of
herein petitioners the Environmental Management Appeals for acceptance of the return of the writ
Bureau (EMB) of the Department of Environment and for hearing, reception of evidence, and
and Natural Resources (DENR), the BPI and the rendition of judgment.31 In a hearing before the CA
Fertilizer and Pesticide Authority (FPA) of the DA, on August 14, 2012, UPLB was impleaded as a
UPLBFI, and ISAAA, and UPMFI, alleging that party to the case and was furnished by
the Bt talong field trials violated their respondents a copy of their petition. Consequently
constitutional right to health and a balanced the CA directed UPLB to file its comment to the
ecology considering, among others, that: (a) the petition32 and, on August 24, 2012, UPLB filed its
Environmental Compliance Certificate (ECC), as Answer33 adopting the arguments and allegations
required by Presidential Decree No. (PD) in the verified return filed by UPLBFI. On the other
1151,19 was not secured prior to the field hand, in a Resolution34 dated February 13, 2013,
trials;20 (b) the required public consultations under the CA discharged UPMFI as a party to the case
pursuant to the Manifestation and Motion filed by country's rich biodiversity, the consequences of
respondents in order to expedite the proceedings contamination and genetic pollution would be
and resolution of the latter's petition. disastrous and irreversible.47
The CA Ruling The Court likewise agreed with the CA in not
In a Decision35 dated May 17, 2013, the CA ruled in dismissing the case for being moot and academic
favor of respondents and directed petitioners to despite the completion and termination of the Bt
pem1anently cease and desist from conducting talong field trials, on account of the following
the Bt talong field trials.36 At the outset, it did not exceptions to the mootness principle: (a) the
find merit in petitioners' contention that the case exceptional character of the situation and the
should be dismissed on the ground of mootness, paramount public interest is involved; and (b) the
noting that the issues raised by the latter were case is capable of repetition yet evading review.48
"capable of repetition yet evading review" since Further, the Court noted that while the provisions
the Bt talong field trial was just one of the phases of DAO 08-2002 were observed, the National
or stages of an overall and bigger study that is Biosafety Framework (NBF) established under EO
being conducted in relation to the said genetically- 514, series of 200649 which requires public
modified organism.37 It then held that the participation in all stages of biosafety decision-
precautionary principle set forth under Section making, pursuant to the Cartagena Protocol on
1,38 Rule 20 of the Rules of Procedure for Biosafety50 which was acceded to by the
Environmental Cases39 is relevant, considering the Philippines in 2000 and became effective locally in
Philippines' rich biodiversity and uncertainty 2003, was not complied with.51 Moreover, the field
surrounding the safety of Bt talong. It noted the testing should have been subjected to
possible irreversible effects of the field trials and Environmental Impact Assessment (EIA),
the introduction of Bt talong to the market, and considering that it involved new technologies with
found the existing regulations issued by the DA uncertain results.52
and the Department of Science and Technology Thus, the Court permanently enjoined the field
(DOST) insufficient to guarantee the safety of the testing of Bt talong. In addition, it declared DAO
environment and the health of the people.40 08-2002 null and void for failure to consider the
Aggrieved, petitioners separately moved for provisions of the NBF. The Court also temporarily
reconsideration.41 However, in a enjoined any application for contained use, field
Resolution42 dated September 20, 2013, the CA testing, propagation, commercialization, and
denied the same and remarked that introducing importation of genetically modified organisms
genetically modified plant into the ecosystem is an until a new administrative order is promulgated in
ecologically imbalancing act.43 Anent UPLB 's accordance with law.53
argument that the Writ of Kalikasan violated its The Issues Presented in the Motions for
right to academic freedom, the CA emphasized Reconsideration
that the writ did not stop the research on Bt Undaunted, petitioners moved for
talong but only the procedure employed in reconsideration,54 arguing, among others, that: (a)
conducting the field trials, and only at this time the case should have been dismissed for
when there is yet no law ensuring its safety when mootness in view of the completion and
introduced to the environment.44 termination of the Bt talong field trials and the
Dissatisfied, petitioners filed their respective expiration of the Biosafety Permits;55 (b) the Court
petitions for review on certiorari before this Court. should not have ruled on the validity of DAO 08-
The Proceedings Before the Court 2002 as it was not raised as an issue;56 and (c) the
In a Decision45 dated December 8, 2015, the Court Court erred in relying on the studies cited in the
denied the petitions and accordingly, affinned with December 8, 2015 Decision which were not
modification the ruling of the CA.46 Agreeing with offered in evidence and involved Bt corn, not Bt
the CA, the Court held that the precautionar; talong.57
principle applies in this case since the risk of harm In their Consolidated Comments,58 respondents
from the field trials of Bt talong remains uncertain maintain, in essence, that: (a) the case is not
and there exists a possibility of serious and mooted by the completion of the field trials since
irreversible harm. The Court observed that field testing is part of the process of
eggplants are a staple vegetable in the country commercialization and will eventually lead to
that is mostly grown by small-scale farmers who propagation, commercialization, and consumption
are poor and marginalized; thus, given the of Bt talong as a consumer product;59 (b) the
validity of DAO 08-2002 was raised by recognizes these four instances as exceptions to
respondents when they argued in their petition for the mootness principle.
Writ of Kalikasan that such administrative In the December 8, 2015 Decision of the Court, it
issuance is not enough to adequately protect the was held that (a) the present case is of exceptional
Constitutional right of the people to a balanced character and paramount public interest is
and healthful ecology;60 and (c) the Court correctly involved, and (b) it is likewise capable of repetition
took judicial notice of the scientific studies yet evading review. Hence, it was excepted from
showing the negative effects of Bt technology and the mootness principle.66 However, upon a closer
applied the precautionary principle.61 scrutiny of the parties' arguments, the Court
The Court's Ruling reconsiders its ruling and now finds merit in
The Court grants the motions for reconsideration petitioners' assertion that the case should have
on the ground of mootness. been dismissed for being moot and academic, and
As a rule, the Court may only adjudicate actual, that the aforesaid exceptions to the said rule
ongoing controversies.62 The requirement of the should not have been applied.
existence of a "case" or an "actual controversy" for I. On the paramount public interest exception.
the proper exercise of the power of judicial review Jurisprudence in this jurisdiction has set no hard-
proceeds from Section 1, Article VIII of the 1987 and-fast rule in determining whether a case
Constitution: involves paramount public interest in relation to
Section 1. The judicial power shall be vested in one the mootness principle. However, a survey of
Supreme Court and in such lower courts as may be cases would show that, as a common guidepost
established by law. for application, there should be some perceivable
Judicial power includes the duty of the comis of benefit to the public which demands the Court to
justice to settle actual controversies involving proceed with the resolution of otherwise moot
rights which are legally demandable and questions.
enforceable, and to determine whether or not there In Gonzales v. Commission on Elections,67an
has been a grave abuse of discretion amounting to action for declaratory judgment assailing the
lack or excess of jurisdiction on the part of any validity of Republic Act No. (RA) 4880,68 which
branch or instrumentality of the Government. prohibits the early nomination of candidates for
(Emphasis supplied) elective offices and early election campaigns or
Accordingly, the Court is not empowered to decide partisan political activities became moot by
moot questions or abstract propositions, or to reason of the holding of the 1967 elections before
declare principles or rules of law which cannot the case could be decided. Nonetheless, the Court
affect the result as to the thing in issue in the case treated the petition as one for prohibition and
before it. In other words, when a case is moot, it rendered judgment in view of "the paramount
becomes non-justiciable.63 public interest and the undeniable necessity for a
An action is considered "moot" when it no longer ruling, the national elections [of 1969] being barely
presents a justiciable controversy because the six months away."69
issues involved have become academic or dead or In De Castro v. Commission on Elections,70 the
when the matter in dispute has already been Court proceeded to resolve the election protest
resolved and hence, one is not entitled to judicial subject of that case notwithstanding the
intervention unless the issue is likely to be raised supervening death of one of the contestants.
again between the parties. There is nothing for the According to the Court, in an election contest,
court to resolve as the determination thereof has there is a paramount need to dispel the uncertainty
been overtaken by subsequent events.64 that beclouds the real choice of the electorate.71
Nevertheless, case law states that the Court will In David v. Macapagal-Arroyo,72the Court ruled on
decide cases, otherwise moot, if: first, there is a the constitutionality of Presidential Proclamation
grave violation of the Constitution; second, the No. 1017, s. 2006,73 which declared a state of
exceptional character of the situation and the National Emergency, even though the same was
paramount public interest are lifted before a decision could be rendered. The
involved; third, when the constitutional issue Court explained that the case was one of
raised requires formulation of controlling exceptional character and involved paramount
principles to guide the bench, the bar, and the public interest, because the people's basic rights
public; and fourth, the case is capable of repetition to expression, assembly, and of the press were at
yet evading review.65 Thus, jurisprudence issue.74
In Constantino v. S'andiganbayan,75 both of the 200284 and each stage is distinct, such that
accused were found guilty of graft and corrupt "[s]ubsequent stages can only proceed if the prior
practices under Section 3 (e) of RA 3019.76 One of stage/s [is/]are completed and clearance is given
the accused appealed the conviction, while the to engage in the next regulatory
other filed a petition for certiorari before the Court. stage."85 Specifically, before a genetically
While the appellant died during the pendency of his modified organism is allowed to be propagated
appeal, the Court still ruled on the merits thereof under DAO 08-2002: (a) a permit for propagation
considering the exceptional character of the must be secured from the BPI; (b) it can be shown
appeals in relation to each other, i.e., the two that based on the field testing conducted in the
petitions were so intertwined that the absolution of Philippines, the regulated article will not pose any
the deceased was determinative of the absolution significant risks to the environment; (c) food
of the other accused.77 and/or feed safety studies show that the regulated
More recently, in Funa v. Manila Economic and article will not pose any significant risks to human
Cultural Office (MECO),78the petitioner prayed that and animal health; and (d) if the regulated article
the Commission on Audit (COA) be ordered to audit is a pest-protected plant, its transformation event
the MECO which is based in Taiwan, on the has been duly registered with the FPA.86
premise that it is a government-owned and As the matter never went beyond the field testing
controlled corporation.79 The COA argued that the phase, none of the foregoing tasks related to
case is already moot and should be dismissed, propagation were pursued or the requirements
since it had already directed a team of auditors to therefor complied with. Thus, there are no
proceed to Taiwan to audit the accounts of guaranteed after-effects to the already
MECO.80 Ruling on the merits, the Court explained concluded Bt talong field trials that demand an
that the case was of paramount public interest adjudication from which the public may
because it involved the COA's performance of its perceivably benefit. Any future threat to the right
constitutional duty and because the case concerns ,of herein respondents or the public in general to a
the legal status of MECO, i.e., whether it may be healthful and balanced ecology is therefore more
considered as a government agency or not, which imagined than real.
has a direct bearing on the country's commitment In fact, it would appear to be more beneficial to the
to the One China Policy of the People's Republic of public to stay a verdict on the safeness of Bt
China.81 talong - or GMOs, for that matter - until an actual
In contrast to the foregoing cases, no perceivable and justiciable case properly presents itself before
benefit to the public - whether rational or practical the Court. In his Concurring Opinion87 on the main,
- may be gained by resolving respondents' petition Associate Justice Marvic M.V.F. Leonen (Justice
for Writ of Kalikasan on the merits. Leonen) had aptly pointed out that "the findings
To recount, these cases, which stemmed from [resulting from the Bt talong field trials] should be
herein respondents petition for Writ the material to provide more rigorous scientific
of Kalikasan, were mooted by the undisputed analysis of the various claims made in relation
expiration of the Biosafety Permits issued by the to Bt talong."88 True enough, the concluded field
BPI and the completion and termination of the Bt tests ·- like those in these cases – would yield data
talong field trials subject of the same.82 These that may prove useful for future studies and
incidents effectively negated the necessity for the analyses. If at all, resolving the petition for Writ
reliefs sought by respondents in their petition for of Kalikasan would unnecessarily arrest the
Writ of Kalikasan as there was no longer any field results of further research and testing on Et
test to enjoin. Hence, at the time the CA rendered talong, and even GMOs in general, and hence, tend
its Decision dated May 17, 2013, the reliefs to hinder scientific advancement on the subject
petitioner sought and granted by the CA were no matter.
longer capable of execution. More significantly, it is clear that no benefit would
At this juncture, it is important to understand that be derived by the public in assessing the merits of
the completion and termination of the field tests field trials whose parameters are not only unique
do not mean that herein petitioners may inevitably to the specific type of Bt talong tested, but are
proceed to commercially propagate Bt now, in fact, rendered obsolete by the supervening
talong.83 There are three (3) stages before change in the regulatory framework applied to
genetically-modified organisms (GMOs) may GMO field testing. To be sure, DAO 08-2002 has
become commercially available under DAO 08- already been superseded by Joint Department
Circular No. 1, series of 201689 (JDC 01-2016), 2002. In fact, the new parameters in JDC 01-2016
issued by the Department of Science and pertain to provisions which prompted the Court to
Technology (DOST), the DA, the DENR, the invalidate D'AO 08-2002. In the December 8, 2015
Department of Health (DOH), and the Department Decision of the Court, it was observed that: (a) DAO
of Interior and Local Government (DILG), which 08-2002 has no mechanism to mandate
provides a substantially different regulatory compliance with inten1ational biosafety
framework from that under DAO 08-2002 as will protocols;95 (b) DAO 08-2002 does not comply
be detailed below. Thus, to resolve respondents' with the transparency and public participation
petition for Writ of Kalikasan on its merits, would requirements under the NBF;96 and (c) risk
be tantamount to an unnecessary scholarly assessment is conducted by an informal group,
exercise for the Court to assess alleged violations called the Biosafety Advisory Team of the DA,
of health and environmental rights that arose from composed of representatives from the BPI, Bureau
a past test case whose bearings do not find any - of Animal Industry, FPA, DENR, DOH, and DOST.97
if not minimal -- relevance to cases operating Under DAO 08-2002, no specific guidelines were
under today's regulatory framework. used in the conduct of risk assessment, and the DA
Therefore, the paramount public interest exception was allowed to consider the expert advice of, and
to the mootness rule should not have been guidelines developed by, relevant inteniational
applied.1âwphi1 organizations and regulatory authorities of
II. The case is not one capable of repetition vet countries with significant experience in the
evading review. regulatory supervision of the regulated
Likewise, contrary to the Court's earlier article.98 However, under JDC 01-2016, the
ruling,90 these cases do not fall under the "capable CODEX Alimentarius Guidelines was adopted to
of repetition yet evading review" exception. govern the risk assessment of activities involving
The Court notes that the petition for Writ the research, development, handling and use,
of Kalikasan specifically raised issues only transboundary movement, release into the
against the field testing of Bt talong under the environment, and management of genetically
premises 'of DAO 08,..2002,91 i.e., that herein modified plant and plant products derived from the
petitioners failed to: (a) fully inform the eople use of modem biotechnology.99 Also, whereas
regarding the health, environment, and other DAO 08-2002 was limited to the DA's authority in
hazards involved;92 and (b) conduct any valid risk regulating the importation and release into the
assessment before conducting the field trial.93 As environment of plants and plant products derived
further pointed out by Justice Leonen, the reliefs from the use of modern biotechnology,100 under
sought did not extend far enough to enjoin the use JDC 01-2016, various relevant government
of the results of the field trials that have been agencies such as the DOST, DOH, DENR, and the
completed. Hence, the petition's specificity DILG now participate in all stages of the biosafety
prevented it from falling under the above exception decision-making process, with the DOST being the
to the mootness rule.94 central and lead agency.101
More obviously, the supersession of DAO 08-2002 JDC 01-2016 also provides for a more
by JDC 01-2016 clearly prevents this case from comprehensive avenue for public participation in
being one capable of repetition so as to warrant cases involving field trials and requires
review despite its mootness. To contextualize, applications for permits and permits already
JDC 01-2016 states that: issued to be made public by posting them online in
Section 1. Applicability. This Joint Department the websites of the NCBP and the BPI.102 The
Circular shall apply to the research, development, composition of the Institutional Biosafety
handling and use, transboundary movement, Committee (IBC) has also been modified to include
release into the environment, and management of an elected local official in the locality where the
genetically-modified plant and plant products field testing will be conducted as one of the
derived from the use of modern technology, community representatives.103 Previously, under
included under "regulated articles." DAO 08-2002, the only requirement for the
As earlier adverted to, with the issuance of JDC community representatives is that they shall not
01-2016, a new regulatory framework in the be affiliated with the applicant and shall be in a
conduct of field testing now applies. position to represent the interests of the
Notably, the new framework under JDC 01-2016 is communities where the field testing is to be
substantially different from that under DAO 08- conducted.104
JDC 01-2016 also prescribes additional
Section 2 Agencies Consistent
qualifications for the members of the Scientific
Coverage with the NBF and the
and Technical Review Panel (STRP), the pool of
A. Scope - This Order laws granting their
scientists that evaluates the risk assessment
covers the powers and
submitted by the applicant for field trial,
importation or functions, national
commercial propagation, or direct use of regulated
release into the government agencies
articles. Aside from not being an official, staff or
environment of: 1. shall have the
employee of the DA or any of its attached agencies,
Any plant which has following roles:
JDC 01-2016 requires that members of the
been altered or A. [DA]. As the
STRP: (a) must not be directly or indirectly
produced through the principal agency of
employed or engaged by a company or institution
use of modem the Philippine
with pending applications for pennits under JDC
biotechnology if the Government
01-2016; (b) must possess technical expertise in
donor organism, host responsible for the
food and nutrition, toxicology, ecology, crop
organism, or vector promotion of
protection, environmental science, molecular
or vector agent agricultural and rural
biology and biotechnology, genetics, plant
belongs to any of the growth and
breeding, or animal nutrition; and (c) must be well-
genera or taxa development so as to
respected in the scientific community.105
classified by BPI as ensure food security
Below is a tabular presentation of the differences
meeting the definition and to contribute to
between the relevant portions of DAO 08-2002
of plant pest or is a poverty
and JDC 01-2016:
medium for the alleviation, the DA
DAO 08-2002 JDC 01-2016 introduction of shall take the lead in
noxious weeds; or addressing biosafety
1. As to coverage and government 2. Any plant or plant issues related to the
participation product altered or country's agricultural
produced through the productivity and food
WHEREAS, under Title ARTICLE I. GENERAL use of modern security.x x x.
IV, Chapter 4, Section PROVISIONS biotechnology which B. [DOST]. As the
19 of the Section may pose significant premier science and
Administrative Code 1. Applicability. This risks to human health technology body in
of 1987, the Joint Department and the environment the country, the DOST
Department of Circular shall apply to based on available shall take the lead in
Agriculture, through the research, scientific and ensuring that the best
the Bureau of Plant development, technical available science is
Industry, is handling and use, information. utilized and applied in
responsible for the transboundary B. Exceptions. - This adopting biosafety
production of movement, release Order shall not apply policies, measures
improved planting into the environment, to the contained use and guidelines, and in
materials and and management of of a regulated article, making biosafety
protection of genetically-modified which is within the decision.
agricultural crops plant and plant regulatory x xx.
from pests and products derived supervision of NCBP. C. [DENR]. As the
diseases; and from the use of primary government
xxxx modern agency responsible
PART I biotechnology, for the conservation
GENERAL included under management,
PROVISIONS "regulated articles." development and
xxxx xxxx proper use of the
PART I ARTICLE III. country's
GENERAL ADMINISTRATIVE environment and
PROVISIONS FRAMEWORK natural resources, the
xxxx Section 4. Role of DENR shall ensure
National Government that environmental
assessments are Order. The following policies and
done and impacts principles shall be standards on risk
identified in biosafety followed when assessment issued
decisions. x x x. performing a risk by the NCBP; and
D. [DOH]. The DOH, assessment to guided by Annex III of
as the principal determine whether a the Cartagena
authority on health, regulated article Protocol on
shall formulate poses significant Biosafety. Pursuant
guidelines in risks to human health to the NBF, the
assessing the health and the environment: following principles
impacts posed by 1. The risk shall be followed
modern assessment shall be when performing a
biotechnology and its carried out in a risk assessment to
applications. x x x. scientifically sound determine whether a
E. [DILG]. The DILG and transparent regulated article
shall coordinate with manner based on poses significant
the DA, DOST, DENR available scientific risks to human health
and DOH in and technical and the environment.
overseeing the information. The 1. The risk
implementation of expert advice of, and assessment shall be
this Circular in guidelines developed carried out in a
relation to the by, relevant scientifically sound
activities that are to international and transparent
be implemented in organizations and manner based on
specific LGUs, regulatory authorities available scientific
particulady in relation of countries with and technical
to the conduct of significant experience information. The
public consultations in the regulatory expert advice of and
as required under the supervision of the guidelines developed
Local Government regulated article shall by, relevant
Code. x x x. be taken into account international
in the conduct of risk organizations,
2. As to guidelines in risk assessment assessment. including
x x xx intergovernmental
PART I ARTICLE II. bodies, and
BIOSAFETY regulatory authorities
DECISIONS of countries with
significant experience
GENERAL Section 3. Guidelines in the regulatory
PROVISIONS in Making Biosafety supervision of the
xxxx Decisions regulated article shall
Section 3 The principles under be taken into
Risk Assessment the NBF shall guide account. In the
A. Principles of Risk concerned agencies conduct of risk
Assessment - No in making biosafety assessment, CODEX
regulated article shall decisions, including: Alimentarius
be allowed to be xxxx Guidelines on the
imported or released B. Risk Assessment. Food Safety
into the environment Risk assessment Assessment of Foods
without the conduct shall be mandatory Derived from the
of a risk assessment and central in making Recombinant-DNA
performed in biosafety decisions, Plants shall
accordance with this consistent with internationally
adopted as well as posting. It shall be m
other internationally a language
accepted consensus understood in the
documents. community. During
x x x x (Underscoring the comment period,
supplied) any interested person
may submit to BPI
3. As to public participation written comments
regarding the
PART III ARTICLE V. FIELD application. The
APPROVAL PROCESS TRIAL OF applicant shall
FOR FIELD TESTING REGULATED submit proof of
OF REGULATE ARTICLES posting in the form of
ARTICLES Section 12. Public certifications from
xxxx Participation for Field the concerned
Section 8 Trial barangay captains
Requirements for A. The BPI shall make and city/municipal
Field Testing public all applications mayors or an affidavit
xxxx and Biosafety stating the dates and
G. Public Permits for Field Trial places of posting duly
Consultation. - The through posting on executed by the
applicant, acting the NCBP and BPI responsible officer or
through its IBC, shall websites, and in the his duly authorized
notity and invite offices of the DA and representative.
comments on the DOST in the province,
field testing proposal city, or municipality 4. As to membership in the Institutional
from the barangays where the field trial Biosafety Committee
and city/municipal will be conducted.
governments with x x xx PART I ARTICLE III.
jurisdiction over the GENERAL ADMINISTRATIVE
field test sites. The PROVISIONS FRAMEWORK
IBC shall post for Section 1 xxxx
three (3) consecutive Definition of Terms Section 6.
weeks copies of xxxx Institutional
the Public L. "IBC" means the Biosafety Committee
Information Sheet for Institutional The company or
Field Biosafety Committee institution applying
Testing approved by established by an for and granted
the BPI in at least applicant in permits under this
three (3) conspicuous preparation for the Circular shall
places in each of the field testing of a constitute an IBC
concerned barangay regulated article and prior to the contained
and city/municipal whose membership use, confined test, or
halls. The Public has been approved by field trial of a
Information Sheet for BPI. The JBC shall be regulated article. The
Field Testing shall, responsible for the membership of the
among others, invite initial evaluation of IBC shall be approved
interested parties to the risk assessment by the DOST-BC for
send their comments and risk management contained use or
on the proposed field strategies of the confined test, or by
testing to BPI within applicant for field the DA-BC for field
a period of thirty (30) testing. It shall be trial. The IBC is
days from the date of composed of at least responsible for the
five (5) members, conduct of the risk be selected from the
three (3) of whom assessment and residents who are
shall be designated preparation of risk members of the Civil
as "scientist- management Society Organizations
members" who shall strategies of the represented in the
possess scientific applicant for Local Poverty
and technological contained use, Reduction Action
knowledge and confined test, or field Team, pursuant to
expertise sufficient to trial. It shall make DILG Memorandum
enable them to sure that the Circular No. 2015-
evaluate and monitor environment and 45. For multi-location
properly any work of human health are trials, community
the applicant relating safeguarded in the representatives of the
to the field testing of conduct of any IBC shall be
a regulated activity involving designated per site. x
article. The other regulated articles. x x. (Underscoring
members, who shall The IBC shall be supplied)
be designated as composed of at least
"community five (5) members, 5. As to the composition and qualifications of
representatives", three (3) of whom the members of the Scientific and Technical
shall not be affiliated shall be designated, Review
with the applicant as scientist-members Panel
apart from being and two (2) members
members of its IBC shall be community PART I ARTICLE III.
and shall be in a representatives. All GENERAL ADMINISTRATIVE
position to represent scientist-members PROVISIONS FRAMEWORK
the interests of the must possess Section 1 xxxx
communities where scientific or Definition of Terms Section 7. Scientific
the field testing is to technological xxxx and Technical Review
be conducted. For the knowledge and EE. "STRP" means the Panel (STRP) The DA
avoidance of doubt, expertise sufficient to Scientific and shall create a
NCBP shall be enable them to Technical Review Scientific and
responsible for property evaluate and Panel created by BPI Technical Review
approving the monitor any work as an advisory body, Panel composed of a
membership of the involving regulated composed of at least pool of non-DA
IBC for contained use articles conducted by three (3) reputable scientists with
of a regulated article. the applicant. and independent expertise in the
x x x x (Underscoring The community scientists who shall evaluation of the
supplied) regresentative must not be employees of potential risks of
not be affiliated with the Department and regulated articles to
the applicant, and who have the relevant the environment and
must be in a position professional health. x x x
to regresent the background xxxx
interests of the necessary to evaluate The DA shall select
communities where the potential risks of scientists/experts in
the activities are to the proposed activity the STRP, who shall
be conducted. One of to human health and meet the following
the community the environment qualifications:
regresentatives shall based on available A. Must not be an
be an elected official scientific and official, staff or
of the LGU. The other technical employee of the DA
community information. or any of its attached
representative shall agencies;
General Appropriations Act, known as the Priority
x x x x (Underscoring B. Must not be
Development Assistance Fund (PDAF), was
supplied) directly or indirectly
assailed. In that case, the Court rejected the view
employed or engaged
that the issues related thereto had been rendered
by a company or
moot and academic by the reforms undertaken by
institution with
the Executive Department and former President
pending applications
Benigno Simeon S. Aquino III's declaration that he
for permits covered
had already "abolished the PDAF." Citing the
by this Circular;
historical evolution of the ubiquitous Pork Barrel
C. Possess technical
System, which was the source of the PDAF, and the
expertise in at least
fact that it has always been incorporated in the
one of the following
national budget which is enacted annually, the
fields: food and
Court ruled that it is one capable of repetition yet
nutrition; toxicology,
evading review, thus:
ecology, crop
Finally, the application of the fourth exception [to
protection,
the rule on mootness] is called for by
environmental
the recognition that the preparation and passage
science, molecular
of the national budget is, by constitutional
biology and
imprimatur, an affair of annual occurrence. The
biotechnology,
relevance of the issues before the Court does not
genetics, plant
cease with the passage of a "PDAF-free budget for
breeding, animal
2014." The evolution of the "Pork Barrel System,"
nutrition; and
by its multifarious iterations throughout the
D. Well-respected in
course of history, lends a semblance of truth to
the scientific
petitioners' claim that "the same dog will just
community as
resurface wearing a different collar." In Sanlakas
evidenced by
v. Executive Secretary, the government had
positions held in
already backtracked on a previous course of action
science-based
yet the Court used the "capable of repetition but
organizations,
evading review" exception in order "[t]o prevent
awards and
similar questions from re-emerging." The situation
recognitions,
similarly holds true to these cases. Indeed, the
publications in local
myriad of issues underlying the manner in which
and international
certain public funds are spent, if not resolved at
peer-reviewed
this most opportune time, are capable of repetition
scientific journals.
and hence; must not evade judicial
x x x x (Underscoring
review.107 (Emphases supplied)
supplied)
Evidently, the "frequent" and "routinary" nature of
Based on the foregoing, it is apparent that the the Pork Barrel Funds and the PDAF are wanting
regulatory framework now applicable in herein. To reiterate, the issues in these cases
conducting risk assessment in matters involving involve factual considerations which are peculiar
the research, development, handling, movement, only to the controversy at hand since the petition
and release into the environment of genetically for Writ of Kalikasan is specific to the field testing
modified plant and plant products derived from the of Bt talong and does not involve other GMOs.
use of modem biotechnology is substantially At this point, the Court discerns that there are two
different from that which was applied to the (2) factors to be considered before a case is
subject field trials. In this regard, it cannot be said deemed one capable of repetition yet evading
that the present case is one capable of repetition review: (1) the challenged action was in its
yet evading review. duration too short to be fully litigated prior to its
The essence of cases capable of repetition yet cessation or expiration; and (2) there was a
evading review was succinctly explained by the reasonable expectation that the same complaining
Court in Belgica v. Ochoa, Jr.,106 where the party would be subjected to the same action.
constitutionality of the Executive Department's Here, respondents cannot claim that the duration
lump-sum, discretionary funds under the 2013 of the subject field tests was too short to be fully
litigated. It must be emphasized that the Biosafety transparent, and comprehensive scientific and
Permits for the subject field tests were issued on socio-economic risk assessment, public
March 16, 2010 and June 28, 2010, and were valid information, consultation, and participation, and
for two (2) years. However, as aptly pointed out by providing for their effective implementation, in
Justice Leonen, respondents filed their petition for accord with international safety
Writ of Kalikasan only on April 26, 2012 - just a standards[.]"114 This attempt to assail the
few months before the Biosafety Permits expired constitutionality of the public info1mation and
and when the field testing activities were already consultation requirements under DAO 08-2002
over.108 Obviously, therefore, the cessation of the and the NBF constitutes a collateral attack on the
subject field tests before the case could be said provisions of law that runs afoul of the
resolved was due to respondents' own inaction. wdlsettled rule that the constitutionality of a
Moreover, the situation respondents complain of is statute cannot be collaterally attacked as
not susceptible' to repetition. As discussed above, constitutionality issues must be pleaded directly
DAO 08-2002 has already been superseded by and not collaterally.115 Verily, the policy of the
JDC 01-2016. Hence, future applications for field courts is to avoid ruling on constitutional
testing will be governed by JDC 01-2016 which, as questions and to presume that the acts of the
illustrated, adopts a regulatory framework that is political departments are valid, absent a clear and
substantially different from that of DAO 08-2002. unmistakable showing to the contrary, in
Therefore, it was improper for the Court to resolve deference to the doctrine of separation of powers.
the merits of the case which had become moot in This means that the measure had first been
view of the absence of any valid exceptions to the carefuliy studied by the executive department and
rule on mootness, and to thereupon rule on the found to be in accord with the Constitution before
objections against the validity and consequently it was finally enacted and approved.116
nullify DAO 08-2002 under the premises of the All told, with respondents' petition for Writ of
precautionary principle. Kalikasan already mooted by the expiration of the
In fact, in relation to the latter, it is observed that Biosafoty Permits and the completion of the field
the Court should not have even delved into the trials subject of these cases, and with none of the
constitutionality of DAO 08-2002 as it was exceptions to the mootness principle properly
merely collaterally challenged by respondents, attending, the Court grants the instant motions for
based on the constitutional precepts of the reconsideration and hereby dismisses the
people's rights to infonnation on matters of public aforesaid petition. With this pronouncement, no
concern, to public participation, to a balanced and discussion on the substantive merits of the same
healthful ecology, and to health.109 A cursory should be made.
perusal of the petition for Writ of Kalikasan filed by WHEREFORE, the motions for reconsideration
respondents on April 26, 2012 before the Court are GRANTED. The Decision dated December 8,
shows that they essentially assail herein 2015 of the Court, which affirmed with
petitioners' failure to: (a) fully infom1 the people modification the Decision dated May 17, 2013 and
regarding the health, environment, and other the Resolution dated September 20, 2013 of the
hazards involved;110 and (b) conduct any valid risk Court of Appeals in CA-G.R. SP No. 00013, is
assessment before conducting the field hereby SET ASIDE for the reasons above-
trial.111 However, while the provisions of DAO 08- explained. A new one is ENTERED DISMISSING the
2002 were averred to be inadequate to Petition for Writ of Continuing Mandamus and Writ
protect (a) the constitutional right of the people to of Kalikasan with Prayer for the Issuance of a
a balanced and healthful ecology since "said Temporary Environmental Protection Order (TEPO)
regulation failed, among others, to anticipate 'the filed by respondents Greenpeace Southeast Asia
public implications caused by the importation of (Philippines), Magsasaka at Siyentipiko sa
GMOs in the Philippines"';112and (b) "the people Pagpapaunlad ng Agrikultura, and others on the
from the potential harm these genetically modified ground of mootness. SO ORDERED.
plants and genetically modified organisms may
cause human health and the environment, [and] EN BANC
thus, x x x fall short of Constitutional G.R. No. 207257 February 3, 2015
compliance,"113 respondents merely prayed for HON. RAMON JESUS P. PAJE, in his capacity as
its amendment, as well as that of the NBF, to SECRETARY OF THE DEPARTMENT OF
define or incorporate "an independent, ENVIRONMENT AND NATURAL RESOURCES
(DENR), Petitioner, vs.
vs. RAMON JESUS P. PAJE in his capacity as
HON. TEODORO A. CASIÑO, HON. RAYMOND V. SECRETARY OF THE DEPARTMENT OF
PALATINO, HON. RAFAEL V. MARIANO, HON. ENVIRONMENT AND NATURAL RESOURCES,
EMERENCIANA A. DE JESUS, CLEMENTE G. SUBIC BAY METROPOLITAN AUTHORITY, AND
BAUTISTA, JR., HON. ROLEN C. PAULINO, HON. REDONDO PENINSULA ENERGY,
EDUARDO PIANO, HON. JAMES DE LOS REYES, INC., Respondents.
HON. AQUILINO Y. CORTEZ, JR., HON. SARAH x-----------------------x
LUGERNA LIPUMANO-GARCIA, NORAIDA G.R. No. 207366
VELARMINO, BIANCA CHRISTINE GAMBOA SUBIC BAY METROPOLITAN
ESPINOS, CHARO SIMONS, GREGORIO LLORCA AUTHORITY, Petitioner,
MAGDARAOG, RUBELH PERALTA, ALEX CORPUS vs.
HERMOSO, RODOLFO SAMBAJON, REV. FR. HON. TEODORO A. CASIÑO, HON. RAYMOND V.
GERARDO GREGORIO P. JORGE, CARLITO A. PALATINO, HON. RAFAEL V. MARIANO, HON.
BALOY, OFELIA D. PABLO, MARIO ESQUILLO, EMERENCIANA A. DE JESUS, HON. ROLEN C.
ELLE LATINAZO, EVANGELINE Q. RODRIGUEZ, PAULINO, HON EDUARDO PIANO, HON. JAMES
JOHN CARLO DELOS REYES, Respondents. DE LOS REYES, HON. AQUILINO Y. CORTEZ, JR.,
x-----------------------x HON. SARAH LUGERNA LIPUMANOGARCIA,
G.R. No. 207276 NORAIDA VELARMINO, BIANCA CHRISTINE
REDONDO PENINSULA ENERGY, INC., Petitioner, GAMBOA, GREGORIO LLORCA MAGDARAOG,
vs. RUBELHPERALTA, ALEX CORPUS HERMOSO,
HON. TEODORO A. CASIÑO, HON. RAYMOND V. RODOLFO SAMBAJON, REV. FR. GERARDO
PALATINO, HON. RAFAEL V. MARIANO, HON. GREGORIO P. JORGE, CARLITO A. BALOY, OFELIA
EMERENCIANA A. DE JESUS, CLEMENTE G. D. PABLO, MARIO ESQUILLO, ELLE·LATINAZO, EV
BAUTISTA, JR., HON. ROLEN C. PAULINO, HON. ANGELINE Q. RODRIGUEZ, JOHN CARLO DELOS
EDUARDO PIANO, HON. JAMES DE LOS REYES, REYES, HON. RAMON JESUS P. PAJE, in his
HON. AQUILINO Y. CORTEZ, JR., HON. SARAH capacity as SECRETARY OF THE DEPARTMENT
LUGERNA LIPUMANO-GARCIA, NORAIDA OF ENVIRONMENT AND NATURAL RESOURCES
VELARMINO, BIANCA CHRISTINE GAMBOA AND REDONDO PENINSULA ENERGY,
ESPINOS, CHARO SIMONS, GREGORIO LLORCA INC., Respondents.
MAGDARAOG, RUBELH PERALTA, ALEX CORPUS
HERMOSO, RODOLFO SAMBAJON, REV. FR. DECISION
GERARDO GREGORIO P. JORGE, CARLITO A. DEL CASTILLO, J.:
BALOY, OFELIA D. PABLO, MARIO ESQUILLO, Before this Court are consolidated Petitions for
ELLE LATINAZO, EVANGELINE Q. RODRIGUEZ, Review on Certiorari1 assailing the Decision2 dated
JOHN CARLO DELOS REYES, RAMON JESUS P. January 30, 2013 and the Resolution3 dated May
PAJE, in his capacity as SECRETARY OF THE 22, 2013 of the Court of Appeals (CA) in CA-G.R.
DEPARTMENT OF ENVIRONMENT AND NATURAL SP No. 00015, entitled "Hon. Teodoro A. Casiño, et
RESOURCES AND SUBIC BAY METROPOLITAN al. v. Hon. Ramon Jesus P. Paje, et al."
AUTHORITY, Respondents. Factual Antecedents
x-----------------------x In February 2006, Subic Bay Metropolitan
G.R. No. 207282 Authority· (SBMA), a government agency
HON. TEODORO A. CASIÑO, HON. RAYMOND V. organized and established under Republic Act No.
