PIONEER KNITWEARS (BD) LTD.

ZERO-DISCHARGE EFFLUENT TREATMENT PLANT (CAPACITY = 15 M 3 /HR)

EQUALIZATION TANK-02

Ø 40 mm LATERALS
13 m X 4 m X 3.9 m
A Ø 150 mm Header
A

Ø-150mm
PIT
0.6 X 0.6 X 0.45 m

Equalization Tank: 02 Plan

FGL = 00

Equalization Tank: 02 Section : A-A

Equalization Tank-2A Details

PIONEER KNITWEARS (BD) LTD.

L Dynamic Engineering Ltd. DESIGN & DRAWING BY : DATE : 14/02/2020


DE
TITLE :
We Make Healthy Environment ENGR. ALAMGIR
SCALE : AS SHOWN Equalization Tank-2A Details
OFFICE : House- 19, Road-1, Nikunjo-2, Dhaka-1229, CHECKED BY :
Mobile : 01714063455, 88 0172-0212785
ENGR. ROBIUL ISLAM APPROVED BY : DRAWING NO : D-06
E-mail : hce.carbon@gmail.com, rabiul.p.330@gmail.com