You are on page 1of 3

Health & Safety violation Inspection Report NEOM Health Safety

& Environment

Inspector Awais Maqbool 2nd Aug 2022 NMA HSE

Project:/Location: Bajdah Asphalt Project


Note:
Coordinates available on each photo for more details.

S/
(Violation/Observation Photo) NON-CONFORMANCE (Rectification Photo)
N

Replace N-95 mask for all


workers at the site after
some time of usage due to
extreme weather and type
of activity. Provide at
1
least 2 masks to workers
on daily basis. Also
replace dirty vests with
new ones.

Proper barrication required


2 with safety cones and warning
tape. 1
Proper barrication required
3 with safety cones and warning
tape.

Proper barrication required


4 with safety cones and warning
tape.

Provide road work ahead and


5 slow speed safety signs on
both sides of road works.
Report Closeout by: Signature:

……………
……………………

Date:

……………

You might also like