PALATINO, HON. EMERENCIANA A. DE JESUS, (RA) 7227,4 and Taiwan Cogeneration Corporation
CLEMENTE G. BAUTISTA, JR., HON. RAFAEL V. (TCC) entered into a Memorandum of
MARIANO, HON. ROLEN C. PAULINO, HON. Understanding (MOU) expressing their intention to
EDUARDO PIANO, HON. JAMES DE LOS REYES, build a power plant in Subic Bay which would
HON. AQUILINO Y. CORTEZ, JR., HON. SARAH supply reliable and affordable power to Subic Bay
LUGERNA LIPUMANO-GARCIA, NORAIDA Industrial Park (SBIP).5
VELARMINO, BIANCA CHRISTINE GAMBOA On July 28, 2006, SBMA and TCC entered into
ESPINOS, CHARO SIMONS, GREGORIO LLORCA another MOU, whereby TCC undertook to build and
MAGDARAOG, RUBELH PERALTA, ALEX CORPUS operatea coal-fired power plant.6 In the said MOU,
HERMOSA, RODOLFO SAMBAJON, ET TCC identified 20 hectares of land at
AL., Petitioners, SitioNaglatore, Mt. Redondo, Subic Bay Freeport
Zone (SBFZ) as the suitable area for the project over a 380,004.456-square meter parcel of land to
and another site of approximately 10 hectares be used for building and operating the coal-fired
tobe used as an ash pond.7 TCC intends to lease power plant.20
the property from SBMA for a term of 50 years with On July 8, 2010, the DENR-EMBissued an
rent fixed at$3.50 per square meter, payable in 10 amended ECC (first amendment) allowing the
equal 5-year installments.8 inclusion ofadditional components, among
On April 4, 2007, the SBMA Ecology Center issued others.21
SBFZ Environmental Compliance Certificate (ECC) Several months later, RP Energy again requested
No. EC-SBFZ-ECC-69-21-500 in favor of Taiwan the DENR-EMB to amend the ECC.22 Instead of
Cogeneration International Corporation (TCIC), a constructing a 2x150-MW coal-fired power plant,
subsidiary of TCC,9 for the construction, as originally planned, it now sought toconstruct a
installation,and operation of 2x150-MW 1x300-MWcoal-fired power plant.23 In support of
Circulating Fluidized Bed (CFB) Coal-Fired its request, RP Energy submitted a Project
Thermal Power Plant at Sitio Naglatore.10 Description Report (PDR) to the DENR-EMB.24
On June 6, 2008, TCC assigned all its rights and On May 26, 2011, the DENR-EMB granted the
interests under the MOU dated July 28, 2006 to request and further amended the ECC (second
Redondo Peninsula Energy, Inc. (RP Energy),11 a amendment).25
corporation duly organized and existing under the On August 1, 2011, the Sangguniang
laws of the Philippines with the primary purpose of Panglalawiganof Zambales issued Resolution No.
building, owning, and operating powerplants in the 2011-149, opposing the establishment of a coal-
Philippines, among others.12 Accordingly, an fired thermal power plant at SitioNaglatore, Brgy.
Addendum to the said MOU was executed by Cawag, Subic, Zambales.26
SBMA and RP Energy.13 On August 11, 2011, the Liga ng mga Barangayof
RP Energy then contracted GHD Pty, Ltd. (GHD) to Olongapo City issued Resolution No. 12, Series of
prepare an Environmental Impact Statement (EIS) 2011, expressing its strong objection to the coal-
for the proposed coal-fired power plant and to fired power plant as an energy source.27
assist RP Energy in applying for the issuance ofan On July 20, 2012, Hon. Teodoro A. Casiño, Hon.
ECC from the Department of Environment and Raymond V. Palatino, Hon. Rafael V. Mariano, Hon.
Natural Resources (DENR).14 On August 27, 2008, Emerenciana A. De Jesus, Clemente G. Bautista,
the Sangguniang Panglungsodof Olongapo City Jr., Hon. Rolen C. Paulino,Hon. Eduardo Piano,
issued Resolution No. 131, Series of 2008, Hon. James de los Reyes, Hon. Aquilino Y. Cortez,
expressing the city government’s objection to the Jr., Hon. Sarah Lugerna Lipumano-Garcia, Noraida
coal-fired power plant as an energy source and Velarmino, Bianca Christine Gamboa Espinos,
urging the proponent to consider safer alternative Charo Simons, Gregorio Llorca Magdaraog, Rubelh
sources ofenergy for Subic Bay.15 Peralta, Alex Corpus Hermoso,Rodolfo Sambajon,
On December 22, 2008, the DENR, through former Rev. Fr. Gerardo Gregorio P. Jorge, Carlito A. Baloy,
Secretary Jose L. Atienza, Jr., issued an ECC for Ofelia D. Pablo, Mario Esquillo, Elle Latinazo,
the proposed 2x150-MW coal-fired power plant.16 Evangeline Q. Rodriguez, and John Carlo delos
Sometime thereafter, RP Energy decided to include Reyes (Casiño Group) filed before this Court a
additional components in its proposed coal-fired Petition for Writ of Kalikasan against RP Energy,
power plant. Due to the changes in the project SBMA, and Hon. Ramon Jesus P. Paje, in his
design, which involved the inclusion of a barge capacity as Secretary of the DENR.28
wharf, seawater intake breakwater, subsea On July 31, 2012, this Court resolved, among
discharge pipeline, raw water collection system, others, to: (1) issue a Writ of Kalikasan; and (2)
drainage channel improvement, and a 230kV refer the case to the CA for hearing and reception
double-circuit transmission line,17 RP Energy of evidence and rendition of judgment.29 While the
requested the DENR Environmental Management case was pending, RP Energy applied for another
Bureau(DENR-EMB) to amend its ECC.18 In support amendment to its ECC (third amendment) and
of its request, RP Energy submitted to the DENR- submitted another EPRMP to the DENR-EMB,
EMBan Environmental Performance Report and proposing the construction and operation of a
Management Plan (EPRMP), which was prepared 2x300-MW coal-fired power plant.30
by GHD.19 On September 11, 2012, the Petition for Writ of
On June 8, 2010, RP Energy and SBMA entered Kalikasanwas docketed as CA-G.R. SP No. 00015
into a Lease and Development Agreement (LDA) and raffled to the Fifteenth Division of the CA.31 In
the Petition, the Casiño Group alleged, among Republic Act No. 7160 or the Local
others, that the power plant project would cause Government Code;
grave environmental damage;32 that it would 3. Whether x x x Section 8.3 of
adversely affect the health of the residents of the DENRAdministrative Order No. 2003-30
municipalities of Subic,Zambales, Morong, (‘DAO No. 2003-30,’ x x x ) providing for the
Hermosa, and the City of Olongapo;33 that the ECC amendment of an ECC is null and void for
was issued and the LDA entered into without the being ultra vires; and
prior approval of the concerned sanggunians as 4. Whether x x x the amendment of
required under Sections 26 and 27 of the Local RPEnergy’s ECC under Section 8.3 of DAO
Government Code (LGC);34 that the LDA was No. 2003-30 is null and void.
entered into without securing a prior certification B. Respondent RP Energy
from the National Commission on Indigenous 1. Whether x x x Section 8.3 of DAO No.
Peoples (NCIP) as required under Section 59 of 2003-30 can be collaterally attacked;
RA8371 or the Indigenous Peoples’ Rights Act of 1.1 Whether x x x the same is valid
1997 (IPRA Law);35 that Section 8.3 of DENR until annulled;
Administrative Order No. 2003-30 (DAO 2003-30) 2. Whether x x x petitioners exhausted their
which allowsamendments of ECCs is ultra administrative remedies with respect to the
viresbecause the DENR has no authority to decide amended ECC for the 1x300 MW Power
on requests for amendments of previously issued Plant;
ECCs in the absence of a new EIS;36 and that due 2.1 Whether x x x the instant Petition
to the nullity of Section 8.3 of DAO 2003-30, all is proper;
amendments to RP Energy’s ECC are null and 3. Whether x x x RP Energycomplied with all
void.37 the procedures/requirements for the
On October 29, 2012, the CA conducted a issuance of the DENR ECC and its
preliminary conference wherein the parties, with amendment;
their respective counsels, appeared except for 3.1 Whether x x x a Certificate of Non-
Hon. Teodoro A. Casiño, Hon. Rafael V. Mariano, Overlap from the National
Hon. Emerencia A. De Jesus, Clemente G. Bautista, Commission on Indigenous Peoples is
Mario Esquillo, Elle Latinazo,Evangeline Q. applicable in the instant case;
Rodriguez, and the SBMA.38 The matters taken up 4. Whether x x x the LGU’s approval under
during the preliminary conference were embodied Sections 26 and 27 of the Local
in the CA’s Resolution dated November 5, 2012, to Government Code is necessaryfor the
wit: issuance of the DENR ECC and its
I. ISSUES amendments, and what constitutes LGU
A. Petitioners (Casiño Group) approval;
1. Whether x x x the DENR Environmental 5. Whether x x x there is a threatened or
Compliance Certificate (‘ECC’ x x x) in favor actual violation of environmental laws to
of RP Energy for a 2x150 MW Coal-Fired justify the Petition;
Thermal Power Plant Project (‘Power Plant,’ 5.1 Whether x x x the approved 1x300
x x x ) and its amendment to 1x300 MW MW Power Plant complied with the
Power Plant, and the Lease and accepted legal standards on thermal
Development Agreement between SBMA pollution of coastal waters, air
and RP Energy complied with the pollution, water pollution, and acid
Certification Precondition as required under deposits on aquatic and terrestrial
Section 59 of Republic Act No. 8371 or the ecosystems; and
Indigenous People’s Rights Act of 1997 6. Whether x x x the instant Petition should
(‘IPRA Law,’ x x x); be dismissed for failure to comply with the
2. Whether x x x RP Energy can proceed requirements of properverification and
with the construction and operation of the certification of nonforum shopping with
1x300 MW Power Plant without prior respect to some petitioners.
consultation with and approval of the C. Respondent DENR Secretary Paje
concerned local government units (‘LGUs,’ x 1. Whether x x x the issuance of the DENR
x x ), pursuant to Sections 26 and 27 of ECC and its amendment in favor of RP
Energy requires compliance with Section 59
of the IPRA Law, as well as Sections 26 and Ouano), a licensed Chemical Engineer, Sanitary
27 of the Local Government Code; Engineer, and Environmental Planner in the
2. Whether x x x Section 8.3 of DAO No. Philippines;47 and (5) David C. Evangelista (Mr.
2003-30 can be collaterally attacked in this Evangelista), a Business Development Analyst
proceeding; and working for RP Energy.48
3. Whether x x x Section 8.3 of DAO No. SBMA, for its part, presented its Legal Department
2003-30 is valid. Manager, Atty. Von F. Rodriguez (Atty.
II. ADMISSIONS/DENIALS Rodriguez).49
Petitioners, through Atty. Ridon, admittedall the The DENR, however, presented no evidence.50
allegations in RP Energy’s Verified Return, except Meanwhile, on October 31, 2012, a Certificate of
the following: Non-Overlap (CNO) was issued in connection with
1. paragraphs 1.4 to 1.7; RP Energy’s application for the 2x300-MW coal-
2. paragraphs 1.29 to 1.32; and fired power plant.51
3. paragraphs 1.33 to 1.37. On November 15, 2012, the DENR-EMB granted RP
Petitioners made no specific denial withrespect to Energy’s application for the third amendment to its
the allegations of DENR Secretary Paje’s Verified ECC, approving the construction and operation of
Return. x x x a 2x300-MW coal-fired power plant, among
Respondent RP Energy proposed the following others.52
stipulations, which were all admitted by Ruling of the Court of Appeals
petitioners, through Atty. Ridon, viz: On January 30, 2013, the CA rendereda Decision
1. The 1x300 MW Power Plant is not yet denying the privilege of the writ of kalikasanand
operational; the application for an environment protection
2. At present, there is no environmental order due to the failure of the Casiño Group to
damage; prove that its constitutional right to a balanced
3. The 1x300 MW Power Plant project is and healthful ecology was violated or
situated within the Subic Special Economic threatened.53 The CA likewise found no reason to
Zone; and nullify Section 8.3 ofDAO No. 2003-30. It said that
4. Apart from the instant case, petitioners the provision was not ultra vires,as the express
have not challenged the validity of Section power of the Secretary of the DENR, the Director
8.3 of DAO No. 2003-30. and Regional Directors of the EMB to issue an ECC
Public respondent DENR Secretary Paje did not impliedly includes the incidental power to amend
propose any matter for stipulation.39 the same.54 In any case, the CA ruled that the
Thereafter, trial ensued. validity of the said section could not becollaterally
The Casiño Group presented three witnesses, attacked in a petition for a writ of kalikasan.55
namely: (1) Raymond V. Palatino, a two-term Nonetheless, the CA resolved to invalidate the ECC
representativeof the KabataanPartylist in the dated December 22, 2008 for non-compliance
House of Representatives;40 (2) Alex C. Hermoso, with Section 59 of the IPRA Law56 and Sections 26
the convenor of the Zambales-Olongapo City Civil and 27 of the LGC57 and for failure of Luis Miguel
Society Network,a director of the Aboitiz (Mr. Aboitiz), Director of RP Energy, to affix
PREDA41 Foundation, and a member of the his signature in the Sworn Statement of Full
Zambales Chapter of the Kaya NatinMovement Responsibility, which is an integral part of the
and the Zambales Chapter of the People Power ECC.58 Also declared invalid were the ECC first
Volunteers for Reform;42 and (3) Ramon Lacbain, amendment dated July 8, 2010 and the ECC
the ViceGovernor of the Province of Zambales.43 second amendment dated May 26, 2011 in view of
RP Energy presented five witnesses,namely: (1) the failure of RP Energy to comply with the
JunisseP. Mercado (Ms. Mercado), an employee of restrictions set forth in the ECC, which specifically
GHD and the Project Directorof ongoing projects require that "any expansion of the project beyond
for RP Energy regarding the proposed power plant the project description or any change in the
project;44 (2) Juha Sarkki (Engr. Sarkki), a Master activity x x x shall be subject to a new
of Science degree holder inChemical Environmental Impact Assessment."59 However,
Engineering;45 (3) Henry K. Wong, a degree holder as to the ECC third amendment dated November
of Bachelor of Science Major in Mechanical 15, 2012, the CA decided not to rule on its validity
Engineering from Worcester Polytechnic since it was not raised as an issue during the
Institute;46 (4) Dr. Ely Anthony R. Ouano (Dr. preliminary conference.60
The CA also invalidated the LDA entered into by On May 22, 2013, the CAissued a
SBMA and RP Energy as it was issued without the Resolution70 denying the aforesaid motions for
prior consultation and approval of all the lack of merit. The CA opined that the reliefs it
sanggunians concerned as required under granted in its Decision are allowed under Section
Sections 26 and 27 of the LGC,61 and in violation 15, Rule 7 of the Rules of Procedure for
of Section 59, Chapter VIII ofthe IPRA Law, which Environmental Cases as the reliefs enumerated
enjoins all departments and other governmental therein are broad, comprehensive, and
agencies from granting any lease without a prior nonexclusive.71 In fact, paragraph (e) of the
certification that the area affected does not saidprovision allows the granting of "such other
overlap with any ancestral domain.62 The CA noted reliefs" in consonance with the objective, purpose,
that no CNO was secured from the NCIP prior to and intent of the Rules.72 SBMA’s contention that
the execution of the LDA,63 and that the CNO dated the stoppage of a project for non-compliance with
October 31, 2012 was secured during the Section 59 of the IPRA Law may only be done by
pendency of the case and was issued in the indigenous cultural communities or
connection with RP Energy’s application for a indigenous peoples was also brushed aside by the
2x300-MW coalfired power plant.64 CA as the Casiño Group did not file a case under
Thus, the CA disposed of the case in this wise: the IPRA Law but a Petition for a Writ of Kalikasan,
WHEREFORE, premises considered, judgment is which is available to all natural or juridical persons
hereby rendered DENYING the privilege of the writ whose constitutional right to a balanced and
of kalikasan and the application for an healthful ecology is violated, or threatened to be
environmental protection order. The prayer to violated.73 As to RP Energy’s belated submission
declare the nullity of Section 8.3 of the DENR of a signed Statement of Accountability, the CA
Administrative Order No. 2003-30 for being ultra gaveno weight and credenceto it as the belated
vires is DENIED; and the following are all declared submission of such document, long after the
INVALID: presentation of evidence of the parties had been
1. The Environmental Compliance Certificate terminated, is not in accord with the rules of fair
(ECC Ref. Code: 0804-011-4021) dated 22 play.74 Neither was the CA swayed by the
December 2008 issued in favor of argument that the omitted signature of Luis Miguel
respondent Redondo Peninsula Energy, Inc. Aboitiz is a mere formal defect, which does not
by former Secretary Jose L. Atienza, Jr. of affect the validity of the entire document.75 The
the Department of Environment and Natural dispositive portion of the Resolution reads:
Resources; WHEREFORE,premises considered, respondents
2. The ECC first amendment dated 08 July Subic Bay Metropolitan Authority’s Motion for
2010 and ECC second amendment dated 26 Reconsideration dated 18 February 2013,
May 2011, both issued in favor ofrespondent Department of Environment and Natural
Redondo Peninsula Energy, Inc. by OIC Resources Secretary Ramon Jesus P. Paje’s
Director Atty. Juan Miguel T. Cunaof the Motion for Reconsideration dated 19 February
Department of Environment and Natural 2013, and Redondo Peninsula Energy, Inc.’s
Resources, Environmental Management Motion for Partial Reconsideration dated 22
Bureau; and February 2013, as well as petitioners’
3. The Lease and Development Agreement OmnibusMotions for Clarification and
dated 08 June 2010 entered into by Reconsideration dated 25 February 2013,are all
respondents Subic Bay Metropolitan DENIED for lack of merit.
Authority and Redondo Peninsula Energy, SO ORDERED.76
Inc. involving a parcel of land consisting of Unsatisfied, the parties appealed to this Court.
₱380,004.456 square meters. The Casiño Group’s arguments
SO ORDERED.65 The Casiño Group, in essence, argues that it is
The DENR and SBMA separately moved for entitled to a Writ of Kalikasan as it was able to
reconsideration.66 RP Energy filed a Motion for prove that the operation of the power plant would
Partial Reconsideration,67 attaching thereto a cause environmental damage and pollution, and
signed Statement of Accountability.68 The Casiño that thiswould adversely affect the residents of the
Group, on the other hand, filed Omnibus Motions provinces of Bataan and Zambales, particularly the
for Clarification and Reconsideration.69 municipalities of Subic, Morong, Hermosa, and the
City of Olongapo. It cites as basis RP Energy’s EIS,
which allegedly admits that acid rain may occur in containing the signature of Mr. Aboitiz on the
the combustion of coal;77 that the incidence of Statement of Accountability may be accepted and
asthma attacks among residents in the vicinity of accorded weight and credence.89
the project site may increasedue to exposure to SBMA’s arguments
suspended particles from plant operations;78 and For its part, SBMA asserts that since the CA did not
that increased sulfur oxides (SOx) and nitrogen issue a Writ of Kalikasan, it should not have
oxides (NOx) emissions may occur during plant invalidated the LDA and that in doing so, the CA
operations.79 It also claims that when the SBMA acted beyond its powers.90 SBMA likewise puts in
conducted Social Acceptability Policy issue the legal capacity of the Casiño Group to
Consultations with different stakeholders on the impugn the validity of the LDA91 and its failure to
proposed power plant, the results indicated that exhaust administrative remedies.92 In any case,
the overall persuasion of the participants was a SBMA contends that there is no legal basis to
clear aversion to the project due to environmental, invalidate the LDA as prior consultation under
health, economic and socio-cultural Sections 26 and 27 of the LGC is not required in
concerns.80 Finally, it contends that the ECC third this case considering that the area is within the
amendment should also be nullified for failure to SBFZ.93 Under RA 7227, it is the SBMA which has
comply with the procedures and requirements for exclusive jurisdiction over projects and leases
the issuance of the ECC.81 within the SBFZ and that in case of conflict
The DENR’s arguments between the LGC and RA 7227, it is the latter, a
The DENR imputes error on the CAin invalidating special law, which must prevail.94 Moreover, the
the ECC and its amendments, arguing that the lack of prior certification from the NCIP is alsonot
determination of the validity of the ECC as well as a ground to invalidate a contract.95 If at all, the
its amendments is beyond the scope of a Petition only effect of non-compliance with the said
for a Writ of Kalikasan.82 And even if it is within the requirement under Section 59 of the IPRA Law is
scope, there is no reason to invalidate the ECC and the stoppage or suspension of the
its amendments as these were issued in project.96 Besides, the subsequent issuance of a
accordance with DAO No. 2003-30.83 The DENR CNO has cured any legal defect found in the LDA.97
also insists that contrary to the view of the CA, a RP Energy’s arguments
new EIS was no longer necessary since the first EIS RP Energy questions the proprietyof the reliefs
was still within the validity period when the first granted by the CA considering that it did not issue
amendment was requested, and that this is a writ of kalikasanin favor of the Casiño
precisely the reason RP Energy was only required Group.98 RP Energy is of the view that unless a writ
to submit an EPRMP in support of its application of kalikasanis issued, the CA has no power to grant
for the first amendment.84 As to the second the reliefs prayed for in the Petition.99 And even if
amendment, the DENR-EMB only required RP it does, the reliefs are limited to those enumerated
Energy to submit documents to support the in Section 15, Rule 7 of the Rules of Procedure for
proposed revision considering that the change in Environmental Cases and that the phrase "such
configuration of the power plant project, from other reliefs" in paragraph (e) should be limited
2x150MW to 1x300MW, was not only to those of the same class or general nature
substantial.85 Furthermore, the DENR argues that as the four other reliefs enumerated.100 As to the
no permits, licenses, and/or clearances from other validity of the LDA, the ECC and its amendments,
government agencies are required in the the arguments of RP Energy are basically the same
processing and approval of the ECC.86 Thus, non- arguments interposed by SBMA and the DENR. RP
compliance with Sections 26 and 27 of the LGC as Energy maintains that the ECC and its
well as Section 59 ofthe IPRA Law is not a ground amendments were obtained in compliance with
to invalidate the ECC and its amendments.87 The the DENR rules and regulations;101 that a CNO is
DENR further posits that the ECC is not a not necessary in the execution of anLDA and in the
concession, permit, or license but is a document issuance of the ECC and its amendments;102 and
certifying that the proponent has complied with all that prior approval of the local governments, which
the requirements of the EIS System and has may be affected by the project, are not required
committed to implement the approved because under RA 7227, the decision of the SBMA
Environmental Management Plan.88 The DENR shall prevail in matters affecting the Subic Special
invokes substantial justice so that the belatedly Economic Zone (SSEZ), except in matters involving
submitted certified true copy of the ECC defense and security.103 RP Energy also raises the
issue of non-exhaustion of administrative of a public official or employee, or private
remedies on the part of the Casiño individual or entity; and (3) the actual or
Group.104 Preliminaries threatened violation involves or will lead to an
This case affords us an opportunity to expound on environmental damage of such magnitude as to
the nature and scope of the writ of kalikasan. It prejudice the life, health or property ofinhabitants
presents some interesting questions about law in two or more cities or provinces.
and justice in the context of environmental cases, Expectedly, the Rules do not definethe exact
which we will tackle in the main body of this nature or degree of environmental damage but
Decision. only that it must be sufficientlygrave, in terms of
But we shall first address some preliminary the territorial scope of such damage, so as tocall
matters, in view of the manner by which the for the grant ofthis extraordinary remedy. The
appellate court disposed of this case. gravity ofenvironmental damage sufficient to
The Rules on the Writ of Kalikasan,105 which is Part grant the writ is, thus, to be decided on a case-to-
III of the Rules of Procedure for Environmental case basis.
Cases,106 was issued by the Court pursuant to its If the petitioner successfully proves the foregoing
power to promulgate rules for the protection and requisites, the court shall render judgment
enforcement of constitutional rights,107 in granting the privilege of the writ of kalikasan.
particular, the individual’s rightto a balanced and Otherwise, the petition shall be denied. If the
healthful ecology.108 Section 1 of Rule 7 provides: petition is granted, the court may grant the reliefs
Section 1. Nature of the writ.- The writ is a provided for under Section 15of Rule 7, to wit:
remedy available to a natural or juridical Section 15. Judgment.- Within sixty (60) daysfrom
person, entity authorized by law, people’s the time the petition is submitted for decision, the
organization, nongovernmental court shall render judgment granting or denying
organization, or any public interest group the privilege of the writ of kalikasan.
accredited by or registered with any The reliefs that may be granted under the writ are
government agency, on behalf of persons the following:
whose constitutional right to a balanced and (a) Directing respondent to permanently
healthful ecology is violated, or threatened cease and desist from committing acts or
with violation by an unlawful act or omission neglecting the performance of a duty in
of a public official or employee, or private violation of environmental laws resulting in
individual or entity, involving environmental environmental destruction or damage;
damage of such magnitude as to prejudice (b) Directing the respondent public official,
the life, health or property of inhabitants in government agency, private person or entity
two or more cities or provinces. to protect, preserve, rehabilitate or restore
The writ is categorized as a special civil action and the environment;
was, thus, conceptualized as an extraordinary (c) Directing the respondent public official,
remedy,which aims to provide judicial relief from government agency, private person or entity
threatened or actual violation/s of the to monitor strict compliance with the
constitutional right to a balanced and healthful decision and orders of the court;
ecology of a magnitude or degree of damage that (d) Directing the respondent public official,
transcends political and territorial government agency, or private person or
boundaries.109 It is intended "to provide a entity to make periodic reports on the
strongerdefense for environmental rights through execution of the final judgment; and
judicial efforts where institutional arrangements of (e) Such other reliefs which relate to the right
enforcement, implementation and legislation have of the people to a balanced and healthful
fallen short"110 and seeks "to address the ecology or to the protection, preservation,
potentially exponential nature of large-scale rehabilitation or restoration of the
ecological threats."111 environment, except the award of damages
Under Section 1 of Rule 7, the following requisites to individual petitioners.
must be present to avail of this extraordinary It must be noted, however,that the above
remedy: (1) there is an actual or threatened enumerated reliefs are non-exhaustive. The reliefs
violation of the constitutional right to a balanced that may be granted under the writ are broad,
and healthful ecology; (2) the actual or threatened comprehensive and non-exclusive.112
violation arises from an unlawful act or omission
Prescinding from the above, the DENR, SBMA and courts to nullify an ECC existed even prior to the
RP Energy are one in arguing that the reliefs promulgation of the Rules on the Writ of
granted by the appellate court, i.e.invalidating the Kalikasanfor judicial review of the acts of
ECC and its amendments, are improper because it administrative agencies or bodies has long been
had deniedthe Petition for Writ of Kalikasanupon a recognized114 subject, of course, to the doctrine of
finding that the Casiño Group failed to prove the exhaustion of administrative remedies.115
alleged environmental damage, actual or But the issue presented before us is nota simple
threatened, contemplated under the Rules. case of reviewing the acts of an administrative
Ordinarily, no reliefs could and should be granted. agency, the DENR, which issued the ECC and its
But the question may be asked, could not the amendments. The challenge to the validity ofthe
appellate court have granted the Petition for Writ ECC was raised in the context of a writ of
of Kalikasanon the ground of the invalidity of the kalikasancase. The question then is, can the
ECC for failure to comply with certain laws and validity of an ECC be challenged viaa writ of
rules? kalikasan?
This question is the starting point for setting up We answer in the affirmative subject to certain
the framework of analysis which should govern qualifications.
writ of kalikasan cases. As earlier noted, the writ of kalikasanis principally
In their Petition for Writ of Kalikasan,113 the Casiño predicated on an actual or threatened violation of
Group’s allegations, relative to the actual or the constitutional right to a balanced and healthful
threatened violation of the constitutional right to a ecology, which involves environmental damage of
balanced and healthful ecology, may be grouped a magnitude that transcends political and
into two. territorial boundaries. A party, therefore, who
The first set of allegations deals withthe actual invokes the writ based on alleged defects or
environmental damage that will occur if the power irregularities in the issuance of an ECC must not
plant project isimplemented. The Casiño Group only allege and prove such defects or irregularities,
claims that the construction and operation of the but mustalso provide a causal link or, at least, a
power plant will result in (1) thermal pollution of reasonable connection between the defects or
coastal waters, (2) air pollution due to dust and irregularities in the issuance of an ECC and the
combustion gases, (3) water pollution from toxic actual or threatened violation of the constitutional
coal combustion waste, and (4) acid deposition in right to a balanced and healthful ecology of the
aquatic and terrestrial ecosystems, which will magnitude contemplated under the Rules.
adversely affect the residents of the Provinces of Otherwise, the petition should be dismissed
Bataan and Zambales, particularly the outright and the action re-filed before the proper
Municipalities of Subic, Morong and Hermosa, and forum with due regard to the doctrine of
the City of Olongapo. exhaustion of administrative remedies. This must
The second set of allegations deals with the be so ifwe are to preserve the noble and laudable
failureto comply with certain laws and rules purposes of the writ against those who seek to
governing or relating to the issuance ofan ECC and abuse it.
amendments thereto. The Casiño Group claims An example of a defect or an irregularity in the
that the ECC was issued in violation of (1) the issuance of an ECC, which could conceivably
DENR rules on the issuance and amendment of an warrant the granting of the extraordinary remedy
ECC, particularly, DAO 2003-30 and the Revised of the writ of kalikasan, is a case where there are
Procedural Manual for DAO 2003-30 (Revised serious and substantial misrepresentations or
Manual), (2) Section 59 of the IPRA Law,and (3) fraud in the application for the ECC, which, if not
Sections 26 and 27 of the LGC. In addition, it immediately nullified, would cause actual negative
claims that the LDA entered into between SBMA environmental impacts of the magnitude
and RP Energy violated Section 59 of the IPRA contemplated under the Rules, because the
Law. government agenciesand LGUs, with the final
As to the first set of allegations, involving actual authority to implement the project, may
damage to the environment, it is not difficult to subsequently rely on such substantially defective
discern that, if they are proven, then the Petition or fraudulent ECC in approving the implementation
for Writ of Kalikasan could conceivably be granted. of the project.
However, as to the second set of allegations, a To repeat, in cases of defects or irregularities in
nuanced approach is warranted. The power of the the issuance of an ECC, it is not sufficient to merely
allege such defects or irregularities, but to show a administrative bodies (like the NCIP) or a separate
causal link or reasonable connection with the action to compel compliance before the courts, as
environmental damage of the magnitude the case may be. However, the writ of kalikasan
contemplated under the Rules. In the case at bar, would not be the appropriate remedy to address
no such causal link or reasonable connection was and resolve such issues.
shown or even attempted relative to the aforesaid Be that as it may, we shall resolve both the issues
second set of allegations. It is a mere listing of the proper in a writ of kalikasan case and those which
perceived defects or irregularities in the issuance are not, commingled as it were here, because of
of the ECC. This would havebeen sufficient reason the exceptional character of this case. We take
to disallow the resolution of such issues in a writ judicial notice of the looming power crisis that our
of kalikasan case. nation faces. Thus, the resolution of all the issues
However, inasmuch as this is the first time that we in this case is of utmost urgency and necessity in
lay down this principle, we have liberally examined order to finally determine the fate of the project
the alleged defects or irregularities in the issuance center of this controversy. If we were to resolve
of the ECC and find that there is only one group of only the issues proper in a writ of kalikasancase
allegations, relative to the ECC, that can be and dismiss those not proper therefor, that will
reasonably connected to anenvironmental leave such unresolved issues open to another
damageof the magnitude contemplated under the round of protracted litigation. In any case, we find
Rules. This is withrespect to the allegation that the records sufficient to resolve all the issues
there was no environmental impact assessment presented herein. We also rule that, due to the
relative to the first and second amendments to the extreme urgency of the matter at hand, the present
subject ECC. If this were true, then the case is an exception to the doctrine of exhaustion
implementation of the project can conceivably of administrative remedies.117 As we have often
actually violate or threaten to violate the right to a ruled, in exceptional cases, we can suspend the
healthful and balanced ecology of the inhabitants rules of procedure in order to achieve substantial
near the vicinity of the power plant. Thus, the justice, and to address urgent and paramount
resolution of such an issue could conceivably be State interests vital to the life of our nation.
resolved in a writ of kalikasan case provided that Issues
the case does not violate, or is anexception to the In view of the foregoing, we shall resolve the
doctrine of exhaustion of administrative remedies following issues:
and primary jurisdiction.116 1. Whether the Casiño Group was able to
As to the claims that the issuance of the ECC prove that the construction and operation of
violated the IPRA Law and LGC and that the LDA, the power plant will cause grave
likewise, violated the IPRA Law, we find the same environmental damage.
not to be within the coverage of the writ of 1.1. The alleged thermal pollution of
kalikasanbecause, assuming there was non- coastal waters, air pollution due to
compliance therewith, no reasonable connection dust and combustion gases, water
can be made to an actual or threatened violation of pollution from toxic coal combustion
the right to a balanced and healthful ecology of the waste, and acid deposition to aquatic
magnitude contemplated under the Rules. and terrestrial ecosystems that will
To elaborate, the alleged lackof approval of the becaused by the project.
concerned sanggunians over the subject project 1.2. The alleged negative
would not lead toor is not reasonably connected environmental assessment of the
with environmental damage but, rather, it is an project by experts in a report generated
affront to the local autonomy of LGUs. Similarly, during the social acceptability
the alleged lack of a certificate precondition that consultations.
the project site does not overlap with an ancestral 1.3. The alleged admissions of grave
domain would not result inor is not reasonably environmental damage in the EIS itself
connected with environmental damage but, rather, of the project.
it is an impairment of the right of Indigenous 2. Whether the ECC is invalid for lackof
Cultural Communities/Indigenous Peoples signature of Mr. Luis Miguel Aboitiz, as
(ICCs/IPs) to their ancestral domains. These representative of RP Energy, in the
alleged violationscould be the subject of Statement of Accountability of the ECC.
appropriate remedies before the proper
3. Whether the first and second amendments toxic coal combustion waste, and acid
to the ECC are invalid for failure to undergo a deposition in aquatic and terrestrial
new environmental impact assessment (EIA) ecosystems that will be caused by the project.
because of the utilization of inappropriate As previously noted, the Casiño Group alleged that
EIA documents. the construction and operation of the power plant
4. Whether the Certificate of Non-Overlap, shall adversely affect the residents of the
under Section 59 of the IPRA Law, is a Provinces of Bataan and Zambales, particularly,
precondition to the issuanceof an ECC and the Municipalities of Subic, Morong and Hermosa,
the lack of its prior issuance rendered the and the City of Olongapo, as well as the sensitive
ECC invalid. ecological balance of the area. Their claims of
5. Whether the Certificate of Non-Overlap, ecological damage may be summarized as
under Section 59 of the IPRA Law, is a follows:
precondition to the consummation of the 1. Thermal pollution of coastal waters. Due
Lease and Development Agreement (LDA) to the discharge of heated water from the
between SBMA and RPEnergy and the lack of operation of the plant, they claim that the
its prior issuance rendered the LDA invalid. temperature of the affected bodies of water
6. Whether compliance with Section 27, in will rise significantly. This will have adverse
relation to Section 26, of the LGC (i.e., effects on aquatic organisms. It will also
approval of the concerned cause the depletion of oxygen in the water.
sanggunianrequirement) is necessary prior RP Energy claims that there will beno more
to the implementation of the power plant than a 3°C increase in water temperature but
project. the Casiño Group claims that a 1°C to 2°C
7. Whether the validity of the third rise can already affect the metabolism and
amendment to the ECC can be resolved in other biological functions of aquatic
this case. organisms such asmortality rate and
Ruling reproduction.
The parties to this case appealed from the decision 2. Air pollution due to dust and combustion
of the appellate court pursuant to Section 16, gases. While the Casiño Group admits that
Rule7 of the Rules of Procedure for Environmental Circulating Fluidized Bed (CFB) Coal
Cases, viz: technology, which will be used in the power
Section 16. Appeal.- Within fifteen (15) days from plant, is a clean technology because it
the date of notice of the adverse judgment or reduces the emission of toxic gases, it
denialof motion for reconsideration, any party may claims that volatile organic compounds,
appeal to the Supreme Court under Rule45 of the specifically, polycyclic aromatic
Rules of Court. The appeal may raise questions of hydrocarbons (PAHs) will also be emitted
fact. (Emphasis supplied) under the CFB. PAHs are categorized as
It is worth noting that the Rules on the Writ of pollutants with carcinogenic and mutagenic
Kalikasan allow the parties to raise, on appeal, characteristics. Carbon monoxide, a
questions of fact— and, thus, constitutes an poisonous gas, and nitrous oxide, a lethal
exception to Rule 45 of the Rules of Court— global warming gas, will also be produced.
because ofthe extraordinary nature of the 3. Water pollution from toxic coal
circumstances surrounding the issuance of a writ combustion waste. The waste from coal
of kalikasan.118 Thus, we shall review both combustion or the residues from burning
questions of law and fact in resolving the issues pose serious environmental risk because
presented in this case. they are toxic and may cause cancer and
We now rule on the above-mentioned issues in birth defects. Their release to nearby bodies
detail. of water will be a threatto the marine
I. ecosystem of Subic Bay. The project is
Whether the Casiño Group was able to prove that located in a flood-prone area and is near
the construction and operation of the power plant three prominent seismic faults as identified
will cause grave environmental damage. by Philippine Institute of Volcanology and
The alleged thermal pollution of coastal Seismology. The construction of an ash
waters, air pollution due to dust and pond in an area susceptible to flooding and
combustion gases, water pollution from earthquake also undermines SBMA’s duty to
prioritize the preservation of the water graduate of BS Sociology and a practicing
quality in Subic Bay. business director involved in social development
4. Acid deposition in aquatic and terrestrial and social welfare services. Lacbain, incumbent
ecosystems. The power plant will release ViceGovernor of the Province of Zambales,
1,888 tons of nitrous oxides and 886 tons of anaccounting graduate with a Master in Public
sulfur dioxide per year. These oxides are Administration, was a former BancoFilipino teller,
responsible for acid deposition. Acid entertainment manager, disco manager,
deposition directly impacts aquatic marketing manager and college instructor, and is
ecosystems. It is toxic to fish and other also not an expert on the CFB technology. Lacbain
aquatic animals. It will also damage the also admitted that he is neither a scientist nor an
forests near Subic Bay as well as the wildlife expert on matters of the environment.
therein. This will threaten the stability of the Petitioners cited various scientific studies or
biological diversity of the Subic Bay Freeport articles and websites culled from the internet.
which was declared as one of the ten priority However, the said scientific studiesand articles
sites among the protected areas in the including the alleged Key Observations and
Philippines and the Subic Watershed and Recommendations on the EIS of the Proposed RPE
Forest Reserve. This will also have an Project by Rex Victor O. Cruz (Exhibit "DDDDD")
adverse effect on tourism.119 attached to the Petition, were not testified to by an
In its January 30, 2013 Decision, the appellate expert witness, and are basically hearsay in nature
court ruled that the Casiño Group failed to prove and cannot be given probative weight. The article
the above allegations. purportedly written by Rex Victor O. Cruz was not
We agree with the appellate court. even signed by the said author, which fact was
Indeed, the three witnesses presented by the confirmed by Palatino. Petitioners’ witness,
Casiño Group are not experts on the CFB Lacbain, admitted that he did not personally
technology or on environmental matters. These conduct any study on the environmental or health
witnesses even admitted on cross-examination effects of a coal-firedpower plant, but only
that theyare not competent to testify on the attended seminars and conferences pertaining to
environmental impact of the subject project. What climate change; and that the scientific studies
is wanting in their testimonies is their technical mentioned in the penultimate whereas clause of
knowledgeof the project design/implementation Resolution No. 2011-149 (Exhibit "AAAAA") of the
or some other aspects of the project, even those Sangguniang Panlalawiganof Zambales is based
not requiring expertknowledge, vis-à-vis the on what he read on the internet, seminars he
significant negative environmental impacts which attended and what he heard from unnamed
the Casiño Group alleged will occur. Clearly, the experts in the field of environmental protection.
Casiño Group failed to carry the onusof proving the In his Judicial Affidavit (Exhibit "HHHHH"),
alleged significant negative environmental Palatino stated that he was furnished by the
impacts of the project. In comparison, RP Energy concerned residents the Key Observations and
presented several experts to refute the allegations Recommendations on the EIS of Proposed RPE
of the Casiño Group. Project by Rex Victor O. Cruz, and that he merely
As aptly and extensively discussed by the received and read the five (5) scientific studies and
appellate court: articles which challenge the CFB technology.
