Professional Documents
Culture Documents
Work Plan and Timeline (DRRM) Day
Work Plan and Timeline (DRRM) Day
DEPARTMENT OF EDUCATION
Region 02
Division of Isabela
ROXAS NATIONAL HIGH SCHOOL
2. Canal Cleaning operation -To eliminate flooding in -Conduct Intensified -Eliminated flooding in
including de-clogging Roxas National High School canal visitation and Roxas National High
Teacher
(SHS) through canal de- monitor drainage 9:30-10:30 am School (SHS) through
concerned,
clogging, rehabilitation of (July 20, 2018) canal de-clogging,
Administrator
existing canals. rehabilitation of existing
and Staff
- eliminate public risk canals.
- eliminated public risks
3. Preparation of evacuation -To provide a clear, easy to -Monitor regularly and -Provided a clear, easy to
centers use (visual, multi-lingual) set religiously the progress use (visual, multi-lingual)
of safe evacuation of the evacuation centers 10:30-11:30 am Teacher set of safe evacuation
instructions for (July 20, 2018) concerned, instructions for
students/teachers/visitors. Administrator students/teachers/visitors.
and Staff
4. Inspection of electrical -To verify proper functioning -Inspect regularly and - Verified proper
connections of the electrical connections religiously the progress functioning of the electrical
after installation; and of the attendance of the connections after
-To verify that the electrical connection for Teacher installation; and
performance of the installed the safety of the children 1:30-2:30 pm concerned, - Verified that the
electrical connections meet and teachers and school (July 20, 2018) Administrator performance of the
with the specified design administration and staff and Staff installed electrical
intent through a series of connections meet with the
tests and adjustments. specified design intent
through a series of tests
and adjustments.
5. Tree-planting and - Improve the environment of -Weekly monitor for the - Improved the
vegetables gardening school vegetables as well as environment of school
- Provide a treed space for trees in school. Teacher - Provided a treed space
recreation of school 2:30-3:30 pm concerned, for recreation of school
- Prevent soil erosion by (July 20, 2018) Administrator - Prevented soil erosion by
wind or water and Staff wind or water
- Provide healthy food - Provided healthy food
- Conserve energy - Conserved energy
Prepared By:
MELCHOR G. GABUR, JR
Teacher 2
JOCELYN C.ZIPAGAN
Teacher 2
Noted By:
INOFEMIA G. GUADO
Asst. Principal 2
Approved By: