Professional Documents
Culture Documents
Locations:
PPEs to be used:
Safety Helmet, Safety Shoes, Hand Gloves, Dust Mask, safety goggles, safety reflective jacket, Gum boots (optional)
Tools required/ Used:
Shoves, Spades, axes, lawn mower, grass/bush cutting machine.
Analysed Job
Job Steps,Hazards And Controls
Sl No Activities (Sequential Task) Hazard Required Control Person Resposible
1 Digging for the planting of sapling/ a)Contact with electrical cables/
trees. Electrocution a)Take excavation permit before
any sort of excavation if depth of XYZ
excavation is more than 1.2 meters