Petitioners120 presented three (3) witnesses, Palatino also testified that: he was only furnished
namely, Palatino, Hermoso, and Lacbain, all of by the petitioners copies of the studies mentioned
whom are not experts on the CFB technology or in his Judicial Affidavit and he did not participate
even on environmental matters. Petitioners did not in the execution, formulation or preparation of any
present any witness from Morong or Hermosa. of the said documents; he does not personally
Palatino, a former freelance writer and now a know Rex Cruz or any of the authors of the studies
Congressman representing the Kabataan Partylist, included in his Judicial Affidavit; he did not read
with a degree of BS Education major in Social other materials about coal-fired power plants; he
Studies, admitted that he is not a technical expert. is not aware of the acceptable standards as far as
Hermoso, a Director of the PREDA foundation the operation of a coal-fired power plant is
which is allegedly involved on environmental concerned; petitioner Velarmino was the one who
concerns, and a member of Greenpeace, is not an furnished him copies of the documents in
expert on the matter subject of this case. He is a reference to the MOU and some papers related to
the case; petitioner Peralta was the one who e- director of boiler performance and mechanical
mailed to him the soft copy ofall the documents design engineering and pulverized coal product
[letters (a) to (o) of his Judicial Affidavit], except director. He explained that: CFB stands for
the LGU Resolutions; and he has never been at the Circulating Fluidized Bed; it is a process by which
actual Power Plant projectsite. It must be noted fuel is fed to the lower furnace where it is burned
that petitioners Velarmino and Peralta were never in an upward flow of combustion air; limestone,
presented as witnesses in this case. In addition, which is used as sulfur absorbent, is also fed to the
Palatino did not identify the said studies but lower furnace along with the fuel; the mixture
simplyconfirmed that the said studies were offuel, ash, and the boiler bed sorbent material is
attached to the Petition. carried to the upper part of the furnace and into a
Indeed, under the rules of evidence, a witness can cyclone separator; the heavier particles which
testify only to those facts which the witness knows generally consist of the remaining uncombusted
of his orher personal knowledge, that is, which are fuel and absorbent material are separated in the
derived from the witness’ own perception. cyclone separator and are recirculated to the lower
Concomitantly, a witness may not testify on furnace to complete the combustion of any
matters which he or she merely learned from unburned particles and to enhance SO2 capture by
others either because said witness was told or the sorbent; fly ash and flue gas exit the cyclone
read or heard those matters. Such testimony is and the fly ash is collected in the electrostatic
considered hearsay and may not be received as precipitator; furnace temperature is maintained in
proof of the truth of what the witness has learned. the range of 800° to 900° C by suitable heat
This is known as the hearsay rule. Hearsay is absorbing surface; the fuel passes through a
notlimited to oral testimony or statements; the crusher that reduces the size to an appropriate
general rule that excludes hearsay as evidence size prior to the introduction into the lower furnace
applies to written, as well as oral statements. along with the limestone; the limestone is used as
There are several exceptions to the hearsay rule a SO2 sorbent which reacts with the sulfur oxides
under the Rules of Court, among which are learned to form calcium sulfate, an inert and stable
treatises under Section 46 of Rule 130, viz: material; air fans at the bottom of the furnace
"SEC. 46. Learned treatises. -A published treatise, create sufficient velocity within the steam
periodical or pamphlet on a subjectof history, law, generator to maintain a bed of fuel, ash, and
science, or art is admissible as tending to prove limestone mixture; secondary air is also
the truth of a matter stated therein if the court introduced above the bed to facilitate circulation
takes judicial notice, or a witness expert in the and complete combustion of the mixture; the
subject testifies, that the writer of the statement in combustion process generates heat, which then
the treatise, periodical or pamphlet is recognized heats the boiler feedwater flowing through boiler
in his profession or calling as expert in the tube bundles under pressure; the heat generated in
subject." the furnace circuit turns the water to saturated
The alleged scientific studies mentioned in the steam which is further heated to superheated
Petition cannot be classified as learned treatises. steam; this superheated steam leaves the CFB
We cannot take judicial notice of the same, and no boiler and expands through a steam turbine; the
witness expert in the subjectmatter of this case steam turbine is directly connected to a generator
testified, that the writers of the said scientific that turns and creates electricity; after making its
studies are recognized in their profession or way through the steam turbine, the low-pressure
calling as experts in the subject. steam is exhausted downwards into a condenser;
In stark contrast, respondent RP Energy presented heat is removed from the steam, which cools and
several witnesses on the CFB technology. condenses into water (condensate); the
In his Judicial Affidavit, witness Wong stated that condensate is then pumped back through a train
he obtained a Bachelor of Science, Major in of feedwater heaters to gradually increase its
Mechanical Engineering from Worcester temperature beforethis water is introduced to the
Polytechnic Institute; he is a Consulting Engineer boiler to start the process all over again; and CFB
of Steam Generators of URS; he was formerly technology has advantagesover pulverized coal
connected with Foster Wheeler where he held the firing without backend cleanup systems, i.e.,
positions of site commissioning engineer, testing greater fuel flexibility, lower SO2 and NOx
engineer, instrumentation and controls engineer, emissions. Moreover, Wong testified, inter alia,
mechanical equipment department manager, that: CFBs have a wider range of flexibility so they
can environmentally handle a wider range of fuel In his Judicial Affidavit, Ouano stated that: he is a
constituents, mainly the constituent sulfur; and is licensed Chemical Engineer, Sanitary Engineer and
capable of handling different types of coal within Environmental Planner in the Philippines; he is
the range of the different fuelconstituents; since also a chartered Professional Engineer inAustralia
CFB is the newer technology than the PC or stalker and a member of the colleges of environmental
fire, it has better environmental production; 50 engineers and chemical engineers of the
percent ofthe electric generation in the United Institution of Engineers (Australia); he completed
States is still produced by coal combustion; and his Bachelor in Chemical Engineering in 1970,
the CFB absorbs the sulfur dioxide before it is Master of Environmental Engineering in 1972 and
emitted; and there will be a lower percentage of Doctor of Environmental Engineering in 1974; he
emissions than any other technology for the coal. also graduated from the University of Sydney Law
In his Judicial Affidavit, Sarrki, stated that: he is School with the degree of Master of Environmental
the Chief Engineer for Process Concept in Law in 2002 and PhD in Law from Macquarie
FosterWheeler; he was a Manager of Process University in 2007. He explained in his Judicial
Technology for Foster Wheeler from 1995 to 2007; Affidavit that: the impacts identified and analyzed
and he holds a Master of Science degree in in the EIA process are all potential or likely
Chemical Engineering.He explained that: CFB impacts; there are a larger number of EIA
boilers will emit PAHs but only in minimal techniques for predicting the potential
amounts, while BFB will produce higher PAH environmental impacts; it is important to note that
emissions; PAH is a natural product of any all those methods and techniques are only for
combustion process; even ordinary burning, such predicting the potential environmental impacts,
as cooking or driving automobiles, will have some not the real impacts; almost all environmental
emissions that are not considered harmful; it is systems are non-linear and they are subject to
only when emissions are of a significant level that chaotic behavior that even the most sophisticated
damage may be caused; a CFB technology has computer could not predict accurately; and the
minimal PAH emissions; the high combustion actual or real environmental impact could only be
efficiency of CFB technology, due to long established when the project is in actual operation.
residence time of particles inside the boiler, leads He testified, inter alia, that: the higher the
to minimal emissions of PAH; other factors such temperature the higher the nitrous oxide emitted;
as increase in the excess air ratio[,] decrease in in CFB technology, the lower the temperature, the
Ca/S, as well as decrease in the sulfur and chlorine lower is the nitrogen oxide; and it still has a
contents of coal will likewise minimize PAH nitrogen oxide but not as high as conventional
production; and CFB does not cause emissions coal; the CFB is the boiler; from the boiler
beyond scientificallyacceptable levels. He itself,different pollution control facilities are going
testified, inter alia, that: the CFB technology is to be added; and for the overall plant with the
used worldwide; they have a 50% percent share of pollution control facilities, the particulate matters,
CFB market worldwide; and this will be the first nitrogen oxide and sulfur dioxide are under
CFB by Foster Wheeler in the Philippines; Foster control. (Citations omitted)121
Wheeler manufactures and supplies different We also note that RP Energy controverted in detail
type[s] of boilers including BFB, but CFB is always the afore-summarized allegations of the Casiño
applied on burning coal, so they do not apply any Group on the four areas of environmental damage
BFB for coal firing; CFB has features which have that will allegedly occur upon the construction and
much better combustion efficiency, much lower operation of the power plant:
emissions and it is more effective as a boiler 1. On thermal pollution of coastal waters.
equipment; the longer the coal stays inthe As to the extent of the expected rise in water
combustion chamber, the better it is burned; eight temperature once the power plant is operational,
(8) seconds is already beyond adequate but it Ms. Mercado stated in her JudicialAffidavit thus:
keeps a margin; in CFB technology, combustion Q: What was the result of the Thermal Plume
technology is uniform throughout the combustion Modeling that was conducted for RP Energy?
chamber; high velocity is used in CFB technology, A: The thermal dispersion modeling results show
that is vigorous mixing or turbulence; turbulence is that largest warming change (0.95°C above
needed to get contact between fuel and ambient) is observed in the shallowest (5 m)
combustion air; and an important feature of CFB is discharge scenario. The warmest surface
air distribution. temperature change for the deepest (30 m)
scenario is 0.18°C. All the simulated scenarios of the organisms; (3) Mobility or Space for
comply with the DAO 90-35 limit for temperature Migration (i.e., an aquarium with limited space or
rise of 3°C within the defined 70 x 70 m mixing an open ocean that the organism can move to a
zone. The proposed power plant location is near space more suited to [a] specific need, such as the
the mouth of Subic Bay, thus the tidal currents migratory birds); and (4) Ecosystem Complexity
influence the behavior of thermal discharge plume. and Succession. The more complex the ecosystem
Since the area is well-flushed, mixing and dilution the more stable it is as succession and adaptation
of the thermal discharge is expected. [are] more robust.
It also concluded that corals are less likely to be Normally, the natural variation in water
affected by the cooling water discharge as corals temperature between early morning to late
may persist in shallow marine waterswith afternoon could be several degrees (four to five
temperatures ranging from 18°C to 36°C. The degrees centigrade and up to ten degrees
predicted highest temperature of 30.75°C, from centigrade on seasonal basis). Therefore, the less
the 0.95°C increase in ambient in the shallowest (5 than one degree centigrade change predicted by
m) discharge scenario, is within this range.122 the GHD modeling would have minimal impact.123
In the same vein, Dr. Ouano stated in his Judicial On cross-examination, Dr. Ouano further
Affidavit: explained—
Q: In page 41, paragraph 99 of the Petition, it was ATTY. AZURA:
alleged that: "x x x a temperature change of 1°C to x x x When you say Organism Type – you
2°C canalready affect the metabolism and other mentioned that mammals have a higher tolerance
biological functions of aquatic organisms such as for temperature change?
mortality rate and reproduction." What is your DR. OUANO:
expert opinion, if any, on this matter alleged by the Yes.
Petitioners? ATTY. AZURA:
A: Living organisms have proven time and again What about other types of organisms, Dr. Ouano?
that they are very adaptable to changes in the Fish for example?
environment. Living organisms have been isolated DR. OUANO:
in volcanic vents under the ocean living on the Well, mammals have high tolerance because
acidic nutrient soup of sulfur and other minerals mammals are warm[- ]blooded. Now, when it
emitted by the volcano to sub-freezing comes to cold[-]blooded animals the tolerance is
temperature in Antarctica. Asa general rule, much lower. But again when you are considering x
metabolism and reproductive activity [increase] x x fish [e]specially in open ocean you have to
with temperature until a maximum is reached after remember that nature by itself is x x x very brutal x
which [they decline]. For this reason, during winter, x x where there is always the prey-predator
animals hibernate and plants become dormant relationship. Now, most of the fish that we have in
after shedding their leaves. It is on the onset of open sea [have] already a very strong adaptability
spring that animals breed and plants bloom when mechanism.And in fact, Kingman back in 1964 x x
the air and water are warmer. At the middle of x studied the coal reefaround the gulf of Oman
autumn when the temperature drops to single where the temperature variation on day to day
digit, whales, fish, birds and other living basis varied not by 1 degree to 2 degrees but by
organisms, which are capable of migrating, move almost 12 degrees centigrade. Now, in the Subic
to the other end of the globe where spring is just Bay area which when you’re looking at it between
starting. In the processes of migration, those daytime variation, early dawn when it is cold, the
migratory species have to cross the tropics where air is cold, the sea temperature, sea water is quite
the temperature is not just one or two degrees cold. Then by 3:00 o’clock in the afternoon it starts
warmer but 10 to 20 degrees warmer. When to warm up. Sothe variation [in the] Subic Bay area
discussing the impact of 1 to 2 degrees is around 2 to 4 degrees by natural variation from
temperature change and its impact on the the sun as well as from the current that goes
ecosystem, the most important factors to consider around it. So when you are talking about what the
are – (1) Organism Type – specifically its report has said of around 1 degree change, the
tolerance to temperature change (mammals have total impact x x x on the fishes will be minimal. x x
higher tolerance); (2) Base Temperature – it is the x
temperature over the optimum temperature such ATTY. AZURA:
that an increasewill result in the decline in number
x x x So, you said, Dr. Ouano, that fish, while they Specifically, Dr. Ouano, what does negligible
have a much lower tolerance for temperature mean, what level of variation are we talking about?
variation, are still very adaptable. What about DR. OUANO:
other sea life, Dr. Ouano, for example, sea reptiles? If you are talking about a thermometer, you might
DR. OUANO: be talking about, normally about .1 degrees
That’s what I said. The most sensitive part of the centigrade. That’sthe one that you could more or
marine ecology is physically the corals because less ascertain. x x x
corals are non-migratory, they are fix[ed]. ATTY. AZURA:
Second[ly] x x x corals are also highly dependent Dr. Ouano, you mentioned in youranswer to the
on sunlight penetration. If they are exposed out of same question, Question 51, that there is a normal
the sea, they die; if theyare so deep, they die. And variation in water temperature. In fact, you said
that is why I cited Kingman in his studies of coral there is a variation throughout the day, daily and
adaptability [in] the sea ofOman where there was a also throughout the year, seasonal. Just to clarify,
very high temperature variation, [they] survived. Dr. Ouano. When the power plant causes the
ATTY. AZURA: projected temperature change of 1 degree to 2
Would you be aware, Dr. Ouano, if Kingman has degrees Celsius this will be in addition to existing
done any studies in Subic Bay? variations? What I mean, Dr. Ouano, just so I can
DR. OUANO: understand, how will that work? How will the
Not in Subic Bay but I have reviewedthe temperature change caused by the power plant
temperature variation, natural temperature work with the existing variation? DR. OUANO:
variation from the solar side, the days side as well There is something like what we call the zonal
as the seasonal variation. There are two types of mixing. This is an area of approximately one or two
variation since temperatures are very critical. One hectares where the pipe goes out, the hot water
is the daily, which means from early morning to goes out. So that x x x, we have to accept x x x that
around 3:00 o’clock, and the other one is seasonal [throughout it] the zone will be a disturb[ed] zone.
variation because summer, December, January, After that one or two hectares park the water
February are the cold months and then by April, temperature is well mixed [so] that the
May we are having warm temperature where the temperature above the normal existing variation
temperature goes around 32-33 degrees; now practically drops down to almost the normal
Christmas time, it drops to around 18 to 20 level.124
degrees so it[']sa variation of around seasonal 2. On air pollution due to dust and combustion
variation of 14 degrees although some of the fish gases.
might even migrate and that is why I was trying to To establish that the emissions from the operation
put in corals because they are the ones that are of the power plant would be compliant with the
really fix[ed]. They are not in a position to migrate standards under the Clean Air Act,125 Ms. Mercado
in this season. stated in her Judicial Affidavit thus:
ATTY. AZURA: 271. Q: What was the result of the Air Dispersion
To clarify. You said that the most potentially Modeling that was conducted for RP Energy?
sensitive part of the ecosystem would be the A: The Air Dispersion Modeling predicted that the
corals. DR. OUANO: Power Plant Project will produce the following
Or threatened part because they are the ones [that] emissions, which [are] fully compliant with the
are not in a position to migrate. standards set by DENR:
ATTY AZURA: Predicted National Ambient
In this case, Dr. Ouano, with respectto this project GLC126 for 1-hr Air Quality
and the projected temperature change, will the averaging period Guideline Values
corals in Subic Bay be affected?
DR. OUANO: SO2 45.79 µg/Nm3 340 µg/Nm3
As far as the outlet is concerned, they have
established it outside the coral area. By the time it NO2 100.8 µg/Nm3 260 µg/Nm3
reaches the coral area the temperature variation,
as per the GHD study is very small, it[’]s almost CO 10 µg/Nm3 35 µg/Nm3
negligible.
ATTY AZURA:
Predicted GLC for National Ambient It means there are more emissions that could
8-hr averaging Air Quality potentially be released when it is under upset
period Guideline Values condition.
ATTY. AZURA:
CO 0.19 mg/ncm 10 µg/Nm3 I also noticed, Ms. Mercado, at the bottom part of
this chart there are Receptor IDs, R1, R2, R3 and so
forth and on page 188 of this same document,
Predicted GLC for National Ambient Annex "9-Mercado," there is a list identifying these
24-hr averaging Air Quality receptors, for example, Receptor 6, Your Honor,
period Guideline Values appears to have been located in Olongapo City,
Poblacion. Just so I can understand, Ms. Mercado,
SO2 17.11 µg/Nm3 180 µg/Nm3 does that mean that if upset condition[s] were to
occur, the Olongapo City Poblacion will be affected
NO2 45.79 µg/Nm3 150 µg/Nm3
by the emissions? MS. MERCADO:
All it means is that there will be higher emissions
Predicted GLC for National Ambient and a higher ground concentration. But you might
1-yr averaging Air Quality want to alsopay attention to the "y axis," it says
period Guideline Values there GLC/CAA [Ground Level
Concentration/Clean Air Act limit]. So it means
SO2 6.12 µg/Nm3 80 µg/Nm3 that even under upset conditions… say for R6, the
ground level concentration for upset condition is
NO2 No standard --- still around .1 or 10% percent only of the Clean Air
Act limit. So it’s still much lower than the limit.
CO No standard --- ATTY. AZURA:
272. Q: What other findings resulted from the Air But that would mean, would it not, Ms. Mercado,
Dispersion Modeling, if any? that in the event of upset conditions[,]
A: It also established that the highest GLC to emissionswould increase in the Olongapo City
CleanAir Act Standards ratio among possible Poblacion?
receptors was located 1.6 km North NorthEast MS. MERCADO:
("NNE") of the Power Plant Project. Further, this Not emissions will increase. The emissions will be
ratio was valued only at 0.434 or less than half of the same but the ground level concentration, the
the upper limit set out in the Clean Air Act. This GLC, will be higher if you compare normal versus
means that the highest air ambient quality upset. But even if it[’]s under upset conditions, it is
disruption will happen only 1.6 km NNE of the still only around 10% percent of the Clean Air Act
Power Plant Project, and that such disruption Limit.
would still be compliant with the standards xxxx
imposed by the Clean Air Act.127 J. LEAGOGO:
The Casiño Group argued, however, that, as stated So you are trying to impress upon this Court that
inthe EIS, during upset conditions, significant even if the plant is in an upset condition, it will emit
negative environmental impact will result from the less than what the national standards dictate?
emissions. This claim was refuted by RP Energy’s MS. MERCADO:
witness during cross-examination: Yes, Your Honor.128
ATTY. AZURA: With respect to the claims that the powerplant will
If I may refer you to another page of the same release dangerous PAHs and CO, Engr. Sarrki
annex, Ms. Mercado, that’s page 202 of the same stated in his Judicial Affidavit thus:
document, the August 2012. Fig. 2-78 appears to Q: In page 42, paragraph 102 of the Petition, the
show, there’s a Table, Ms. Mercado, the first table, Petitioners alleged that Volatile Organic
the one on top appears to show a comparison in Compounds ("VOC") specifically Polycyclic
normal and upset conditions. I noticed, Ms. Aromatic Hydrocarbon ("PAH") will be emitted
Mercado, that the black bars are much higher than even by CFB boilers. What can you say about this?
the bars in normal condition. Can you state what A: Actually, the study cited by the Petitioners does
this means? not apply to the present case because it does not
MS. MERCADO: refer to CFB technology. The study refers to a
laboratory-scale tubular Bubbling Fluidized Bed
("BFB") test rig and not a CFB. CFB boilers will emit International Finance Corporation ("IFC")
PAHs but only in minimal amounts. Indeed, a BFB standards. Furthermore, characteristics of CFB
will produce higher PAH emissions. technology such as long residence time, uniform
xxxx temperature and high turbulence provide an
Q: Why can the study cited by Petitioners not apply effective combustion environment which results
in the present case? [in] lower and safer CO emissions.
A: The laboratory-scale BFB used in the study only Q: I have no further questions for youat the
has one (1) air injection point and does not moment. Is there anything you wish to add to the
replicate the staged-air combustion process of the foregoing?
CFB that RP Energy will use. Thisstaged-air A: Yes. PAH is a natural product of ANY
process includes the secondary air. Injecting combustion process. Even ordinary burning, such
secondary air into the system will lead to more as cooking or driving automobiles, will have some
complete combustion and inhibits PAH emissions that are not considered harmful. It is
production. There is a study entitled "Polycyclic only when emissions are of a significant level that
Aromatic Hydrocarbon (PAH) Emissions from a damage may be caused.
Coal-Fired Pilot FBC System" byKunlei Liu, Wenjun Given that the Power Plant Project will utilize CFB
Han, Wei-Ping Pan, John T. Riley found in the technology, it will have minimal PAH emissions.
Journal of Hazardous Materials B84 (2001) where The high combustion efficiency of CFB technology,
the findings are discussed. due to the long residence time of particles inside
Also, the small-scale test rig utilized in the study the boiler, leads to the minimal emissions of PAH.
does not simulate the process conditions Furthermore,other factors such as increase in the
(hydrodynamics, heat transfer characteristics, excess air ratio, decrease in Ca/S, as well as
solid and gas mixing behavior, etc.) seen in a large decrease in the sulfur and chlorine contents of
scale utility boiler, like those which would be coal will likewise minimize PAH production. CFB
utilized by the Power Plant Project. does not cause emissions beyond scientifically
xxxx acceptable levels, and we are confident it will not
Q: Aside from residence time of particles and result in the damage speculated by the
secondary air, what other factors, if any, reduce Petitioners.129
PAH production? 3. On water pollution from toxic coal combustion
A: Increase in the excess air ratio will also waste.
minimizePAH production. Furthermore, decrease With regard to the claim that coal combustion
in Calcium to Sulfur moral ratio ("Ca/S"), as well as waste produced by the plant will endanger the
decrease in the sulfur and chlorine contents of health of the inhabitants nearby, Dr. Ouano stated
coal will likewise minimize PAH production. This is in his Judicial Affidavit thus:
also based on the study entitled "Polycyclic Q: In page 43, paragraph 110 of the Petition, it was
Aromatic Hydrocarbon (PAH) Emissions from a alleged that: "[s]olid coal combustion waste is
Coal-Fired Pilot FBC System" by Kunlei Liu, highly toxic and is said to cause birth defects and
Wenjun Han, Wei-Ping Pan, John T. Riley. cancer risks among others x x x." What is your
In RP Energy’s Power Plant Project, the projected expert opinion, if any, on this matter alleged by the
coal to be utilized has low sulfur and chlorine Petitioners?
contents minimizing PAH production. Also, due to A: Coal is geologically compressed remains of
optimum conditions for the in-furnace living organisms that roamed the earth several
SO2capture, the Ca/S will be relatively low, million years ago. In the process of compression,
decreasing PAH production. some of the minerals in the soil, rocks or mud, the
Q: In paragraph 104 of the Petition, it was alleged geologic media for compression, are also imparted
that "Carbon monoxide (CO), a poisonous, into the compressed remains. If the compressing
colorless and odorless gas is also produced when media of mud, sediments and rocks contain high
there is partial oxidation or when there is not concentration of mercury, uranium, and other toxic
enough oxygen (O2) to form carbon dioxide substances, the coal formed will likewise contain
(CO2)." What can you say about this? high concentration of those substances. If the
A: CFB technology reduces the CO emissions of compressing materials have low concentration of
the Power Plant Project to safe amounts. In fact, I those substances, then the coal formed will
understand that the projected emissions level of likewise have low concentration of those
the Power Plant Project compl[ies]with the substances. If the coal does not contain excessive
quantities of toxic substances, the solid residues 4.1.52 Fly ash from the electrostatic
are even used in agriculture to supply precipitator is pneumatically removed from
micronutrients and improve the potency of the collection hopper using compressed air
fertilizers. It is used freely as a fill material in roads and transported in dry state to the fly ash
and other construction activities requiring large silo. Two discharge chutes will be installed
volume of fill and as additive in cement at the base of the fly ash silo. Fly ash can
manufacture. After all, diamonds that people love either be dry-transferred through a loading
to hang around their necks and keep close to the spout into an enclosed lorry or truck for
chest are nothing more than the result of special selling, re-cycling, or wet-transferred
geologic action, as those in volcanic pipes on through a wet unloader into open dump
coal.130 trucks and transported to ash cells. Fly ash
RP Energy further argued, a matter which the discharge will operate in timed cycles, with
Casiño Group did not rebut or refute, that the waste an override function to achievecontinuous
generated by the plant will be properly handled, to discharge if required. Fly ash isolation valves
wit: in each branch line will prevent leakage and
4.1.49 When coal is burned in the boiler backflow into non-operating lines.
furnace, two by-products are generated - 4.1.53 Approximately 120,000m² will be
bottom and fly ash. Bottom ash consists required for the construction of the ash cell.
oflarge and fused particles that fall to the Ash will be stacked along the sloping hill,
bottom of the furnace and mix with the bed within a grid of excavations (i.e. cells) with a
media.Fly ash includes finegrained and 5m embankment. Excavated soils will be
powdery particles that are carried away by used for embankment construction and
flue gas into the electrostatic precipitator, backfill. To prevent infiltration [of] ash
which is then sifted and collected. These by- deposits into the groundwater, a clay layer
products are non-hazardous materials. In with minimum depth of400mm will be laid at
fact, a coal power plant’s Fly Ash, Bottom the base of each cell. For every 1-m depth of
Ash and Boiler Slag have consequent ash deposit, a 10-cm soil backfill will be
beneficial uses which "generate significant applied to immobilize ash and prevent
environmental, economic, and performance migration via wind. Ash cell walls will be
benefits." Thus, fly ash generated during the lined with high-density polyethylene to
process will be sold and transported to prevent seepage. This procedure and
cement manufacturing facilities or other treatment method is in fact suitable for
local and international industries. disposal of toxic and hazardous wastes
4.1.50 RP Energy shall also install safety although fly ash is not classified as toxic and
measures to insure that waste from burning hazardous materials.131
of coal shall be properly handled and stored. Anent the claims that the plant is susceptible to
4.1.51 Bottom ash will be continuously earthquake and landslides, Dr. Ouano testified
collected from the furnace and transferred thus:
through a series of screw and chain J. LEAGOGO:
conveyors and bucket elevator to the bottom In terms of fault lines, did you study whether this
ash silo. The collection and handling system project site is in any fault line?
is enclosed to prevent dust generation. DR. OUANO:
Discharge chutes will be installed at the base There are some fault linesand in fact, in the
of the bottom ash silo for unloading. Open Philippines it is very difficult to find an area except
trucks will be used to collect ash through the Palawan where there is no fault line within 20 to
discharge chutes. Bottom ash will be sold, 30 [kilometers]. But then fault lines as well as
and unsold ash will be stored in ash cells. A earthquakes really [depend] upon your engineering
portion of the bottom ash will be reused as design. I mean, Sto. Tomas University has
bed materialthrough the installation of a bed withstood all the potential earthquakes we had in
media regeneration system (or ash recycle). Manila[,] even sometimes it[’]s intensity 8 or so
Recycled bottom ash will be sieved using a because the design for it back in 1600 they are
vibrating screen and transported to a bed already using what we call floating foundation. So
material surge bin for re-injection into the if the engineering side for it[,] technology is there
boiler.
to withstand the expected fault line [movement]. J. redistribute and recycle those essential chemicals
LEAGOGO: for use by plants. Without the NO2 and SO2 in the
What is the engineering side of the project? You air, plant and animal life would be limited to small
said UST is floating. areas of this planet where nitrogen and sulfur are
DR. OUANO: found in abundance. With intensive agricultural
The foundation, that means to say you don’t practices, nitrogen and sulfur are added in the soil
break… as fertilizers.
J. LEAGOGO: Acid rain takes place when the NO2 and SO2
Floating foundation. What about this, what kind of concentration are excessive or beyond those
foundation? values set in the air quality standards. NO2 and
DR. OUANO: SO2 in the air in concentrations lower than those
It will now depend on their engineering design, the set in the standards have beneficial effect to the
type of equipment… environment and agriculture and are commonly
J. LEAGOGO: known as micronutrients.133
No, but did you read it in their report? On clarificatory questions from the appellate
DR. OUANO: It[’]s not there in their report because court, the matter was further dissected thus:
it will depend on the supplier, the equipment J. LEAGOGO:
supplier. x x x The project will release 1,888 tons of nitrous
J. LEAGOGO: oxide per year. And he said, yes; that witness
So it[’]s not yet there? answered, yes, itwill produce 886 tons of sulfur
DR. OUANO: dioxide per year. And he also answered yes, that
It[’]s not yet there in the site but it is also covered these oxides are the precursors to the formation of
inour Building Code what are the intensities of sulfuric acid and nitric acid. Now my clarificatory
earthquakes expected of the different areas in the question is, with this kind of releases there will be
Philippines. acid rain?
J. LEAGOGO: DR. OUANO:
Have you checked our geo-hazard maps in the No.
Philippines to check on this project site? J. LEAGOGO:
DR. OUANO: Why?
Yes. It is included there in the EIA Report. DR. OUANO:
J. LEAGOGO: Because it[’]s so dilute[d].
It[’]s there? J. LEAGOGO:
DR. OUANO: It will?
It[’]s there.132 DR. OUANO:
4. On acid deposition in aquatic and terrestrial Because the acid concentration is so dilute[d] so
ecosystems. that it is not going to cause acid rain.
Relative to the threat of acid rain, Dr. Ouano stated J. LEAGOGO:
in his Judicial Affidavit, thus: The acid concentration is so diluted that it will not
Q: In page 44, paragraph 114 of the Petition, it was cause acid rain?
alleged that "the coalfired power plant will release DR. OUANO:
1,888 tons of nitrous oxides (NOx) per year and Yes .
886 tons of sulfur dioxide (SO2) per year. These J. LEAGOGO:
oxides are the precursors to the formation of What do you mean it[’]s so diluted? How will it be
sulfuric acid and nitric acid which are responsible diluted?
for acid deposition." Whatis your expert opinion on DR. OUANO:
this matter alleged by the Petitioners? Because it[’]s going to be mixed withthe air in the
A: NO2 is found in the air, water and soil from atmosphere; diluted in the air in the atmosphere.
natural processes such as lightning, bacterial And besides this 886 tons, this is not released in
activities and geologic activities as well as from one go, it is released almost throughout the year.
human activities such as power plants and J. LEAGOGO:
fertilizer usage in agriculture. SO2 is also found in You also answered in Question No. 61, "acid
air, water and soil from bacterial, geologic and raintakes place when the NO2 AND SO2
human activities. NO2 and SO2 in the air are part concentration are excessive." So whendo you
of the natural nitrogen and sulfur cycle to widely consider it as excessive?
DR. OUANO: Apart from the foregoing evidence, wealso note
That is something when you are talking about that the above and other environmental concerns
acid… are extensively addressed in RP Energy’s
J. LEAGOGO: Environmental Management Plan or
In terms of tons of nitrous oxide and tons of sulfur Program(EMP). The EMP is "a section in the EIS
oxide, when do you consider it as excessive? that details the prevention, mitigation,
DR. OUANO: compensation, contingency and monitoring
It is in concentration not on tons weight, Your measures to enhance positive impacts and
Honor. minimize negative impacts and risks of a proposed
J. LEAGOGO: project or undertaking."135 One of the conditions of
In concentration? the ECC is that RP Energy shall strictly comply with
DR. OUANO: and implement its approved EMP. The Casiño
In milligrams per cubic meter, milligrams per Group failed to contest, with proof, the adequacy
standard cubic meter. of the mitigating measures stated in the aforesaid
J. LEAGOGO: EMP.
So being an expert, whatwill be the concentration In upholding the evidence and arguments of RP
of this kind of 1,888 tons of nitrous oxide? What Energy, relative to the lack of proof as to the
will be the concentration in terms of your…? alleged significant environmental damage that will
DR. OUANO: be caused by the project, the appellate court relied
If the concentration is in excess ofsomething like mainly on the testimonies of experts, which we
8,000 micrograms per standard cubic meters, then find to be in accord withjudicial precedents. Thus,
there isalready potential for acid rain. we ruled in one case:
J. LEAGOGO: Although courts are not ordinarily bound by
I am asking you, Dr. Ouano, you said it will release testimonies of experts, they may place whatever
1,888 tons of nitrous oxide? weight they choose upon such testimonies in
DR. OUANO: accordance with the facts of the case. The relative
Yes . weight and sufficiency of expert testimony is
J. LEAGOGO: peculiarly within the province of the trial court to
In terms of concentration, what will that be? decide, considering the ability and character of the
DR. OUANO: witness, his actions upon the witness stand, the
In terms of the GHD study that will result [in] 19 weight and process of the reasoning by which he
milligrams per standard cubic meters and the time has supported his opinion, his possible bias in
when acid rain will start [is when the concentration favor of the side for whom he testifies,the fact that
gets] around 8,000 milligrams per standard cubic he is a paid witness, the relative opportunities for
meters. So we have 19 compared to 8,000. So study and observation of the matters about which
weare very, very safe. he testifies, and any other matters which serve to
J. LEAGOGO: illuminate his statements. The opinion of the
What about SO2? expert may not be arbitrarily rejected; it isto be
DR. OUANO: considered by the court in view of all the facts and
SO2, we are talking about ... youwon’t mind if I go circumstances in the case and when common
to my codigo. For sulfur dioxide this acid rain most knowledge utterly fails, the expert opinion may be
likely will start at around 7,000 milligrams per given controlling effects (20 Am. Jur., 1056-
standard cubic meter but then … sorry, it[’]s around 1058). The problem of the credibility of the expert
3,400 micrograms per cubic meter. That is the witness and the evaluation of his testimony is left
concentration for sulfur dioxide, and in our plant it to the discretion of the trial court whose ruling
will be around 45 micrograms per standard cubic thereupon is not reviewable inthe absence of an
meter. So the acid rain will start at 3,400 and the abuse of that discretion.136
emission is estimated here to result to Hence, we sustain the appellate court’s findings
concentration of 45.7 micrograms. that the Casiño Group failed to establish the
J. LEAGOGO: alleged grave environmental damage which will be
That is what GHD said in their report. caused by the construction and operation of the
DR. OUANO: power plant.
Yes. So that is the factor of x x x safety that we In another vein, we, likewise, agree with the
have.134 observationsof the appellate court that the type of
coal which shall be used in the power plant has The specialists shared the judgment that the
important implications as to the possible conditions were not present to merit the operation
significant negative environmental impacts of the of a coal-fired power plant,and to pursue and carry
subject project.137 However, there is no coal supply out the project with confidence and assurance that
agreement, as of yet, entered into by RP Energy the natural assets and ecosystems within the
with a third-party supplier. In accordance with the Freeport area would not be unduly compromised,
terms and conditions of the ECC and in compliance or that irreversible damage would not occur and
with existing environmental laws and standards, that the threats to the flora and fauna within the
RP Energy is obligated to make use of the proper immediate community and its surroundings would
coal type that will not cause significant negative be adequately addressed. The three experts were
environmental impacts. also of the same opinion that the proposed coal
The alleged negative environmental plant project would pose a wide range of negative
assessment of the project by experts in a impacts on the environment, the ecosystems and
report generated during the social human population within the impact zone.
acceptability consultations The specialists likewise deemed the Environment
The Casiño Group also relies heavily on a report on Impact Assessment (EIA) conducted by RPEI to be
the social acceptability process of the power plant incomplete and limited in scope based on the
project to bolster itsclaim that the project will following observations:
cause grave environmental damage. We purposely i. The assessment failed to include areas
discuss this matter in this separate subsection for 10km. to 50km. from the operation site,
reasons which will be made clear shortly. although according tothe panel, sulfur
But first we shall present the pertinent contents of emissions could extend as far as 40-50 km.
this report. ii. The EIA neglected to include other forests
According to the Casiño Group, from December 7 in the Freeport in its scope and that there
to 9, 2011, the SBMA conducted social were no specific details on the protection of
acceptabilitypolicy consultations with different the endangered flora and endemic fauna in
stakeholders on RP Energy’s proposed 600 MW the area. Soil, grassland, brush land, beach
coal plant project at the Subic Bay Exhibition and forests and home gardens were also
Convention Center. The results thereof are apparently not included in the study.
contained in a document prepared by SBMA iii. The sampling methods used inthe study
entitled "Final Report: Social Acceptability Process were limited and insufficient for effective
for RP Energy, Inc.’s 600-MW Coal Plant Project" long-term monitoring of surface water,
(Final Report). We notethat SBMA adopted the erosion control and terrestrial flora and
Final Report as a common exhibit with the Casiño fauna.
Group in the course of the proceedings before the The specialists also discussed the potential
appellate court. effects of an operational coalfired power plant [on]
The Final Report stated that there was a clear its environs and the community therein. Primary
aversion to the concept of a coal-fired power plant among these were the following:
from the participants. Their concerns included i. Formation of acid rain, which would
environmental, health, economic and socio- adversely affect the trees and vegetation in
cultural factors. Pertinent to this case is the the area which, in turn, would diminish forest
alleged assessment, contained in the Final Report, cover. The acid rain would apparently
of the potential effects of the project by three worsen the acidity of the soil in the Freeport.
experts: (1) Dr. Rex Cruz (Dr. Cruz), Chancellor of ii. Warming and acidification of the seawater
the University of the Philippines, Los Baños and a in the bay, resulting in the bio-
forest ecology expert, (2) Dr. Visitacion Antonio, a accumulationof contaminants and toxic
toxicologist, who related information as to public materials which would eventually lead to the
health; and (3) Andre Jon Uychiaco, a marine overall reduction of marine productivity.
biologist. iii. Discharge of pollutants such as Nitrous
The Final Report stated these experts’alleged Oxide, Sodium Oxide, Ozone and other heavy
views on the project, thus: metals suchas mercury and lead to the
IV. EXPERTS’ OPINION surrounding region, which would adversely
xxxx affect the health of the populace in the
vicinity.
V. FINDINGS emissions can extend as far as 40 to 50
Based on their analyses of the subject matter, the km away from the source.
specialists recommended that the SBMA re- 3. There are 39 endemic fauna and 1
scrutinize the coal-fired power plant project with endangered plant species (Molave) in the
the following goals in mind: proposed project site. There will be a need
i. To ensure its coherence and compatibility to make sure that these species are
to [the] SBMA mandate, vision, mission and protected from being damaged
development plans, including its Protected permanently in wholesale. Appropriate
Area Management Plan; measures such as ex situconservation
ii. To properly determine actual and potential and translocation if feasible must be
costs and benefits; implemented.
iii. To effectively determine the impacts on 4. The Project site is largely in grassland
environment and health; and interspersed with some trees. These
iv. To ensure a complete and comprehensive plants if affected by acid rain or by
impacts zone study. sulphur emissions may disappear and
The specialists also urged the SBMA to conduct a have consequences on the soil properties
Comprehensive Cost And Benefit Analysis Of The and hydrological processes in the area.
