JOB SAFETY ANALYSIS

Job Title Lifting and slinging Job


Job to be performed by XYZ
Date 00.00.2021
JSA Team/Assesment Team
Name Mr. XYZ,CAB,BNB Mr. BNB Mr. STS
Role Team Members Team Leader Facilitator
Locations

Analysed Job
Job Steps,Hazards And Controls
Sl No Activities (Sequential Task) Hazard Required Control Person Resposible
1 Rigging Equipment Failure of rigging components
can result in loss of load and Use only components with a known or
risk serious injury to ground labeled working load limit. Carefully
crew. inspect all components for any XYZ
defects, signs of over loading or
excessive wear and tested.

2 Placement and stability of anchors Unstable placement: the


load exceeds the Anchors must be strong enough to
stability of the anchor. safely withstand the force required to
Climbing tree to place move loads. Anchors set for hoists XYZ
and maintain anchor. and winches should be set at a
Elevating a tripod upon convenient height to provide safe and
boulders above trail. effective operation.

3 Working loads Equipment failure of any Do not exceed the safe working load XYZ
rigging component. on all rigging components.
4 Working load calculations Load on any rigging Properly calculate loads on every
component not calculated rigging component prior to use of
correctly. rigging. Estimate the weight and size
of the moved or lifted object prior to
tension. Trail Work Leader can XYZ
designate an experienced rigger to
determine rigging system and
components.

5 Communication Lack of experience working with Conduct a tailgate briefing session at


rigging equipment and the beginning of each project.
understanding rigging Coordinate how the crew will
terminology. communicate. Use verbal and
nonverbal communication to move
load (hand signals and radios).
Always acknowledge that commands
have been received and understood. XYZ
Brief and educate the crew on the
terminology and use of equipment
prior to handling.
Implement an Emergancy Evacuation
Plan (EEP).

6 Stability of Worksite Footing in a creek, footing Analyze work site for slippery or
on rocks, climbing trees. loose rocks, falling hazards on the XYZ
ground and/or overhead hazards.
7 Fly Away Zone Working under the rigging Team members will be directed to
equipment. Exposure to stay out from under and well clear of
anchor, block, or line all loads and loaded rigging. XYZ
failure can lead to serious
injury.