Date :28.01.

19

GACL-NALCO ALKALIES & CHEMICALS PVT.LTD


JOB SAFETY ANALYSIS Document No.: B&R/GANL/JSA/004 Rev. 00
Main Activity Piling work by Hydraulic Rig, Unit/Location 800 CAUSTIC SODA PROJECT
Equipment’s to be used Crane, Pick & Carry,JCB,Web sling, D shackles, Team Members ARIIT,SINTU,SUSANTA,SP.MISHRA
Required PPEs. Safety Helmet, Safety Shoes, Hand Gloves, Safety Goggles and Ear Plug where ever required
SN. Job Activities Hazards Control Measures Responsibility
1 Hydraulic rig marching Marching and placing of Rig and  Always maintain proper access & egress for rig movement. Engineer/
Crane,  Communicate to operations & nearby working team about rig Supervisor
and Crane movement
 Provide flagman to control movement traffic.
 JSTI or Toolbox talk to be conducted for the rig mobilizing crew.
 Job engineer / Job supervisor & shall take leadership for rig
movement support.
2 Hydraulic rig marching  Hit or stuck around  Clear the rig moving access from other obstructions Engineer/
 Inform the area operations team for rig movement support. Supervisor
 Property damage  Bow down the Kelly beam to horizontal position to move safely.
 Use job specific PPEs
 Personal injury

 Overhead lines

3 Releasing the lifting  striking object  Area should be free of obstacles and housekeeping needs to be Engineer/
tools and tackles ensured on completion of execution. Supervisor

 Ensure that the weight of the load is fully released from the Crane.

Prepared By Reviewed By Approved By