Proposed Coal Plant Project Relative To Each Accelerated soil erosion and increased
Stakeholder Which Should Include The surface runoff and reduced infiltration of
Environment As Provider Of Numerous rainwater into the soil.
Environmental Goods And Services. 5. The rest of the peninsula is covered with
They also recommended an brushland but were never included as part
Integrated/Programmatic Environmental Impact of the impact zone.
Assessmentto accurately determine the 6. There are home gardens along the coastal
environmental status of the Freeport ecosystem areas of the site planted to ornamental
as basis and reference in evaluating future similar and agricultural crops which are likely to
projects. The need for a more Comprehensive be affected by acid rain.
Monitoring System for the Environment and 7. There is also a beach forest dominated by
Natural Resourceswas also reiterated by the aroma, talisai and agoho which will likely
panel.138 be affectedalso by acid rain.
Of particular interest are the alleged key 8. There are no Environmentally Critical
observations of Dr. Cruz on the EIS prepared by RP Areas within the 1 km radius from the
Energy relative to the project: project site. However, the
Key Observations and Recommendations on the OlongapoWatershed Forest Reserve, a
EIS of Proposed RPE Project protected area is approximately 10
Rex Victor O. Cruz kmsouthwest of the projectsite.
Based on SBMA SAP on December 7-9, 2011 Considering the prevailing wind
1. The baseline vegetation analysis was movement in the area, this forest reserve
limited only within the project site and its is likely to be affected by acid rain if it
immediate vicinity. No vegetation occurs from the emission of the power
analysis was done in the brushland areas plant. This forest reserve is however not
in the peninsula which is likely to be included as partof the potential impact
affected in the event acid rain forms due area.
to emissions from the power plant. 9. Soil in the project site and the peninsula is
2. The forest in the remaining forests inthe thin and highly acidic and deficient in NPK
Freeport was not considered as impact with moderate to severe erosion
zone as indicated by the lack potential. The sparse vegetation cover in
ofdescription of these forests and the the vicinity of the projectsite is likely a
potential impacts the project might have result of the highly acidic soil and the
on these forests. This appears to be a key nutrient deficiency. Additional acidity
omission in the EIS considering that these may result from acid rain that may form in
forests are well within 40 to 50 km away the area which could further make it
from the site and that there are studies harder for the plants to grow in the area
showing that the impacts of sulphur that in turn could exacerbate the already
severe erosion in the area. 10. There is a terrestrial flora and fauna with climate
need to review the proposalto ensure that change, farming and other human
the proposed project is consistent with activities and the resulting influences on
the vision for the Freeport as enunciated soil, water, biodiversity, and other vital
in the SBMA Master Plan and the ecosystem services in the Freeport.139
Protected Area Management Plan. This We agree with the appellate court that the alleged
will reinforce the validity and legitimacy statements by these experts cannot be given
of these plans as a legitimate framework weight because they are hearsay evidence. None
for screening potential locators in the of these alleged experts testified before the
Freeport. Itwill also reinforce the trust and appellate court to confirm the pertinent contents
confidence of the stakeholders on the of the Final Report. No reason appears in the
competence and authority of the SBMA records of this case as to why the Casiño Group
that would translate in stronger popular failed to present these expert witnesses.
support to the programs implemented in We note, however, that these statements, on their
the Freeport. face, especially the observations of Dr. Cruz, raise
11. The EGF and Trust Fund (Table 5.13) serious objections to the environmental
should be made clear that the amounts soundness of the project, specifically, the EIS
are the minimum amount and that thereof.It brings to fore the question of whether
adequate funds will be provided by the the Court can, on its own, compel the testimonies
proponent as necessary beyond the of these alleged experts in order to shed light on
minimum amounts. Furthermore the these matters in view of the rightat stake— not just
basis for the amounts allocated for the damage to the environment but the health, well-
items (public liability and rehabilitation) being and,ultimately, the livesof those who may be
in Trust Fund and in EGF (tree planting affected by the project.
and landscaping, artificial reef The Rules of Procedure for Environmental Cases
establishment) must be clarified. The liberally provide the courts with means and
specific damages and impacts that will be methods to obtain sufficient information in order
covered by the TF and EGF must also be to adequately protect orsafeguard the right to a
presented clearly at the outset to avoid healthful and balanced ecology. In Section 6
protracted negotiations in the event of (l)140 of Rule 3 (Pre-Trial), when there is a failure to
actual impacts occurring in the future. settle, the judge shall, among others, determine
12. The monitoring plan for terrestrial flora the necessity of engaging the services of a
and fauna is not clear on the frequency of qualified expert as a friend of the court (amicus
measurement. More importantly, the curiae). While, in Section 12141 of Rule 7 (Writ of
proposed method of measurement Kalikasan), a party may avail of discovery
(sampling transect) while adequate for measures: (1) ocular inspection and (2) production
estimating the diversity of indices for or inspection of documents or things. The liberality
benchmarking is not sufficient for long[- of the Rules in gathering and even compelling
]term monitoring. Instead, long[-]term information, specifically with regard to the Writ of
monitoringplots (at least 1 hectare in Kalikasan, is explained in this wise: [T]he writ of
size) should be established to monitor the kalikasanwas refashioned as a tool to bridge the
long[-]term impacts of the project on gap between allegation and proof by providing a
terrestrial flora and fauna. remedy for would-be environmental litigants to
13. Since the proposed monitoring of compel the production of information within the
terrestrial flora and fauna is limited to the custody of the government. The writ would
vicinity of the project site, it will be useful effectively serve as a remedy for the enforcement
not only for mitigating and avoiding of the right to information about the environment.
unnecessary adverse impacts ofthe The scope of the fact-finding power could be: (1)
project but also for improving anything related to the issuance, grant of a
management decisions if long[-]term government permit issued or information
monitoring plots for the remaining natural controlled by the government or private entity and
forests in the Freeport are established. (2) [i]nformation contained in documents such as
These plots will also be useful for the environmental compliance certificate (ECC) and
study of the dynamic interactions of other government records. In addition, the [w]rit
may also be employed to compel the production of EIS, do not clearly and specifically establish
information, subject to constitutional limitations. how these omissions have led to the
This function is analogous to a discovery measure, issuance of an ECC that will pose significant
and may be availed of upon application for the negative environmental impacts once the
writ.142 project is constructed and becomes
Clearly, in environmental cases, the power operational. The recommendations stated
toappoint friends of the court in order to shed light therein would seem to suggest points for
on matters requiring special technical expertise as improvement in the operation and
well as the power to order ocular inspections and monitoring of the project,but they do not
production of documents or things evince the main clearly show why such recommendations are
thrust of, and the spirit behind, the Rules to allow indispensable for the project to comply with
the court sufficient leeway in acquiring the existing environmental laws and standards,
necessary information to rule on the issues or how non-compliance with such
presented for its resolution, to the end that the recommendations will lead to an
right toa healthful and balanced ecology may be environmental damage of the magnitude
adequately protected. To draw a parallel, in the contemplatedunder the writ of kalikasan.
protection of the constitutional rights of an Again, these statements do not state with
accused, when life or liberty isat stake, the sufficient particularity how the EMP in the
testimonies of witnesses may be compelled as an EIS failed to adequately address these
attribute of the Due Process Clause. Here, where concerns.
the right to a healthful and balanced ecology of a Fourth, because the reason for the non-
substantial magnitude is at stake, should we not presentation of the alleged expert witnesses
tread the path of caution and prudence by does not appear on record, we cannot
compelling the testimonies of these alleged assume that their testimonies are being
experts? unduly suppressed.
After due consideration, we find that, based on the By ruling that we do not find a sufficiently
statements in the Final Report, there is no compelling reason to compel the taking of the
sufficiently compelling reason to compel the testimonies of these alleged expert witnesses in
testimonies of these alleged expert witnesses for relation to their serious objections to the power
the following reasons. plant project, we do not foreclose the possibility
First, the statementsare not sufficiently that their testimonies could later on be presented,
specificto point to us a flaw (or flaws) in the in a proper case, to more directly, specifically and
study or design/implementation (or some sufficientlyassail the environmental soundness of
other aspect) of the project which provides a the project and establish the requisite magnitude
causal link or, at least, a reasonable of actualor threatened environmental damage, if
connection between the construction and indeed present. After all, their sense ofcivic duty
operation ofthe project vis-à-vis potential may well prevail upon them to voluntarily testify, if
grave environmental damage. In particular, there are truly sufficient reasons tostop the
they do not explain why the Environmental project, above and beyond their inadequate claims
Management Plan (EMP) contained in the in the Final Report that the project should not be
EIS of the project will notadequately address pursued. As things now stand,however, we have
these concerns. insufficient bases to compel their testimonies for
Second, some of the concerns raisedin the the reasons already proffered.
alleged statements, like acid rain, warming The alleged admissions of grave environmental
and acidification of the seawater, and damage in the EIS of the project.
discharge of pollutants were, as previously In their Omnibus Motions for Clarification and
discussed, addressed by the evidence Reconsideration before the appellate court and
presented by RP Energy before the appellate Petition for Review before thisCourt, the Casiño
court. Again, these alleged statements do Group belatedly claims that the statements in the
not explain why such concerns are not EIS prepared by RPEnergy established the
adequately covered by the EMP of RP significant negative environmental impacts of the
Energy. project. They argue in this manner:
Third, the key observations of Dr. Cruz, while Acid Rain
concededly assailing certain aspects of the
35. According to RP Energy’s Environmental conveyors and coal dome) to eliminate the
Impact Statement for its proposed 2 x 150 MW exposure of coal to open air, and therefore
Coal-Fired Thermal Power Plant Project, acid rain greatly reduce the potential for particulates
may occur in the combustion of coal, to wit – x x x from being carried away by wind
x (coalhandling systems, Section 3.4.3.3). In
During the operation phase, combustion of coal addition, the proposed process will include
will result in emissions of particulates SOx and an electrostaticprecipitator that will remove
NOx. This may contribute to the occurrence of acid fly ash from the flue gas prior to its release
rain due to elevated SO2 levels in the atmosphere. through the stacks, and so particulates
High levels of NO2 emissions may give rise to emissions will be minimal.146 (Emphasis
health problems for residents within the impact supplied)
area. We agree with RP Energy that, while the EIS
xxxx discusses the subjects of acid rain and asthma
Asthma Attacks attacks, it goes on to state that there are
36. The same EPRMP143 mentioned the incidence mitigating measures that will be put in place to
of asthma attacks [as a] result of power plant prevent these ill effects. Quite clearly, the Casiño
operations, to wit – Group quoted piecemeal the EIS in sucha way as
xxxx to mislead this Court as to its true and full
The incidence of asthma attacks among residents contents.
in the vicinity of the project site may increase due We deplore the way the Casiño Group has argued
to exposure to suspended particulates from plant this point and we take this time to remind it that
operations.144 litigants should not trifle withcourt processes.
RP Energy, however, counters that the above Along the same lines, we note how the Casiño
portions of the EIS were quoted out of context. As Group has made serious allegations in its Petition
to the subject of acid rain, the EIS states in full: for Writ of Kalikasanbut failed to substantiate the
Operation same in the course of the proceedings before the
During the operation phase, combustion of coal appellate court. In particular, during the
will result in emissions of particulates, SOx and preliminary conference of this case, the Casiño
NOx. This may contribute to the occurrence of acid Group expressly abandoned its factual claims on
rain due to elevated SO2 levels in the atmosphere. the alleged grave environmental damage that will
High levels of NO2 emissions may give rise to be caused by the power plant (i.e., air, water and
health problems for residents within the impact land pollution) and, instead, limited itself to legal
area. Emissions may also have an effect issues regarding the alleged non-compliance of
onvegetation (Section 4.1.4.2). However, the use RP Energy with certain laws and rules in the
of CFBC technology is a built-in measure that procurement of the ECC.147 We also note how the
results in reduced emission concentrations. SOx Casiño Group failed to comment on the subject
emissions will beminimised by the inclusion of a Petitions before this Court, which led this Court to
desulfurisation process, whilst NOx emissions will eventually dispense with its comment.148 We must
be reduced as the coal is burned at a temperature express our disapproval over the way it has
lower than that required to oxidise prosecuted itsclaims, bordering as it does on
nitrogen.145 (Emphasis supplied) trifling with court processes. We deem itproper,
As to the subject of asthma attacks, the EIS states therefore, to admonishit to be more circumspect in
in full: how it prosecutesits claims.
The incidence of asthma attacks among In sum, we agree with the appellate court that the
residents in the vicinity of the project site Casiño Group failed to substantiate its claims
may increase due to exposureto suspended thatthe construction and operation of the power
particulates from plant operations. Coal and plant will cause environmental damage of the
ash particulates may also become magnitude contemplated under the writ of
suspended and dispersed into the air during kalikasan. The evidence it presented is inadequate
unloading and transport, depending on wind to establish the factual bases of its claims.
speed and direction. However, effect on air II.
quality due to windblown coal particulates Whether the ECC is invalid for lack of signature of
will be insignificant as the coal handling Mr. Luis Miguel Aboitiz (Mr. Aboitiz), as
system will have enclosures (i.e. enclosed
representative of RP Energy, in the Statement of Now, who is the authorized representative of RP
Accountability of the ECC. Energy?
The appellate court ruled that the ECC is invalid MS. MERCADO:
because Mr. Aboitiz failed to sign the Statement of It would be Mr. Aaron Domingo, I believe.
Accountability portion of the ECC. J. LEAGOGO:
We shall discuss the correctness ofthis ruling on Please tell the Court why this was not signed by
both procedural and substantive grounds. Mr. Luis Miguel Aboitiz, the Statement of
Procedurally, we cannot fault the DENR for Accountability?
protesting the manner by which the appellate court Because the Statement of Accountability says,
resolved the issue of the aforesaid lack of "Mr. Luis Miguel Aboitiz, Director, representing
signature. We agree with the DENR that this issue Redondo Peninsula Energy with office address
was not among those raised by the Casiño Group located at 110 Legaspi Street, Legaspi Village,
in its Petition for Writ of Kalikasan.149 What is Makati City, takes full responsibility in complying
more, this was not one of the triable issues with all conditions in thisEnvironmental
specificallyset during the preliminary conference Compliance Certificate [ECC][.]" Will you tell this
of this case.150 Court why this was not signed?
How then did the issue oflack of signature arise? MS. MERCADO:
A review of the voluminous records indicates that It was signed, Your Honor, but this copy wasn’t
the matterof the lack of signature was discussed, signed. My apologies, I was the one who provided
developed or surfaced only inthe course of the this, I believe, to the lawyers. This copy was not
hearings, specifically, on clarificatory questions signed because during….
from the appellate court, to wit: J. LEAGOGO:
J. LEAGOGO: But this is your exhibit, this is yourExhibit "18" and
I would also show to you your ECC, that’s page 622 this is not signed. Do you agree with me that your
of the rollo. I am showing to you this Exhibit "18" is not signed by Mr. Aboitiz?
Environmental Compliance Certificate dated MS. MERCADO:
December 22, 2008 issued by Sec. Jose L. Atienza, That’s correct, Your Honor.151
Jr. of the DENR. This is your "Exhibit "18." Would We find this line of questioning inadequate to
you like to go over this? Are you familiar with this apprise the parties that the lack of signature would
document? be a key issue in this case; as in fact it became
MS. MERCADO: decisive in the eventual invalidation of the ECC by
Yes, it[’]s my Annex "3," Your Honor. the appellate court.
J. LEAGOGO: Concededly, a court has the power to suspend its
I would like to refer you to page 3 of the ECC dated rules of procedure in order to attain substantial
December 22, 2008. Page 2 refers to the justice so that it has the discretion, in exceptional
Environmental Compliance Certificate, ECC Ref. cases, to take into consideration matters not
No. 0804-011-4021. That’s page 2 of the letter originally within the scope of the issues raised in
dated December 22, 2008. And on page 3, Dr. the pleadings or set during the preliminary
Julian Amador recommended approval and it was conference, in order to prevent a miscarriage of
approved by Sec. Atienza. You see that on page 3? justice. In the case at bar, the importance of the
MS. MERCADO: signature cannot be seriously doubted because it
Yes, Your Honor. goes into the consent and commitment of the
J. LEAGOGO: project proponent to comply with the conditions of
Okay. On the same page, page 3, there’s a the ECC, which is vital to the protection of the right
Statement of Accountability. to a balanced and healthful ecology of those who
MS. MERCADO: may be affected by the project. Nonetheless, the
Yes, Your Honor. power of a court tosuspend its rules of procedure
J. LEAGOGO: in exceptional cases does not license it to foist a
Luis, who is Luis Miguel Aboitiz? surprise on the parties in a given case. To
MS. MERCADO: illustrate, in oral arguments before this Court,
During that time he was the authorized involving sufficiently important public interest
representative of RP Energy, cases, we note that individual members of the
Your Honor. Court, from time to time, point out matters that
J. LEAGOGO: may not have been specifically covered by the
advisory (the advisory delineates the issues to be the rest of the requirements
argued and decided). However, a directive is given are in terms of EMB office of
to the concerned parties to discuss the aforesaid application, endorsing and
matters in their memoranda. Such a procedure decision authorities, duration
ensures that, at the very least, the parties are of processing.
apprised that the Court has taken an interest in
such matters and may adjudicate the case on the 2.0 SCOPING Scopingis a Proponent-driven
basis thereof. Thus, the parties are given an multi-sectoral formal process
opportunity to adequately argue the issue or meet of determining the focused
the issue head-on. We, therefore, find that the Terms of Reference of the EIA
appellate court should have, at the very least, Study. Scoping identifies the
directed RP Energy and the DENR to discuss and most significant
elaborate on the issue of lack of signature in the issues/impacts of a proposed
presentation of their evidence and memoranda, project, and then, delimits the
beforemaking a definitive ruling that the lack extent of baseline information
thereof invalidated the ECC.This is in keeping with to those necessary to
the basic tenets of due process. evaluate and mitigate the
At any rate, we shall disregard the procedural impacts. The need for and
defect and rule directly on whether the lack of scope of an Environmental
signature invalidated the ECC in the interest of Risk Assessment (ERA) is also
substantial justice. done during the scoping
The laws governing the ECC, i.e., session. Scoping is done with
PresidentialDecree No. (PD) 1151 and PD 1586, do the local community through
not specifically state that the lack of signature in Public Scoping and with a
the Statement of Accountability has the effect of third party EIA Review
invalidating the ECC. Unlike in wills or donations, Committee (EIARC) through
where failure to comply withthe specific form Technical Scoping, both with
prescribed by law leads to its nullity,152 the the participation of the DENR-
applicable laws here are silentwith respect to the EMB. The process results in a
necessity of a signature in the Statement of signed Formal Scoping
Accountability and the effect of the lack thereof. Checklist by the review team,
This is, of course, understandable because the with final approval by the EMB
Statement of Accountability is a mere off-shoot of Chief.
the rule-making powers of the DENR relative tothe
implementation of PD 1151 and PD 1586. To EIA STUDY The EIA Studyinvolves a
determine, therefore, the effect of the lack of and description of the proposed
signature, we must look atthe significance thereof 3.0 REPORT project and its alternatives,
under the Environmental Impact Assessment (EIA) PREPARATION characterization of the project
Rules of the DENR and the surrounding environment, impact
circumstances of this case. identification and prediction,
To place this issue in its proper context, a helpful evaluation of impact
overview of the stages of the EIA process, taken significance, impact
from the Revised Manual, is reproduced below: mitigation, formulation of
Figure 1-3 Overview of Stages of the Philippine Environmental Management
EIA Process153 and Monitoring Plan,
withcorresponding cost
1.0 Screeningdetermines if a
estimates and institutional
SCREENING project is covered or not
support commitment. The
covered by the PEISS.154 If a
study results are presented in
project is covered, screening
an EIA Reportfor which an
further determines what
outline is prescribed by EMB
document type the project
for every major document
should prepare to secure the
type
needed approval, and what
EIA REPORT Review of EIA commitments prior to the
4.0 REPORT Reportsnormally entails an release of the ECC. 156 The
and EMB procedural screening for ECC is then transmitted to
EVALUATION compliance with minimum concerned LGUs and other
requirements specified during GAs for integration into their
Scoping, followed by a decisionmaking process. The
substantive review of either regulated part of EIA Review
composed third party experts is limited to the processes
commissioned by EMB as the within EMB control. The
EIA Review Committee for timelines for the issuance of
PEIS/EIS-based applications, decision documents provided
or DENR/EMB internal for in AO 42 and DAO 2003-
specialists, the Technical 30 are applicable only from
Committee, for IEE-based the time the EIA Report is
applications. EMB evaluates accepted for substantive
the EIARC recommendations review to the time a decision
and the public’s inputs during is issued on the application.
public consultations/hearings
in the process of MONITORING. Monitoring, Validation and
recommending a decision on 6.0 Evaluation/Audit stage
the application. The EIARC VALIDATION, assesses performance of the
Chair signs EIARC and Proponent against the ECC
recommendations including EVALUATION/ and itscommitments in the
issues outside the mandate of AUDIT Environmental Management
the EMB. The entire EIA and Monitoring Plans to
review and evaluation process ensure actual impacts of the
is summarized in the Review project are adequately
Process Report (RPR) of the prevented or mitigated.
EMB, which includes a draft The signing of the Statement of Accountability
decision document. takes placeat the Decision Making Stage. After a
favorable review of its ECC application, the project
5.0 DECISION Decision Making involves proponent, through its authorized representative,
MAKING evaluation of EIA is made to sign a sworn statement of full
recommendations and the responsibility on the implementation ofits
draft decision document, commitments prior to the official release of the
resulting to the issuance of an ECC.
ECC, CNC or Denial Letter. The definition of the ECC in the Revised Manual
When approved, a covered highlights the importance of the signing of the
project is issued its certificate Statement of Accountability:
of Environmental Compliance Environmental Compliance Certificate (ECC) - a
Commitment (ECC) while an certificate of Environmental Compliance
application of a non-covered Commitment to which the Proponent conforms
project is issued a Certificate with, after DENR-EMB explains the ECC conditions,
of Non-Coverage (CNC). by signing the sworn undertaking of full
Endorsing and deciding responsibility over implementation of specified
authorities are designated by measures which are necessary to comply with
AO 155 42, and further existing environmental regulations or to operate
detailed in this Manual for within best environmental practices that are not
every report type. Moreover, currently covered by existing laws. It is a
the Proponent signs a sworn document issued by the DENR/EMB after a
statement of full positive review of an ECC application, certifying
responsibility on that the Proponent has complied with all the
implementation of its requirements of the EIS System and has
committed to implement its approved Redondo Peninsula Energy with office address
Environmental Management Plan. The ECC also located at 110 Legaspi Street, Legaspi Village,
provides guidance to other agencies and to LGUs Makati City, takes full responsibility in complying
on EIA findings and recommendations, which need with all conditions in this Environmental
to be considered in their respective decision- Compliance Certificate [ECC][.]" Will you tell this
making process.157 (Emphasis supplied) Court why this was not signed?
As can be seen, the signing of the Statement of MS. MERCADO:
Accountabilityis an integral and significant It was signed, Your Honor, but this copy wasn’t
component of the EIA process and the ECC itself. signed. My apologies, I was the one who provided
The evident intention is to bind the project this, I believe, to the lawyers. This copy was not
proponentto the ECC conditions, which will ensure signed because during…
that the project will not cause significant negative J. LEAGOGO:
environmental impacts by the "implementation of But this is your exhibit, this is yourExhibit "18" and
specified measures which are necessary to comply this is not signed. Do you agree with me that your
with existing environmental regulations or Exhibit "18" is not signed by Mr. Aboitiz?
tooperate within best environmental practices that MS. MERCADO:
are not currently covered by existing laws." Indeed, That’s correct, Your Honor.158 (Emphasis supplied)
the EIA process would be a meaningless exercise Due to the inadequacy of the transcriptand the
if the project proponent shall not be strictly bound apparent lack of opportunity for the witness to
to faithfully comply withthe conditions necessary explain the lack of signature, we find that the
toadequately protect the right of the people to a witness’ testimony does not, by itself, indicate that
healthful and balanced ecology. there was a deliberate or malicious intent not to
Contrary to RP Energy’s position, we, thus, find sign the Statement of Accountability.
that the signature of the project proponent’s Second, as previously discussed, the concerned
representative in the Statement of Accountability parties to this case, specifically, the DENR and RP
is necessary for the validity of the ECC. It is not, as Energy, werenot properly apprised that the issue
RP Energy would have it, a mere formality and its relative to the lack of signature would be decisive
absence a mere formal defect. inthe determination of the validity of the ECC.
The question then is, was the absence of the Consequently, the DENR and RPEnergy cannot be
signature of Mr. Aboitiz, as representative of RP faulted for not presenting proof during the course
Energy, in the Statement of Accountability ofthe hearings to squarely tackle the issue of lack
sufficient ground to invalidate the ECC? of signature.
Viewed within the particular circumstances of this Third, after the appellate court ruled in its January
case, we answer in the negative. 30, 2013 Decision that the lack of signature
While it is clear that the signing of the Statement invalidated the ECC,RP Energy attached, to its
of Accountability is necessary for the validity ofthe Motion for Partial Reconsideration, a certified true
ECC, we cannot close oureyes to the particular copy of the ECC, issued by the DENREMB, which
circumstances of this case. So often have we ruled bore the signature of Mr. Aboitiz. The certified true
that this Court is not merely a court of law but a copy of the ECC showed that the Statement of
court of justice. We find that there are several Accountability was signed by Mr. Aboitiz on
circumstances present in this case which militate December 24, 2008.159
against the invalidation of the ECC on this ground. The authenticity and veracity of this certified true
We explain. copy of the ECC was not controverted by the
First, the reason for the lack of signature was not Casiño Group in itscomment on RP Energy’s
adequately taken into consideration by the motion for partial reconsideration before the
appellate court. To reiterate, the matter surfaced appellate court nor in their petition before this
during the hearing of this case on clarificatory Court. Thus, in accordance with the presumption
questions by the appellate court, viz: of regularity in the performance of official duties,
J. LEAGOGO: it remains uncontroverted that the ECC on file with
Please tell the Court why this was not signed by the DENR contains the requisite signature of Mr.
Mr. Luis Miguel Aboitiz, the Statement of Aboitiz in the Statement of Accountability portion.
Accountability? As previously noted, the DENR and RPEnergy were
Because the Statement of Accountability says, not properly apprised that the issue relative to the
"Mr. Luis Miguel Aboitiz, Director, representing lack ofsignature would be decisive in the
determination of the validity of the ECC. As a futurelitigation over non-compliance with the ECC
result, we cannot fault RP Energy for submitting conditions.
the certified true copy of the ECC only after it In sum, we rule that the appellate court erred when
learned that the appellate court had invalidated the it invalidated the ECC on the ground of lack of
ECC on the ground of lack ofsignature in its signature of Mr. Aboitiz in the ECC’s Statement of
January 30, 2013 Decision. Accountability relative to the copy of the ECC
We note, however, that, as previously discussed, submitted by RP Energy to the appellate court.
the certified true copy of the Statement of While the signature is necessary for the validity of
Accountability was signed by Mr. Aboitiz on the ECC, the particular circumstances of this case
December 24, 2008 or two days after the ECC’s show that the DENR and RP Energy were not
official release on December 22, 2008. The properly apprised of the issue of lack ofsignature
aforediscussed rules under the Revised Manual, in order for them to present controverting evidence
however, state that the proponent shall sign the and arguments on this point, as the matter only
sworn statement of full responsibility on developed during the course of the proceedings
implementation of its commitments priorto the upon clarificatory questions from the appellate
release of the ECC. Itwould seem that the ECC was court. Consequently, RP Energy cannot be faulted
first issued, then it was signed by Mr. Aboitiz, and for submitting the certified true copy of the ECC
thereafter, returned to the DENR to serve as its file only after it learned that the ECC had been
copy. Admittedly, there is lack of strict compliance invalidated on the ground of lack of signature in
with the rules although the signature ispresent. Be the January 30, 2013 Decision of the appellate
thatas it may, we find nothing in the records to court.
indicate that this was done with bad faith or The certified true copy of the ECC, bearing the
inexcusable negligence because of the inadequacy signature of Mr. Aboitiz in the Statement of
of the evidence and arguments presented, relative Accountability portion, was issued by the DENR-
to the issue of lack of signature, in view of the EMB and remains uncontroverted. Itshowed that
manner this issue arose in this case, as previously the Statement of Accountability was signed by Mr.
discussed. Absent such proof, we are not prepared Aboitiz on December 24, 2008. Although the
to rule that the procedure adopted by the DENR signing was done two days after the official
was done with bad faithor inexcusable negligence release of the ECC on December 22, 2008, absent
but we remind the DENR to be more circumspect sufficient proof, we are not prepared to rule that
in following the rules it provided in the Revised the procedure adoptedby the DENR was done with
Manual. Thus, we rule that the signature bad faith or inexcusable negligence. Thus, werule
requirement was substantially complied with pro that the signature requirement was substantially
hac vice. complied with pro hac vice.
Fourth, we partly agree with the DENRthat the III.
subsequent letter-requests for amendments to the Whether the first and second amendments to the
ECC, signed by Mr. Aboitiz on behalf of RP Energy, ECC are invalid for failure to undergo a new
indicate its implied conformity to the ECC environmental impact assessment (EIA) because
conditions. In practical terms, if future litigation of the utilization of inappropriate EIA documents.
should occur due to violations of the ECC Upholding the arguments of the Casiño Group, the
conditions, RP Energy would be estopped from appellate court ruled that the first and second
denying its consent and commitment to the ECC amendments tothe ECC were invalid because the
conditions even if there was no signature in the ECC contained an express restriction that any
Statement of Accountability. However, we note expansion of the project beyond the project
that the Statement of Accountability precisely description shall be the subject of a new EIA. It
serves to obviate any doubt as to the consent and found that both amendments failed to comply with
commitment of the project proponent to the ECC the appropriate EIA documentary requirements
conditions. At any rate, the aforesaid letter- under DAO 2003-30 and the Revised Manual. In
requests do additionally indicate RP Energy’s particular, it found that the Environmental
conformity to the ECC conditions and, thus, negate Performance Report and Management Plan
a pattern to maliciously evade accountability for (EPRMP) and Project Description Report (PDR),
the ECC conditions or to intentionally create a which RP Energy submitted tothe DENR, relative to
"loophole" in the ECC to be exploited in a possible the application for the first and second
amendments, respectively, were not the proper EIA
document type. Hence, the appellate court ruled SECTION 4. Presidential Proclamation
that the aforesaid amendments were invalid. ofEnvironmentally Critical Areas and Projects. The
Preliminarily, we must state that executive actions President of the Philippines may, on his own
carry presumptive validity so that the burden of initiative or upon recommendation of the National
proof is on the Casiño Group to show that the Environmental Protection Council, by
procedure adopted bythe DENR in granting the proclamation declare certain projects,
amendments to the ECC were done with grave undertakings or areas in the country as
abuse of discretion. More so here because the environmentally critical. No person, partnership or
administration of the EIA process involves special corporation shall undertake or operate any such
technical skill or knowledge which the law has declared environmentally critical project or area
specifically vested in the DENR. without first securing an Environmental
After our own examination of DAO 2003-30 and Compliance Certificate issued by the President or
the Revised Manual as well as the voluminous EIA his dulyauthorized representative. x x x (Emphasis
documents of RP Energy appearing in the records supplied)
of this case, we find that the appellate court made The PEISS consists of the Environmental Impact
an erroneous interpretation and application of the Assessment (EIA) process, which is mandatory for
pertinent rules. private orpublic projects thatmay significantly
We explain. affect the quality of the environment. It involves
As a backgrounder, PD 1151 set the Philippine evaluating and predicting the likely impacts of the
Environment Policy. Notably, this law recognized project on the environment, designing appropriate
the right ofthe people to a healthful preventive, mitigating and enhancement measures
environment.160 Pursuant thereto, in every action, addressing these consequences to protect the
project or undertaking, which significantly affects environment and the community’s welfare.163
the quality of the environment, all agencies and PD 1586 was implemented by DAO 2003-30
instrumentalities of the national government, which, in turn, set up a system or procedure to
including government-owned or -controlled determine when a project is required to secure an
corporations, as well as private corporations, ECC and when it is not. When an ECC is not
firms, and entities were required to prepare, file required, the project proponent procures a
and include a statement (i.e., Environmental Certificate of Non-Coverage (CNC).164 As part of
Impact Statement or EIS) containing: the EIA process, the project proponent is required
(a) the environmental impact of the to submit certain studies or reports (i.e., EIA
proposed action, project or undertaking; document type) to the DENR-EMB, which willbe
(b) any adverse environmental effect which used in the review process in assessing the
cannot be avoided should the proposal be environmental impact of the project and the
implemented; adequacy of the corresponding environmental
(c) alternative to the proposed action; management plan or program to address such
(d) a determination that the short-term uses environmental impact. This will then be part of the
of the resources of the environment are bases to grant or deny the application for an ECC
consistent with the maintenance and or CNC, as the case may be.
enhancement of the longterm productivity Table 1-4 of the Revised Manual summarizes the
of the same; and required EIA document type for each project
(e) whenever a proposal involves the use of category. It classifies a project as belonging to
depletable or non-renewable resources, a group I, II, III, IV or V, where:
finding must be made that such use and I- Environmentally Critical Projects (ECPs) in
commitment are warranted.161 either Environmentally Critical Area (ECA) or
To further strengthen and develop the EIS, PD1586 Non-Environmentally Critical Area (NECA),
was promulgated, which established the Philippine II- Non-Environmentally Critical Projects
Environmental Impact Statement System (PEISS). (NECPs) in ECA,
The PEISS is "a systems-oriented and integrated III- NECPs in NECA,
approach to the EIS system to ensure a rational IV- Co-located Projects, and
balance between socio-economic development V- Unclassified Projects.
and environmental protection for the benefit of The aforesaid table then further classifies a
present and future generations."162 The ECC project, as pertinent to this case, as belonging to
requirement ismandated under Section 4 thereof: category A,B or C, where:
A- new; projects, a checklist form of the EPRMP would
B- existing projects for modification or re- suffice;171 (Emphasis supplied)
start up; and Further, the table in Section 5 of DAO 2003-30
C- operating projects without an ECC. states that an EPRMP is required for "A-2: Existing
Finally, the aforesaid table considers whether the and to beexpanded (including undertakings that
project is single or co-located.165 After which, it have stopped operations for more than 5 years and
states the appropriateEIA document typeneeded plan to re-start with or without expansion) and A-
for the application for an ECC or CNC, as the case 3: Operating without ECC."
may be. On the other hand, the Revised Manual delineates
The appropriate EIA document type vis-à-vis a when an EPRMP is the proper EIA document type,
particular project depends on the potential thus:
significant environmental impact of the project. At For operating projects with previous ECCs but
the highest level would be an ECP, such as the planning or applying for clearance to
subject project. The hierarchy of EIA document modify/expand or re-start operations, or for
type, based on comprehensiveness and detail of projects operating without an ECCbut applying to
the study or report contained therein, insofar as secure one to comply with PD 1586 regulations,
single projects are concerned, is as follows: the appropriate document is not an EIS but an EIA
1. Environmental Impact Statement166 (EIS), Report incorporating the project’s environmental
2. Initial Environmental Examination167 (IEE) performance and its current Environmental
Report, Management Plan. This report isx x x anx x x
3. Initial Environmental Examination168 (IEE) Environmental Performance Report and
Checklist Report, Management Plan (EPRMP) for single project
4. Environmental Performance Report and applications x x x172 (Emphasis supplied)
Management Plan169 (EPRMP), and In its "Glossary," the Revised Manual defines an
5. Project Description170 (PD) or Project EPRMP as:
Description Report (PDR). Environmental Performance Report and
Thus, in the course of RP Energy’s application for Management Plan (EPRMP) - documentation of
anECC, it was required by the DENR-EMB to submit the actual cumulative environmental impacts and
an EIS because the subject project is: an ECP, new effectiveness of current measures for single
and a single project. projects that are already operating but without
The present controversy, however, revolves ECCs.173 (Emphasis supplied)
around, not an application for an ECC, but Finally, Table 1-4, in the Revised Manual, states
amendments thereto. that an EPRMP is required for "Item I-B: Existing
RP Energy requested the subject first amendment Projects for Modification or Re-start up (subject to
to its ECC due to its desire to modify the project conditions in Annex 2-1c) and I-C: Operating
design through the inclusion of a barge wharf, without ECC."
seawater intake breakwater, subsea discharge From these definitions and tables, an EPRMP is,
pipeline, raw water collection system, drainage thus, the required EIA document type for an ECP-
channel improvement and a 230-kV double single project which is:
transmission line. The DENR-EMB determined that 1. Existing and to be expanded (including
this was a major amendment and, thus, required undertakings that have stopped operations
RP Energy to submit an EPRMP. for more than 5 years and plan to re-start
The Casiño Group argued, and the appellate court with or without expansion);
sustained, that an EPRMP is not the correct EIA 2. Operating but without ECCs;
document type based on the definition of an 3. Operating projects with previous ECCs but
EPRMP in DAO 2003-30 and the Revised Manual. planning or applying for clearance to
In DAO 2003-30, an EPRMP is defined as: modify/expand orre-start operations; and
Environmental Performance Report and 4. Existing projects for modification or re-
Management Plan (EPRMP) — documentation of start up.
the actual cumulative environmental impacts and It may be observed that, based from the above,
effectiveness of current measures for single DAO2003-30 and the Revised Manual appear to
projects that are already operating but without use the terms "operating"and "existing"
ECC's, i.e., Category A-3. For Category B-3 interchangeably. In the case at bar, the subject
project has not yet been constructed although
there have been horizontal clearing operations at of requirements for project modifications,
the project site. particularly for delineating which application
On its face, therefore, the theory of the Casiño scenarios will require EPRMP (which will be
Group, as sustained by the appellate court — that subject to Figure 2-1 process) or other support
the EPRMP is not the appropriate EIA document documentations (which will be subject to Figure 2-
type— seems plausible because the subject 4 process). Figure 2-4, in turn, provides:
project is not: (1) operating/existing with a Figure 2-4. Flowchart on Request for ECC
previous ECC but planning or applying for Amendments175
modification or expansion, or (2) operating but Scenario 1: Scenario 2: Request for Major
without an ECC. Instead, the subject project is an Request for Amendments
unimplemented or a non-implemented, Minor 1. Expansion of project area
hence,non-operating project with a previous ECC Amendment w/in catchment described in EIA
but planning for modification or expansion. s 2. Increase in production
The error in the above theory lies in the failure to 1. capacity or auxiliary component
consider or trace the applicable provisions of DAO Typographic of the original project
2003-30 and the Revised Manual on amendments al error 3. Change/s in process flow or
to an ECC. 2. Extension technology
The proper starting point in determining the of deadlines 4. Addition of new product
validity of the subject first amendment, for 5. Integration of ECCs for similar
specifically, the propriety of the EIA document type submission or dissimilar but contiguous
(i.e., EPRMP) which RP Energy submitted in of post-ECC projects (NOTE: ITEM#5 IS
relation to its application for the aforesaid requirement PROPONENT’S OPTION, NOT
amendment, must of necessity be the rules on /s EMB’S)
amendments to an ECC.174 This is principally 3. Extension 6. Revision/Reformatting of ECC
found in Section 8.3,Article II of DAO 2003-03, viz: of ECC Conditions
8.3 Amending an ECC validity 7. Other amendments deemed
Requirements for processing ECC amendments 4. Change in "major" at the discretion of the
shall depend on the nature of the request but shall company EMB CO/RO Director
be focused on the information necessary to assess name/owne
the environmental impact of such changes. rship
8.3.1. Requests for minor changes to ECCs 5. Decrease
such as extension of deadlines for in
submission of post-ECC requirements shall land/project
be decided upon by the endorsing authority. area or
8.3.2. Requests for major changes to ECCs production
shall be decided upon by the deciding capacity
authority. 6. Other
8.3.3. For ECCs issued pursuant to an IEE or amendment
IEE checklist, the processing of the s deemed
amendment application shall not exceed "minor" at
thirty (30) working days; and for ECCs issued the
pursuant to an EIS, the processing shall not discretion
exceed sixty (60) working days. Provisions of the
on automatic approval related to prescribed EMB CO/RO
timeframes under AO 42 shall also apply for Director
the processing of applications to amend
ECCs. (Emphasis supplied) 1 [Start] 1[Start]
Implementing the afore-quoted section, the
Revised Manual pertinently states in Section 2.2, Within three Within three (3) years from ECC
paragraph 16: (3) years issuance (for projects not
16) Application Process for ECC Amendments from ECC started)177 OR at any time during
Figure 2-4 presents how Proponents may request issuance project implementation, the
for minor or major changes in their ECCs. Annex 2- (for projects Proponent prepares and submits
1c provides a decision chart for the determination not to the ECC-endorsing DENR-
started)176 O EMB office a LETTER- Authority decides on Letter
R at any REQUESTfor ECC amendments, decides on Requests/EPRMP/PEPRMP/Oth
time during including data/information, the Letter- er documents based on EMB CH
project reports or documents to Request, and/or Tech/Review Committee
implementa substantiate the requested based on recommendations.
tion, the revisions. CH
Proponent recommend
prepares 2 ation
and submits
For projects that have started Maximum Max Processing Time to
to the ECC-
implementation, EMB evaluates Processing Issuance of Decision
endorsing
request based on Annex 2-1cfor Time to
DENR-EMB
various scenarios of project Issuance of
office a
modification. Documentary Decision
LETTER-
requirements may range from a
REQUEST
Letter-Request to an EPRMP to E 7 CO CO RO RO
for ECC
the EMB CO/RO while for those M workd PEPR EPRM PEPR EPRM
amendment,
with Programmatic ECC, a B ays MP P MP P
including
PEPRMP may need to be CO
data/inform
submitted to the EMB CO to
ation, E 7 120 90 60 30
support the request. It is
reports or M workd workd workd workd workd
important to note that for
documents B ays ays ays ays ays
operating projects, the
to RO
appropriate document is not an
substantiat
EIS but an EIA Report
e the Other document applications:
incorporating the project’s
requested max 30 workdays (EMB CO and
historical environmental
revisions. RO)
performance and its current
EMP, subject to specific
documentary requirements
detailed in Annex 2-1cfor every
modification scenario.
