Professional Documents
Culture Documents
AREAS OF FOCUS:
1) BARRICADE BARRIERS & SIGNAGES
2) PPE COMPLIANCE
3) LADDER SAFETY
4) HOT WORK
2. To identify the location of work to be done and to highlight the work area Inadequate Work To survey the work site with the Area Owner.
and the related jobs going to be done for the day to the Area Owner. Area Assessment GC EHS site team shall perform Hazard Identification before
start work at the area.
3. To unload the tools, materials and equipments arrived from lorry and to Unauthorized If the unloading task taking a long period workers shall
mobilize in to the working area using trolley and supporting by manpower. Work / Traffic temporarily barricade the unloading spot with safety cone. To
Obstruction have a full time spotter to control the traffic flow if necessary.
Sharp Edges Workers shall wear hand glove to prevent hand cut and injurie
during the mobilization works.
Ergonomics Worker shall perform work with buddy system when lifting th
long materials and ladders.
Security Clearance GC site team needs to inform Intel Security Dept. when
moving 'IN' the materials through emergency doors.
4. To use ‘A’ frame ladder & scaffold to perform work at height. Faulty Ladders Only inspected and tagged ladders are allowed to use at site.
(if necessary) To comply buddy system and the 3 point contact method whil
Unprotected Edge working on ladder above 6 feet. Watch for people working
under or around the ladder.
Competency To ensure the scaffold been inspected and tag by the
competency scaffolder.
RED tag for not save to use and GREEN tag for save to use.
Falling Object Worker need to wear approved and inspected full body harnes
and hook on solid structure (wire rope life line or approved
anchorage points) or whenever exceed 6ft of working height.
To secure 100% tie off to solid structure or lifeline.
To comply chinstrap usage while working in the elevated area
Do not drop any material or tools from heights.
To strap the tools on approved strapping mechanism while
working in the elevated area.
To not allow the tools or material to be stored in the elevated
area.
5.To mobilize in AHU unit using heavy duty roller & pallet jack. Ergonomic To have sufficient manpower while perform loading works. To
. Hand injuries use cut resistant hand gloves when performing the works.
and physical Make sure aisle have sufficient clearances.
injuries
6.To install AHU unit using manpower, power tools and hand tools. Unprotected Edge Worker need to wear approved and inspected full body harnes
and hook on solid structure (wire rope life line or approved
anchorage points) or whenever exceed 6ft of working height.
To secure 100% tie off to solid structure or lifeline.
Ergonomic To use sufficient manpower when mobilizing the ahu unit.
Manpower and rope to be used to transfer the chain block to
the I-beam.(if needed)
Mechanical Failure To ensure all the safety gear and mechanical moveable /
rotating part fully function as per requirement.
Pre-inspection upon start using.
Falling object Cordoned off platform lifting area.
No personal to be under lifting load.
Unprotected Edge Worker need to wear approved and inspected full body harnes
and hook on solid structure (wire rope life line or approved
anchorage points) or whenever exceed 6ft of working height.
To secure 100% tie off to solid structure or lifeline.
ACKNOWLEDGE SIGNATURE
No. Name Signature
FOREMAN
01.
02.
03.
04.
05.
06.
07.
08.
11. To mobilize in the work tools, materials and equipments to Temporary Physical Injury To ensure proper mobilization with spotters controlling the
storage area from the work area. traffic flow in that mobilizing area.
To comply the safety helmet, safety boots and safety glass
usage while mobilizing the tools and materials.
Signature Of Supervisor :
Name :
Signature Of CM :
Name :