2 Noteworthy in the above, which is pertinent to the
3 issue at hand, is that the amendment process
squarely applies to projects not started, such as
the subject project, based on the phrase "[w]ithin
three (3) years from ECC issuance (for projects not
The ECC- For EPRMP/PEPRMP-based started) x x x".
endorsing requests, EMB forms a Annex 2-1c, in turn, provides a "Decision Chart for
EMB office Technical/Review Committee to Determination of Requirements For Project
assigns a evaluate the request. For other Modification." We reproduce below the first three
Case requests, a Case Handler may columns of Annex 2-1c, as are pertinent to the
Handler to solely undertake the evaluation. issue at hand:
evaluate the EMB CO and RO will process ANNEX 2-1c
request P/EPRMP for PECC/ECC under DECISION CHART FOR DETERMINATION OF
Groups I and II respectively. (Go REQUIREMENTS FOR PROJECT MODIFICATION178
to Figure 2-1) Proposed Analysis Resulting
Modifications of Proposed Decision
3 4
to the Current Modifications Document/
Project Type of EIA
Report
ECC- ECC-endorsing/issuing Required
endorsing Authority (per Table 1-4)
Operational 3. Increase in Non- ECC
projects, or capacity exceedance of Amendmen
those or PDR (non t /Letter
which have auxiliary covered Request
stopped for componen project) with brief
≤5 years t of the threshold is description
and plan to original assumed that of
re-start project impacts are additional
which will not capacity or
For Groups eithernot significant; component
I and II entail Modification
EISbased exceedanc scenario and
Projects e of PDR decision
with an ECC (non- process are
applying for covered applicable to
modificatio project) both
n thresholds nonimplement
or EMP & ed and
1. Expansion Since the ECC
ERA can operating
of modification Amendmen
still projects
land/proje will be in an t /Letter
address issued ECCs
ct area area already Request
impacts &
w/in described and with brief
risks
catchment evaluated in description
arising
or the original of activities
from
environme EIA Report, in the
modificati
nt incremental additional
on
described impacts from area
in the additional land 4. Increase in Exceedance of ECC
original development capacity PDR (non- Amendmen
EIA Report will have been or covered) t
addressed in auxiliary threshold is /Environme
the approved componen assumed that ntal
EMP t of the impacts may Performanc
original be potentially e Report
2. Expansion It is assumed ECC
project significant, and
of the Amendmen
which will particularly if Manageme
land/proje modification t
either modification nt Plan
ct area proposal may /Environme
exceed will result to a (EPRMP)
OUTSIDE have ntal
PDR next higher
catchment significant Performanc
(noncover level of
or potential e Report
ed project) threshold
environme impacts due to and
thresholds range
nt absence of Manageme
, or EMP & Modification
described prior nt Plan
ERA scenario and
in the assessment (EPRMP)
cannot decision
original as to how the
address process are
EIA Report project may
impacts applicable to
affect the
and risks both
proposed
arising nonimplement
expansion
from ed and
area
modificati operating
on projects with
or without area or impacts; may of ECC
issued ECCs other units result to lower Commitme
of project nts
5. Change/s EMP and ERA ECC measure threshold or (Conversion
in process can still Amendmen of may result to to CNC):
flow or address t /Letter thresholds non-coverage /Letter-
technolog impacts & Request limits Request
y risks arising with brief only
from process
modification description 8. Conversio Considered New ECC
n to new new /EIS
EMP and ERA ECC project application
cannot Amendmen type (e.g. but with lesser
address t bunker- data
impacts & /Environme fired plant requirements
risks arising ntal to gas- since most
from Performanc fired) facilities are
modification e Report established;
and environmental
Manageme performance
nt Plan in the past will
(EPRMP) serve as
baseline;
6. Additional Activity is ECC
However, for
componen directly Amendmen
operating
t or lessening or t /Letter
projects, there
products mitigating the Request
may be need
which will project’s with
to request for
enhance impacts on the consolidate
Relief from
the environment. d Project
ECC
environme However, to Description
Commitment
nt (e.g. ensure there is Report of
prior to
due to no component new project
applying for
complianc in the component
new project
e to new modification and
type to ensure
stringent which fall integrated
no balance of
requireme under covered EMP
environmental
nts) or project types,
accountabilitie
lessen EMB will
s from the
impacts require
current project
on the disclosure of
environme the 9. Integration No physical ECC
nt (e.g. description of of ECCs change in Amendmen
thru the for similar project t /Letter
utilization components or size/area; no Request
of waste and process contiguou change in with
into new with which the s projects process/techn consolidate
products) new product (Note: ology but d Project
will be Integration improved Description
developed. of ECCs is management Report and
at the of continuous integrated
7. Downgrad No From ECC
option of projects by EMP
e project incremental Amendmen
the having an
size or adverse t to Relief
Proponent integrated
to planning 7. Other amendments deemed "major at the
request/ap document in discretion of the EMB CO/RO Director
ply) the form or an The Casiño Group does not controvert this finding
integrated ECC by the DENR-EMB and we find the same
(ECC reasonably supported by the evidence on record
conditions will considering that, among others, the construction
be harmonized of a 230-kVdouble transmission line would result
across in major activities outside the project site which
projects; could have significant environmental impacts.
conditions Consequently, the amendment was considered
relating to asfalling under Item#4 of Annex 2-1c, and, thus,
requirements the appropriate EIA document typeis an EPRMP,
within other viz:
agencies’ 4 Increase Exceedance of ECC
mandates will . in capacity PDR (non- Amendment
be deleted) or covered) /Environmen
auxiliary thresholds is tal
1 Revision/ No physical ECC componen assumed that Performance
0. Reformatti change on the Amendmen t of the impacts may Report and
ng of ECC project but t /Letter original be potentially Management
Conditions ECC Request project significant, Plan
conditions only which will particularly if (EPRMP)182
relating to either modification
requirements exceed will result to a
within other PDR (non- next higher
agencies’ covered level of
mandates will project) threshold
be deleted thresholds range
We now apply these provisions to the case at bar. , or EMP & Modification
To reiterate, the first amendment to the ECC was ERA scenario and
requested by RP Energy due to its planned change cannot decision
of project design involving the inclusion of a barge address process are
wharf, seawater intake breakwater, impacts applicable to
subseadischarge pipeline, raw water collection and risks both
system, drainage channel improvement and a arising nonimplement
230-kV double transmission line. The DENR-EMB from ed and
determined179 that the proposed modifications modificati operating
involved a major amendment because it will result on projects with
in anincrease in capacity or auxiliary component, or without
as per Scenario 2,Item #2 of Figure 2-4: issued
Scenario 2: Request for Major Amendments ECCs181
1. Expansion of project area w/in catchment Note that the Chart expressly states that,
described in EIA "[m]odification scenario and decision process are
2. Increase in production capacity or applicable to both non-implementedand operating
auxiliary component of the original projects withor without ECCs."183 To recall, the
project180 subject project has not been constructed and is
3. Change/s in process flow or technology not yet operational, although horizontal clearing
4. Addition of new product activities have already been undertaken at the
5. Integration of ECCs for similar or project site. Thus, the subject project may be
dissimilar but contiguous projects (NOTE: reasonably classified as a non-implemented
ITEM#5 IS PROPONENT’S OPTION, NOT project with an issued ECC, which falls under
EMB’S) Item#4 and, hence, an EPRMP is the appropriate
6. Revision/Reformatting of ECC Conditions EIA document type.
This lengthy explanation brings us toa simple necessary to assess the environmental impact of
conclusion. The definitions in DAO 2003-30 and such changes."185
the Revised Manual, stating that the EPRMP is This brings us to the next logicalquestion, did the
applicable to (1) operating/existing projectswith a EPRMP provide the necessary information in order
previous ECC but planning or applying for for the DENR-EMB to assess the environmental
modification or expansion, or (2) operating impact of RP Energy’s request relative to the first
projects but without an ECC, were not an exclusive amendment?
list. We answer in the affirmative.
The afore-discussed provisions of Figure 2-4, in In the first place, the Casiño Group never
relation to Annex 2-1c, plainly show that the attempted to prove that the subject EPRMP,
EPRMP can, likewise, be used as an appropriate submitted by RP Energy to the DENR-EMB, was
EIA document type for a single, non-implemented insufficient for purposes of evaluating the
project applying for a major amendment to its ECC, environmental impact of the proposed
involving an increase in capacity or auxiliary modifications to the original project design. There
component, which will exceed PDR (non-covered is no claim that the data submitted were falsified
project) thresholds, or result in the inability of the or misrepresented. Neither was there an attempt
EMP and ERA to address the impacts and risks to subpoena the review process documents of the
arising from the modification, such as the subject DENR to establish thatthe grant of the amendment
project. to the ECC was done with grave abuse of discretion
That the proposed modifications in the subject or to the grave prejudice of the right to a healthful
project fall under this class or type of amendment environment of those who will beaffected by the
was a determination made by the DENR-EMBand, project. Instead, the Casiño Group relied solely on
absent a showing of grave abuse of discretion, the the definition of terms in DAO 2003-30 and the
DENR-EMB’s findings are entitled to great respect Revised Manual, which approach, as previously
because it is the administrative agency with the discussed,was erroneous.
special competence or expertise to administer or At any rate, we have examined the contents of the
implement the EIS System. The apparent voluminous EPRMP submitted by RP Energy and
confusion of the Casiño Group and the appellate wefind therein substantial sections explaining the
court is understandable. They had approached the proposed changes as well as the adjustments that
issue with a legal training mindset or background. will be made in the environmental management
As a general proposition, the definition of terms in plan in order to address the potential
a statute or rule is controlling as to its nature and environmental impacts of the proposed
scope within the context of legal or judicial modifications to the original project design. These
proceedings. Thus, since the procedure adopted are summarized in the "Project Fact Sheet"186 of
by the DENR-EMB seemed to contradict or go the EPRMP and extensively discussed in Section
beyond the definition of terms in the relevant 4187 thereof. Absent any claim or proof to the
issuances, the Casiño Group and the appellate contrary, we have no bases to conclude that these
court concluded that the procedure was infirm. data were insufficient to assess the environmental
However, a holistic reading of DAO2003-30 and impact of the proposed modifications. In
the Revised Manual will show that such a legalistic accordance with the presumption of regularity in
approach inits interpretation and application is the performance of official duties, the DENR-EMB
unwarranted. This is primarily because the EIA must be deemed to have adequately assessed the
process is a system, not a set of rigid rules and environmental impact of the proposed changes,
definitions. In the EIA process, there is much room before granting the request under the first
for flexibility in the determination and use ofthe amendment to the subject ECC.
appropriate EIA document type as the foregoing In sum, the Revised Manual permits the use of an
discussion has shown.184 To our mind, whatshould EPRMP, as the appropriate EIA document type, for
be controlling is the guiding principle set in DAO major amendments to an ECC, even for an
2003-30 in the evaluation of applications for unimplemented or non-implementedproject with a
amendments to ECCs, as stated in Section 8.3 previous ECC, such as the subject project.
thereof: "[r]equirements for processing ECC Consequently, we find that the procedure adopted
amendments shall depend on the nature of the by the DENR, in requiring RP Energy to submitan
requestbut shall be focused on theinformation EPRMP in order to undertake the environmental
impact assessment of the planned modifications
to the original project design, relative to the first However, for small project modifications, an
amendment to the ECC, suffers from no infirmity. updating of the project description or the
We apply the same framework of analysis in Environmental Management Plan with the use of
determining the propriety of a PDR, as the the proponent’s historical performance and
appropriate EIA document type, relative to the monitoring records may suffice.189
second amendment to the subject ECC. xxxx
Again, the Casiño Group, as sustained by the Project Description (PD) - document, which may
appellate court, relied on the definitions of a PDR also be a chapter in an EIS, that describes the
in DAO 2003-30 and the Revised Manual: nature, configuration, use of raw materials and
Project Description (PD) — document, which may natural resources, production system, waste or
also be a chapter in an EIS, that describes the pollution generation and control and the activities
nature, configuration, use of raw materials and of a proposed project. It includes a description of
natural resources, production system, waste or the use of human resources as well as activity
pollution generation and control and the activities timelines, during the pre-construction,
of a proposed project. It includes a description of construction, operation and abandonment
the use of human resources as well as activity phases.190
timelines, during the pre-construction, We will no longer delve intothe details of these
construction, operation and abandonment phases. definitions. Suffice it to state, similar to the
It is tobe used for reviewing co-located and single discussion on the EPRMP, that if we go by the
projects under Category C, aswell as for Category strict limits of these definitions, the PDR relative to
D projects.188 the subject second amendment would not fall
xxxx squarely under any of the above.
a) For new projects: x x x For non-covered projects However, again, these are not the only provisions
in Groups II and III, a x x x Project Description governing the PDR in the Revised Manual.
Report (PDR) is the appropriate document to After the favorable grant of the first amendment,
secure a decision from DENR/EMB. The PDR is a RP Energy applied for another amendment to its
"must" requirement for environmental ECC, this time inconsideration of its plan to change
enhancement and mitigation projects in both ECAs the configuration of the project from 2 x 150 MWto
(Group II) and NECAs (Group III) to allow EMB to 1 x 300 MW. In practical terms, this meant that the
confirm the benign nature of proposed operations subject project will still produce 300 MW of
for eventual issuance of a Certificate ofNon- electricity but will now make use of only one boiler
Coverage (CNC). All other Group III (non-covered) (instead of two) to achieve greater efficiency in the
projects do not need to submit PDRs – application operations of the plant. The DENR-EMB
is at the option of the Proponent should it need a determined191 this amendment to be minor, under
CNC for its own purposes, e.g. financing pre- Scenario 1, Item#6 of Figure 2-4:
requisite. For Group V projects, a PDR is required Scenario 1: Request for Minor
to ensure new processes/technologies or any new Amendments
unlisted project does not pose harm to the 1. Typographical error
environment. The Group V PDR is a basis for either 2. Extension of deadlines for
issuance of a CNC or classification of the project submission of post-ECC
into its proper project group. requirement/s
b) For operating projects with previous ECCs but 3. Extension of ECC validity
planning or applying for clearance to 4. Change in company
modify/expand or re-start operations, or for name/ownership
projects operating without an ECC but applying to 5. Decrease in land/project area or
secure oneto comply with PD 1586 regulations, production capacity
the appropriate document is not an EIS but an EIA 6. Other amendments deemed "minor"
Report incorporating the project’s environmental at the discretion of the EMB CO/RO
performance and its current Environmental Director192
Management Plan. This report is either an (6) — because (1) there is no increase in capacity; (2)
Environmental Performance Report and it does not constitute any significant impact; and
Management Plan (EPRMP) for single project (3) its EMP and ERA as specified in the submitted
applications or a (7) Programmatic EPRMP EPRMP remain the same.193 Relative to Annex 2-
(PEPRMP) for co-located project applications.
1c, the requested amendment was, in turn, to submit a PDR in order to assess the
determinedto fall under Item#3: environmental impact of the planned
3 Increase in Non- ECC modifications relative to the second amendment.
. capacity or exceedance Amendment In their Petition before this Court, the Casiño Group
auxiliary of PDR (non /Letter boldly asserts that "[t]here is nothing in the Project
component covered Request with Description Report that provides an environmental
of the project) brief impact assessment of the effects of constructing
original thresholds description and operating a single 300-MW generating
project is assumed of additional unit."196 However, to our dismay, as in their other
which will that impacts capacity or serious allegations in their Petition for Writ
either not are not component19 ofKalikasan, the same is, likewise, baseless. Apart
entail significant; 5 from such a sweeping claim, the Casiño Group has
exceedance Modification provided no evidence or argument to back up the
of PDR scenario same.
(non- and decision An examination of the PDR readily reveals that it
covered process are contains the details of the proposed
project) applicable modifications197 and an express finding that no
thresholds to both non- significant environmental impact will be generated
or EMP & implemente bysuch modifications, as in fact it is expected that
ERA can d and the operation of the power plant will become more
still address operating efficient as a result of the change from 2 x 150 MW
impacts & projects to 1 x 300 MW configuration.198 Consequently, the
risks arising issued PDR merely reiterates the same mitigating
from ECCs194 measures that will presumably address the minor
modificatio modifications to the project design. Again, no
n evidence was presented to show substantial errors
or misrepresentations in these data or their
We make the same observation, as before, that the inadequacy for providing the bases for the DENR-
above applies to an unimplemented or non- EMB to assess the environmental impact of the
implemented project with a previous ECC, like the proposed modifications under the second
subject project. Although it may be noted thatthe amendment.
proposed modification does not squarely fall In fine, absent proof to the contrary, bearing in
under Item#3, considering that, as previously mind that allegations are not proof, we sustain the
mentioned,there will be no increase in capacity procedure adoptedby the DENR-EMB in requiring
relative to the second amendment, still, we find RP Energy to submit a PDR and, on the basis
nothing objectionable to this classification by the thereof, approving the request for the second
DENR-EMB, for it seems plain enough that this amendment.
classification was used because the modification In another vein, we note that the appellate court
was deemed too minor to require a detailed project proceeded from the erroneous premise that the EIA
study like an EIS or EPRMP. Since this is the is a document, when it repeatedly stated that the
classification most relevant and closely related to amendments to the ECC require a new EIA, and not
the intended amendment, following the basic merely an EPRMP or PDR. The appellate court
precept that the greater includes the lesser, the relied on the provisoin the ECC, which stated that
DENR-EMB reasonably exercised its discretion in "[a]ny expansion of the project beyond the project
merely requiring a letter request with a brief description or any change in the activity or transfer
description of the modification. of location shall besubject to a new Environmental
As earlier noted, the PDR is the EIA document type Impact Assessment."199
with the least detail, and, thus, applicable to such However, as correctly pointed out by the DENR and
minor modifications. Thus, the DENR-EMB cannot RP Energy, the EIA is not a document but a
be faulted for requiring RPEnergy to submit a PDR process:
relative to its application for the second Environmental Impact Assessment (EIA) —
amendment. Consequently, as before, we findthat processthat involves evaluating and predicting the
the Revised Manual supports the procedure likely impacts of a project (including cumulative
adopted by the DENR-EMB in requiring RP Energy impacts) on the environment during construction,
commissioning, operation and abandonment. It discretion or patent illegality, relative to both the
also includes designing appropriate preventive, procedure and substance of the amendment
mitigating and enhancement measures process, we uphold the validity of these
addressing these consequences to protect the amendments.
environment and the community's welfare.The IV.
process is undertaken by, among others, the Whether the Certificate of Non-Overlap (CNO),
project proponent and/orEIA Consultant, EMB, a under Section 59 of the IPRA Law, is a
Review Committee, affected communities and precondition to the issuance of anECC and the
other stakeholders.200 (Emphasis supplied) lack of its prior issuance rendered the ECC
When the provisoin the ECC, therefore, states that invalid.
a new EIA shall beconducted, this simply means The appellate court ruled that the ECC issued in
that the project proponent shall be required to favor of RP Energy on December 22, 2008 is
submit such study or report, as warranted by the invalid because the CNO covering the subject
DENR Rules and circumstances, which will project was issued only on October 31, 2012 or
sufficiently aid the DENR in making a new EIA and, almost fouryears from the timeof issuance of the
thus, determine whether to grant the proposed ECC. Thus, the ECC was issued in violation of
amendment (or project modification). Aswe have Section 59 of the IPRA Law and its implementing
seen, consistent with DAO 2003-30 and the rules which require that a CNO be obtained prior to
Revised Manual, the DENR required RP Energy to the issuance of a government agency of, among
submit an EPRMP and a PDR relative to the latter’s others, a license or permit. In so ruling, the
request involving the first and second appellate court implicitly upheld the Casiño
amendments, respectively, which led to the new Group’s argument that the ECC is a form of
EIA of the project in compliance with the provisoof government license or permit pursuant to Section
the ECC. 4 of PD 1586 which requires all entities to
Verily, the various EIA documents, such as the securean ECC before (1) engaging in an
EPRMP and PDR, are mere tools used by the DENR environmentally critical project or (2)
to assess the environmental impact of a particular implementing a project within an environmentally
project. These documents are flexibly used by the critical area.
DENR, as the circumstances warrant, in order to The DENR and RP Energy, however, argue that an
adequately assess the impacts of a new project or ECC is not the license or permit contemplated
modifications thereto. Being the administrative under Section 59 of the IPRA Law and its
agency entrusted with the determination of which implementing rules as may be deduced from the
EIA document type applies to a particular definition, nature and scope of an ECC under DAO
application for an amendment to an ECC, falling as 2003-03 and the Revised Manual. The DENR
it does within its particular technical expertise, explains that the issuance of an ECC does not
wemust accord great respect to its determination, exempt the project proponent from securing other
absent a showing of grave abuse of discretion or permits and clearances as required under existing
patent illegality. laws, including the CNO, and that the final decision
In sum, we find that the appellate court erred when on whether a project will be implemented lies with
it ruled that the first and second amendments to the concerned local government unit/s or the lead
the subject ECC wereinvalid for failure to comply government agency which has sectoral mandate
with a new EIA and for violating DAO 2003-30 and to promote the government programwhere the
the Revised Manual. The appellate court failed to project belongs.
properly consider the applicable provisions in DAO We agree with the DENR and RP Energy.
2003-30 and the Revised Manual on amendments Section 59, Chapter VIII of the IPRA Law provides:
to ECCs. Our examination of the provisions on SEC. 59. Certification Precondition. All
amendments to ECCs, as well as the EPRMP and departments and other governmental agencies
PDR themselves, shows that the DENR reasonably shall henceforth be strictly enjoined from issuing,
exercised its discretion in requiring an EPRMP and renewing, or granting any concession,license or
a PDR for the first and second amendments, lease, or entering into any production-sharing
respectively. Through these documents, which the agreement, without prior certification from the
DENR reviewed, a new EIA was conducted relative NCIP that the area affected does not overlap with
to the proposed project modifications. Hence, any ancestral domain.Such certification shall only
absent sufficient showing of grave abuse of be issued after a field-based investigation is
conducted by the Ancestral Domains Office of the Indigenous Cultural Communities/Indigenous
area concerned: Provided, That no certification Peoples (ICCs/IPs) to their ancestral domains in
shall be issued by the NCIP without the free and order to ensure their economic, social and cultural
prior informed and written consent of ICCs/IPs well-being as well as to recognize the applicability
concerned: Provided, further, That no department, of customary laws governing property rights or
government agency or government-owned or - relations in determining the ownership and extent
controlled corporation may issue new concession, of such ancestral domain.203
license, lease, or production sharing agreement The IPRA Law and its implementing rules do not
while there is a pending application for a CADT: define the terms "license" and "permit" so that
Provided, finally, That the ICCs/IPs shall have the resort to their plain or ordinary meaning in relation
right to stop or suspend, in accordance with this to the intendment of the law is appropriate.
Act, any project that has not satisfied the A "license" has been defined as "a governmental
requirement of this consultation process. permission to perform a particular act (such as
(Emphasis supplied) getting married), conduct a particular business or
While Section 9, Part II, Rule VIII of National occupation, operate machinery or vehicles after
Commission on Indigenous Peoples (NCIP) proving capacity and ability to do so safely, or use
Administrative Order No. 01-98201 states: property for a certain purpose"204 while a "permit"
SECTION 9. Certification Precondition Prior to has been defined as "a license or other document
Issuance of any Permits or Licenses. — given by an authorized public official or agency
a. Need for Certification. No department of (building inspector, department ofmotor vehicles)
government or other agencies shall issue, to allow a person or business to perform certain
renew or grant anyconcession, license, acts."205
lease, permit, or enter into any production The evident intention of Section 59, in requiring
sharing agreement without a prior the CNO prior to the issuance of a license or
certification from the NCIP that the area permit, is to prevent the implementation of a
affected does not overlap any ancestral project that may impair the right of ICCs/IPs to
domain. their ancestral domains. The law seeks to ensure
b. Procedure for Issuance ofCertification by that a project willnot overlap with any ancestral
NCIP. domain prior to its implementation and thereby
1) The certification, above mentioned, pre-empt any potential encroachment of, and/or
shall be issued by the Ancestral damage to the ancestral domains of ICCs/IPs
Domain Office, only after a field based without their prior and informed consent.
investigation that such areas are not With these considerationsin mind, we now look
within any certified or claimed atthe definition, nature and scope of an ECC in
ancestral domains. order to determine if it falls within the ambit of a
2) The certification shall be issued only "license" or "permit" to which the CNO
upon the free, prior, informed and requirement, under Section 59 of the IPRA Law and
written consent of the ICCs/IPs who its implementing rules, finds application. Section 4
will be affected by the operation of of PD 1586 provides, in part:
such concessions, licenses or leases SECTION 4. Presidential Proclamation of
or production-sharing agreements. A Environmentally Critical Areas and Projects. — The
written consent for the issuance of President of the Philippines may, on his own
such certification shall be signed by at initiative or upon recommendation of the National
least a majority of the representatives Environmental Protection Council, by
of all the households comprising the proclamation declare certain projects,
concerned ICCs/IPs. (Emphasis undertakings or areas in the country as
supplied) environmentally critical. No person, partnership or
As may be deduced from its subtitle, Section 59 corporation shall undertake or operate any
requires as a precondition, relative to the issuance suchdeclared environmentally critical project or
of any concession, license, lease or agreement area without first securing an Environmental
over natural resources, a certification issued by Compliance Certificate issued by the President
the NCIP that the area subject thereof does not lie orhis duly authorized representative.For the
within any ancestral domain.202 This is in keeping proper management of said critical project or area,
with the State policy to protect the rights of the President may by his proclamation reorganize
such government offices, agencies, institutions, of the ECC allows the project to proceed to the next
corporations or instrumentalities including the re- stage of project planning, which is the acquisition
alignment of government personnel, and their of approvals from other government agencies and
specific functionsand responsibilities. (Emphasis LGUs, after which the project can start
supplied) implementation.
While the above statutory provision reveals that xxxx
the ECC is an indispensable requirement before (1) 6) The EIA Process inRelation to Other Agencies’
the conduct of an environmentally critical project Requirements It is inherent upon the EIA Process
or (2) the implementation of a project inan to undertake a comprehensive and integrated
environmentally critical area, it does not follow approach in the review and evaluation of
that the ECC is the "license" or "permit" environment-related concerns of government
contemplated under Section 59 of the IPRA Law agencies (GAs), local government units (LGUs) and
and its implementing rules. the general public. The subsequent EIA findings
Section 3(d), Article I of DAO 2003-03 defines an shall provide guidance and recommendations to
ECC in this wise: these entities as a basis for their decision making
SECTION 3. Definition of Terms. — process.
For the purpose of this Order, the following a) An Inter-agency MOA on EIS Streamlining
definitions shall be applied: was entered into in 1992 by 29 government
xxxx agencies wherein ECC of covered projects
d. Environmental Compliance Certificate (ECC) — was agreed to be a prerequisite of all other
document issued by the DENR/EMB after a subsequent government approvals;
positive review of an ECC application, certifying b) DENR Memo Circular No. 2007-08 issued
that based on the representations of the on 13 July 2007 reiterates in effect the intent
proponent, the proposed project or undertaking of the MOA and reinforces the role of the
will not cause significant negative environmental ECC/CNC as a guidance document to other
impact. The ECC also certifies that the proponent agencies and LGUs, as follows:
has complied with all the requirements of the EIS i) "No permits and/or clearances
System and has committed to implement its issued by other National Government
approved Environmental Management Plan. The Agencies and Local Government Units
ECC contains specific measures and conditions shall be required in the processing of
that the project proponent has to undertake ECC or CNC applications.
beforeand during the operation of a project, and in ii) The findings and recommendations
some cases, during the project's abandonment ofthe EIA shall be transmitted to
phase to mitigate identified environmental relevant government agencies for
impacts. them to integrate in their decision
In turn, Section 1.0, paragraphs 3 and 6 of the making prior to the issuance of
Revised Manual provide, in part: clearances, permits and licenses under
3) Purpose of the EIA Process their mandates.
As a basic principle, EIA is used to enhance iii) The issuance of an ECC or CNC for
planning and guide decisionmaking. In this a project under the EIS System does
Manual, EIA is primarily presented in the context of not exempt the Proponent from
a requirement to integrate environmental securing other government permits
concerns in the planning process of projects at the and clearances as required by other
feasibility stage. Through the EIA Process, adverse laws. The current practice of requiring
environmental impacts of proposed actions are various permits, clearancesand
considerably reduced through a reiterative review licenses only constrains the EIA
process of project siting, design and other evaluation process and negates the
alternatives, and the subsequent formulation of purpose and function of the EIA."
environmental management and monitoring plans. iv) Henceforth, all related previous
A positive determination by the DENR-EMB results instructions and other issuances shall
to the issuance of an Environmental Compliance be made consistent with the Circular.
Commitment (ECC) document, to be conformed to c) "Permits, licenses and clearances"
by the Proponent and represents the project’s are inclusive of other national and local
Environmental Compliance Certificate. The release government approvals such as
endorsements, resolutions, and Development Agreement (LDA) between
certifications, plans and programs, SBMA and RP Energy and the lack of its prior
which have to be cleared/approved or issuance rendered the LDA invalid.
other government documents required We now turn to the applicability of Section 59 of
within the respective mandates and the IPRA Law to the LDA entered into between the
jurisdiction of these agencies/LGUs. SBMA and RP Energy on June 8, 2010. Similar to
xxxx the ECC, the LDA was entered into prior to the
f) The final decision whether a project will be issuance ofthe CNO on October 31, 2012.
implemented or not lies either with the LGUs who Before this Court, SBMA and RP Energy reiterate
have spatial jurisdiction over the project or with their arguments on why the CNO is no longer
the lead government agency who has sectoral necessary in the instant case, to wit:
mandate to promote the government program 1. Prior to entering into the LDA withRP
where the project belongs, e.g. DOE for energy Energy, SBMA entered into a lease
projects; DENR-MGB for mining agreement with HHIC206 -Philippines, Inc.
projects.(Emphasis supplied) and a CNO was already issued therefor
As can be seen, the issuance of the ECC does not, which, for all intents and purposes, is
by and of itself, authorize the implementation of applicable to the area leased by RP Energy
the project. Although it is indispensable before the being part of contiguous lots in Redondo
covered project can be commenced, asper Section Peninsula.
4 of PD 1586,the issuanceof the ECC does not, as 2. The site of the power plant project is very
of yet, result inthe implementation of the project. distant from the boundaries of the lone area
Rather, the ECC is intended to, among others, at the Subic Bay Freeport Zone covered by an
provide guidance or act as a decision-making tool Aeta Community’s Certificate of Ancestral
to other government agencies and LGUs which Domain Title (CADT).
have the final authority to grant licenses or 3. There was no indigenous community
permits, such as building permits or licenses to within the vicinity of the project area as
operate, that will ultimately result in, or authorize stated in RP Energy’s EIS.
the implementation of the project or the conduct 4. The land where the project is located was
of specific activities. subsequently classified as industrial by the
As a consequence, we find that the CNO SBMA. 5. The scoping/procedural screening
requirement under Section 59 of the IPRA Law is checklist classified as "not relevant" the
not required to be obtained prior to the issuance of issue of indigenous people.
an ECC. As previously discussed, Section 59 aims 6. Ms. Mercado, who was part of the team
to forestall the implementation of a project that which prepared the EIS, testified that she
may impair the right of ICCs/IPs totheir ancestral visited the project site ten or more times and
domains, by ensuring or verifying that a project will did not see any Aeta communities there.
not overlap with any ancestral domain prior to its 7. Mr. Evangelista testified that the project
implementation. However, because the issuance site used to be a firing range of the U.S.
of an ECC does not result in the implementation of Armed Forces which would make it
the project, there is no necessity to secure a CNO impossible to be a settlement area of
prior to an ECC’s issuance as the goal orpurpose, indigenous communities.
which Section 59 seeks to achieve, is, at the time 8. Atty. Rodriguez stated that the project site
of the issuance of an ECC, not yet applicable. is not covered by a CADT and that from the
In sum, we find that the ECC is not the license or start of negotiations on the LDA, the SBMA
permit contemplated under Section 59 of the IPRA Ecology Center verified with the NCIP that
Law and its implementing rules. Hence, there is no there was no application for said area to be
necessity to secure the CNO under Section 59 covered by a CADT.
before an ECC may be issued and the issuance of RP Energy further argues that, in any case, as a
the subject ECC without first securing the matter of prudence, it secured a CNO from the
aforesaid certification does not render it invalid. NCIP. On October 31, 2012, the NCIP issued the
V. subject CNO over the project site, which should
Whether the Certificate of Non-Overlap (CNO), erase any doubt as to whether it overlaps with an
under Section 59 of the IPRA Law, is a ancestral domain.
precondition to the consummation of the Lease
Upholding the arguments of the Casiño Group, the withthe CNO requirement does not invalidate the
appellate court ruled that SBMA failed to comply LDA.
with the CNO requirement and, thus, the LDA For convenience, and as starting point of
entered into between SBMA and RP Energy is ouranalysis, we reproduce Section 59 of the IPRA
invalid. It rejected the reasons given by SBMA and Law below:
RP Energy, to wit: SEC. 59. Certification Precondition. All
1. RP Energy’s reliance on its own field departments and other governmental agencies
investigation that no indigenous community shall henceforth be strictly enjoined from issuing,
was found within the vicinity is unavailing renewing, or granting any concession, license or
because it was not the field investigation by lease, or entering into any productionsharing
the NCIP required by the IPRA Law. agreement, without prior certification from the
2. RP Energy acknowledged that Aetas were NCIP that the area affected does not overlap with
among the earliest settlers in the any ancestral domain.Such certification shall only
municipality where the project will be built. be issued after a field-based investigation is
Hence, it was not clearly shown that in 2008, conducted by the Ancestral Domains Office of the
at the time the LDA was entered into, there area concerned: Provided, That no certification
were no indigenouscommunities in the shall be issued by the NCIP without the free and
project site. prior informed and written consent of ICCs/IPs
3. SBMA’s representation that the project concerned: Provided, further, That no department,
site is industrial relies on a letter dated government agency or government-owned or -
March 5, 2008 and the scoping checklist, controlled corporation may issue new concession,
which are hearsay evidence. license, lease, or production sharing agreement
4. The statements of Atty. Rodriguez have no while there is a pending application for a CADT:
probative value because he is not an officer Provided, finally, That the ICCs/IPs shall have the
of SBMA Ecology Center oran officer of NCIP. right to stop or suspend, in accordance with this
5. At the time the CNO was issued on Act, any project that has not satisfied the
October 31, 2012, and the field investigation requirement of this consultation process.
relative thereto was conducted by the NCIP, (Emphasis supplied)
the project site no longer reflected the actual The law is clear but its actual operation or
condition on December 22, 2008 when the application should not be interpreted beyond the
LDA was entered into because the bounds of reason or practicality.
households which occupied the site had We explain.
already been relocated by then. Indeed, a CNO is required prior to the grant of a
6. SBMA, prior to entering into a lease lease by all government agencies, including the
agreement with HHIC, secured a CNO, but SBMA. Again, the evident intention is to prevent
oddly did not do the same with respect to the the impairment of the right of ICCs/IPs to their
lease agreement with RP Energy, ancestral domains. A lease, such as the LDA under
considering that both leases cover lands consideration, would result in, among others,
located within the same peninsula. RP granting RP Energy the right to the use and
Energy appears to have been accorded a enjoyment of the project site to the exclusion of
different treatment. third parties.207 As such, the lease could
7. The CNO issued in favor of HHIC cannot conceivably encroach on an ancestral domain if
justify the lack of a CNO for the power plant the CNO is not first obtained.
project because the two projects are situated However, implicit in the operation of Section 59 is
in different locations: the HHIC project is the practical reality that the concerned
located in Sitio Agusuhin,while the power government agency must make a preliminary
plant project is located in Sitio Naglatore. determinationon whether or not to obtain the
While we agree with the appellate court that a CNO required certification in the first place. To
should have been secured prior to the expound, a government agency, which wishes to
consummation of the LDA between SBMAand RP lease part of its property located near Padre Faura
Energy, and not after, as was done here, we find Street, Manila City could not, and should not be
that, under the particular circumstances of this reasonably expected to obtain the CNO, as it is
case, the subsequent and belated compliance obviously inapplicable to its planned lease. In
contrast, a government agency, which intends to
lease a property in a valley or mountainous region, no matter how remote, the proper and prudent
where indigenous communities are known to course ofaction is to obtain the CNO. In case of
reside, conduct hunting activities, perform rituals, doubt, the doubt should be resolved in favor of
or carry out some other activities, should be securing the CNO and, thus, the government
reasonably expected to secure the CNO prior to agency is under obligation tosecure the aforesaid
consummating the planned lease with third certification in order to protect the interests and
persons. rights of ICCs/IPs to their ancestral domains. This
Even if the indigenous community does not must be so if we are to accord the proper respect
actuallyreside on the proposed lease site, the due to, and adequately safeguard the interests and
government agency would still be required to rights of, our brothers and sisters belonging to
obtain the CNO preciselyto rule out the possibility ICCs/IPs in consonance with the constitutional
that the proposed lease site encroaches upon an policy209 to promote and protect the rights of
ancestral domain. The reason for this is that an ICCS/IPs as fleshed out in the IPRA Law and its
ancestral domain does not only cover the lands implementing rules.
actually occupied by an indigenous community, In the case at bar, we find, applying this rule of
but all areas where they have a claim of ownership, action, that the SBMA should have first secured a
through time immemorial use, such as hunting, CNO before entering into the LDA with RP Energy
burial or worship grounds and to which they have for the following reasons.
traditional access for their subsistence and other First, the Subic area is historicallyknown to be the
traditional activities.208 home of our brothers and sisters belonging to the
The wording of the law itself seems to presuppose Aeta communities. In particular, the EIS210 itself of
that if the concession, lease, license or RP Energy noted that Aeta communities originally
production-sharing agreement is over natural occupiedthe proposed project site of the power
resources, then the CNO should be first obtained. plant. Thus, even if we assume that, at the time of
This is because the lastterm, "production-sharing the ocular inspection of the proposed project site
agreement," normally refers to natural resources. in 2008, there were no Aeta communities seen
But the problem arises as to what should be thereat, as claimed by RP Energy, the exercise of
considered "natural resources"; for a vacant lot, reasonable prudence should have moved SBMA
nearPadre Faura Street, or a forest land, in Mt. and RP Energy to secure a CNO in order to rule out
Banahaw, could both beconsidered as "natural the possibility that the project site may overlap
resources," depending on the restrictive or with an ancestral domain. This is especially so, in
expansive understanding of that term. view of the observation previously made, that lack
After due consideration, we find that the proper of actual occupation by an indigenous community
rule of action, for purposes of application of ofthe area does not necessarily mean that it is not
Section 59, is that all government offices should a part of anancestral domain because the latter
undertake proper and reasonable diligence in encompasses areas that are not actually occupied
making a preliminary determination on whether to by indigenouscommunities but are used for other
secure the CNO, bearing in mind the primordial purposes like hunting, worship or burial grounds.
State interest in protecting the rights of ICCs/IPs Second, SBMA and RP Energy claim that the SBMA
to their ancestral domains. They should consider Ecology Center verified with the NCIP that the
the nature and location of the areas involved; the project site does not overlap with an ancestral
historical background of the aforesaid areas domain. However, the person, who allegedly did
relative to the occupation, use or claim of the verification, and the officer from the NCIP, who
ownership by ICCs/IPs; the present and actual was contacted in this alleged verification, were not
condition of the aforesaid areas likethe existence presented in court. Assuming that this verification
of ICCs/IPs within the area itself or within nearby did take place and that the SBMA Ecology Center
territories; and such other considerations that determined that there is no pendingapplication for
would help determine whether a CNO should be a CADT covering the project site and that the
first obtained prior to granting a concession, lease, presently recognized CADT of Aeta communities is
license or permit, or entering into a production- too far away from the project site, it still does not
sharing agreement. follow that the CNO under Section 59 should have
If there are circumstances that indicate that a been dispensed with. The acts of individual
claim of ownership by ICCs/IPs may be present or members ofa government agency, who allegedly
a claim of ownership may be asserted in the future, checked with the NCIP that the project site does
not overlap with an ancestral domain, cannot the possibility that the project site overlapped with
substitute for the CNO required by law. The reason an ancestral domain.
is obvious. Such posture would circumvent the All in all, we find, applying the foregoing rule of
noble and laudable purposes of the law in action,that SBMA should have secured a CNO
providing the CNO as the appropriate mechanism before entering into the LDA with RP Energy.
in order to validly and officially determine whether Considering that Section 59 is a prohibitory
a particular project site does not overlap with an statutory provision, a violation thereof would
ancestral domain. It would open the doors to ordinarily result in the nullification of the
abuse because a government agency can easily contract.212 However, we rule that the harsh
claim that it checked with the NCIP regarding any consequences of such a ruling should not be
application for an ancestral domain over a applied to the case at bar.
proposed project site while stopping short of The reason is that this is the first time that we lay
securing a CNO. To reiterate, the legally mandated down the foregoing rule of action so much so that
manner to verify if a project site overlaps with an it would be inequitable to retroactively apply its
ancestral domain is the CNO,and not through effects with respect to the LDA entered into
personal verification by members of a government between SBMA and RPEnergy. We also note that,
agency with the NCIP. under the particular circumstances of this case,
Third, that the project site was formerlyused as the there is no showing that SBMA and RP Energy had
firing range of the U.S. Armed Forces does not a deliberate or ill intent to escape, defeat or
preclude the possibility that a present orfuture circumvent the mandate of Section 59 of the IPRA
claim of ancestral domain may be made over the Law. On the contrary, they appear to have believed
aforesaid site. The concept of an ancestral domain in good faith, albeiterroneously, that a CNO was no
indicates that, even if the use ofan area was longer needed because of the afore-discussed
interrupted by the occupation of foreign forces, it defenses they raised herein. When the matter of
may still be validly claimed to be an ancestral lack of a CNO relative to the LDA was brought to
domain.211 their attention, through the subject Petition for
Fourth, that the project site was subsequently Writ ofKalikasan filed by the Casiño Group, RP
classified by the SBMA as forming part of an Energy, with the endorsement of SBMA, promptly
industrial zone does not exempt it from the CNO undertook to secure the CNO, which was issued on
requirement. The change in the classification of October 31, 2012 and stated that the project site
the land is not an exception to the CNO does not overlap with any ancestral domain.213
requirement under the IPRA Law. Otherwise, Thus, absent proof to the contrary, weare not
government agencies can easily defeat the rights prepared to rule that SBMA and RP Energy acted
of ICCs/IPs through the conversion of land use. inbad faith or with inexcusable negligence,
Fifth, SBMA argues that the CNO issued to HHIC considering that the foregoing rule of action has
should, for all intents and purposes, be applicable not heretofore been laiddown by this Court. As a
to RP Energy. However, ascorrectly ruled by the result, we hold that the LDA should notbe
appellate court, the CNO issued to HHIC’s shipyard invalidated due to equitable considerations
cannot be extended to RP Energy’s project site present here.
because they involve two different locations By so ruling, we clarify that we reject RP Energy’s
although found within the same land mass. The claim that the belated submission of the CNO is an
CNO issued in favor of HHIC clearly states that the "over compliance" on its part. Quite the contrary,
findings in the CNO are applicable only to the as we have discussed, the CNO should have been
shipyard location of HHIC. Last, the steps taken by first secured given the surrounding circumstances
SBMA, in securing a CNO prior to its lease of this case.
agreement with HHIC, was the proper and prudent In the same vein, we reject SBMA’s argument
course of action that should have been applied to thatthe belated application for, and submission of
the LDA with RP Energy. It does notmatter that the CNO cured whatever defect the LDA had. We
HHIC itself asked for the CNO prior to entering into have purposely avoided a ruling to the effect that
a lease agreement with SBMA, as claimed by a CNO secured subsequent to the concession,
SBMA, while RP Energy did not make such a lease, license, permit or production-sharing
request because, as we have discussed, SBMA had agreement will cure the defect. Such a ruling
the obligation, given the surrounding would lead to abuse of the CNO requirement since
circumstances, to secure a CNO in order to rule out the defect can be cured anyway by a subsequent
and belated application for a CNO. Government The DENR impliedly agrees with the Casiño Group
agencies and third parties, either through that compliance with Section 27 is still required
deliberate intent or negligence, may view it as an but without clearly elaborating its reasons
excuse not to timely and promptly secure the CNO, therefor.
even when the circumstances warrant the The SBMA and RP Energy, however, argue that the
application for a CNO under the aforediscussed prior approval of the concerned
rule of action, tothe damage and prejudice of sanggunianrequirement, under Section 27, is
ICCs/IPs. Verily, once the concession, lease, inapplicable to the subject project because it is
license or permit is issued, or the agreement is located within the SSEZ. The LGC and RA 7227
entered into without the requisite CNO, cannot be harmonized because of the clear
consequent damages will have already occurred if mandate of the SBMA to govern and administer all
it later turns out that the site overlaps with investments and businesses within the SSEZ.
anancestral domain. This is so even if the ICCs/IPs Hence, RA 7227 should be deemed as carving out
can have the project stopped upon discovery thatit an exception to the prior approval of the concerned
overlapped with their ancestral domain under the sanggunianrequirement insofar as the SSEZ is
last proviso214 of Section 59. To prevent this evil, concerned.
compliance with the CNO requirement should be We agree with the SBMA and RP Energy.
followed through the aforediscussed rule of Preliminarily, we note that Sections 26 and 27 of
action. the LGC contemplate two requirements: (1) prior
In sum, we rule that a CNO should have been consultations and (2) prior approval of the
secured prior to the consummation of the LDA concerned sanggunian,viz:
between SBMA and RP Energy. However, SECTION 26. Duty of National Government
considering that this is the first time we lay down Agencies in the Maintenance of Ecological
the rule of action appropriate to the application of Balance. — It shall be the duty of every national
Section 59, we refrain from invalidating the LDA agency or government-owned or -controlled
due to equitable considerations. corporation authorizing or involved in the planning
VI. and implementation of any project or program that
Whether compliance with Section 27, inrelation may cause pollution, climatic change, depletion of
to Section 26, of the LGC (i.e., approval of the non-renewable resources, loss of cropland,
concerned sanggunianrequirement) is necessary rangeland, or forest cover, and extinction of animal
prior to the implementation of the power plant or plant species, to consult with the local
project. government units, non governmental
Sustaining the arguments ofthe Casiño Group, the organizations, and other sectors concerned and
appellate court ruled that the subject project explain the goals and objectives of the project or
cannot beconstructed and operated until after the program, its impact upon the peopleand the
prior approval of the concerned community in terms of environmental or
sanggunianrequirement, under Section 27 of the ecological balance, and the measures that will be
LGC, is complied with. Hence, the ECC and LDA undertaken to prevent or minimize the adverse
could not be validly granted and entered into effects thereof. (Emphasis supplied)
without first complying with the aforesaid SECTION 27. Prior Consultations Required. — No
provision. It held that all the requisites for the project or program shall be implemented by
application of the aforesaid provision are present. government authorities unless the consultations
As to the pertinent provisions of RA 7227 or mentioned in Sections 2 (c) and 26 hereof are
"TheBases Conversion and Development Act of complied with, and prior approval of the
1992," which grants broad powers of sanggunian concerned is obtained: Provided, That
administration to the SBMA over the Subic Special occupants in areas where such projects are to be
Economic Zone(SSEZ), the appellate court ruled implemented shall not be evicted unless
that RA 7227 contains a provision recognizing the appropriate relocation sites have been provided, in
basic autonomy ofthe LGUs which joined the accordance with the provisions of the
SSEZ. Thus, the LGC and RA 7227should be Constitution. (Emphasis supplied)
harmonized whereby the concerned In the case at bar, the Casiño Group only questions
sanggunian’spower to approve under Section 27 the alleged lack of the prior approval of the
must be respected. concerned sanggunians under Section 27 of the
LGC. Thus, we shall limit our discussion to the
resolution of this issue. (Parenthetically, we note i.e., national programs and/or projects which are
that prior consultations, as required by Section 26 to be implemented in a particular local community;
of the LGC, appear to have been complied with. and (2) the project or program may cause
This may begleaned from the EIS of RPEnergy pollution, climatic change, depletion of non-
which contains the documentation of the renewable resources, loss of cropland, rangeland,
extensive public consultations held, under the or forest cover, extinction of animal or plant
supervision of the DENR-EMB, relative to the species, or call for the eviction of a particular
subject project, as required by the EIA group of people residing in the locality where the
process,215 as well as the socialacceptability project will be implemented.219
policy consultations conducted by the SBMA, In the case at bar, the two requisites are evidently
which generated the document entitled "Final present: (1) the planning and implementation of
Report: Social Acceptability Process for RP the subject project involves the Department of
Energy, Inc.’s 600-MW Coal Plant Project," as Energy, DENR, and SBMA; and (2) the subject
noted and discussed in an earlier subsection.216) project may cause pollution, climatic change,
We also note that the Casiño Group argues that the depletion of non-renewable resources, loss of
approval of the concerned sanggunian cropland, rangeland, or forest cover, and extinction
requirement was necessary prior to the issuance of animal or plant species,or call for the eviction of
of the ECC and the consummation of the LDA; the a particular group of people residing in the locality
absence of which invalidated the ECC and LDA. where the project will be implemented. Hence,
We shall no longer discuss at length whether the Section 27 of the LGC should ordinarily apply.
approval of the concerned sanggunian It is not disputed that no approval was sought from
requirement must be complied with prior to the the concerned sangguniansrelative to the subject
issuance of an ECC. As discussed in an earlier project.1a\^/phi1 Whatis more, the affected LGUs
subsection, the issuance of an ECC does not, by have expressed their strong oppositions to the
itself, result in the implementation of the project. project through various sanggunian
Hence, the purpose or goal of Sections 26 and 27 resolutions.220 However, it is also undisputed that
of the LGC,like Section 59 of the IPRA Law, does the subject project is located within the SSEZ and,
not yet obtain and, thus, the ECC may be issued thus, under the territorial jurisdiction of the SBMA
evenwithout prior compliance with Sections 26 pursuant to RA 7227.
and 27 of the LGC. Thus, we are tasked to determine the applicability
We, thus, limit the discussion as to whether the of the prior approval of the concerned sanggunian
approval of the concerned sanggunian requirement, under Section 27 of the LGC, relative
requirement should have been complied with prior to a project within the territorial jurisdiction of the
to the consummation of the LDA, considering that SBMA under RA 7227.
the LDA is part of the implementation of the RA 7227 was passed on March 13, 1992 in the
subject project and already vests in RP Energy the aftermath of the Mount Pinatubo eruption and the
right to the use and enjoyment of the project site, closure of the Subic Naval Base ofthe U.S. Armed
asin fact horizontal clearing activities were already Forces. It sought to revivethe affected areas by
undertaken by RP Energy at the project site by creating and developing the SSEZ into a "self-
virtue of the LDA. sustaining industrial, commercial, financial and
The prior approval of the concerned sanggunian investment center to generate employment
requirement is an attribute and implementation of opportunities in and around the zone and to attract
the local autonomy granted to, and enjoyed by and promote productive foreign
LGUs under the Constitution.217 The LGU has the investments."221 The SSEZ covered the City of
duty to protect its constituents and interests in the Olangapo and Municipality of Subic in the Province
implementation of the project. Hence, the approval ofZambales and the lands and its contiguous
of the concerned sanggunian is required by law to extensions occupied by the former U.S. Naval
ensure thatlocal communities partake in the fruits Base, which traversed the territories of the
of their own backyard.218 Municipalities of Hermosa and Morong in the
For Section 27, in relation to Section 26, to apply, Province of Bataan. Under Section 12 of RA 7227,
the following requisites must concur: (1) the the creation of the SSEZ was made subject to the
planning and implementation of the project or concurrence by resolution of the respective
program is vested in a national agency or sanggunians of the City of Olongapo and the
government-owned and-controlled corporation, Municipalities of Subic, Morong and Hermosa, viz:
SECTION 12. Subic Special Economic Zone. — subdivision owners elect their representatives to
Subject to the concurrence by resolution of the run the affairs of the subdivision, toset the
sangguniang panlungsod of the City of Olongapo policies, to set the guidelines.
and the sangguniang bayanof the Municipalities of We would like to see Subic area converted into a
Subic, Morong and Hermosa, there is hereby little Hong Kong, Mr. President, where there is a
created a Special Economic and Free-port Zone hub of free port and free entry, free duties and
consisting of the City of Olongapo and the activities to a maximum spur generation of
Municipality of Subic, Province of Zambales, the investment and jobs.
lands occupied by the Subic Naval Base and its While the investor is reluctant to come in the
contiguous extensions as embraced, covered, and Philippines, as a rule, because of red tape and
defined by the 1947 Military Bases Agreement perceived delays, we envision this special
between the Philippines and the United States of economic zone to be an area where there will be
America as amended, and within the territorial minimum government interference.
jurisdiction of the Municipalities of Morong and The initial outlay may not only come from the
Hermosa, Province of Bataan, hereinafter referred Government or the Authority as envisioned here,
to as the Subic Special Economic Zone whose but from them themselves, because they would be
metes and bounds shall be delineated in a encouraged to invest not only for the land but also
proclamation to be issued by the President of the for the buildings and factories. As long as they are
Philippines. Within thirty (30) days after the convinced that in such an area they can do
approval of this Act, each local government unit business and reap reasonable profits, thenmany
shall submit its resolution of concurrence to join from other parts, both local and foreign, would
the Subic Special Economic Zone to the office of invest, Mr. President.223 (Emphasis in the original)
the President. Thereafter, the President of the To achieve the above-mentioned purposes, the
Philippines shall issue a proclamation defining the law created SBMA to administer the SSEZ. In the
metes and bounds of the Zone as provided herein. process, SBMA was granted broad and enormous
Subsequently, the aforesaid sanggunians powers as provided for under Section 13(b) of RA
submitted their respective resolutions of 7227:
concurrence and the President issued Presidential Sec. 13. The Subic Bay Metropolitan Authority. –
Proclamation No. 532, Series of 1995, defining the xxxx
metes and bounds of the SSEZ. (b) Powers and functions of the Subic Bay
In Executive Secretary v. Southwing Heavy Metropolitan Authority - The Subic Bay
Industries, Inc.,222 we described the concept of Metropolitan Authority, otherwise knownas
SSEZ as a Freeport: the Subic Authority, shall have the following
The Freeport was designed to ensurefree flow or powers and function: (1) To operate,
movement of goods and capital within a portion of administer, manage and develop the ship
the Philippine territory in order to attract investors repair and ship building facility, container
to invest their capital in a business climate with port, oil storage and refueling facility and
the least governmental intervention. The concept Cubi Air Base within the Subic Special
ofthis zone was explained by Senator Guingona in Economic and Free-port Zone as a free
this wise: market in accordance with the policies set
Senator Guingona. Mr. President, the special forth in Section 12 of this Act;
economic zone is successful in many places, (2) To accept any local or foreign
particularly Hong Kong, which is a free port. The investment, business or enterprise,
difference between a special economic zone and subject only to such rules and
an industrial estate is simply expansive in the regulations to be promulgated by the
sense that the commercial activities, including the Subic Authority in conformity with the
establishment of banks, services, financial policies of the Conversion Authority
institutions, agro-industrial activities, maybe without prejudice to the
agriculture to a certain extent. nationalization requirements provided
This delineates the activities that would have the for in the Constitution;
least of government intervention, and the running (3) To undertake and regulate the
of the affairs of the special economic zone would establishment, operation and
be run principally by the investors themselves, maintenance of utilities, other services
similar toa housing subdivision, where the and infrastructure in the Subic Special
Economic Zone including shipping and (9) To protect, maintain and develop
related business, stevedoring and port the virgin forests within the baselands,
terminal services or concessions, which will be proclaimed as a national
incidental thereto and airport park and subject to a permanent total
operations in coordination with the log ban, and for this purpose, the rules
Civil Aeronautics Board, and to fix just and regulations of the Department of
and reasonable rates, fares charges Environment and Natural Resources
and other prices therefor; and other government agencies
(4) To construct, acquire, own, lease, directly involved in the above functions
operate and maintain on its own or shall be implemented by the Subic
through contract, franchise, license Authority;
permits bulk purchase from the private (10) To adopt and implement
sector and build-operate transfer measures and standards for
scheme or joint-venture the required environmental pollution control of all
utilities and infrastructurein areas within its territory, including but
coordination with local government not limited to all bodies of water and to
units and appropriate government enforce the same. For which purpose
agencies concerned and inconformity the Subic Authority shall create an
with existing applicable laws therefor; Ecology Center; and
(5) To adopt, alter and use a corporate (11) To exercise such powers as may
seal; to contract, lease, sell, dispose, be essential, necessary or incidental to
acquire and own properties; to sue and the powers granted to it hereunder as
be sued in order to carry out its duties well as to carry out the policies and
and functions as provided for in this objectives of this Act. (Emphasis
Act and to exercise the power of supplied) The Implementing Rules of
eminent domain for public use and RA 7227 further provide:
public purpose; Sec. 11. Responsibilities of the SBMA. Other than
(6) Within the limitation provided by the powers and functions prescribed in Section 10
law, to raise and/or borrow the of these Rules, the SBMA shall have the following
necessary funds from local and responsibilities:
international financial institutions and (a) The SBMA shall exercise authority and
to issue bonds, promissory notes and jurisdiction over all economic activity within the
other securities for that purpose and to SBF224
secure the same by guarantee, pledge, xxxx
mortgage deed of trust, or assignment (f) Consistent with the Constitution, the SBMA
of its properties held by the Subic shall have the following powers to enforce the law
Authority for the purpose of financing and these Rules in the SBF:
its projects and programs within the xxxx
framework and limitation of this Act; (8) to issue, alter, modify, suspend or revoke for
(7) To operate directly or indirectly or cause, any permit, certificate, license, visa or
license tourism related activities privilege allowed under the Act or these Rules;
subject to priorities and standards set xxxx
by the Subic Authority including games (11) to promulgate such other rules, regulations
and amusements, except horse racing, and circulars as may be necessary, proper or
dog racing and casino gambling which incidental to carry out the policies and objectives
shall continue to be licensed by the of the Act, these Rules, as well as the powers and
Philippine Amusement and Gaming duties of the SBMA thereunder.225
Corporation (PAGCOR) upon As can be seen, the SBMA was given broad
recommendation of the Conversion administrative powers over the SSEZ and these
Authority; to maintain and preserve the necessarily include the power to approve or
forested areas as a national park; disapprove the subject project, which is within its
(8) To authorize the establishment territorial jurisdiction. But, as previously
ofappropriate educational and medical discussed, the LGC grants the concerned
institutions; sangguniansthe power to approve and disapprove
this same project. The SBMA asserts that its Sec. 14. Relationship with the Conversion
approval of the project prevails over the apparent Authority and the Local Government Units.
disapproval of the concerned sanggunians. There (a) The provisions of existing laws, rules
is, therefore, a real clash between the powers and regulations to the contrary
granted under these two laws. notwithstanding, the Subic Authority shall
Which shall prevail? exercise administrative powers, rule-
Section 12 of RA 7227 provides: making and disbursement of funds over the
Sec. 12. Subic Special Economic Zone. x x x Subic Special Economic Zonein conformity
The abovementioned zone shall be subjected to with the oversight function of the
the following policies: Conversion Authority.
(a) Within the framework and subject to the (b) In case of conflict between the Subic
mandate and limitations of the Constitution and Authority and the local government units
the pertinent provisions of the Local Government concerned on matters affecting the Subic
Code, the Subic Special Economic Zone shall Special Economic Zone other than defense
bedeveloped into a self-sustaining, industrial, and security, the decision of the Subic
commercial, financial and investment center to Authority shall prevail. (Emphasis supplied)
generate employment opportunities in and around Clearly, the subject project does not involve
the zone and to attract and promote productive defense or security, but rather business and
foreign investments; investment to further the development of the
xxxx SSEZ. Such is in line with the objective of RA 7227
(i) Except as herein provided, the local government to develop the SSEZ into a self-sustaining
units comprising the Subic Special Economic Zone industrial, commercial, financial and investment
shall retain their basic autonomy and identity. The center. Hence, the decision of the SBMA would
cities shall be governed by their respective prevail over the apparent objections of the
charters and the municipalities shall operate and concerned sanggunians of the LGUs.
function in accordance with Republic Act No. Significantly, the legislative deliberations on RA
7160, otherwise known as the Local Government 7227, likewise, support and confirm the foregoing
Code of 1991. (Emphasis supplied) interpretation. As earlier noted, Section 13 b(4) of
This section sets out the basic policies underlying RA 7227 provides:
the creation of the SSEZ. Indeed, as noted by the Sec. 13. The Subic Bay Metropolitan Authority. –
appellate court, Section 12(i) expressly recognizes xxxx
the basic autonomy and identity of the (b) Powers and functions of the Subic Bay
LGUscomprising the SSEZ. However, the clause Metropolitan Authority - The Subic Bay
"[e]xcept as herein provided" unambiguously Metropolitan Authority, otherwise knownas the
provides that the LGUs do not retain their basic Subic Authority, shall have the following powers
autonomy and identitywhen it comes to matters and function: x x x x
specified by the law as falling under the powers, (4) To construct, acquire, own, lease, operate and
functions and prerogatives of the SBMA. maintain on its own or through contract, franchise,
In the case at bar, we find that the power to license permits bulk purchase from the private
approve or disapprove projects within the SSEZ is sector and build-operate transfer scheme or joint-
one such power over which the SBMA’s authority venture the required utilities and infrastructure in
prevails over the LGU’s autonomy. Hence, there coordination with local government units and
isno need for the SBMA to secure the approval of appropriate government agencies concerned and
the concerned sangguniansprior to the in conformity with existing applicable laws
implementation of the subject project. therefor;
This interpretation is based on the broad grant of In the Senate, during the period of amendments,
powers to the SBMA over all administrative when the provision which would eventually
matters relating to the SSEZ under Section 13 of become the afore-quoted Section 13 b(4) of RA
RA 7227, as afore-discussed. Equally important, 7227 was under consideration, the following
under Section 14, other than those involving exchanges took place:
defense and security, the SBMA’s decision prevails Senator Laurel. Mr. President.
in case of conflict between the SBMA and the LGUs The President. Senator Laurel is recognized.
in all matters concerning the SSEZ, viz.: Senator Laurel. Relative to line 27 up to line 31 of
page 16, regarding the provision to the effect that
the Authoritywill have the following functions: "to franchise, license, permits, bulk purchases from
construct, acquire, own, etcetera," that is all right. private sector, buildoperate-and-transfer scheme,
My motion is that we amend this particular line, or joint venture, the required utilities and
starting from the word "structures", by deleting the infrastructure, subject to approval by the
words that follow on line 31, which states: "in appropriate Sanggunian of the local government
coordination with local government unitsand", and concerned.
substitute the following in place of those words: This amendment to the amendment has been
"SUBJECT TO THE APPROVAL OF THE rejected by the Sponsor. So, we are voting now on
SANGGUNIAN OF THE AFFECTED LOCAL this amendment.
GOVERNMENT UNITS AND IN COORDINATION As many as are in favor of the Laurel amendment,
WITH." say Aye. (Few Senators: Aye.)
So, this paragraph will read, as follows: "to Those who are against the said amendment, say
construct, own, lease, operate, and maintain on its Nay. (Several Senators: Nay.)
own or through contract, franchise, license Senator Laurel. Mr. President, may I ask for a
permits, bulk purchase from the private sector and nominal voting.
build-operate-transfer scheme or joint venture the The President. A nominal voting should beupon
required utilities and infrastructure SUBJECT TO the request of one-fifth of the Members of the
THE APPROVAL OF THE SANGGUNIAN OF THE House, but we can accommodate the Gentleman
AFFECTED LOCAL GOVERNMENT UNITS AND IN by asking for a division of the House. Therefore,
coordination with appropriate government those in favor of the Laurel amendment, please
agencies concerned and in conformity with raise their right hands. (Few Senators raised their
existing applicable laws therefor." right hands.)
The President. What does the Sponsor say? Senator Laurel. I was asking, Mr. President, for a
Senator Shahani. I believe this would cripple the nominal voting. The President. A nominal voting
Authority. I would like to remind our Colleagues can be had only upon motion ofone-fifth of the
that in the Board of Directors, the representatives Members of the Body. Senator Laurel. That is
of the local government units that agree to join correct, Mr. President. But this issuch an
with the Subic Special Economic Zone will be important issue being presented to us, because
members of the Board so that they will have a say, this question is related to the other important
Mr. President. But if we say "subject," that is a very issue, which is: May an elected public official of a
strong word. It really means that they will be the particular government unit, such as a town or
ones to determine the policy. municipality, participate as a member of the Board
So, I am afraid that I cannot accept this of Directors of this particular zone.
amendment, Mr. President. The President. The ruling of the Chair stands. The
Senator Laurel. May I respond or react, Mr. division of the House is hereby directed.
President. As many as are infavor of the Laurel amendment,
The President. Yes. please raised (sic) their right hands. (Few Senators
Senator Laurel. The Constitution is there,very raised their right hands.)
categorical inthe promotion and encouragement As many as are against the said amendment,
of local autonomy, and mandating Congress to please do likewise. (Several Senators raised their
enact the necessary Local Government Code with right hands.)
emphasis on local autonomy. The amendment is lost.226 (Emphasis supplied)
We have now Section 27 of the new Local Indubitably, the legislature rejected the attempts
Government Code which actually provides that for to engraft Section 27’s prior approval of the
every projectin any local government territory, the concerned sanggunian requirement under the LGC
conformity or concurrence of the Sanggunian of into RA 7227. Hence, the clear intent was to do
every such local government unit shall be secured awaywith the approval requirement of the
in the form of resolution—the consent of the concerned sangguniansrelative to the power ofthe
Sanggunian. SBMA to approve or disapprove a project within
The President. Well, both sides have already been the SSEZ.
heard. There is the Laurel amendment that would The power to create the SSEZ is expressly
make the power of the Subic Bay Metropolitan recognized in Section 117 of the LGC, viz.:
Authority to construct, acquire, own, lease, operate TITLE VIII.
and maintain on its own or through contract, Autonomous Special Economic Zones
SECTION 117. Establishment of Autonomous concerned sanggunians, under Section 27 of the
Special Economic Zones. — The establishment by LGC, and the SBMA’s decision to approve the
law of autonomous special economic zones in project prevails over the apparent objections of the
selected areas of the country shall be subject to concerned sangguniansof the LGUs, by virtue
concurrence by the local government units ofthe clear provisions of RA 7227. Thus, there was
included therein. no infirmity when the LDA was entered into
When the concerned sanggunians opted to join the between SBMA and RP Energy despite the lack of
SSEZ, they were, thus, fully aware that this would approval of the concerned sanggunians. VII.
lead to some diminution of their local autonomy in Whether the validity of the third amendment to the
order to gain the benefits and privileges of being a ECC can be resolved by the Court.
part of the SSEZ. The Casiño Group argues that the validity of the
Further, the point of Senator Shahani that the third amendment should have been resolved by
representation of the concerned LGUs in the Board the appellate court because it is covered by the
of Directors will compensate for the diminution of broad issues set during the preliminary
their local autonomy and allow them to be conference.
represented in the decision-making of the SBMA is RP Energy counters that this issue cannot be
not lost on us. This is expressly provided for in resolved because it was expressly excluded during
Section 13(c) of RA 7227, viz: the preliminary conference.
SECTION 13. The Subic Bay Metropolitan The appellate court sustained the position of RP
Authority. — Energy and ruled that this issue was not included
xxxx in the preliminary conference so that it cannot be
(c) Board of Directors. — The powers of the Subic resolved without violating the right todue process
Authority shall be vested in and exercised by a of RP Energy.
Board of Directors, hereinafter referred to as the We agree with the appellate court.
Board, which shall be composed of fifteen (15) Indeed, the issue of the validity of the third
members, to wit: amendment to the ECC was not part of the issues
(1) Representatives of the local government set during the preliminary conference, as it
units that concur to join the Subic Special appears at that time that the application for the
Economic Zone; third amendment was still ongoing. The following
(2) Two (2) representatives from the clarificatory questions during the aforesaid
National Government; conference confirm this, viz.:
(3) Five (5) representatives from the private J. LEAGOGO:
sector coming from the present naval So what are you questioning in your Petition?
stations, public works center, ship repair ATTY. RIDON:
facility, naval supply depot and naval air We are questioning the validity of the amendment,
station; and Your Honor.
(4) The remaining balance to complete the J. LEAGOGO:
Board shall be composed of representatives Which amendment?
from the business and investment sectors. ATTY. RIDON:
(Emphasis supplied) From 2 x 150 to 1 x 300, Your Honor.
SBMA’s undisputed claim is that, during the board J. LEAGOGO:
meeting when the subject project was approved, Your Petition does not involve the 2 x 300 which is
exceptfor one, all the representatives of the still pending with the DENR. Because you still have
concerned LGUs were present and voted to remedies there, you can make your noise there,
approve the subject project.227 Verily, the wisdom you can question it to your heart[’]s content
of the law creating the SSEZ; the wisdom of the because it is still pending
choice of the concerned LGUs to join the SSEZ; and xxxx
the wisdom ofthe mechanism of representation of J. LEAGOGO:
the concerned LGUs in the decision-making Atty. Ridon, I go back to my question. We’re not yet
process of the SBMA are matters outside the talking of the legal points here. I’m just talking of
scope of the power of judicial review. We can only what are you questioning. You are questioning the
interpret and apply the law as we find it. 1 x 300?
In sum, we find that the implementation of the ATTY. RIDON:
project is not subject to the prior approval of the Yes, Your Honor.
J. LEAGOGO: an abandonment or, at least, a modification of our
Because it was 2 x 150 and then 1 x 300? ruling in the landmark case of Oposa v.
ATTY. RIDON: Factoran.229 It will also require an amendment or a
Yes, Your Honor. modification of Section 5 (on citizen suits), Rule 2
J. LEAGOGO: ofthe Rules of Procedure for Environmental Cases.
Up to that point? Hence, it is more appropriate to await a case where
ATTY. RIDON: such issues and arguments are properly raisedby
Yes, Your Honor. the parties for the consideration of the Court.
J. LEAGOGO: B.
Because there is no amended ECC yet for the 2 x Justice Leonen reasons that the amendments to
300 or 600. That’s clear enough for all of us. the subject ECC are void because the applications
ATTY. RIDON: therefor were unsupported by anEIS, as required
Yes, Your Honor.228 by PD 1151 and PD 1586. The claim is made that
Given the invocation of the right to due process by an EIS is required by law, even if the amendment
RP Energy, we must sustain the appellate court’s to the ECC is minor, because an EIS is necessary
finding that the issue as to the validity of the third to determine the environmental impact of the
amendment cannot be adjudicated in this case. proposed modifications to the original project
Refutation of the Partial Dissent. design. The DENR rules, therefore, which permit
Justice Leonen partially dissents from the the modification of the original project design
foregoing disposition on the following grounds: without the requisite EIS, are void for violating PD
(a) Environmental cases, such asa petition 1151 and PD 1586.
for a writ of kalikasan, should not, in We disagree.
general,be litigated viaa representative, Indeed, Section 4 of PD 1151 sets out the basic
citizen or class suit because of the danger of policy of requiring an EIS in every action, project or
misrepresenting the interests— and thus, undertaking that significantly affects the quality of
barring future action due to res judicata— of the environment, viz:
those not actually present in the prosecution SECTION 4. Environmental Impact Statements. —
of the case, either because they do not yet Pursuant to the above enunciated policies and
exist, like the unborn generations, or goals, all agencies and instrumentalities of the
because the parties bringing suit do not national government, including government-
accurately represent the interests ofthe owned or -controlled corporations, as well as
group they represent or the class to which private corporations, firms and entities shall
they belong. As an exception, such prepare, file and include in every action, projector
representative, citizen or class suit may be undertaking which significantly affects the quality
allowed subject to certain conditions; and of the environmenta detailed statement on —
(b) The amendments to the ECC, granted by (a) the environmental impact of the
the DENR in favor of RP Energy, are void for proposed action, project or undertaking;
failure to submit a new EIS in support of the (b) any adverse environmental effect which
applications for these amendments to the cannot be avoided should the proposal be
subject ECC, and a petition for writ of implemented;
kalikasanis not the proper remedy to raise a (c) alternative to the proposed action;
defect inthe ECC. (d) a determination that the short-term uses
We disagree. of the resources of the environment are
A. consistent with the maintenance and
Justice Leonen’s proposition that environmental enhancement of the long-term productivity
cases should not, in general, be litigated via a of the same; and
representative, citizen or class suit is both novel (e) whenever a proposal involves the use of
and ground-breaking. However, it isinappropriate depletable or nonrenewable resources, a
to resolve such an important issue in this case, in finding must be made that such use and
view of the requisites for the exercise of our power commitment are warranted.
of judicial review, because the matter was not Before an environmental impact statement is
raised by the parties so that the issue was not issued by a lead agency, all agencies having
squarely tackled and fully ventilated. The jurisdiction over, or special expertise on, the
proposition will entail, as Justice Leonen explains, subject matter involved shall comment on the
draft environmental impact statement made by the which, among others, classified fossil-fueled
lead agency within thirty (30) days from receipt of power plants as environmentally critical projects.
the same. (Emphasis supplied) In conformity with the above-quoted laws and
As earlier stated, the EIS was subsequently their implementing issuances, the subject project,
developed and strengthened through PD 1586 a coal power plant, was classified by the DENR as
which established the Philippine Environmental an environmentally critical project, new and single.
Impact Statement System. Sections 4 and 5 of PD Hence, RP Energy was required to submit an EIS in
1586 provide: support of its application for an ECC. RP Energy
SECTION 4. Presidential Proclamation of thereafter complied with the EIS requirement and
Environmentally Critical Areas and the DENR, after review, evaluation and compliance
Projects.1avvphi1 The President of the Philippines with the other steps provided in its rules, issued an
may, on his own initiative or upon ECC in favor of RP Energy. As can be seen, the EIS
recommendation of the National Environmental requirement was duly complied with.
Protection Council, by proclamation declare Anent Justice Leonen’s argument thatthe
certain projects, undertakings or areas in the subsequent amendments to the ECC were void for
country as environmentally critical. No person, failure to prepare and submit a new EIS relative to
partnership or corporation shall undertake or these amendments, it is important to note thatPD
operate any such declared environmentally critical 1586 does not state the procedure to be followed
project or area without first securing an when there is an application for an amendment to
Environmental Compliance Certificate issued by a previously issued ECC. There is nothing in PD
the President or his duly authorized 1586 which expressly requires an EIS for an
representative. For the proper management of said amendment to an ECC.
critical project or area, the President may by his In footnote 174 of the ponencia, it is stated:
proclamation reorganize such government offices, Parenthetically, we must mention that the validity
agencies, institutions, corporations or of the rules providing for amendments to the ECC
instrumentalities including the re-alignment of was challenged by the Casiño Group on the ground
government personnel, and their specific that it is ultra vires before the appellate court. It
functions and responsibilities. argued that the laws governing the ECC do not
For the same purpose as above, the Ministry of expressly permit the amendment of an ECC.
Human Settlements shall: (a) prepare the proper However, the appellate court correctly ruled that
land or water use pattern for said critical project(s) the validity of the rules cannot be collaterally
or area(s); (b) establish ambient environmental attacked. Besides,the power of the DENR to issue
quality standards; (c) develop a program of rules on amendments of an ECC is sanctioned
environmental enhancement or protective under the doctrine of necessary implication.
measures against calamituous factors such as Considering that the greater power todeny or grant
earthquake, floods, water erosion and others, and an ECC is vested by law in the President or his
(d) perform such other functions as may be authorized representative, the DENR, there is no
directed by the President from time to time. obstacle to the exercise of the lesser or implied
SECTION 5. Environmentally Non-Critical Projects. power to amend the ECC for justifiable reasons.
— All other projects, undertakings and areas not This issue was no longer raised before this Court
declared by the President as environmentally and, thus, we no longertackle the same here.
critical shall be considered as non-critical and Because PD 1586 did not expressly provide the
shall not be required to submit an environmental procedure to be followed in case of an application
impact statement. The National Environmental for an amendment toa previously issued ECC, the
Protection Council, thru the Ministry of Human DENR exercised its discretion, pursuant to its
Settlements may however require non-critical delegated authority to implement this law, in
projects and undertakings to provide additional issuing DAO 2003-30 and the Revised Manual.
environmental safeguards as it may deem Justice Leonen’s argument effectively challenges
necessary. (Emphasis supplied) the validity of the provisions in DAO 2003-30 and
These laws were, in turn, implemented by DAO the Revised Manual relative to amendments to an
2003-30 and the Revised Manual. ECC for being contrary to PD 1151 and 1586.
As correctly noted by Justice Leonen,Presidential We disagree.
Proclamation No. 2146 was subsequently issued
First, to repeat, there is nothing in PD 1586 which to address the potential impacts of these planned
expressly requires an EIS for an amendment to an modifications. Hence, absent sufficient proof,
ECC. there is no basis to conclude that the procedure
Second, as earlier noted, the proposition would adopted by the DENR was done with grave abuse
constitute a collateral attack on the validity of DAO of discretion.
2003-30 and the Revised Manual, which is not Justice Leonen’s proposition would effectively
allowed under the premises. The Casiño Group impose a stringent requirement of an EIS for each
itself has abandoned this claim before this Court and every proposed amendment to an ECC, no
so that the issue is not properly before this Court matter how minor the amendment may be. While
for its resolution. this requirement would seem ideal, in order to
Third, assuming that a collateral attack on the ensure that the environmental impact of the
validity of DAO 2003-30 and the Revised Manual proposed amendment is fully taken into
can be allowed in this case, the rules on consideration, the pertinent laws do not, however,
amendments appear to be reasonable, absent a expressly require that such a procedure be
showing of grave abuse of discretion or patent followed.As already discussed, the DENR appear
illegality. to have reasonably issued DAO 2003-30 and the
Essentially, the rules take into consideration the Revised Manualrelative to the amendment process
nature of the amendment in determining the of an ECC, by balancing practicality vis-à-vis the
proper Environmental Impact Assessment (EIA) need for sufficient information in determining the
document type that the project proponent will environmental impact of the proposed amendment
submit in support of its application for an to an ECC. In fine, the Court cannot invalidate the
amendment to its previously issued ECC. A minor rules which appear to be reasonable, absent a
amendment will require a less detailed EIA showing of grave abuse of discretion or patent
document type, like a Project Description Report illegality.
(PDR), while a major amendment will require a We next tackle Justice Leonen’s argument that a
more detailed EIA document type, like an petition for certiorari,and not a writ of kalikasan,is
Environmental Performance Report and the proper remedy to question a defect in an ECC.
Management Plan (EPRMP) or even an EIS.230 In general, the proper procedure to question a
The rules appear to be based on the premise that defectin an ECC is to follow the appeal process
it would be unduly burden some or impractical to provided in DAO 2003-30 and the Revised Manual.
require a project proponent to submit a detailed After complying with the proper administrative
EIA document type, like an EIS, for amendments appeal process, recourse may be made to the
that, upon preliminary evaluation by the DENR, will courts in accordance with the doctrine of
not cause significant environmental impact. In exhaustion of administrative remedies. However,
particular, as applied to the subject project, the as earlier discussed, in exceptional cases, a writ of
DENR effectively determined that it is impractical kalikasan may be availed of to challenge defects in
to requireRP Energy to, in a manner of speaking, the ECC providedthat (1) the defects are causally
start from scratch by submitting a new EIS in linked or reasonably connected to an
support of its application for the first amendment environmental damage of the nature and
to its previously issued ECC, considering that the magnitudecontemplated under the Rules on Writ
existing EIS may be supplemented by an EPRMP to of Kalikasan, and (2) the case does not violate, or
adequately evaluate the environmental impact of falls under an exception to, the doctrine of
the proposed modifications under the first exhaustion of administrative remedies and/or
amendment. The same reasoning may be applied primary jurisdiction.
to the PDR relative to the second amendment. As As previously discussed, in the case at bar, only
previously discussed, the Casiño Group failed to the allegation with respect to the lack of an EIA
provethat the EPRMP and PDR were inadequate to relative to the first and second amendments to the
assess the environmental impact of the planned subject ECC may be reasonably connected to such
modifications under the first and second an environmental damage. Further, given the
amendments, respectively. On the contrary, the extreme urgency of resolving the issue due to the
EPRMP and PDR appeared to contain the details of looming power crisis, this case may be considered
the planned modifications and the corresponding as falling under an exception to the doctrine of
adjustments to bemade in the environmental exhaustion of administrative remedies. Thus, the
management plan or mitigating measures inorder
aforesaid issue may be conceivably resolved in a the signing was done after the official
writ of kalikasan case. release of the ECC on December 22, 2008,
More importantly, we have expressly ruled that this wenote that the DENR did not strictly follow
case is an exceptional case due to the looming its rules, which require that the signing of the
power crisis, so that the rules of procedure may be Statement of Accountability should be done
suspended in order to address issues which, before the official release of the ECC.
ordinarily, the Court would not consider proper in However, considering that the issue was not
a writ of kalikasan case. Hence, all issues, adequately argued norwas evidence
including those not proper in a writ of kalikasan presented before the appellate court on the
case, were resolved here in order to forestall circumstances at the time of signing, there is
another round of protracted litigation relative to insufficient basis to conclude that the
the implementation of the subject project. procedure adoptedby the DENR was tainted
Conclusion with bad faith or inexcusable negligence. We
We now summarize our findings: remind the DENR, however, to be more
1. The appellate court correctly ruled that the circumspect in following its rules. Thus, we
Casiño Group failed to substantiate its rule that the signature requirement was
claims thatthe construction and operation of substantially complied with pro hac vice.
the power plant will cause environmental 3. The appellate court erred when it ruled
damage of the magnitude contemplated that the first and second amendments to the
under the writ of kalikasan. On the other ECC were invalid for failure to comply with a
hand, RP Energy presented evidenceto new EIA and for violating DAO 2003-30 and
establish that the subject project will not the Revised Manual. It failed to properly
cause grave environmental damage, through consider the applicable provisions in DAO
its Environmental Management Plan, which 2003-30 and the Revised Manual for
will ensure thatthe project will operate within amendment to ECCs. Our own examination
the limits of existing environmental laws and of the provisions on amendments to ECCs in
standards; DAO 2003-30 and the Revised Manual, as
2. The appellate court erred when it wellas the EPRMP and PDR themselves,
invalidated the ECC on the ground of lack of shows that the DENR reasonably exercised
signature of Mr. Aboitiz in the ECC’s its discretion in requiring an EPRMP and a
Statement of Accountability relative to the PDR for the first and second amendments,
copy of the ECC submitted by RP Energy to respectively. Through these documents,
the appellate court. While the signature is which the DENR reviewed, a new EIA was
necessary for the validity of the ECC, the conducted relative to the proposed project
particular circumstances of this case show modifications. Hence, absent sufficient
that the DENR and RP Energy were not showing of grave abuse of discretion or
properly apprised of the issue of lack of patent illegality, relative to both the
signature in order for them to present procedure and substance of the amendment
controverting evidence and arguments on process, we uphold the validity of these
this point, as the issue only arose during the amendments;
course of the proceedings upon clarificatory 4. The appellate court erred when it
questions from the appellate court. invalidated the ECC for failure to comply with
Consequently, RP Energy cannot be faulted Section 59 of the IPRA Law.1âwphi1 The
for submitting the certified true copy of the ECC is not the license or permit
ECC only after it learned that the ECC had contemplated under Section 59 of the IPRA
been invalidatedon the ground of lack of Law and its implementing rules. Hence, there
signature in the January 30, 2013 Decision is no necessity to secure the CNO under
of the appellate court. The certified true copy Section 59 before an ECC may be issued, and
of the ECC, bearing the signature of Mr. the issuance of the subject ECC without first
Aboitiz in the Statement of Accountability securing the aforesaid certification does not
portion, was issued by the DENR-EMB, and render it invalid;
remains uncontroverted. It showed that the 5. The appellate court erred when it
Statement of Accountability was signed by invalidated the LDA between SBMA and RP
Mr. Aboitiz on December 24, 2008. Because Energy for failure to comply withSection 59
of the IPRA Law. While we find that a CNO SP No. 00015, is denied for
should have been secured prior to the insufficiency of evidence;
consummation of the LDA between SBMA 2.3. The validity of the December
and RP Energy, considering that this is the 22, 2008 Environmental
first time we lay down the rule of action Compliance Certificate, as well
appropriate to the application of Section 59, as the July 8, 2010 first
we refrain from invalidating the LDA for amendment and the May 26,
reasons of equity; 2011 second amendment
6. The appellate court erred when it ruled thereto, issued by the
that compliance with Section 27, in relation Department of Environment and
to Section 26, of the LGC (i.e., approval of the Natural Resources in favor of
concerned sanggunian requirement) is Redondo Peninsula Energy, Inc.,
necessary prior to issuance of the are upheld; and
subjectECC. The issuance of an ECC does 2.4. The validity of the June 8,
not, by itself, result inthe implementation of 2010 Lease and Development
the project. Hence, there is no necessity to Agreement between Subic Bay
secure prior compliance with the approval of Metropolitan Authority and
the concerned sanggunian requirement, and Redondo Peninsula Energy, Inc.
the issuance of the subject ECC without first is upheld.
complying with the aforesaid requirement SO ORDERED.
does not render it invalid. The appellate
court also erred when it ruled that FIRST DIVISION
compliance with the aforesaid requirement G.R. No. 160932 January 14, 2013
is necessary prior to the consummation of SPECIAL PEOPLE, INC. FOUNDATION,
the LDA. By virtue of the clear provisions of REPRESENTED BY ITS CHAIRMAN, ROBERTO P.
RA 7227, the project is not subject to the CERICOS, Petitioner,
aforesaid requirement and the SBMA’s vs.
decision to approve the project prevails over NESTOR M. CANDA, BIENVENIDO LIPA YON,
the apparent objections of the concerned JULIAN D. AMADOR, BOHOL PROVINCIAL CHIEF,
sanggunians. Thus, the LDA entered into REGIONAL DIRECTOR, AND NATIONAL
between SBMA and RP Energy suffers from DIRECTOR, RESPECTIVELY, ENVIRONMENTAL
no infirmity despite the lack of approval of MANAGEMENT BUREAU, DEPARTMENT OF
the concerned sanggunians; and ENVIRONMENT AND NATURAL RESOURCES, AND
7. The appellate court correctly ruled thatthe THE SECRETARY OF THE DEPARTMENT OF
issue as to the validity of the third ENVIRONMENT AND NATURAL RESOURCES, ALL
amendment to the ECC cannot be resolved in SUED IN BOTH THEIR OFFICIAL AND PRIVATE
this case because it was not one of the CAPACITIES, Respondents.
issues set during the preliminary conference,
and would, thus, violate RP Energy’s right to DECISION
due process. WHEREFORE, the Court BERSAMIN, J.:
resolves to: The peremptory writ of mandamus is an
1. DENY the Petition in G.R. No. extraordinary remedy that is issued only in
207282; and extreme necessity, and the ordinary course of
2. GRANT the Petitions in G.R.Nos. procedure is powerless to afford an adequate and
207257, 207366 and 207276: speedy relief to one who has a clear legal right to
2.1. The January 30, 2013 the performance of the act to be compelled.
Decision and May 22, 2013 Antecedents
Resolution of the Court of The petitioner was a proponent of a water-
Appeals in CA-G.R. SP No. resource development and utilization project in
00015 are reversed and set Barangay Jimilia-an in the Municipality of Loboc,
aside; Bohol that would involve the tapping and purifying
2.2. The Petition for Writ of of water from the Loboc River, and the distribution
Kalikasan, docketed as CA-G.R. of the purified water to the residents of Loboc and
six other municipalities. The petitioner applied for
a Certificate of Non-Coverage (CNC) with the case of follow-up and submission of additional
Environmental Management Bureau (EMB) of the requirements.4
Department of Environment and Natural Later on, RD Lipayon informed the petitioner that
Resources (DENR), Region 7, seeking to be exempt an Initial Environmental Examination document
from the requirement of the Environmental was required for the project due to its significant
Compliance Certificate (ECC) under Section 4 of impact in the area.5
Presidential Decree No. 1586 on the following On August 26, 2002, RD Lipayon required the
justifications, to wit: petitioner to submit the following documents to
1) The whole project simply involves tapping enable the EMB to determine whether the project
of water from the Loboc River, filtering and was within an environmentally critical area or not,
purifying it, and distributing the same to the to wit:
consumers in the covered towns; 1. Certification from DENR, Provincial
2) From the source to the filtration plant, Environment and Natural Resources Office
then to the purifier stations, then finally to (PENRO) that it is not within areas declared
the consumers’ households, water flows by law as national parks, watershed
through steel pipes; reserves, wildlife preservation area,
3) The filtration and purifying process sanctuaries and not within the purview of
employs the latest technology— Republic Act No. 7586 or the National
"electrocatalytic"—internationally accepted Integrated Protected Areas System (NIPAS)
for safety and environment friendliness; Act, and other issuances including
4) No waste is generated, as the international commitments and
electrocatalytic process dissolves all declarations;
impurities in the water; 2. Certification from the DENR Regional
5) The project involves no destruction [n]or Office/ PENRO [that] the areas within the
harm to the environment. On the other hand, project do not constitute the habitat for any
it is environment friendly.1 endangered or threatened species or
Upon evaluating the nature and magnitude of the indigenous wildlife (Flora and Fauna).
environmental impact of the project, respondent 3. Certification from the following:
Nestor M. Canda, then Chief of EMB in Bohol, 3.1. Philippine Atmospheric
rendered his findings in a letter dated December 4, Geophysical and Astronomical
2001, as follows: Services Administration (PAGASA)
1) The project is located within a critical that the area is not frequently visited or
area; hence, Initial Environmental hard-hit by typhoons. This shall refer
Examination is required. to all areas where typhoon signal no. 3
2) The project is socially and politically not hoisted for at least twice a year
sensitive therefore proof of social during the last five (5) years prior to
acceptability should be established. Proper the year of reckoning. Years to be
indorsement from the Protected Area considered shall be from January 1995
Management Bureau or PAMB should be to December 2001.
secured.2 (Emphasis supplied) 3.2. Philippine Institute of Volcanology
On January 11, 2002, the petitioner appealed and Seismology (PHIVOLCS) that the
Canda’s findings to respondent EMB Region 7 area was not subjected to an
Director Bienvenido L. Lipayon (RD Lipayon), earthquake of at least intensity VII in
claiming that it should also be issued a CNC the Rossi-Forel scale or its equivalent
because the project was no different from the and hit by tsunamis during the period
Loboc-Loay waterworks project of the Department of 1638 until the year 2001.
of Public Works and Highways (DPWH) that had 3.3. PHIVOLCS that the area was not
recently been issued a CNC.3 subjected to earthquakes of at least
On April 3, 2002, RD Lipayon notified the petitioner intensity VII in the Rossi-Forel scale or
that its documents substantially complied with the its equivalent during the period of
procedural aspects of the EMB’s review, and that 1949 until the year 2001.
the application was assigned EMB-DENR-7 3.4. PAGASA that the area is not storm
Control No. CNC-02-080 for easy reference in surge-prone.
3.5. Mines and Geosciences Bureau from the sea caused Alijuan River in the town of
Region 7 (MGB 7) that the area is not Duero to flow inland. The report also states that
located along fault lines or within fault the waves affected 10-50 meters of the coastal
zones and not located in critical slope. beach of the towns of Jagna, Duero, Guindulman,
3.6. City Mayor and/or City Engineers Garcia Hernandez and Valencia.8 (Emphases
Office that the area is not flood prone. supplied)
3.7. Network of Protected Areas for The petitioner failed to secure a certification from
Agriculture (NPAA) of the Bureau of the Regional Office of the Mines and Geosciences
Soils and Water Management (BSWM) Bureau (RO-MGB) to the effect that the project
that the area is not classified as Prime area was not located along a fault line/fault zone
Agricultural Land. or a critical slope because RO-MGB did not have
4. Certification from the Provincial Tourism the data and expertise to render such finding, and
Office or its equivalent office that areas in thus had to forward the petitioner’s request to the
your project are not set-aside as aesthetic MGB Central Office.9
potential tourist spot. Upon the MGB’s advice, the petitioner sought and
5. Certification from the National Water obtained the required certification from
Resources Board (NWRB) that areas within PHIVOLCS, but the certification did not state
your project are not recharged areas of whether the project area was within a critical
aquifer. slope. Instead, the certification stated that the
6. Certification from DENR regional Office project site was approximately 18 kilometers west
and/or Environmental Management Bureau of the East Bohol Fault.10
7 (EMB 7) that Loboc River is not Given the tenor of the certification from
characterized by one or any combination of PHIVOLCS, RD Lipayon’s letter dated February 4,
the following conditions: 2003 declared that the project was within an
a. Tapped for domestic purposes; environmentally critical area, and that the
b. With controlled and/or protected petitioner was not entitled to the CNC, viz:
areas declared by appropriate After thorough review of your submitted
authorities; and certifications, it was found out that the area was
c. Which support wildlife and fishery subjected to an earthquake of Intensity VII in the
activities. adapted Rossi-Forel scale wherein the magnitude
A Certificate of Non-Coverage will duly be issued of the earthquake is 6.8 with the highest intensity
to your foundation once all the above mentioned reported of VIII and you fail to support certification
required certifications are complied with. that the project area is not within critical slope.
Projects that are covered by P.D. 1586 or the And based on the Water Usage and Classification
Environmental Impact System (EIS) Law should per Department Order (DAO) 34 Series of 1990,
not start unless the Project Proponent should subject river system was officially classified as
secure an Environmental Compliance Certificate Class B intended for swimming and bathing
(ECC), otherwise penalties shall be purposes. Moreover, one component of your
imposed.6 (Emphases supplied) project involves opening of roadway connected to
On January 28, 2003, the petitioner submitted the barangay road.
eight certifications,7 including the certification Therefore, we reiterate our previous stand that
issued by the Philippine Institute of Volcanology your project is covered by the EIS System pursuant
and Seismology (PHIVOLCS), as follows: to P.D. 1586, the Environmental Impact Statement
That the project area, Loboc, Bohol was subjected Law.11
to an earthquake of Intensity VII in the adapted On March 27, 2003, the petitioner filed a petition
Rossi-Forel scale of I-IX last February 8, 1990. The for mandamus and damages in the Regional Trial
magnitude of the earthquake is 6.8 and the highest Court (RTC) in Loay, Bohol,12 alleging that it was
intensity reported was VIII, based on the Rossi- now entitled to a CNC as a matter of right after
Forel Intensity Scale. During the said earthquake, having complied with the certification
the PMI Academy Building collapsed while minor requirements; and that the EMB had earlier issued
cracks were sustained by the municipal hall, public a CNC to the DPWH for a similar waterworks
school, town church and some other houses in the project in the same area.
town. There were reports that immediately after In the decision dated November 18, 2003,13 the
the earthquake, the force of the incoming waves RTC dismissed the petition for mandamus upon
the following considerations, namely: (1) brought the petition for mandamus precisely as a
PHIVOLCS certified that the project site had been speedier recourse.
subjected to an Intensity VII earthquake in 1990; In their comment, RD Lipayon and Canda aver that
(2) the CNC issued by the EMB to a similar the act complained of against them involved an
waterworks project of the DPWH in the same area exercise of discretion that could not be compelled
was only for the construction of a unit spring box by mandamus; that the petitioner’s proposed
intake and pump house, and the DENR issued a project was located within an environmentally
cease and desist order relative to the DPWH’s critical area, and the activities to be done were so
additional project to put up a water filtration plant significant that they would create massive earth
therein; (3) the determination of whether an area movement and environmental degradation; that
was environmentally critical was a task that the petitioner violated the rule against forum
pertained to the EMB; (4) the assignment of a shopping; and that the petitioner had no cause of
control number by the EMB to the petitioner’s action against them for failure to exhaust
application did not mean that the application was administrative remedies.
as good as approved; (5) the RTC would not On his part, the DENR Secretary, through the
interfere with the primary prerogative of the EMB Solicitor General, contends that the petition raises
to review the merits of the petitioner’s application questions of fact that are not proper in a petition
for the CNC; and (6) there was already a pending for review; that the petitioner should have
appeal lodged with the DENR Secretary. appealed to the CA under Rule 41 of the Rules of
Hence, this appeal brought directly to the Court via Court; that the grant or denial of a CNC application
petition for review on certiorari. is discretionary and cannot be compelled by
Issues mandamus; and that the petitioner failed to
The petitioner submits the following issues: exhaust administrative remedies.
A. WHETHER OR NOT, AFTER PETITIONER’S Accordingly, the Court is called upon to resolve,
DUE COMPLIANCE WITH THE firstly, whether the appeal directly to this Court
REQUIREMENTS MANDATED BY from the RTC was proper, and, secondly, whether
RESPONDENTS FOR THE ISSUANCE OF THE the petition for mandamus was the correct
CERTIFICATE OF NON-COVERAGE (CNC) recourse.
APPLIED FOR BY PETITIONER, IT IS NOW Ruling
THE RIPENED DUTY OF RESPONDENTS, The petition for review is denied for its lack of
THROUGH RESPONDENT EMB REGIONAL merit.
DIRECTOR, TO ISSUE SAID DOCUMENT IN 1.
FAVOR OF PETITIONER; Petitioner’s appeal is improper under Rule 45,
B. WHETHER OR NOT PETITIONER HAS Rules of Court
EXHAUSTED AVAILABLE ADMINISTRATIVE This appeal by certiorari is being taken under Rule
REMEDIES THROUGH AN APPEAL TO 45, Rules of Court, whose Section 1 expressly
RESPONDENT DENR SECRETARY WHO HAS requires that the petition shall raise only questions
SAT ON SAID APPEAL UP TO THE PRESENT; of law which must be distinctly set forth. Yet, the
C. WHETHER OR NOT PETITIONER IS petitioner hereby raises a question of fact whose
ENTITLED TO RECOVER DAMAGES FROM resolution is decisive in this appeal. That issue of
RESPONDENTS IN THEIR PERSONAL fact concerns whether or not the petitioner
CAPACITY.14 established that its project was not located in an
The petitioner insists that RD Lipayon already environmentally critical area. For this reason, the
exercised his discretion by finding that the Court is constrained to deny due course to the
application substantially complied with the petition for review.
procedural aspects for review and by assigning It is a settled rule, indeed, that in the exercise of
Control No. CNC-02-080 to its application; that our power of review, the Court is not a trier of facts
after the petitioner complied with the requirements and does not normally undertake the re-
enumerated in the August 26, 2002 letter of RD examination of the evidence presented by the
Lipayon, the EMB became duty-bound to issue the contending parties during the trial of the case. The
CNC to the petitioner; that the EMB issued a CNC Court relies on the findings of fact of the Court of
to a similar project of the DPWH in the same area; Appeals or of the trial court, and accepts such
that it filed an appeal with the DENR Secretary, but findings as conclusive and binding unless any of
the appeal remained unresolved; and that it the following exceptions obtains, namely: (a) when
the findings are grounded entirely on speculation, application for the CNC, Administrative Order No.
surmises or conjectures; (b) when the inference 42 dated November 2, 200219 had just vested the
made is manifestly mistaken, absurd or authority to grant or deny applications for the ECC
impossible; (c) when there is grave abuse of in the Director and Regional Directors of the EMB.
discretion; (d) when the judgment is based on a Notwithstanding the lack of a specific
misapprehension of facts; (e) when the findings of implementing guideline to what office the ruling of
facts are conflicting; (f) when in making its the EMB Regional Director was to be appealed, the
findings the Court of Appeals or the trial court went petitioner could have been easily guided in that
beyond the issues of the case, or its findings are regard by the Administrative Code of 1987, which
contrary to the admissions of both the appellant provides that the Director of a line bureau, such as
and the appellee; (g) when the findings are the EMB,20 shall have supervision and control over
contrary to the trial court; (h) when the findings are all division and other units, including regional
conclusions without citation of specific evidence offices, under the bureau.21 Verily, supervision and
on which they are based; (i) when the facts set control include the power to "review, approve,
forth in the petition as well as in the petitioner’s reverse or modify acts and decisions of
main and reply briefs are not disputed by the subordinate officials or units."22 Accordingly, the
respondent; (j) when the findings of fact are petitioner should have appealed the EMB Regional
premised on the supposed absence of evidence Director’s decision to the EMB Director, who
and contradicted by the evidence on record; and exercised supervision and control over the former.
(k) when the Court of Appeals or the trial court It is relevant to mention that the DENR later
manifestly overlooked certain relevant facts not promulgated Administrative Order No. 2003-
disputed by the parties, which, if properly 3023 in order to define where appeals should be
considered, would justify a different taken, providing as follows:
conclusion.15 However, none of the Section 6. Appeal
aforementioned exceptions applies herein. Any party aggrieved by the final decision on the
2. ECC/CNC applications may, within 15 days from
Mandamus was an improper remedy for receipt of such decision, file an appeal on the
petitioner following grounds:
We dismiss the present recourse because the a. Grave abuse of discretion on the part of
petitioner failed to exhaust the available the deciding authority, or
administrative remedies, and because it failed to b. Serious errors in the review findings.
show that it was legally entitled to demand the The DENR may adopt alternative conflict/dispute
performance of the act by the respondents. resolution procedures as a means to settle
It is axiomatic, to begin with, that a party who grievances between proponents and aggrieved
seeks the intervention of a court of law upon an parties to avert unnecessary legal action.
administrative concern should first avail himself of Frivolous appeals shall not be countenanced.
all the remedies afforded by administrative The proponent or any stakeholder may file an
processes. The issues that an administrative appeal to the following:
agency is authorized to decide should not be
summarily taken away from it and submitted to a Deciding Authority Where to file the
court of law without first giving the agency the appeal
opportunity to dispose of the issues upon due
deliberation.16 The court of law must allow the EMB Regional Office Office of the EMB
administrative agency to carry out its functions Director Director
and discharge its responsibilities within the
specialized areas of its competence.17 This rests EMB Central Office Office of the DENR
on the theory that the administrative authority is in Director Secretary
a better position to resolve questions addressed to
its particular expertise, and that errors committed DENR Secretary Office of the President
by subordinates in their resolution may be rectified Moreover, the petitioner states in its pleadings that
by their superiors if given a chance to do so.18 it had a pending appeal with the DENR
The records show that the petitioner failed to Secretary.1âwphi1 However, the records reveal
exhaust the available administrative remedies. At that the subject of the appeal of the petitioner was
the time RD Lipayon denied the petitioner’s an undated resolution of the DENR Regional
Director, Region VII, denying its application for the P.D. No. 1586 exempted from the requirement of
CNC,24 not the decision of RD Lipayon. an EIS the projects and areas not declared by the
Nonetheless, even assuming that the pending President of the Philippines as environmentally
appeal with the DENR Secretary had related to RD critical,27 thus:
Lipayon’s decision, the petitioner should still have Section 5. Environmentally Non-Critical Projects. -
waited for the DENR Secretary to resolve the All other projects, undertakings and areas not
appeal in line with the principle of exhaustion of declared by the Presidents as environmentally
administrative remedies. Its failure to do so critical shall be considered as non-critical and
rendered its resort to mandamus in the RTC shall not be required to submit an environmental
premature. The omission is fatal, because impact statement. The National Environmental
mandamus is a remedy only when there is no Protection Council, thru the Ministry of Human
appeal, nor any plain, speedy and adequate Settlements may however require non-critical
remedy in the ordinary course of law.25 projects and undertakings to provide additional
Another reason for denying due course to this environmental safeguards as it may deem
review is that the petitioner did not establish that necessary.
the grant of its application for the CNC was a On December 14, 1981, the President issued
purely ministerial in nature on the part of RD Proclamation No. 2146 declaring areas and types
Lipayon. Hence, mandamus was not a proper of projects as environmentally critical and within
remedy. the scope of the EIS System, as follows:
The CNC is a certification issued by the EMB A. Environmentally Critical Projects
certifying that a project is not covered by the I. Heavy Industries
Environmental Impact Statement System (EIS a. Non-ferrous metal industries
System) and that the project proponent is not b. Iron and steel mills
required to secure an ECC.26 The EIS System was c. Petroleum and petro-chemical
established by Presidential Decree (P.D.) No. 1586 industries including oil and gas
pursuant to Section 4 of P.D. No. 1151 (Philippine d. Smelting plants
Environmental Policy) that required all entities to II. Resource Extractive Industries
submit an EIS for projects that would have a a. Major mining and quarrying projects
significant effect on the environment, thus: b. Forestry projects
Section 4. Environmental Impact Statements. – 1. Logging
Pursuant to the above enunciated policies and 2. Major wood processing
goals, all agencies and instrumentalities of the projects
national government, including government- 3. Introduction of fauna (exotic-
owned or controlled corporations, as well as animals) in public/private forests
private corporations, firms and entities shall 4. Forest occupancy
prepare, file and include in every action, project or 5. Extraction of mangrove
undertaking which significantly affects the quality products
of the environment a detailed statement on– 6. Grazing
(a) the environmental impact of the c. Fishery Projects
proposed action, project or undertaking 1. Dikes for fishpond
(b) any adverse environmental effect which development projects
cannot be avoided should the proposal be III. Infrastructure Projects
implemented a. Major dams
(c) alternative to the proposed action b. Major power plants (fossil-fueled,
(d) a determination that the short-term uses nuclear fueled, hydroelectric or
of the resources of the environment are geothermal)
consistent with the maintenance and c. Major reclamation projects
enhancement of the long-term productivity d. Major roads and bridges.
of the same; and B. Environmentally Critical Areas
(e) whenever a proposal involves the use of 1. All areas declared by law as national
depletable or non-renewable resources, a parks, watershed reserves, wildlife preserves
finding must be made that such use and and sanctuaries;
commitment are warranted. 2. Areas set aside as aesthetic potential
xxxx tourist spots;
3. Areas which constitute the habitat for any environment based on the documents to be
endangered or threatened species of submitted by the applicant.
indigenous Philippine Wildlife (flora and The petitioner maintains that RD Lipayon already
fauna); exercised his discretion in its case when he made
4. Areas of unique historic, archaeological, his finding that the application substantially
or scientific interests; complied with the procedural requirements for
5. Areas which are traditionally occupied by review. As such, he was then obliged to issue the
cultural communities or tribes; CNC once the petitioner had submitted the
6. Areas frequently visited and/or hard-hit by required certifications.
natural calamities (geologic hazards, floods, The petitioner errs on two grounds.
typhoons, volcanic activity, etc.); Firstly, RD Lipayon had not yet fully exercised his
7. Areas with critical slopes; discretion with regard to the CNC application when
8. Areas classified as prime agricultural he made his finding. It is clear that his finding
lands; referred to the "procedural requirements for
9. Recharged areas of aquifers; review" only. He had still to decide on the
10. Water bodies characterized by one or any substantive aspect of the application, that is,
combination of the following conditions; whether the project and the project area were
a. tapped for domestic purposes considered critical to the environment. In fact, this
b. within the controlled and/or was the reason why RD Lipayon required the
protected areas declared by petitioner to submit certifications from the various
appropriate authorities government agencies concerned. Surely, the
c. which support wildlife and fishery required certifications were not mere formalities,
activities because they would serve as the bases for his
11. Mangrove areas characterized by one or decision on whether to grant or deny the
any combination of the following conditions: application.
a. with primary pristine and dense Secondly, there is no sufficient showing that the
young growth; petitioner satisfactorily complied with the
b. adjoining mouth of major river requirement to submit the needed certifications.
systems; For one, it submitted no certification to the effect
c. near or adjacent to traditional that the project site was not within a critical slope.
productive fry or fishing grounds; Also, the PHIVOLCS’s certification showed that the
d. which act as natural buffers against project site had experienced an Intensity VII
shore erosion, strong winds and storm earthquake in 1990, a fact that sufficed to place
floods; the site in the category of "areas frequently visited
e. on which people are dependent for and/or hard-hit by natural calamities." Clearly, the
their livelihood. petitioner failed to establish that it had the legal
12. Coral reef, characterized by one or any right to be issued the CNC applied for, warranting
combination of the following conditions: the denial of its application.
a. with 50% and above live coralline It is not amiss for us to observe, therefore, that the
cover; petitioner grossly misunderstood the nature of the
b. spawning and nursery grounds for remedy of mandamus. To avoid similar
fish; misunderstanding of the remedy hereafter, a short
c. which act as natural breakwater of exposition on the nature and office of the remedy
coastlines. is now appropriate.
Projects not included in the foregoing enumeration The writ of mandamus is of very ancient and
were considered non-critical to the environment obscure origin. It is believed that the writ was
and were entitled to the CNC. originally part of the class of writs or mandates
The foregoing considerations indicate that the issued by the English sovereign to direct his
grant or denial of an application for ECC/CNC is subjects to perform a particular act or duty.28 The
not an act that is purely ministerial in nature, but earliest writs were in the form of letters missive,
one that involves the exercise of judgment and and were mere personal commands. The
discretion by the EMB Director or Regional command was a law in itself, from which there was
Director, who must determine whether the project no appeal. The writ of mandamus was not only
or project area is classified as critical to the declaratory of a duty under an existing law, but
was a law in itself that imposed the duty, the perform the same.39 The petitioner bears the
performance of which it commanded.29 The King burden to show that there is such a clear legal right
was considered as the fountain and source of to the performance of the act, and a corresponding
justice, and when the law did not afford a remedy compelling duty on the part of the respondent to
by the regular forms of proceedings, the perform the act.40
prerogative powers of the sovereign were invoked A key principle to be observed in dealing with
in aid of the ordinary powers of the courts.30 petitions for mandamus is that such extraordinary
A judicial writ of mandamus, issued in the King’s remedy lies to compel the performance of duties
name out of the court of King’s Bench that had a that are purely ministerial in nature, not those that
general supervisory power over all inferior are discretionary.41 A purely ministerial act or duty
jurisdictions and officers, gradually supplanted the is one that an officer or tribunal performs in a given
old personal command of the sovereign.31 The state of facts, in a prescribed manner, in obedience
court of King’s Bench, acting as the general to the mandate of a legal authority, without regard
guardian of public rights and in the exercise of its to or the exercise of its own judgment upon the
authority to grant the writ, rendered the writ of propriety or impropriety of the act done. The duty
mandamus the suppletory means of substantial is ministerial only when its discharge requires
justice in every case where there was no other neither the exercise of official discretion or
specific legal remedy for a legal right, and ensured judgment.42
that all official duties were fulfilled whenever the The petitioner's disregard of the foregoing
subject-matter was properly within its fundamental requisites for mandamus rendered its
control.32 Early on, the writ of mandamus was petition in the RTC untenable and devoid of merit.
particularly used to compel public authorities to WHEREFORE, the Court DENIES the petition for
return the petitioners to public offices from which review on certiorari; and ORDERS the petitioner to
they had been unlawfully removed.33 pay the costs of suit. SO ORDERED.
Mandamus was, therefore, originally a purely
prerogative writ emanating from the King himself, FIRST DIVISION
superintending the police and preserving the
peace within the realm.34 It was allowed only in [G.R. No. 148622. September 12, 2002.]
cases affecting the sovereign, or the interest of the
public at large.35 The writ of mandamus grew out REPUBLIC OF THE PHILIPPINES, represented by
of the necessity to compel the inferior courts to HON. HEHERSON T. ALVAREZ, in his capacity as
exercise judicial and ministerial powers invested in Secretary of the DEPARTMENT OF
them by restraining their excesses, preventing ENVIRONMENT AND NATURAL RESOURCES
their negligence and restraining their denial of (DENR), CLARENCE L. BAGUILAT, in his capacity
justice.36 as the Regional Executive Director of DENR-
Over time, the writ of mandamus has been stripped Region XI and ENGR. BIENVENIDO L. LIPAYON, in
of its highly prerogative features and has been his capacity as the Regional Director of the
assimilated to the nature of an ordinary remedy. DENR-ENVIRONMENTAL MANAGEMENT BUREAU
Nonetheless, the writ has remained to be an (DENR-EMB), Region XI, Petitioners, v. THE CITY
extraordinary remedy in the sense that it is only OF DAVAO, represented by BENJAMIN C. DE
issued in extraordinary cases and where the usual GUZMAN, City Mayor, Respondent.
and ordinary modes of proceeding and forms of
remedy are powerless to afford redress to a party DECISION
aggrieved, and where without its aid there would
be a failure of justice.37 YNARES-SANTIAGO, J.:
The writ of mandamus has also retained an Before us is a petition for review 1
important feature that sets it apart from the other on certiorari assailing the decision 2 dated May
remedial writs, i.e., that it is used merely to compel 28, 2001 of the Regional Trial Court of Davao City,
action and to coerce the performance of a pre- Branch 33, which granted the writ of mandamus
existing duty.38 In fact, a doctrine well-embedded and injunction in favor of respondent, the City of
in our jurisprudence is that mandamus will issue Davao, and against petitioner, the Republic,
only when the petitioner has a clear legal right to represented by the Department of Environment
the performance of the act sought to be compelled and Natural Resources (DENR). The trial court also
and the respondent has an imperative duty to
directed petitioner to issue a Certificate of Non- Coverage, pursuant to Presidential Decree No.
Coverage in favor of Respondent. 1586 and related laws, in connection with the
construction by the City of Davao of the Artica
The antecedent facts of the case are as follows: Sports Dome;
2) making the preliminary injunction issued on
On August 11, 2000, respondent filed an December 12, 2000 permanent.
application for a Certificate of Non-Coverage
(CNC) for its proposed project, the Davao City SO ORDERED. 3
Artica Sports Dome, with the Environmental
Management Bureau (EMB), Region XI. Attached to The trial court ratiocinated that there is nothing in
the application were the required documents for PD 1586, in relation to PD 1151 and Letter of
its issuance, namely, a) detailed location map of Instruction No. 1179 (prescribing guidelines for
the project site; b) brief project description; and c) compliance with the EIA system), which requires
a certification from the City Planning and local government units (LGUs) to comply with the
Development Office that the project is not located EIS law. Only agencies and instrumentalities of the
in an environmentally critical area (ECA). The EMB national government, including government
Region XI denied the application after finding that owned or controlled corporations, as well as
the proposed project was within an private corporations, firms and entities are
environmentally critical area and ruled that, mandated to go through the EIA process for their
pursuant to Section 2, Presidential Decree No. proposed projects which have significant effect on
1586, otherwise known as the Environmental the quality of the environment. A local government
Impact Statement System, in relation to Section 4 unit, not being an agency or instrumentality of the
of Presidential Decree No. 1151, also known as the National Government, is deemed excluded under
Philippine Environment Policy, the City of Davao the principle of expressio unius est exclusio
must undergo the environmental impact alterius.
assessment (EIA) process to secure an
Environmental Compliance Certificate (ECC), The trial court also declared, based on the
before it can proceed with the construction of its certifications of the DENR-Community
project. Environment and Natural Resources Office
Believing that it was entitled to a Certificate of (CENRO)-West, and the data gathered from the
Non-Coverage, respondent filed a petition for Philippine Institute of Volcanology and
mandamus and injunction with the Regional Trial Seismology (PHIVOLCS), that the site for the
Court of Davao, docketed as Civil Case No. 28, Artica Sports Dome was not within an
133-2000. It alleged that its proposed project was environmentally critical area. Neither was the
neither an environmentally critical project nor project an environmentally critical one. It therefore
within an environmentally critical area; thus it was becomes mandatory for the DENR, through the
outside the scope of the EIS system. Hence, it was EMB Region XI, to approve respondent’s
the ministerial duty of the DENR, through the EMB- application for CNC after it has satisfied all the
Region XI, to issue a CNC in favor of respondent requirements for its issuance. Accordingly,
upon submission of the required documents. petitioner can be compelled by a writ of
mandamus to issue the CNC, if it refuses to do so.
The Regional Trial Court rendered judgment in
favor of respondent, the dispositive portion of Petitioner filed a motion for reconsideration,
which reads as follows: however, the same was denied. Hence, the instant
petition for review.
WHEREFORE, finding the petition to be
meritorious, judgment granting the writ of With the supervening change of administration,
mandamus and injunction is hereby rendered in respondent, in lieu of a comment, filed a
favor of the petitioner City of Davao and against manifestation expressing its agreement with
respondents Department of Environment and petitioner that, indeed, it needs to secure an ECC
Natural Resources and the other respondents by: for its proposed project. It thus rendered the
instant petition moot and academic. However, for
1) directing the respondents to issue in favor of the the guidance of the implementors of the EIS law
petitioner City of Davao a Certificate of Non- and pursuant to our symbolic function to educate
the bench and bar, 4 we are inclined to address the orderly balance between socio-economic growth
issue raised in this petition. and environmental protection.
x x x
Section 15 of Republic Act 7160, 5 otherwise
known as the Local Government Code, defines a Section 4. Presidential Proclamation of
local government unit as a body politic and Environmentally Critical Areas and Projects. — The
corporate endowed with powers to be exercised by President of the Philippines may, on his own
it in conformity with law. As such, it performs dual initiative or upon recommendation of the National
functions, governmental and proprietary. Environmental Protection Council, by
Governmental functions are those that concern proclamation declare certain projects,
the health, safety and the advancement of the undertakings or areas in the country as
public good or welfare as affecting the public environmentally critical. No person, partnership or
generally. 6 Proprietary functions are those that corporation shall undertake or operate any such
seek to obtain special corporate benefits or earn declared environmentally critical project or area
pecuniary profit and intended for private without first securing an Environmental
advantage and benefit. 7 When exercising Compliance Certificate issued by the President or
governmental powers and performing his duly authorized representative. For the proper
governmental duties, an LGU is an agency of the management of said critical project or area, the
national government. 8 When engaged in President may by his proclamation reorganize
corporate activities, it acts as an agent of the such government offices, agencies, institutions,
community in the administration of local affairs. 9 corporations or instrumentalities including the
realignment of government personnel, and their
Found in Section 16 of the Local Government Code specific functions and responsibilities.
is the duty of the LGUs to promote the people’s
right to a balanced ecology. 10 Pursuant to this, an Section 4 of PD 1586 clearly states that "no
LGU, like the City of Davao, can not claim person, partnership or corporation shall undertake
exemption from the coverage of PD 1586. As a or operate any such declared environmentally
body politic endowed with governmental critical project or area without first securing an
functions, an LGU has the duty to ensure the Environmental Compliance Certificate issued by
quality of the environment, which is the very same the President or his duly authorized
objective of PD 1586.chanrob1es virtua1 1aw representative." 13 The Civil Code defines a person
1ibrary as either natural or juridical. The state and its
political subdivisions, i.e., the local government
Further, it is a rule of statutory construction that units 14 are juridical persons. 15 Undoubtedly
every part of a statute must be interpreted with therefore, local government units are not excluded
reference to the context, i.e., that every part must from the coverage of PD 1586.
be considered with other parts, and kept
subservient to the general intent of the enactment. Lastly, very clear in Section 1 of PD 1586 that said
11 The trial court, in declaring local government law intends to implement the policy of the state to
units as exempt from the coverage of the EIS law, achieve a balance between socio-economic
failed to relate Section 2 of PD 1586 12 to the development and environmental protection, which
following provisions of the same law:chanrob1es are the twin goals of sustainable development. The
virtual 1aw library above-quoted first paragraph of the Whereas
clause stresses that this can only be possible if we
WHEREAS, the pursuit of a comprehensive and adopt a comprehensive and integrated
integrated environmental protection program environmental protection program where all the
necessitates the establishment and sectors of the community are involved, i.e., the
institutionalization of a system whereby the government and the private sectors. The local
exigencies of socio-economic undertakings can government units, as part of the machinery of the
be reconciled with the requirements of government, cannot therefore be deemed as
environmental quality; . . . outside the scope of the EIS system. 16

Section 1. Policy. — It is hereby declared the policy The foregoing arguments, however, presuppose
of the State to attain and maintain a rational and that a project, for which an Environmental
Compliance Certificate is necessary, is without citation of specific evidence on which they
environmentally critical or within an are based; i) when the finding of fact of the Court
environmentally critical area. In the case at bar, of Appeals is premised on the supposed absence
respondent has sufficiently shown that the Artica of evidence but is contradicted by the evidence on
Sports Dome will not have a significant negative record; and j) when the Court of Appeals
environmental impact because it is not an manifestly overlooked certain relevant facts not
environmentally critical project and it is not disputed by the parties and which, if properly
located in an environmentally critical area. In considered, would justify a different conclusion.
support of this contention, respondent submitted 19 None of these exceptions, however, obtain in
the following: this case.

1. Certification from the City Planning and The Environmental Impact Statement System,
Development Office that the project is not located which ensures environmental protection and
in an environmentally critical area; regulates certain government activities affecting
the environment, was established by Presidential
2. Certification from the Community Environment Decree No. 1586. Section 2 thereof states:
and Natural Resources Office (CENRO-West) that
the project area is within the 18-30% slope, is There is hereby established an Environmental
outside the scope of the NIPAS (R.A. 7586), and Impact Statement System founded and based on
not within a declared watershed area; and the environmental impact statement required
under Section 4 of Presidential Decree No. 1151,
3. Certification from PHILVOCS that the project of all agencies and instrumentalities of the
site is thirty-seven (37) kilometers southeast of national government, including government-
the southernmost extension of the Davao River owned or controlled corporations, as well as
Fault and forty-five (45) kilometers west of the private corporations, firms and entities, for every
Eastern Mindanao Fault; and is outside the proposed project and undertaking which
required minimum buffer zone of five (5) meters significantly affect the quality of the environment.
from a fault zone.
Section 4 of PD 1151, on the other hand, provides:
The trial court, after a consideration of the
evidence, found that the Artica Sports Dome is not Environmental Impact Statements. — Pursuant to
within an environmentally critical area. Neither is the above enunciated policies and goals, all
it an environmentally critical project. It is agencies and instrumentalities of the national
axiomatic that factual findings of the trial court, government, including government-owned or
when fully supported by the evidence on record, controlled corporations, as well as private
are binding upon this Court and will not be corporations, firms and entities shall prepare, file
disturbed on appeal. 17 This Court is not a trier of and include in every action, project or undertaking
facts. 18 which significantly affects the quality of the
environment a detailed statement on —
There are exceptional instances when this Court
may disregard factual findings of the trial court, (a) the environmental impact of the proposed
namely: a) when the conclusion is a finding action, project or undertaking
grounded entirely on speculations, surmises, or
conjectures; b) when the inference made is (b) any adverse environmental effect which cannot
manifestly mistaken, absurd, or impossible; c) be avoided should the proposal be implemented
where there is a grave abuse of discretion; d) when
the judgment is based on a misapprehension of (c) alternative to the proposed action
facts; e) when the findings of fact are conflicting;
f) when the Court of Appeals, in making its (d) a determination that the short-term uses of the
findings, went beyond the issues of the case and resources of the environment are consistent with
the same are contrary to the admissions of both the maintenance and enhancement of the long-
appellant and appellee; g) when the findings of the term productivity of the same; and
Court of Appeals are contrary to those of the trial
court; h) when the findings of fact are conclusions
(e) whenever a proposal involves the use of d. Major roads and bridges
depletable or nonrenewable resources, a finding B. Environmentally Critical Areas
must be made that such use and commitment are 1. All areas declared by law as national parks,
warranted. watershed reserves, wildlife preserves and
sanctuaries;
Before an environmental impact statement is 2. Areas set aside as aesthetic potential tourist
issued by a lead agency, all agencies having spots;
jurisdiction over, or special expertise on, the 3. Areas which constitute the habitat for any
subject matter involved shall comment on the endangered or threatened species of
draft environmental impact statement made by the indigenous Philippine Wildlife (flora and
lead agency within thirty (30) days from receipt of fauna);
the same. 4. Areas of unique historic, archaeological, or
scientific interests;
Under Article II, Section 1, of the Rules and 5. Areas which are traditionally occupied by
Regulations Implementing PD 1586, the cultural communities or tribes;
declaration of certain projects or areas as 6. Areas frequently visited and/or hard-hit by
environmentally critical, and which shall fall within natural calamities (geologic hazards, floods,
the scope of the Environmental Impact Statement typhoons, volcanic activity, etc.);
System, shall be by Presidential Proclamation, in 7. Areas with critical slopes;
accordance with Section 4 of PD 1586 quoted 8. Areas classified as prime agricultural lands;
above. 9. Recharged areas of aquifers;
10. Water bodies characterized by one or any
Pursuant thereto, Proclamation No. 2146 was combination of the following conditions;
issued on December 14, 1981, proclaiming the a. tapped for domestic purposes
following areas and types of projects as b. within the controlled and/or protected
environmentally critical and within the scope of areas declared by appropriate authorities
the Environmental Impact Statement System c. which support wildlife and fishery
established under PD 1586: activities
11. Mangrove areas characterized by one or
A. Environmentally Critical Projects any combination of the following conditions:
I. Heavy Industries a. with primary pristine and dense young
a. Non-ferrous metal industries growth;
b. Iron and steel mills b. adjoining mouth of major river systems;
c. Petroleum and petro-chemical industries c. near or adjacent to traditional productive
including oil and gas fry or fishing grounds;
d. Smelting plants d. which act as natural buffers against
II. Resource Extractive Industries shore erosion, strong winds and storm
a. Major mining and quarrying projects floods;
b. Forestry projects e. on which people are dependent for their
1. Logging livelihood.
2. Major wood processing projects 12. Coral reefs, characterized by one or any
3. Introduction of fauna (exotic-animals) combinations of the following conditions:
in public/private forests a. with 50% and above live coralline cover;
4. Forest occupancy b. spawning and nursery grounds for fish;
5. Extraction of mangrove products c. which act as natural breakwater of
6. Grazing coastlines.
c. Fishery Projects
1. Dikes for/and fishpond development In this connection, Section 5 of PD 1586 expressly
projects states:
III. Infrastructure Projects
a. Major dams Environmentally Non-Critical Projects. — All other
b. Major power plants (fossil-fueled, nuclear projects, undertakings and areas not declared by
fueled, hydroelectric or geothermal) the President as environmentally critical shall be
c. Major reclamation projects considered as non-critical and shall not be
required to submit an environmental impact August 28, 1990 – Philjas Corporation,
statement. The National Environmental Protection whose primary purposes, among others are:
Council, thru the Ministry of Human Settlements to own, develop, subdivide, market and
may however require non-critical projects and provide low-cost housing for the poor, was
undertakings to provide additional environmental registered with the Securities and Exchange
safeguards as it may deem necessary. Commission (SEC).
February 19, 1991 – then City Mayor Daniel
The Artica Sports Dome in Langub does not come S. Garcia, endorsed to the Housing and Land
close to any of the projects or areas enumerated Use Regulatory Board (HLURB) the proposed
above. Neither is it analogous to any of them. It is CHS.
clear, therefore, that the said project is not Thereafter, or on 07 March 1991, based on
classified as environmentally critical, or within an the favorable recommendations of Mayor
environmentally critical area. Consequently, the Garcia, respondent TAN, issued the
DENR has no choice but to issue the Certificate of Preliminary Approval and Locational
Non-Coverage. It becomes its ministerial duty, the Clearance (PALC) for the development of
performance of which can be compelled by writ of CHS.
mandamus, such as that issued by the trial court On July 5, 1991, then HLURB Commissioner
in the case at bar. respondent TUNGPALAN issued
Development Permit No. 91-0216 for "land
WHEREFORE, in view of the foregoing, the instant development only" for the entire land area of
petition is DENIED. The decision of the Regional 12.1034 hectares covered by TCT No. 35083
Trial Court of Davao City, Branch 33, in Civil Case (now TCT 208837) and with 1,003 saleable
No. 28,133-2000, granting the writ of mandamus lots/units with project classification B.P.
and directing the Department of Environment and 220 Model A-Socialized Housing (p. 96,
Natural Resources to issue in favor of the City of Records), with several conditions for its
Davao a Certificate of Non-Coverage, pursuant to development.
Presidential Decree No. 1586 and related laws, in Three (3) days thereafter or on July 8, 1991,
connection with the construction of the Artica respondent JASARENO, allowed/granted the
Sports Dome, is AFFIRMED. SO ORDERED. leveling/earth-moving operations of the
development project of the area subject to
SECOND DIVISION certain conditions.
G.R. No. 145972 March 23, 2004 On November 18, 1991, then HLURB
IGNACIA BALICAS, petitioner, Commissioner AMADO B. DELORIA issued
vs. Certificate of Registration No. 91-11-0576
FACT-FINDING & INTELLIGENCE BUREAU (FFIB), in favor of CHS, with License to Sell No. 91-
OFFICE OF THE OMBUDSMAN, respondents. 11-0592 for the 1,007 lots/units in the
subdivision.
DECISION Eventually, on December 10, 1991,
QUISUMBING, J.: respondent POLLISCO issued Small Scale
This petition for review on certiorari assails the Mining Permit (SSMP) No. IV-316 to Philjas
Court of Appeals’ decision1 dated August 25, 2000 to extract and remove 10,000 cu. meters of
and resolution2 of November 13, 2000 in CA-G.R. filling materials from the area where the CHS
SP No. 56386, which affirmed the Ombudsman’s is located.
decision3 dismissing petitioner from government Thereafter, or on January 12, 1994, Philjas
service for gross neglect of duty in connection with applied for a Small Scale Mining Permit
the tragedy at the Cherry Hills Subdivision in (SSMP) under P.D. 1899 with the Rizal
Antipolo City on August 3, 1999. Provincial Government to extract and
The antecedent facts as summarized in the remove 50,000 metric tons of filling
Ombudsman’s decision are as follows: materials per annum on CHS’ 2.8 hectares.
Based on the evidence adduced by the Thus, on January 17, 1994, respondent
complainant, the following is the MAGNO, informed ELIEZER I. RODRIGUEZ of
chronological series of events which led to Philjas that CHS is within the EIS System and
the development of the CHS (Cherry Hills as such must secure ECC from the DENR.
Subdivision): Philjas was accordingly informed of the
matter such that it applied for the issuance Resources (DENR), and the local government of
of ECC from the DENR-Region IV, on Antipolo.
February 3, 1994. The charge against petitioner involved a supposed
On March 12, 1994, an Inspection Report failure on her part to monitor and inspect the
allegedly prepared by respondent BALICAS, development of Cherry Hills Subdivision, which
attested by respondent RUTAQUIO and was assumed to be her duty as DENR senior
approved by respondent TOLENTINO re: field environmental management specialist assigned in
evaluation to the issuance of ECC, was the province of Rizal.
submitted. For her part, petitioner belied allegations that
Consequently, on April 28, 1994, upon monitoring was not conducted, claiming that she
recommendations of respondent monitored the development of Cherry Hills
TOLENTINO, Philjas’ application for ECC was Subdivision as evidenced by three (3) monitoring
approved by respondent PRINCIPE, then reports dated March 12, 1994, August 10, 1994
Regional Executive Director, DENR under and August 23, 1995. She averred that she also
ECC-137-R1-212-94. conducted subsequent compliance monitoring of
A Mining Field Report for SSMP dated May the terms and conditions of Philjas’ Environmental
10, 1994 was submitted pursuant to the Compliance Certificate (ECC) on May 19, 1997 and
inspection report prepared by respondents noted no violation thereon. She further claimed
CAYETANO, FELICIANO, HILADO and good faith and exercise of due diligence, insisting
BURGOS, based on their inspection that the tragedy was a fortuitous event. She
conducted on April 25 to 29, 1994. The reasoned that the collapse did not occur in Cherry
report recommended, among others, that the Hills, but in the adjacent mountain eastern side of
proposed extraction of materials would pose the subdivision.
no adverse effect to the environment. On November 15, 1999, the Office of the
Records further disclosed that on August 10, Ombudsman rendered a decision imposing upon
1994, respondent BALICAS monitored the petitioner the supreme penalty of dismissal from
implementation of the CHS Project office for gross neglect of duty finding:
Development to check compliance with the RESPONDENT BALICAS
terms and conditions in the ECC. Again, on Records show that she monitored and
August 23, 1995, she conducted another inspected the CHS [Cherry Hills Subdivision]
monitoring on the project for the same only thrice (3), to wit:
purpose. In both instances, she noted that 1. Inspection Report dated 12 March
the project was still in the construction stage 1994
hence, compliance with the stipulated 2. Monitoring Report dated 10 August
conditions could not be fully assessed, and 1994
therefore, a follow-up monitoring is proper. 3. Monitoring Report dated 23 August
It appeared from the records that this August 1995
23, 1995 monitoring inspection was the last Verily, with this scant frequency, how can
one conducted by the DENR. respondent Balicas sweepingly claim that
On September 24, 1994, GOV. CASIMIRO I. there was no violation of ECC compliance
YNARES, JR., approved the SSMP applied for and that she had done what is necessary in
by Philjas under SSMP No. RZL-012, accordance with the regular performance of
allowing Philjas to extract and remove her duties. She herself recognized the fact
50,000 metric tons of filling materials from that the "collapsed area is not the
the area for a period of two (2) years from subdivision in question but the adjacent
date of its issue until September 6, 1996.4 mountain eastern side of the CHS." It is
Immediately after the tragic incident on August 3, incumbent upon her to establish the same in
1999, a fact-finding investigation was conducted her monitoring and inspection reports and
by the Office of the Ombudsman through its Fact- make objective recommendations re: its
Finding and Intelligence Bureau (FFIB), which duly possible adverse effect to the environment
filed an administrative complaint with the Office of and to the residents of the CHS and nearby
the Ombudsman against several officials of the areas. Her defense that the position of the
Housing and Land Use Regulatory Board (HLURB), CHS shows the impossibility of checking the
Department of Environment and Natural would-be adverse effect clearly established
her incompetence. No expert mind is needed DENR Region IV, which defines the duties of a
to know that mountains cause landslide and senior environmental management specialist as
erosion. Cherry Hills Subdivision is a living follows:
witness to this.5 1. Conducts investigation of pollution
Petitioner seasonably filed a petition for review of sources or complaints;
the Ombudsman’s decision with the Court of 2. Review[s] plans and specifications of
Appeals. In its decision dated August 25, 2000, the proposes (sic) or existing treatment plants
Court of Appeals dismissed the petition for lack of and pollution abatement structures and
merit and affirmed the appealed decision. It found devices to determine their efficiency and
that the landslide was a preventable occurrence suitability for the kind of pollutants to be
and that petitioner was guilty of gross negligence removed and to recommend issuance or
in failing to closely monitor Philjas’ compliance denial of permits;
with the conditions of the ECC given the known 3. Conducts follow-up inspection of
inherent instability of the ground where the construction of pollution abatement/work
subdivision was developed. The appellate court and structures to oversee compliance with
likewise denied petitioner’s motion for approved plans and specifications;
reconsideration in its resolution dated November 4. Recommends remedial measures for the
13, 2000. prevention, abatement and control of
Petitioner now comes to this Court for review pollution;
on certiorari, under Rule 45 of the Rules of Civil 5. Prepares technical reports on pollution
Procedure, of the appellate court’s decision. She investigation and related activities; and
alleges that the Court of Appeals committed 6. Performs related work as assigned.
serious errors of law in affirming the It is readily apparent that no monitoring duty
Ombudsman’s conclusion that: whatsoever is mentioned in the said letter. The
1. There was gross negligence on the part of PENRO, on the other hand, is mandated to:
petitioner Balicas in the performance of her 1. conduct surveillance and inspection of
official duties as Senior Environmental pollution sources and control facilities and
Management Specialist (SEMS) of the undertake/initiate measures relative to
Provincial Environment and Natural pollution-related complaints of the general
Resources Office (PENRO) Province of Rizal, public for appropriate referral to the regional
DENR Region IV; and the alleged gross office;
neglect of duty of petitioner warranted the 2. comment on the project description,
imposition of the extreme penalty of determine if the project fall within the
dismissal from the service. Environmental Impact Statement (EIS)
2. The landslide which caused the death of System8 and submit the same to the regional
several residents of the subdivision and the office; and
destruction of property is not a fortuitous 3. implement programs and projects related
event and therefore preventible.6 to environmental management within the
The main issues are whether or not the Court of PENRO.9
Appeals committed serious errors of law in: (1) In addition, the PENRO is likewise tasked to
holding petitioner guilty of gross neglect of duty monitor the project proponent’s compliance with
and (2) imposing upon her the extreme penalty of the conditions stipulated in the ECC, with support
dismissal from office. from the DENR regional office and the
In order to ascertain if there had been gross Environmental Management Bureau.10 The primary
neglect of duty, we have to look at the lawfully purpose of compliance monitoring is to ensure the
prescribed duties of petitioner. Unfortunately, judicious implementation of sound and standard
DENR regulations are silent on the specific duties environmental quality during the development
of a senior environmental management specialist. stage of a particular project. Specifically, it aims
Internal regulations merely speak of the functions to:
of the Provincial Environment and Natural 1. monitor project compliance with the
Resources Office (PENRO) to which petitioner conditions set in the ECC;
directly reports. 2. monitor compliance with the
Nonetheless, petitioner relies on a letter7 dated Environmental Management Plan (EMP) and
December 13, 1999 from the chief of personnel, applicable laws, rules and regulations; and
3. provide a basis for timely decision-making measures against calamitous factors such
and effective planning and management of as earthquake, floods, water erosion and
environmental measures through the others; and (d) perform such other functions
monitoring of actual project impacts vis-à- as may be directed by the President from
vis predicted impacts in the EIS.11 time to time. (Emphasis ours.)
Based on the foregoing, the monitoring duties of The legal duty to monitor housing projects, like the
the PENRO mainly deal with broad environmental Cherry Hills Subdivision, against calamities such
concerns, particularly pollution abatement. This as landslides due to continuous rain, is clearly
general monitoring duty is applicable to all types placed on the HLURB, not on the petitioner as
of physical developments that may adversely PENRO senior environmental management
impact on the environment, whether housing specialist. In fact, the law imposes no clear and
projects, industrial sites, recreational facilities, or direct duty on petitioner to perform such narrowly
scientific undertakings. defined monitoring function.
However, a more specific monitoring duty is In the related case of Principe v. Fact-Finding and
imposed on the HLURB as the sole regulatory body Intelligence Bureau,14 this Court found Antonio
for housing and land development. It is mandated Principe, regional executive director for DENR
to encourage greater private sector participation in Region IV who approved Philjas’ application for
low-cost housing through (1) liberalization of ECC, not liable for gross neglect of duty. The Court
development standards, (2) simplification of reversed the decision of the Court of Appeals and
regulations and (3) decentralization of approvals thereby annulled the decision of the Ombudsman
for permits and licenses.12 in OMB-ADM-09-661, dated December 1, 1999,
P.D. No. 158613 prescribes the following duties on dismissing Principe from the government service.
the HLURB (then Ministry of Human Settlements) We ordered his reinstatement with back pay and
in connection with environmentally critical without loss of seniority.15
projects requiring an ECC: The rationale for our decision in Principe bears
SECTION 4. Presidential Proclamation of reiteration: the responsibility of monitoring
Environmentally Critical Areas and Projects. housing and land development projects is not
– The President of the Philippines may, on lodged with the DENR, but with the HLURB as the
his own initiative or upon recommendation sole regulatory body for housing and land
of the National Environment Protection development. Thus, we must stress that we find no
Council, by proclamation declare certain legal basis to hold petitioner, who is an officer of
projects, undertakings or areas in the DENR, liable for gross neglect of the duty
country as environmentally critical. No pertaining to another agency, the HLURB. It was
person, partnership or corporation shall grave error for the appellate court to sustain the
undertake or operate any such declared Ombudsman’s ruling that she should be dismissed
environmentally critical project or area from the service. The reinstatement of petitioner is
without first securing an Environmental clearly called for.
Compliance Certificate issued by the WHEREFORE, the petition is hereby GRANTED. The
President or his duly authorized Court of Appeals’ decision affirming the
representative. For the proper management Ombudsman’s dismissal of petitioner IGNACIA
of said critical project or area, the President BALICAS from office is REVERSED and SET ASIDE,
may by his proclamation reorganize such and petitioner’s REINSTATEMENT to her position
government offices, agencies, institutions, with back pay and without loss of seniority rights
corporations or instrumentalities including is hereby ordered. SO ORDERED.
the re-alignment of government personnel,
and their specific functions and EN BANC
responsibilities. G.R. No. 145973 January 23, 2002
For the same purpose as above, the Ministry ANTONIO G. PRINCIPE, petitioner,
of Human Settlements [now HLURB] shall: vs.
(a) prepare the proper land or water use FACT-FINDING & INTELLIGENCE, BUREAU (FFIB),
pattern for said critical project(s) or area(s); OFFICE OF THE OMBUDSMAN, respondents.
(b) establish ambient environmental quality PARDO, J.:
standards; (c) develop a program of
environmental enhancement or protective The Case
The case is a petition for review on certiorari "Thereafter, or on January 12, 1994, Philjas
seeking to reverse the decision of the Court of applied for a Small Scale Mining Permit
Appeals1 affirming the Ombudsman’s dismissal of (SSMP) under P. D. 1899 with the Rizal
petitioner from the government service for gross Provincial Government to extract and
neglect of duty in connection with the collapse of remove 50,000 metric tons of filling
the housing project at the Cherry Hills Subdivision, materials per annum on CHS’ 2.8 hectares.
Antipolo City, on August 3, 1999. "Thus, on January 17, 1994, respondent
The Facts MAGNO, informed ELIEZER I. RODRIGUEZ of
The facts, as found by the Court of Appeals, are as Philjas that CHS is within the EIS System and
follows: as such must secure ECC from the DENR.
"August 28, 1990- Philjas Corporation, Philjas was accordingly informed of the
whose primary purposes, among others are: matter such that it applied for the issuance
to own, develop, subdivide, market and of ECC from the DENR-Region IV, on
provide low-cost housing for the poor, was February 3, 1994.
registered with the Securities and Exchange "On March 12, 1994, an Inspection Report
Commission (SEC). allegedly prepared by respondent BALICAS,
"February 19, 1991 - then City Mayor Daniel attested by respondent RUTAQUIO and
S. Garcia, endorsed to the Housing and Land approved by respondent TOLENTINO re: field
Use Regulatory Board (HLURB) the proposed evaluation to the issuance of ECC, was
CHS. submitted.
"Thereafter, or on 07 March 1991, based on "Consequently, on April 28, 1994, upon
the favorable recommendation of Mayor recommendation of respondent TOLENTINO,
Garcia, respondent TAN, issued the Philjas application for ECC was approved by
Preliminary Approval and Locational respondent PRINCIPE, then Regional
Clearance (PALC) for the development of Executive Director, DENR under ECC-137-
CHS. RI-212-94.
"On July 5, 1991, then HLURB Commissioner "A Mining Field Report for SSMP dated May
respondent TUNGPALAN issued 10, 1994 was submitted pursuant to the
Development Permit No. 91-0216 for "land inspection report prepared by respondents
development only" for the entire land area of CAYETANO, FELICIANO, HILADO and
12.1034 hectares covered by TCT No. 35083 BURGOS, based on their inspection
(now TCT 208837) and with 1,003 saleable conducted on April 25 to 29, 1994. The
lots/units with project classification B. P. report recommended, among others, that the
220 Model A-Socialized Housing (p. 96, proposed extraction of materials would pose
Records), with several conditions for its no adverse effect to the environment.
development. "Records further disclosed that on August
"Three (3) days thereafter or on July 8, 1991, 10, 1994, respondent BALICAS monitored
respondent JASARENO, allowed/granted the the implementation of the CHS Project
leveling/earth-moving operations of the Development to check compliance with the
development project of the area subject to terms and conditions in the ECC. Again, on
certain conditions. August 23, 1995, she conducted another
"On November 18, 1991, then HLURB monitoring on the project for the same
Commissioner AMADO B. DELORIA issued purpose. In both instances, she noted that
Certificate of Registration No. 91-11-0576 the project was still in the construction stage
in favor of CHS, with License to Sell No. 91- hence, compliance with the stipulated
11-0592 for the 1,007 lots/units in the conditions could not be fully assessed, and
subdivision. therefore, a follow-up monitoring inspection
"Eventually, on December 10, 1991, was the last one conducted by the DENR.
respondent POLLISCO issued Small Scale "On September 24, 1994, GOV. CASIMIRO I.
Mining Permit (SSMP) No. IV-316 to Philjas YNARES, JR., approved the SSMP applied for
to extract and remove 10,000 cu. meters of by Philjas under SSMP No. RZL-012,
filling materials from the area where the CHS allowing Philjas to extract and remove
is located. 50,000 metric tons of filling materials from
the area for a period of two (2) years from investigatory agency of Government, the
date of its issue until September 6, 1996."2 investigation of such cases;
On November 15, 1999, the Ombudsman rendered "(2) Direct, upon complaint or at its own
a decision finding petitioner Principe instance, any officer or employee of the
administratively liable for gross neglect of duty Government, or of any subdivision, agency or
and imposing upon him the penalty of dismissal instrumentality thereof, as well as any
from office. The dispositive portion of the decision government-owned or controlled
reads: corporations with original charter, to
"WHEREFORE, premises considered x x x perform and expedite any act or duty
xxx required by law, or to stop, prevent, and
x x x the following respondents are hereby correct any abuse or impropriety in the
found GUILTY as charged and meted the performance of duties;
respective penalties provided under Section "(3) Direct the officer concerned to take
22, Rule XIV of the Omnibus Rules, appropriate action against a public officer or
Implementing Book V of Executive Order No. employee at fault or who neglects to perform
292, otherwise known as the Administrative an act or discharge a duty required by law,
Code of 1987, viz,: and recommend his removal, suspension,
1. x x x demotion, fine, censure, or prosecution, and
5. Antonio G. Principe - Penalty of Dismissal ensure compliance therewith; or enforce its
from the Service for Gross Neglect of Duty. disciplinary authority as provided in Section
xxx 217 of this Act: Provided, That the refusal by
SO ORDERED."3 any officer without just cause to comply with
On January 4, 2000, petitioner filed with the Court an order of the Ombudsman to remove,
of Appeals a petition for review assailing the suspend, demote, fine, censure, or prosecute
decision of the Ombudsman.4 an officer or employee who is at fault or who
On August 25, 2000, the Court of Appeals neglects to perform an act or discharge a
promulgated a decision denying the petition and duty required by law shall be a ground for
affirming the decision of the Ombudsman.5 disciplinary action against said officer;
Hence, this appeal.6 "(4) Direct the officer concerned, in any
The Issue appropriate case, and subject to such
The issue raised is whether the Ombudsman may limitations as it may provide in its rules of
dismiss petitioner from the service on an procedure, to furnish it with copies of
administrative charge for gross neglect of duty, documents relating to contracts or
initiated, investigated and decided by the transactions entered into by his office
Ombudsman himself without substantial evidence involving the disbursement or use of public
to support his finding of gross neglect of duty funds or properties, and report any
because the duty to monitor and inspect the irregularity to the Commission on Audit for
project was not vested in petitioner. appropriate action;
The Court's Ruling "(5) Request any government agency for
Republic Act No. 6770, Section 15, prescribed the assistance and information necessary in the
powers of the Ombudsman, as follows: discharge of its responsibilities, and to
"Section 15. Powers, Functions and Duties. - examine, if necessary, pertinent records and
The Office of the Ombudsman shall have the documents;
following powers, functions and duties: "(6) Publicize matters covered by its
"(1) Investigate and prosecute on its own or investigation of the matters mentioned in
on complaint by any person, any act or paragraphs (1), (2), (3) and (4) hereof, when
omission of any public officer or employee, circumstances so warrant and with due
office or agency, when such act or omission prudence: Provided, further, that any
appears to be illegal, unjust, improper or publicity issued by the Ombudsman shall be
inefficient. It has primary jurisdiction over balance, fair and true;
cases cognizable by the Sandiganbayan and, "(7) Determine the causes of inefficiency, red
in the exercise of this primary jurisdiction it tape, mismanagement, fraud, and corruption
may take over, at any stage, from any in the Government, and make
recommendations for their elimination and
the observance of high standards of ethics "4.3 Hears/gathers evidences or facts
and efficiency; on pollution cases as delegated by the
"(8) Administer oaths, Pollution Adjudication Board.
issue subpoena and subpoena duces tecum, "4.4. Approves plans and issues permit
and take testimony in any investigation or for mine tailings disposal, including
inquiry, including the power to examine and environmental rehabilitation plans."9
have access to bank accounts and records; Clearly, there is no mention of the responsibility of
"(9) Punish for contempt in accordance with a regional executive director to monitor projects.
the Rules of Court and under the same More apropos is the description of the functions of
procedure and with the same penalties a regional technical director, to wit:
provided therein; "E. REGIONAL TECHNICAL DIRECTOR
"(10) Delegate to the Deputies, or its "1. Forest Management
investigators or representatives such "2. Land Management
authority or duty as shall ensure the effective "3. Mines and Geo-Sciences
exercise or performance of the powers, Development
functions, and duties herein or hereinafter "4. Environmental Management
provided; "4.1 Issues clearance certificate to
"(11) Investigate and initiate the proper vehicles which have passed the
action for the recovery of ill-gotten and/or smoke-belching test.
unexplained wealth amassed after February "4.2 Issues pollution clearance and
25, 1986 and the prosecution of the parties temporary permit to operate pollution
involved therein."8 control devices including the
The Ombudsman without taking into consideration collection of corresponding
the lawfully mandated duties and functions fees/charges.
attached to petitioner’s position, immediately "4.3 Conducts monitoring and
concluded that as the signing and approving investigation of pollution sources and
authority of the ECC issued to PHILJAS, it was control facilities.
incumbent upon petitioner to conduct actual "4.4 Supervises, coordinates and
monitoring and enforce strict compliance with the monitors the implementation of
terms and conditions of the ECC. environmental programs, projects and
The applicable administrative orders provide that activities in the region."10 [emphasis
the function of monitoring environmental supplied]
programs, projects and activities in the region is Furthermore, monitoring is defined in DAO No. 21,
lodged with the Regional Technical Director, not Series of 1992, as the activity designed to gauge
with the Regional Executive Director, the position the level of compliance with the conditions
occupied by petitioner. Under DAO 38-1990, the stipulated in the ECC,11 and in the EIS12 or
following were the functions attached to the office PD13 submitted.14 This is the function of the PENR
of petitioner, to wit: and CENR offices as mandated in DAO No. 37,
"I. REGULATORY MATTERS Series of 1996.15 Particularly, it provided that:
"D. REGIONAL EXECUTIVE DIRECTOR "Section 10. Compliance Monitoring
"1. Forest Management "x x x
"2. Land Management "b. Monitoring of compliance with the
"3. Mines and Geo-Sciences proponent’s ECC issued pursuant to an
Development IEE,16 and applicable laws, rules and
"4. Environmental Management regulations, shall be undertaken by the
"4.1 Issues authority to construct and concerned PENRO and CENRO with support
permit to operate pollution control from the Regional Office and/or EMB
equipment/devices including the whenever necessary."
collection of corresponding Hence, how could petitioner be guilty of neglecting
fees/charges. a duty, which is not even his to begin with?
"4.2 Issues accreditation of pollution Administrative liability could not be based on the
control office of industrial firms and fact that petitioner was the person who signed and
local government entities. approved the ECC, without proof of actual act or
omission constituting neglect of duty.
In the absence of substantial evidence of gross development and conservation of our natural
neglect of petitioner, administrative liability could resources.
not be based on the principle of command "Section 2. Mandate.- (1) The Department of
responsibility.17 The negligence of petitioner’s Environment and Natural Resources shall be
subordinates is not tantamount to his own primarily responsible for the implementation
negligence. of the foregoing policy.
It was not within the mandated responsibilities of "(2) It shall, subject to law and higher
petitioner to conduct actual monitoring of authority, be in charge of carrying out the
projects. The principles governing public officers State’s constitutional mandate to control
under the Revised Administrative Code of 1987 and supervise the exploration, development,
clearly provide that a head of a department or a utilization, and conservation of the country’s
superior officer shall not be civilly liable for the natural resources."19
wrongful acts, omissions of duty, negligence, or However, pursuant to Executive Order No. 90,20 the
misfeasance of his subordinates, unless he has Human Settlements Regulatory Commission,
actually authorized by written order the specific which became the Housing and Land Use
act or misconduct complained of.18 Regulatory Board (HLURB), is the sole regulatory
The investigation conducted by the Ombudsman body for housing and land development.21
refers to the tragic incident in Cherry Hills The Fallo
Subdivision, Antipolo Rizal, where several families WHEREFORE, the Court REVERSES the decision of
lost lives and homes. Despite the fact that what the Court of Appeals.22 In lieu thereof, the Court
was involved was a housing and land development annuls the decision of the Ombudsman in OMB-
project, petitioner, as the Regional Executive ADM-09-661, dated December 1, 1999,
Director for Region IV, Department of Environment dismissing the petitioner from the government
and Natural Resources, was found negligent service, and orders his reinstatement with back
because he was the one who signed and approved pay and without loss of seniority.
the ECC. No costs. SO ORDERED.
As heretofore stated, the responsibility of
monitoring housing and land development
projects is not lodged with the office of petitioner.
The Administrative Code of 1987 spelled out the
mandate of the Department of Environment and
Natural Resources, the agency that has authority
over petitioner, which reads:
"Section 1. Declaration of Policy.- (1) The
State shall ensure for the benefit of the
Filipino people, the full exploration and
development as well as the judicious
disposition, utilization, management,
renewal and conservation of the country’s
forest, mineral, land, waters, fisheries,
wildlife, off-shore areas and other natural
resources, consistent with the necessity of
maintaining a sound ecological balance and
protecting and enhancing the quality of the
environment and the objective of making the
exploration, development and utilization of
such natural resources equitably accessible
to the different segments of the present as
well as future generations.
"(2) The State shall likewise recognize and
apply a true value system that takes into
account social and environmental cost
implications relative to the utilization,